Loading...
HomeMy WebLinkAboutCOURTYARDS AT MIRAMONT PUD - PRELIMINARY - 54-87N - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPreliminary Drainage and Erosion Control Report for COURTYARDS AT MMAMONT P.U.D. Fort Collins, Colorado Prepared for ALBRECHT HOMIES 4836 South College Avenue Suite 10 Fort Collins, Colorado 80525 Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1410-01-94 ® DATE.: March, 1994 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 I hereby state that this Preliminary Report for the Drainage and Erosion Control design of "Courtyards at Arramont P.U.ID.", was prepared under my direct supervision in accordance with the provisions of the City of Fort Collins Storm Drainage Criteria Manual for the owners thereof. Brian W. Shear, P.E. Registered Professional Engineer State of Colorado No: 20262 0 11 PAGE 1 Courtyards at Miramont P.U.D. Preliminary Drainage Report INTRODUCTION: Courtyards at Miramont P.U.D. is one of three (3) projects currently being considered for development in what is- known as Parcel Q of the Oak/Cottonwood Farm Amended Development Plan prepared by Cityscape Urban Design, Inc. with a last date of revision being July 10, 1992. The other two (2) proposed projects are Oak Hills Apartments P.U.D. and Mimmont Tennis Center, both of which have been submitted to the City of Fort. Collins as Preliminary submittals. We have coordinated the storm drainage design of the Courtyards at Miramont P.U.D. with the other two (2) projects in order to produce a safe and aesthetically pleasing neighborhood. Coordination of the drainage design is especially important as the Courtyards at Miramont P.U.D. is the primary location for storm water management facilities for the three projects. The Oak/Cottonwood Farm O.D.P. Drainage Study is the primary reference for the storm water management design for Courtyards at Mi wnont P.U.D. The City of Fort Collins has required that this study be re-evaluated to include the three (3) projects mentioned above. At the time of this preliminary submittal, the Amended Oak/Cottonwood Farms O.D.P. Drainage Study had not been completed. L GENERAL LOCATION AND DESCRIPTION: A. Location 1. Courtyards at Miramont P.U.D. is generally located in the Northeast 1/4 of Section 1, Township 6 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. 2. More specifically, Courtyards at Miramont P.U.D. is located. on the East side of Boardwalk Drive approximately three quarters of a mile South of Harmony Road. It is east of the Upper Meadow at Miramont and west of the Collinwood assisted living facility. 3. Courtyards at Miramont P.U.D. is bounded on the West by Boardwalk Drive, on the north by vacant land. a. The property to the North, which also borders on Boardwalk Drive has been submitted for preliminary review as Oak Hill Apartments P.U.D. b. The other property to the North, which is located at the western terminus of Rule Drive, has been submitted for preliminary review as Miramont Tennis Center. To the South is vacant land which is currently being considered for use as park land by the City of Fort Collins Parks and Recreation Department. PAGE 2 Courtyards at Miramont P.U.D. Preliminary Drainage Report I. GENERAL. LOCATION AND DESCRIPTION: B. Description of Property 1. The 12.86 acre site is currently vacant land covered with native vegetation 2. There is an existing irrigation / detention pond located within the limits of the 12.86 acre site. a. The pond is designated as pond 313 of the Miramont Overall Drainage Plan. b. The pond will be defined within a tract which will be platted with the Courtyards at Miramont project, however will remain under separate ownership. c. The pond tract has an area of approximately 1.97 acres. d. This pond was built based on the original Oak/Cottonwood Farms Overall Drainage Study and in association with the Upper Meadow at Miramont, Second Filing. e. Pond volume and water surface elevation data was provided on the Utility Plan titled "Detention Pond and Erosion Control Plan" for Upper Meadow at Miramont P.U.D., Second Filing, prepared by RBD, Inc., dated June 7, 1993, RBD Project No. 504-003. We understand that this data may change with the required amendment to the Oak/Cottonwood Farm Overall Drainage Study. 3. 46 single family homes are proposed within the limits of Phases I - V, along with the necessary infrastructure to serve them. Phase VI and Phase VII are planned for single family homes as well, but at a future date and with a slightly different concept.. M DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. Courtyards at Miramont P.U.D. is located in the McClellands Mail Creek Basin as delineated on the City of Fort Collins Storm Water Basin Map. a., The Basin fee rate for this basin is $ 3,717.00 per gross acre according to the development fee section of the City of Fort Collins Development Manual. b. Our understanding is that the above mentioned fees may be reduced with the provision for detention. The amount of impervious area created by the development may also affect these