HomeMy WebLinkAbout2590 MIDPOINT DRIVE - FDP - FDP160031 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)F&tC'ollinsr
November 02, 201 is
Cathy Mathis
TB GROUP
444 MOUNTAIN AVE
Berthoud, CO 80513
RE: 2590 Midpoint Drive, FDP160031, Round Number 2
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Meaghan
Overton, at 970-416-2283 or moverton@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews(cDfcgov.com
Topic: General
Comment Number: 4
Comment Originated: 10/31/2016
10/31/2016: Mylars will not be signed until easement deeds with recording fees are
received.
Comment Number: 5 Comment Originated: 10/31/2016
10/31/2016: DCP information will be sent after the 11/2 meeting.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a�poudre-fire.org
Topic: General
Comment Number: 4
Comment Originated: 11/01/2016
11/01/2016: FDC
The Fire Department Connection needs to be located on the SW corner of the
building. This comment may be addressed at time of building permit. Code language
provided below.
> IFC 912.2: Fire Department Connections shall be installed in accordance with
NFPA standards. Fire department connections shall be located on the street side of
buildings, fully visible and recognizable from the street or nearest point of fire
department vehicle access. The location of the FDC shall be approved by the fire
department.
Page 1 of 4
Comment Number: 5
Comment Originated: 11/01/2016
11/01/2016: KEY BOXES REQUIRED
This comment may be addressed at time of building permit. Code language
provided below.
> IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority
requires at least one key box ("Knox Box") to be mounted in an approved, exterior
location (or locations) on every new or existing building equipped with a required fire
sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished
floor and within 10 feet of the front door, or closest door to the fire alarm panel.
Exception can be made by the PFA if it is more logical to have the box located
somewhere else on the structure. Knox Box size and location(s) to be determined
by time of final CO.
Department: Planning Services
Contact: Meaghan Overton, 970-416-2283, moverton(&-fcgov.com
Topic: Building Elevations
Comment Number: 4
Comment Originated: 08/29/2016
10/31/2016: Repeat comment. Colors have been added in the General System
Notes, but others are still TBD in the Keynote Text.
08/29/2016: All TBD for colors should be edited with colors when chosen. Colors
should be neutral.
Topic: Landscape Plans
Comment Number: 9
Comment Originated: 10/31/2016
10/31/2016: Please add scientific names to the native seed mix in note 1. Edit
numbering for seed mix notes to remove repeated #1. In note 3, please correct the
small typo - "Colorado state noxious weeks" should be "Colorado state noxious
weeds."
Topic: Site Plan
Comment Number: 2 Comment Originated: 08/29/2016
10/31/2016: Repeat comment. This has not been corrected.
08/29/2016: Please correct square footage of the office space in the land use table
�, currently shows 2905 square feet, but should be 2950 square feet.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen(a)fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/31/2016
10/28/2016: Repeat comment. Drain time compliance was not seen in the
drainage report.
08/31/2016: Please provide evidence that the detention basin is in compliance with
drain times per Colorado Revised Statute 37-92-602(8). More information on this
statute is available at hftp://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to
show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com with any questions about this requirement or
for assistance with the spreadsheet.
Page 2 of 4
Comment Number: 3 Comment Originated: 08/31/2016
10/28/2016: Repeat comment. It does not appear the easement for Subbasin 2.0
covers the 100-year water surface elevation as shown on the plans; it appears the
just the blue area on the drainage plan is covered, and I am unsure what is depicted
by the blue area.
08/31/2016: Please clarify the easement extents for the two detention basins as
there seems to be discrepancy between the site plan and utility plans. While basin
1.0 seems to be covered on the utility plans, it does not appear to be on the site
plan. Basin 2.0 does not appear to be covered by an easement on the western end.
Comment Number: 4 Comment Originated: 08/31/2016
10/28/2016: Please see redlines.
08/31/2016: More understanding of Basin 2.0 is needed. While it is clear that this
will be combined with existing basin for Lot 19, clarification is needed for the outlet
structure modifications as well as how the water quality capture volumes are being
combined.
Comment Number: 5 Comment Originated: 08/31/2016
10/28/2016: Repeat comment. Please see redlines.
08/31/2016: Additional details are needed for the proposed rain gardens. Please
show the underdrains on the plans and detail the connection to the drywells. Are the
drywells proposed to be open at the surface? It was understood that the drywells
would be capped and the underdrains would be the only tie-in to the drywells.
Comment Number: 6 Comment Originated: 08/31/2016
08/31/2016: Please see redlined report and plans. Please be sure to return these
with future submittals.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com
Topic: Building Elevations
Comment Number: 6 Comment Originated: 10/31/2016
10/31/2016: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 08/31/2016
10/31/2016: There are line over text issues. See redlines.
08/31/2016: There are line over text issues. See redlines.
Comment Number: 7 Comment Originated: 10/31/2016
10/31/2016: Please change the dimension symbol from inches to feet on sheet 3.
See redlines.
Comment Number: 8
Comment Originated: 10/31/2016
10/31/2016: There are notes that reference the City Of Colorado Springs. Please
change all notes specific to City standards to the City Of Fort Collins.
Topic: Landscape Plans
Comment Number: 2
10/31/2016: No comments.
08/31/2016: No comments.
Topic: Lighting Plan
Comment Number: 4
10/31/2016: No comments.
08/31/2016: No comments.
Comment Originated: 08/31/2016
Comment Originated: 08/31/2016
Page 3 of 4
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/01/2016
11/01/2016: No additional comments at this time.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson(d)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/29/2016
08/29/2016: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen(&fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/28/2016
10/28/2016: Please note that all City of Fort Collins Utility Customers are subject to
City Code requirements for wastewater. These requirements include Section
26-306 Wastewater Discharge Permit Requirements and Section 26-332 Prohibitive
Discharge Standards. A permit may be required depending on activities on the site;
however, discharge standards apply to every customer, both large and small,
regardless of what activities take place on the site. Please contact Industrial
Pretreatment, (970)221-6900, to discuss these requirements and how they apply to
this development.