HomeMy WebLinkAbout2590 MIDPOINT DRIVE - FDP - FDP160031 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)F&tC'ollinsr November 02, 201 is Cathy Mathis TB GROUP 444 MOUNTAIN AVE Berthoud, CO 80513 RE: 2590 Midpoint Drive, FDP160031, Round Number 2 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Meaghan Overton, at 970-416-2283 or moverton@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews(cDfcgov.com Topic: General Comment Number: 4 Comment Originated: 10/31/2016 10/31/2016: Mylars will not be signed until easement deeds with recording fees are received. Comment Number: 5 Comment Originated: 10/31/2016 10/31/2016: DCP information will be sent after the 11/2 meeting. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a�poudre-fire.org Topic: General Comment Number: 4 Comment Originated: 11/01/2016 11/01/2016: FDC The Fire Department Connection needs to be located on the SW corner of the building. This comment may be addressed at time of building permit. Code language provided below. > IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA standards. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access. The location of the FDC shall be approved by the fire department. Page 1 of 4 Comment Number: 5 Comment Originated: 11/01/2016 11/01/2016: KEY BOXES REQUIRED This comment may be addressed at time of building permit. Code language provided below. > IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in an approved, exterior location (or locations) on every new or existing building equipped with a required fire sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished floor and within 10 feet of the front door, or closest door to the fire alarm panel. Exception can be made by the PFA if it is more logical to have the box located somewhere else on the structure. Knox Box size and location(s) to be determined by time of final CO. Department: Planning Services Contact: Meaghan Overton, 970-416-2283, moverton(&-fcgov.com Topic: Building Elevations Comment Number: 4 Comment Originated: 08/29/2016 10/31/2016: Repeat comment. Colors have been added in the General System Notes, but others are still TBD in the Keynote Text. 08/29/2016: All TBD for colors should be edited with colors when chosen. Colors should be neutral. Topic: Landscape Plans Comment Number: 9 Comment Originated: 10/31/2016 10/31/2016: Please add scientific names to the native seed mix in note 1. Edit numbering for seed mix notes to remove repeated #1. In note 3, please correct the small typo - "Colorado state noxious weeks" should be "Colorado state noxious weeds." Topic: Site Plan Comment Number: 2 Comment Originated: 08/29/2016 10/31/2016: Repeat comment. This has not been corrected. 08/29/2016: Please correct square footage of the office space in the land use table �, currently shows 2905 square feet, but should be 2950 square feet. Department: Stormwater Engineering Contact: Dan Mogen, 970-224-6192, dmogen(a)fcgov.com Topic: General Comment Number: 2 Comment Originated: 08/31/2016 10/28/2016: Repeat comment. Drain time compliance was not seen in the drainage report. 08/31/2016: Please provide evidence that the detention basin is in compliance with drain times per Colorado Revised Statute 37-92-602(8). More information on this statute is available at hftp://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to show compliance is available for download at http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at (970)224-6192 or dmogen@fcgov.com with any questions about this requirement or for assistance with the spreadsheet. Page 2 of 4 Comment Number: 3 Comment Originated: 08/31/2016 10/28/2016: Repeat comment. It does not appear the easement for Subbasin 2.0 covers the 100-year water surface elevation as shown on the plans; it appears the just the blue area on the drainage plan is covered, and I am unsure what is depicted by the blue area. 08/31/2016: Please clarify the easement extents for the two detention basins as there seems to be discrepancy between the site plan and utility plans. While basin 1.0 seems to be covered on the utility plans, it does not appear to be on the site plan. Basin 2.0 does not appear to be covered by an easement on the western end. Comment Number: 4 Comment Originated: 08/31/2016 10/28/2016: Please see redlines. 08/31/2016: More understanding of Basin 2.0 is needed. While it is clear that this will be combined with existing basin for Lot 19, clarification is needed for the outlet structure modifications as well as how the water quality capture volumes are being combined. Comment Number: 5 Comment Originated: 08/31/2016 10/28/2016: Repeat comment. Please see redlines. 08/31/2016: Additional details are needed for the proposed rain gardens. Please show the underdrains on the plans and detail the connection to the drywells. Are the drywells proposed to be open at the surface? It was understood that the drywells would be capped and the underdrains would be the only tie-in to the drywells. Comment Number: 6 Comment Originated: 08/31/2016 08/31/2016: Please see redlined report and plans. Please be sure to return these with future submittals. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com Topic: Building Elevations Comment Number: 6 Comment Originated: 10/31/2016 10/31/2016: There are line over text issues. See redlines. Topic: Construction Drawings Comment Number: 5 Comment Originated: 08/31/2016 10/31/2016: There are line over text issues. See redlines. 08/31/2016: There are line over text issues. See redlines. Comment Number: 7 Comment Originated: 10/31/2016 10/31/2016: Please change the dimension symbol from inches to feet on sheet 3. See redlines. Comment Number: 8 Comment Originated: 10/31/2016 10/31/2016: There are notes that reference the City Of Colorado Springs. Please change all notes specific to City standards to the City Of Fort Collins. Topic: Landscape Plans Comment Number: 2 10/31/2016: No comments. 08/31/2016: No comments. Topic: Lighting Plan Comment Number: 4 10/31/2016: No comments. 08/31/2016: No comments. Comment Originated: 08/31/2016 Comment Originated: 08/31/2016 Page 3 of 4 Department: Traffic Operation Contact: Nicole Hahn, 970-221-6820, nhahn(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/01/2016 11/01/2016: No additional comments at this time. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson(d)fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/29/2016 08/29/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Department: Water -Wastewater Engineering Contact: Dan Mogen, 970-224-6192, dmogen(&fcgov.com Topic: General Comment Number: 1 Comment Originated: 10/28/2016 10/28/2016: Please note that all City of Fort Collins Utility Customers are subject to City Code requirements for wastewater. These requirements include Section 26-306 Wastewater Discharge Permit Requirements and Section 26-332 Prohibitive Discharge Standards. A permit may be required depending on activities on the site; however, discharge standards apply to every customer, both large and small, regardless of what activities take place on the site. Please contact Industrial Pretreatment, (970)221-6900, to discuss these requirements and how they apply to this development. Page 4 of 4