fees. (Please refer to 01/24/94 conceptual review comments). ® PAGE 3 Courtyards at Miramont P.U.D. Preliminary Drainage Report LI 0 II. DRAINAGE BASINS AND SUB -BASINS: B. Sub -Basin Description 1. Courtyards at Miramont P.U.D. is contained within Basin 208 of the Oak/Cottonwood Farm Overall Drainage Plan. 2. Storm water from the north flows to the existing irrigation / detention pond. Design of the Courtyards at Miramont must facilitate the routing of storm water from the Tennis Center and the Oak Hill Apartment sites according to the requirements of the Oak/Cottonwood Farm Overall Drainage Plan. 3. Our understanding from the review of the drainage reports available, is that allowable storm water release rates are very strictly controlled in this area. The Preliminary Drainage and Erosion Control Study for the Oak Hill Apartments P.U.D. indicates that maximum allowable release rates for this area are 0.20 cfs/acre for the 10-year storm and 0.50 cfs/acre for the 100-year storm. M DRAINAGE DESIGN CRITERIA: A. Regulations 1. Design Criteria from the City of Fort Collins Drainage Criteria Manual were utilized in the design and preparation of the preliminary Drainage and Erosion Control Plan. B. Development Criteria Reference and Constraints 1. The following drainage reports were considered in the drainage design and calculations for Courtyards at Miramont P.U.D. a. Oak Cottonwood Farms O.D.P. Drainage Study, prepared by RBD, Inc.; dated May 4, 1992; RBD Project No 504-001. b. Preliminary Drainage Report for Oak Hill Apartments P.U.D.; prepared by RBD, Inc.; dated February 7, 1994; RBD Project No: 088-010. c.. Preliminary Drainage Plan for Miramont Tennis Center; Water, Waste and Land; dated November 1993; WWL Project No: 402. 2. Historically, this site drains from north to southeast under Lemay Avenue and through Oakridge Development on the East side of Lemay Avenue. The Preliminary Drainage and Erosion Control Study for the Oak Hill Apartments P.U.D. indicates that downstream improvements have been completed within the Oakridge Development to accept a maximum storm water runoff of 1.19 cfs from the entire Oak/Cottonwood Farm development. ® PAGE 4 Courtyards at Miramont P.U.D. Preliminary Drainage Report III DRAINAGE DESIGN CRITERIA: B. Development Criteria Reference and Constraints (continued) 3. RBD, Inc. is currently re-evaluating the Oak/Cottonwood Farms O.D.P. Drainage Study to take into account the development of the Courtyards at Miramont P.U.D., the Miramont Tennis Center and Oak Hill Apartments. 4. The preliminary drainage design for Oak Hill Apartments P.U.D. has a 22' wide (minimum) drainage channel located at the southwest corner of the Oak Hill site which conveys storm water to the existing irrigation/detention pond which is located adjacent to the limits of the Courtyards at Miramont P.U.D. site. a. This storm water will need to be conveyed under the entry private drive to the Courtyards at Miramont P.U.D. site. 5. The property to the east, Collinwood, is developed and limits the amount of grading that can be done along the East property line. C. Hydrological Criteria ® 1. The Rainfall -Intensity -Duration curves for the City of Fort Collins were used (Figure 3.3.1-1, attached in Appendix I for reference), in conjunction with the "Rational Method" for determining peak flows at various concentration points. 2. Detention storage volume requirements will be based on the Cumulative Runoff Method in accordance with The City of Fort Collins Criteria. a. Release rates are to be based on the Amended Oak/Cottonwood Farms O.D.P. Drainage Study or by the original Oak/Cottonwood Farm O.D.P. Drainage Study. This is dependent on the timing of the final submittal for Courtyards at Miramont P.U.D. and the completion of the Amended Oak/Cottonwood Farm O.D.P. Drainage Study 3. The .2 and .100 year storms were utilized in the design of the storm water management infrastructure in accordance with City of Fort Collins Drainage Criteria Manual. In addition, the 10 year storm was studied in association with the Oak/Cottonwood Farm O.D.P. Drainage Study restriction of 0.20 cfs per acre for a 10 year storm. D. Hydraulic Criteria 1. Street capacity references provided in the City of Fort Collins Drainage Criteria Manual and street capacity exhibits which were prepared by this office, based on the Mannings equation, were utilized. ® 2. Storm sewer and drainage channel capacities are based on the Mannings Equation. The Mannings coefficients are as suggested by City of Fort Collins Drainage Criteria Manual. ® PAGE 5 Courtyards at Miramont P.U.D. Preliminary Drainage Report IV DRAINAGE FACILITY DESIGN: A. General Concept 1. Storm water will be conveyed to the imgation/detention pond via a combination of: a. Flow in grassed swale(s). b. Flow in gutter. c. Flow in pipe. 2. The irrigation/detention pond will outfall to the south onto property that is currently being planned for use as a park by the City .of Fort Collins Parks and Recreation Department. The actual outfall will not be designed, or constructed with the Courtyards at Miramont project. a. It is our understanding that negotiations are currently in progress by the City of Fort Collins to purchase the land to the south and develop it into a neighborhood park. b. The outfall may consist of storm sewer pipe which will convey the storm water to detention pond 340 at the northwest corner of Lemay Avenue and Boardwalk. ® Drive (refer to the original Oak/Cottonwood Farms O.D.P. Drainage Study and Plan). c. The final pond outfall design will be provided with the Amended Oak/Cottonwood Farms O.D.P. Drainage Study. B. Specific Details: 1. Specific details will be provided with the submittal of the Final Drainage and Erosion Control Report and Plan for Courtyards at Miramont P.U.D. 2. A 10' type R inlet will be required at the intersection of the private Drive for the Courtyards at Miramont project with Boardwalk Drive. An 18" ADS storm sewer would be required to convey the peak flows adjacent to Boardwalk Drive to the detention f irrigation pond. 3. A 42" storm sewer has been considered adjacent to Boardwalk Drive to facilitate the drainage design requirements for the Oak Hill Apartments P.U.D. a. The 42" storm sewer will be constructed with the following understandings: * The cost of the 42" storm sewer, from the 10' type R inlet, to the northern boundary of the Courtyards at Miramont P.U.D., will be the responsibility of the developer of the Oak Hill Apartments property. ® PAGE 6 Courtyards at Miramont P.U.D. Preliminary Drainage Report IV DRAINAGE FACILITY DESIGN: B. Specific Details: (continued) * The difference in cost of a 42" RCP storm sewer from an 18" ADS storm sewer for the length of storm sewer between 10' type R inlet to the pond, will be the responsibility of the developer of the Oak Hill Apartments property. * The difference in cost of a 60" diameter storm sewer manhole from a 48" diameter storm sewer manhole, will be the responsibility of the developer of the Oak Hill Apartments property. 4. Maintenance of the detention/irrigation pond will be the responsibility of the owner of the tract which the pond is contained. 5. Maintenance of the open space areas within the limits of the Courtyards at Miramont, will be the responsibility of the developer until completion of the project. A Homeowners Association would then assume maintenance responsibilities for the open areas. 6. Boardwalk Drive to the west of Courtyards at Miramont is fully constructed to . collector standards (except the eastern detached sidewalk). a. The Preliminary Drainage and Erosion Control Study for the Oak Hill Apartments P.U.D. indicates that developed runoff from Boardwalk Drive will be conveyed southerly to an existing curb inlet across from Highcastle Drive. The inlet will intercept the stormwater and redirect it into an open channel parallel to Boardwalk Drive and thence to Detention Pond 340, located at the Northwesterly corner of Lemay Avenue and Boardwalk Drive. The inlets, open channel and pond 340 have already been constructed, and have accounted for the portion of Boardwalk adjacent to Courtyards at Miramont P.U.D. 7. The Oak Hill Apartments, Courtyards at Miramont and the Tennis Center at Miramont will contribute storm water to the existing irrigation/detention pond located adjacent to the Courtyards at Miramont P.U.D. (referred to as pond 313 on the Oak/Cottonwood Farms O.D.P. Drainage Plan). a. Possible volume reconsiderations for the existing irrigation/detention pond (Pond 313) may be made in the Amended Oak/Cottonwood Farms O.D.P. Drainage Study being prepared by RBD, Inc. Should additional volume requirements be determined, expansion of the existing pond would tremendously effect the current design of the Courtyards at Milramont. P.U.D. as represented. Downstream, and/or upstream detention volume alternatives are available. C PAGE 7 Courtyards at Miramont P.U.D. Preliminary Drainage Report IV DRAINAGE FACILITY DESIGN: B. Specific Details- (continued) b. The existing irrigation/detention pond was constructed in 1993. The plans for the pond indicate that the pond would first be constructed as an interim pond which would be an irrigationlretention pored. The ultimate pond would act as an irrigation/detention pond. L The interim pond is proposed to have 6.7 ac.-ft of irrigation volume. I The ultimate pond is proposed to have 2:7 ac.-ft. of irrigation volume. Ili. The ultimate pond is proposed to have 4.0 ac: ft. of detention volume. c. Should the existing irrigation / detention pond lack the storage volume to handle the storm water created by the development of the three (3) project contributing to the pond, several alternatives will be evaluated to provide additional storage, including but not limited to: i. An additional detention pond located on the proposed park property to the South. I An additional detention pond located at the southwest corner of Oak Hill Apartments. 8. Release rates and final storage volumes will be based on the Amended Oak/Cottonwood Farms O.D.P. Drainage Study which is currently being prepared. by RBD, Inc. a. Release rates and required storage volumes will be calculated by Shear Engineering at final if the Amended Oak/Cottonwood Farms O.D.P. Drainage Study is not completed at the time of final submittal for the Courtyards at Miramont P.U.D. If the Amended Oak/Cottonwood Farms O.D.P. Drainage Study is not completed, the release rate will be based on the Original Oak/Cottonwood Farms O.D.P. Drainage Study or as recommended by the City of Fort Collins Storm Drainage Utility. 9. The detention pond will also act as an irrigation facility for the site, the green space on the West side of Boardwalk Drive, and the future park land to the south. A pump house and necessary infrastructure will be constructed to distribute the irrigation water as needed. Construction of the pump has will not be associated with Courtyards at Miramont. PAGE 8 Courtyards at Miramont P.U.D. Preliminary Drainage Report V. EROSION CONTROL: A. General Concept: 1. Courtyards At Miramont lies within the Moderate Wind Erodibility Zone per the City of Fort Collins Zone Map. a. Per the City of Fort Collins Erosion Control Reference Manual for Construction sites, the Erosion control performance standard will need to be calculated and appropriate measures taken to control erosion during and after construction at the time of Final design.. 2. Erosion control measures are specified on the Drainage and Erosion Control Plan attached in Appendix I L These measures will effectively reduce the amount of soil erosion potential created during the construction of the project. a. Maintenance of erosion control devices, both onsite and offshe, will remain the responsibility of the developer until the subdivision is totally developed. 3. An Erosion control security deposit will be required according to current City of P Fort Collins policy as presented in the City of Fort Collins Development Manual. a. The security deposit is based on one and one-half times the estimated cost to reseed the actual affected property area during overlot grading activity. Currently, security deposit estimates are based on $500.00 per acre to reseed sites that are 10 or more acres. Reseeding cost estimates have been provided by the City's Storm Water Utility and are based on recent experience. i. The estimated security deposit for the entire 10.89 acre Courtyards at Miramont P.U.D. site would be $8,167.50 (10.89 acres x 1.5 x $500.00/acre). i. The security deposit is reimbursed upon completion of erosion control measures or completion of the project. B. Specific Details 1: Temporary erosion control devices will consist of silt fence along the downstream property lines, hay bale dikes in all swales, and gravel filters at all inlets. Permanent erosion control devices will consist of Rip rap aprons at all storm sewer outfalls. Erosion control devices are shown on the Preliminary Drainage and Erosion Control Plan attached in Appendix IIL PAGE 9 Courtyards at Miramont P.U.D. Preliminary Drainage Report VI. CONCLUSIONS: A. Compliance with Standards: 1, All drainage design and calculations conform with the criteria and requirements of the City of Fort Collins Storm Drainage Criteria. 2. Proposed erosion control measures conform with generally accepted erosion control measures and the City of Fort Collins Erosion Control reference manual. B. Drainage Concept: 1. The design of the drainage infrastructure effectively controls any increase in storm water runoff due to the development of Courtyards at Miramont P.U.D. 2. The erosion control _measures specified will effectively reduce erosion potential during construction. VIL REFERENCES: 1. City of Fort Collins Storm Drainage Design Criteria Manual 2. Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual. 3. City of Fort Collins Erosion Control Reference Manual; prepared by Hydrodynamics, Inc.; dated January 1991. 4. Oak/Cottonwood Farm O.D.P. Drainage Study; RBD, Inc„ dated May 4, 1992; RBD Project No: 504-001 5. Preliminary Drainage Report for Oak Hill Apartments P.U.D.; RBD, Inc.; dated February 7, 1994; RBD Project No: 088-010. 6. Preliminary Drainage Plan for Miramont Tennis Center, Water, Waste and Land; dated November 1993, WWL Project No: 402. 7. "Detention Pond and Erosion Control Plan" for Upper Meadow at Miramont P.UD., Second Filing (Sheet 1 of 1) prepared by RBD, Inc. dated June 7, 1993, Project No. 504-003 ® 0 0 APPENDIX I 0 Storm Drainage Calculations n r 1 SHEAR ENGINEERING CORPORATION SUB BASIN Ic BREAKDOWN PAGE 1 PROJECT :COURTYARDS AT MIRAMONT PROJ.NO. :1410-01-94 DATE= 03/07/94 LOCATION :FORT COLLINS SY: MEO FILE :MIRAMONT NOTES :PRELIMINARY RUNOFF SURFACE CORP. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 0.230 0.950 0.219 CONCRETE 0.110 0.950 0.105 GRAVEL 0.000 0.500 0.000 ROOFS 0.350 0.950 0.333 LAWNS SANDY SOIL FLAT < 2% 0.000 0.100 0.000 AVERAGE 2 - 7% 0.000 0.150 0.000 STEEP > 71 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 21 0.670 0.200 0.134 AVERAGE 2 - 7% 0.000 0.250 0.000 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 1.360 0.790 C2 C5 C10 C100 COMPOSITE C VALUE 0.581 0.581 0.581 0.726 USE 0.58 0.58 0.5.8 0.73 Ll 0 r. SHEAR ENGINEERING CORPORATION PAGE 2 DEVELOPED FLOW TO 'C' PROJECT: COURTYARDS AT MIRAMONT FILE: MIRAMONT AREA (A)- 1.36 ACRES SUB BASIN Ic RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C - 0.58 0.5E 0.73 SEE SPREAD SHEET ATTACHED ON PAGE 1 DATE 03/07/94 PROJ. NO.1410-01-94 BY MEO TIME OF CONCENTRATION (Tc) FORT COLLINS FORMULA OVERLAND TRAVEL TIME (Ti)(1.87(1.1-CCf)+(L)"0.5)/(S)"0.33 NOT APPLICABLE LENGTH a 0 FEET SLOPE a 1.00 % FLOW IN GRASS SWALE INITIALLY 2 YEAR 10 YEAR 100 YEAR C o 0.20 0.20 0.25 Ti (min)- 0.00 0.00 0.00 TRAVEL TIME (Tt) -L/(60+V) FLOW TYPE L (ft) - 150 S (t) - 1.00 GRASSED SWALE V (fps) - 1.60 Tt(min)- 1.56 L (ft) - 150 S (t) - 0.60 GUTTER V (fps) a 1.60 Tt(min)- 1.56 L (ft) - 155 S (t) - 2.00 GUTTER V (fps) - 2.80 Tt(min)m 0.92 L (ft) - S (t) - V (fps) - Tt(min)- 0.00 L (ft) - S (t) - V (fps) - Tt(min)- 0400 L (ft) - S (t) - V (fps) - Tt(min)- 0.00 L (ft) - S (t) - V (fps) - Tt(min)- 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) - 3.13 Tc -Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)- 3.13 3.13 3.13 USE Tc - 5.00 5.00 5.00 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I - 3.29 S.b4 8.70 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q- CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q - 2.60 4.45 8.64 CONCLUDE: INSTALL 5 TYPE IRI INLET NOTE: 5 FOOT OPENING WITH 10 FOOT BOX AS PIPH IS OFFSET INSTALL 135 IF OF 42 - RCP @ 0.6 t n a 0.013 Qcsp a 77.92 CFS NOTEs PIPE IS OVERSIZED FOR DEVELOPED FLOWS FROM UPSTREAM PROJECT 11 11 APPENDIX II Backup Diagrams and Exhibits is Fort Collins Storm Water Basin Map Table 3-3; Rational Method Runoff Coefficients for Composite Analysis Table 3=4; Rational Method Frequency Adjustment Factors Figure 3-2; Estimate of Average Flow Velocity for Use with the Rational Formula Figure 3-1; City of Ft. Collins Rainfall Intensity Duration Curve Table 5-4; Inlet Capacity Reduction Factors Table 5-4; Standard Curb -Opening Inlet Figure 5-5; Standard Curb -Opening Inlet Chart Figure 5-6; Increase in Interception of Compound Street Table 3; Full Flow Coefficient Values Circular Concrete Pipe Table 4; Circular Pipe Flow Capacity 11 M a Ay rt s ♦' - S SNw.,4„ caw .e' •�, r , t al ,*1 a '' a • j',' ` ° Ct Vlp'•'- y/ _4/j y+v 11 r• .a \ r.y i I' •YI ' (,. na ff1M, 1, t t, a ,. �:37 ,..t el •N w �"a3 �•� i - ��°MuwIVrW 't L7 • C I I .one]r I' n•.VJ�7r.. - g.lo i.l t"yt r t�'j 71 '�«IvT.,> e 3 a. cr (t p Q r , , :'.r I♦ ol{ � t. -y A' d cr 1 ! . i er ! !f d fSFYi' .K,y �' • ': ,.S if N '• t a-. r a! ' a•, iR!v!r �' 7 �i} + �IJ���i'j'! � At/'� �{rl. 11 Mik �4r��� I} .iy,Y rw r ° r q• v..Y.wa u' ,j,i t ii t : } � •M•ir A u l iS \�y��Tahift d�i'G�'uj'f f:�;v't�.�1Jn +A,ltl4 Lhlr��.'t+�l ''` '.•:it1 �I ��4t• '- .i fC h S,•y�hr 4 '�_ �� i ��j� -t 1:k t 11� 7rl.x f.• S r �'�•� a t 'a., _ � i'..cJ+.�.C75 '� iar°e '� g iT.t�s ~�74�k... 5 +. as �hlL3a'u1i.a:�r�aii8R0•HYiri'aJ. °ol':�:iL -.. ,L b. ..� {M 33 �` !'M c. •p„N Y 1 ...• �� na .. I tm oAt t a1� o. 1}.wy ti \• 7 u t [• ,s ,a 8 � r t I 'r rr. •� ��1.0 �', A„ F! V 1 •nn^Yar M� F^" nr lar ...L � ' f. � , � . 1 o r • � y/ F� � •� s r. a r y, }� r ' 1. t` I W w N � t d ,� vtc Ih., .� I e p w h..;`y r 1.• ,.. i. A nl) SAC( .1 MI pxsao 1 4• �1 f f Yeyit';✓y61, 1�,}. b � i'� i �s+n § i•«+aqur �� .<' C*M 4�Cl R - 1 n ct �° P na.ere gal act J; •me to i + rt of Yn l K. a M, a Na n C. 1 A r „ac � •a n 0 1 .. ; ., 11Ynraall V• p, .. `' F 5 a • tl i I • L• s ira � C4 Ilar>almin ° IwsanoorA W r I 4 5 r. 0 t Ewa l 6 ; /Iwo N N ■ ��,•• .P � A t Ti '� Y � , 1 e t a u• r• 4 I„ c V,n 4 ¢ •a6 1 Cahn' 0 •1y wAnn[Nqff u s ati I DS/ is co.. Q I i a 1 . r Ai _ �. v cr > aµ I L 1 / 1"it >.rv y�i lay 1 1 t. � ; .=�t'.. *'���+, rt�LlrJkli�'� 'i r•:�r, A,,i � 1 isR •: T s � '�'�+'� 4;i��n ti ,a F t � Ir 1 p�$ `' `r'P,� :?,�lt \+� i}P✓t`Y� *i" a > Y'�t I ��{f' e.' 'i a �r A \QPROXIT Tn ✓ ' �N`2 ��arAk ye :' .�H �� `� ! �'✓.�. ,fir re }t i`{? ` '' t I L GAT lur.; t�..ri �4:� ay4 Aar '� t.,ap�y t 'in4�. 11i•t, k t4',, •J1 w}I ,•w t �4 \ a'."'ra.'"t,y4t/rpr..7}+k�t�Yt5Y1��!�'1'+.,t'A '1 "• �. � 't7 a}. Y�vcr. ./i yt,�.,,\ �� y,/(/y[t"� t �:Yl., k�rfl. i9�.j'.Y`l'lc �,�t {.. tM \ ,•a`1 N! M- �} r l ''�� r 1a. N w\' R V' •a'A..� JpS.J. t�'fR'1 x •12M tir,Y3"j - rr a r.�wa Cif p;, A"� >?'� )• + ! 4t. t«- d SYyyr n�`A'+ t*t^'i n� >rta�•e� aA craM >S S.t t ^Q.tt • u .,i ct { � i�'d r! a: -!, a e, l� q> t' ''12 t>i ✓ ., A f (. 1 t ,�.%I K -< t. ) t r 1ti t - y` j N t a 1���,�T.�r�� /.]��r� )�.L +,� }1ryi�Y iI 1 �'4.f,iurlvt 'rtl e �•if .r� ' y t / ti / i r + . r .. t �, tk � � ft y !�( „� N-"1�}I ,• ri l�r�' t'1rif�.NtB '} t�/,�,•.AIFHZ. �:i a"a h .'q:� al t �i� t Jf a . i t t y;+'4 1 ` •r . t� " ( �v { L 'v��t� i' ' ta_Okla"R Y .4>:1r.•117' n Ya f,SPn a' • NMljar'�{i� : S� 1) \ Y t �' r 'y t.L , f. '1"'i f „t f Y t �{ 1 '• J 7 'r i I Z• '! l{✓»'h �( .N t it, Z.0 <' r , l la ✓ t tY ,. 1 k x Vi Ln+Al `3�. �� F":'�.! a�� ' ('rr� , '17 t•.[r 9(,1,:. •YJ'. i ti✓+.. � � 1 1 N ✓ri p: t J, ♦ �,. +qk t e k . 1 ~ V;. jjJ 1. t`14 � ,),( .�;?r r �Y x�, I� t • t �Yi.; 1r I S , S ! G s ,,. h i ) +.r '/ p • • ,, " 'AS r' a i. i,.°cS y. •) 1'"" : r 4 't t � -.K , � r 1 ! , _, t:�h{ ✓r'+�1; rn Z ♦y Ir,. -I r1 1 d 14x. '. ,{er+� tY J t iy � i•, Al t• t a -' SJ- S 1 ! ' t - n x � - p,,j i ,. 1y,, } at�l1 �. 'eSn� r'✓, - ->.. •.�ttl,_ !.0 M�,al 5 + r .. ,.t +a. �i i,. -t4 J'I ne\'�' r It � 1 JSr��: ; r ,,y. 1 !. ci•4 �'ia y'! {. �/; i I - �'y t .. Z vJ. l i�1t{ ! a 1 /i .`/- / a r / '' r a, , t "e „FS ✓ ! '. f ,,, r •+tt•h d'\.!+ tl+)1 ,,II 'iti, :. 7.. f.aY!' S`l�,-0`,`rt 'tF, p' a r S_ M r - r. t,. .tt ♦. . �),,, � �� "3• .t F,•1'� f 1 y: N 't t?TA M:f; . r�il.rE nYv °` •r t f , Yt. ' . * t 1 11••��-�..t � t✓fib it' S}�'e tip r � ' : fi1W�ty,N,It IJMi•y Dr t i`r +� + i e t ' , r e r � t.�M' w'h.:.r• fr �i ' �i'l. > M`7 1 (".t?..,la;•i„QT�''lY__ .. a S - -e ..i •••, 4 :r , �\ ( ♦ i .•:1r n �; ,• ! r 4 . IkJi1JY' •'S .� r.+ Ix 1♦ �y��N,(•IJ✓,+'C`l1 J. rw� 't... H � � •`^ti r I e , ter. .1TTIa'� ,.: 1 .art . btil:. .�l4�'r• . tS l y�•j �t4 n�r�' 1•. Y ,1} YSYn, .�'i r y A..L _ t. �'b \,: ) • � � � t.. air r:t :� � 6� 7 t�... >� '+' ' ase` .fhi'.R'yy 1"''r.}i«;{�' :A ., '•�.r(yrw� J i t:,,.far)l�r •r1A,. f `� : _ >S s. ' , rr ^�Y. rqY,°s-i.9/ : r �t . , t ; - r. ,, , '.1•� y t 1, r' ► M otf y A ti�"�!;. '° �IAi y'r\'yyldt'iti'�r � •v .,1r tST. C'!.J ri \}h> • dy � U' ' L •..: r .s ^i�r'1" f.i w ..',a�•i Jx .i ♦ frl - _ z•ti) �! '. w !({,w. n t 7P . �ti Y- Y � t .�frr,e +Ri..tra. TTk f /r%nµ'� d .yt ,.S �•.t ! �i. n�• V G� , -, �i `.,, fi14 .'\ a r tX� a • ,,, u t.i .+� ' 1 / }'`\ Y �1.1?�.' t t t � r. 4" 7 S t Ki3• r..� ^ F'�b. ;Kµ;; � r .�M,:y j h it t f r. ,( Va t• �f�a ,, a-, >:. ! .�a �� !Jain+! i r`. a �. x'C s 1,r'G r i .; 'r r i �U. a" � „Y !'• 1 '!� B " 'b�� y! +w i. { ry � ., .r^4ti4s �/ ti' � a {Y 'r, •' r a..y �+".w t. aG xA ir d JC 1:'' Tait, t 4 : It�: a'h��N :t �i��t:�� t Y�',S �.\ o^L.,i F /tr�%✓ rtiY.l.e N t .:dA I`4 �l+Y .,� Ya,:K.r�r rtt,l' '!C �, +r �a`,,�ZPI ri,.ti \+ d..l P v .. e 1 .tr••y` � \,, y ,o � fit.. : yr tti n. r rl 'V �1, -. f+�r.. IN r� �' r 0 - � Iti F r ti ., - i .. iwY.l ;ilk"S , J J�Y 4 L 'r�,., a u lr� Ib •rh . / r1 11l�e� P�" + i � 5 .,. ., y a ! 'e ♦ r t �. { S (,�y/, \A+' 1' f , .:'.ems' _ ( r !;'tN'; - Q. \.o t r i �e. S,,Yrt%� �f�fi t4 • ti6, ,� �'• � �t7 k•,r.y�k`' .�Y♦ A '`I�1 [�� I•.l�r � �q !�..� 41t t 1.f � J ✓ ixf �t {.. -��.. 'y' rC,..., s. �' tom" �t^rr 4iil'O i ali. ,! F..} .rir• . ra 7i, .t• ,y C �, b�}� 1 i 1 9'• N ' rl^.1 ,.:!. r .r '.r• a a. 1 i'i y , 1 + r a! / ,'�",f.\ {�#k''��►� a f- �' .ate j '. dl;.i'i '; i'pjK:'�l.)¢ .('f ,,TM �� -. I~.i� ', t rl oi..•� �eirfl!i%t r n`I N�.,lt d!\ HGt!' C�h ii! $'r..lirt r(, � �a�.jal y. �., s li" +`�Y t••� ; y � 7^I,�r •:`% c . :�ti , as •,t.: '! kl r F,y. i, ti }'° y�. ✓n: t,^e+'n .�li N C ^ ;} t' .n rya... a,;, i! i rl, X �. r j @, .'. lt�.�'.t; `?r'e }''. VOC ri,Y,• -f„•r. yt }rt• . �In. r•� ,.e FY,"\ a a hrCaR ;t'y;•a t. t -�,�$� µt a/ aY• JtiXi. yy�i nF }ti Y'.. •. v "S +v ✓ �. 4 J•ii y. � fR a•.'Ll a , k. r +.i y' 7Yi i .�'t <'.'a, ti '3f+ �a..q'%' bS�V le v 1 .1 �j 0.t .,.r , )V `C• i � YI. },6�,`y l ayt,)�f`•yy,.t + �!�.� r��,ar�� /�.ry �. �.N � 1 al• (i t � .c•.w r;�i.' �Y tiiv',.t::�y,17 Y G $ W,•4�'h4. .. 4. .a�x SC .i, { �r. t ,+��iL41d•"•`t316N-aL �•--"'r � d'��` y:i'�q� '1. • � a :'7 \'$:i '. • � I'A ;�a:c.>:ti5i.+'•F.+T :./:r' 'M:AStii i �-.}.*l �' , �• P'C.�d� a! R-M-P Medium Density Planned Residential District — designation for medium density (PUD) to a variation in use and building placements areas planned as a unit provide with a minimum lot area of 6,000 square feet. R-L-M ® Low Density Multiple Family District = areas containing low density multiple family or in the R-L District with a minimum lot area of 6,000 square feet units any other use for one -family or two-family dwellings and-9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, uses, with minimum lot areas equal to 1/2 of the total including a variety of permitted floor area of the building. B-P Planned Business District — designates areas planned as unit developments to the surrounding residential areas with provide business services while protecting minumum lot areas the same as R-M. H-6 Highway Business District — designates an area of automobile -orientated busi- to 112 of the total floor area of the building. nesses with. a minimum lot area equal B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum the total floor area of the building not to be less than area of lot equal to two times 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled lot areas equal to two times the total floor area of the ® industrial uses with minimum building not to be less than 20,000 square feet. I-G General Industrial District -- designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 11.8. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: 0.95 Asphalt .... .... Concrete........................................................... ..... 0.50 Gravel................................................................................ 0:50 0.95 Roofs.:......... ................. Lawns, Sandy Soil: 0.10 Flat <2% . _ ........ ,....... 0.15 Average2 to 7%.................................:........... .......... 0:20 Steep>7% ..•.................. ........ .............................. .........,...... Lawns, Heavy Soil: 0:20 Flat<2% ........................................ .. •. ,,,•,,, 0;25 Average2 to 7% .................. ............................... ................ 0.35 Steep>7%............................. .....:... MAY 1984 3-4 DESIGN CRITERIA ® 0 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc=1.87 1.1 —CC D112 S- Where Tc Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D Length of Basin, feet C, = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTOF Storm Retum Period Frequency Factor (years) C, 2 to 10 1.00 11 to 1.10 ® 26 to 50 1.20 51 to 100 1:25� Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods. such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C,CIA Where Q = Flow Quantity, cfs A = Total Area of Basin, acres Cr = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) I = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff. should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such analysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA DRAINAGE CRITERO MANUAL RUNOFF prk 30 i— 20 z ILI 0 cc ILI 0. 10 z Iu a 0 5 N ILI cc 3 U � 2 LiJ Q 3 1 _®ttmilli ®Mttt1111/ems// 311111/� ttt FAN ►%Mill .• I e®■ I r e % �ttm' ItMISNOMER ®tt ttt��� s AMWANNI/MYAMW ® a ������■® IMin FAWWAMMOMMMENE NN .2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. - ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE' WITH THE RATIONAL FORMULA. *MOST FREQUENTLY, OCCURRING `UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 =1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT No Text E 11 FORT COLLINS RAINFALL INTENSITY CURVE DATA FOR CITY OF FORT COLLINS FIG 3-1 NOVEKBBR 1975 INTERPRETED DECEMBER 21, 1992 BY MARK OBERSCEMIDT SHEAR ENGINEERING CORPORATION DO NOT INTERPRET BEYOND RON 40 2 5. 30 25 50 100 TIME YEAR. ittiitfffOf YEAR YEAR YEAR YEAR YEAR i if tftOf 4itifffff 5 if 3.29 4.70 iiiidfftitiiiftiiiiii4t4f 5.64 7.02 tiiiitti 7.95 8.70 10 2.54 3.65 4.45 5.50 6.35 7.14 15 2.14 3.07 3.75 4.60 5.29. 6.06 20 1.85 2.65 3.25 4.00 4.60 5.21 25 1.63 2.34 2.87 3.54 4.08 4.63 30 .1.47 2.11 2.60 3.17 3.67 4.20 35 1.32 1.92 2.38 2.88 3.35 3.81 40 140 1.76 2.19 2.67 3.09 3.60 45 1.12 1.62 2.02 2.46 2.84 3.28 50 1.04 1.51 1.67 2.27 2.65 3.02 55 0.97 1.40 1.73 2.12 2.46 2.80 60 0.90 1.32 2.62 2.99 2.32 2.60 65 0.68 1.24 1.52 1.84 2.18 2.43 70 75 0.82 0.79 1.18 1.11 1.44 1.38 1.72 1.62 2.05 1.93 2.30 2.17 80 0.74 1.07 1.30 1.53 1.82 2.07 85 0.70 1.00 1.23 1.46 1.73 1.96 90 0.68 0.97 1.20 1.40 1.67 1.07 95 0.64 0.91 1.33 1.32 1.59 1.77 100 0.61 0.88 1.09 1.27 1.51 1.70 105 0.60 0.83 1.04 1.22 2.46 1.63 110 0.57 0.00 1.00 1.18 1.40 2.57 115 0.54 0.76 0.96 1.14 1.33 1.50 120 0.52 0.76 0.91 1.10 1.19 1.44 •5.3.5 Grates for Pipes Where a clear and present danger exists such as a siphon, a drop in elevation adjacent to a sidewalk or road, a long pipe with one or more manholes, or at pipes which are near play grounds, parks, and residential areas, a grate may be required. For most culverts through embankments and crossing streets, grates will not be required. When called for on the plans, grates shall meet the following requirements: a. Grating shall be constructed of steel bars with a minimum diameter of 5/8". Reinforcing bars shall not be used. b. Welded connections shall be 1/4" minimum. c. Spacing between bars shall normally be 6" unless site conditions are prohibitive. d. All exposed steel shall be galvanized in accordance with AASHTO M 111. e. Welded joints shall be galvanized with a rust preventive paint, f. Grates shall be secured to the headwall or end section by removable devices such as bolts or hinges to allow maintenance access, prevent vandalism, and prohibit entrance by children. '5.4 Inlets Storm inlets shall be installed where sump (low -spot) conditions exist or street runoff -carrying capacities are exceeded. 12 & 13 The curb inlets shown in the Standard Details, pages D-7, 8 , shall be used in all City Streets. If larger inlets are required, the Colorado Department of Highways Type R Curb Inlet, Standard M-604- 12, shall be used. For drainageways other than streets (for example, parking lots, medians, sump basins) an Area Inlet similar to the detail on page D-9 shall be used. The outlet pipe of the storm inlet shall be sized on the basis of the theoretical capacity of the inlet, with a minimum diameter of 15 inches, or 12 inches if elliptical or arch pipe is used. All curb openings shall be installed with the opening at least 2 inches below the f low.line elevation. The minimum transition length shall be 3'6" as shown on the standard details previously listed. Because of debris plugging, pavement overlaying, parked vehicles, and other factors which decrease inlet capacity, the reduction factors listed in Table 5-4 shall be utilized. Table 5-4 fINLEETrPACITY REDUCTI ONON FACTORS Percentage of Drainage Condition Inlet Type Theoretical Capacity Sump or Continuous Grade ........ .............................. CDOH Type R-Curb Opening 5' 800/0 10, 85% 15, 90% Street —Sump 4' Curb Opening 80% ............................................. Street —Continuous Grade ..•. 4' Curb Opening 80% Parking Lots, Medians ....................................•••• Area Inlet 80% The theoretical capacity of inlets in a low point or sump shall be determined from Figures 5-2 and 5-3. The theoretical capacity of curb openings on a continuous grade shall be determined from Figures�5-4. 5-5 an 5-5— The standard curb -opening is illustrated by Figure 54 and is defined as having a gutter depression apron W feet wide at the inlet opening which extends W feet upstream and downstream from the open- ing, has a depression depth (a) equal to W/12 feet at the curb face, and a curb opening height (h) of at least 0.5 feet. The graph as presented by Figure 5-5 is based on a depression apron width (W) equal to 2 feet and depression width (a) equal to 2 inches. The pavement cross-section is straight to the curb MAY 1984 5-8 DESIGN CRITERIA 0 r. SX .(Cross Slope) STREET -S Longitudinal Slope) 4 SIDE B A 1 °o 0 (Gutter Flow) sm (- CARRYOVER Froude No. at This Point _ „ w 0 — 01 Izz` — — — —rng W 01B (Intercepted A� P LAN- riginal Gutter LineT55 Sx wrO 3IN Gutter Depression at Inlet P SECTION A -A �m oa a G N J SECTION - SECTION B_ -B ( Straight Cross Slope) ( Fort, Collins Stondord a Vertical C&G) NOTE: THE FORT COLLINS STANDARDS HAVE GUTTERS WITH CROSS SLOPES STEEPER THAN SX. FIGURE 5-4- STANDARD CURB -OPENING INLETL MAY 1984 5-12 DESIGN CRITERIA No Text No Text I r: i I TA t 90 CONCRETE PIPE DESIGN MANUAL TA13LE 3: FULL FLOW COEFFICIENT VALUES CIRCULAR CONCRETE PIPE D A R Value ofC,=1.486xAx0' Pipe Area Hydraulic n n=0.010 n=0.011 n=0.012 n=A.013 Diameter (inches) (Square Feet) Radius (Feet) 8 0.349 0.167 15.8 14.3 13.1 12.1 10 0.545 0.208 2.8.4 25.8 23.6 21.8 12 0.785 0.250 46A 42.1 38.6 35.7 15 1.227 0.312 84.1 76.5 70.1 64.7 18 1.767 0.375 137 124 114 105 21 2.405 0.437 206 187 172 158 24 3.142 0.500 294 267 245 226 27 3.976 0.562 402 366 335 310 30 4.909 0.625 533 485 444 410 33 5.940 0.688 686 624 574 530 36 7.069 0750 867 788 722 666 9.621 0.875 1308 1189 1090 6 q16 48 12.566 1.000 1867 1698 1556 54 15.904 1.125 2657 2325 2131 1967 60 19.635 1.250 3385 3017 2821 2604 66 23.758 1.375 4364 3967 3636 3357 72 28.274 1.500 5504 5004 4587 4234 78 33.183 1.625 6815 6195 5679 5242 84 38.485 IJ50 8304 7549 6920 6388 90 44.170 1.875 9985 1078 83,21 7681 96 50.266 2.000 11850 10780 9878 9119 102 .56.745 2.125 13940 12670 11620 10720 108 63.617 2250 16230 14760 13530 12490 114 70.882 2.375 18750 17040 15620 14420 120 78.540 2.500 21500 19540 17920 16540 126 86.590 2.625 24480 22260 20400 18830 132 95.033 2.750 27720 25200 23100 21330 138 103.870 2..875 31210 28.370 26010 24010 144 113.100 3.000 34960 31780 29130 26890 TABLE 4 CIRCULAR PIPE FLAW CAPACITY Full Flow (cubic feet per second) mwmi,ngs "n"= 0.012 Dia. *Cony. %'Slope (feet per 100 feet) (in.) Factor 0.02 0:.05 0.10 0.20 0.35 0.50 0.75 1.00 1.25 1.50 1.75 2.0 2.5 5.0 10.0 20.0 O.� o 3 0.957 0.014 0.021 0.030 0.043 0.057 0.068 0.083 0.096 0.107 0.12 0.13 0.14 0.15 0.21 0.30 043 4 2.062 0.029 0.046 0:065 0.092 0.122 0.1460.179 0.206 0..231 0.25 0.27 0.29 0.,33 0.46' 0.65 0.92 5 3.738 0.053 0..084 0.118 0.167 0.221 0.264 0.324 0.374 0.418 0.46 0.49 0.53 0.59 0.84 1.18 1.67 6 6.079 0.086 0.136 0.192 0.272 0.360 0.430 0.526 0.608 0.680 0.74 0.80 0.86 0.96 1.36 1.92 2.72 8 13.091 0.185 0.293 0.414 0.585 0.774 0.926' 1.134 1.309 1.464 1.60 1.73 1.85 2.07 2.93 4.14 5.85 10 23.74 0.34 0.53 0.75 1.06 1.40 1.68 2.06 2.37 2.65 2.91 3.14 3.36 3.75 5.31 7.51 10.61 12 38.60 0.55 0.86 1.22 1.73 2.28 2.73 3.34 3.86 4.32 4.73 5.11 5.46 6.10 8.63 12.21 17.26 15 69.98 0.99 1.56 2.21 .3.13 4.14 4.95 6.06 7.00 7.82 8.57 9.26 9.90 11.06 15.65 22.13 31.30 .8 1.61 2.54 3.60 5.09 6.73 8.05 9.86 11.38 12.72 13.94 15.05 16.09 17.99 25.45 35.99 50.89 21 171.65 2.43 3.84 5.43 7.68 10.16 12.14 14.87 17.17 19.19 21.02 22.71 24,.28 27.14 38.38 54.28 76.77 24 245.08 3.47 5.48 7.75 10.96 14.50 17.33 21.22 24.51 27.40 30.02 32.42 34.66 38.75 54.80 77.50 109.60 27 335.51 4.74 7.50 10.61 15.00 19.85 23.72 29.06 33.55 37.51 41.09 44.38 47.45 53.05 75.0 106.1 10. 0 30 444.35 6.28 9.94 14.05 19.87 26.29 31.42 38.48 44.44 49.68 54,.42 58.78 62.84 70.26 99.4 140.5 198.7 36 722.57 10.22 16.16 22.85 32.31 42.75' 51:09 62.58 72.26 80.79 88.50 95.59 102.19 114.25. 161.6 228.5 323.1 42 1089.9 15.41 24.37 34.47 48.74 64.5 77.1 94.4 109.0 121.9 133.5 144.2 154.1 172.3 243.7 344.7 487.4 48 1556.1 22.01 34.80 49.21 69.59 92.1 110.0 134.8 155.6 174.0 190.6 205.9 220.1 246.0 348.0 492.1 695.9 * Conveyance Factor = (1.486 x R2/3 x A) / n F]j E APPENDIX III Stuffer Envelope Preliminary Drainage and Erosion Control Plan Detention and Erosion Control Plan for Upper Meadow at Miramont P.U.D. Second Filing Sheet 1 of 1, prepared by RBD, Inc., dated June 7, 1993 0