HomeMy WebLinkAboutSUN COMMUNITIES - THE FOOTHILLS - FDP220005 - SUBMITTAL DOCUMENTS - ROUND 6 - EROSION CONTROL LETTER/REPORTProject: Disturbed Acres:52.65
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
L.F. 2255 $1.60 $3,608.00
L.F. 384.0 $25.00 $9,600.00
L.F. 6581.0 $2.00 $13,162.00
L.F. 6581.0 $0.20 $1,316.20
L.F. 0.0 $9.00 $0.00
A.C. 0.2 $1,100.00 $209.00
L.F. 5344 $2.00 $10,688.00
S.Y. 926.40 $2.00 $1,852.80
E.A. 2.00 $1,000.00 $2,000.00
E.A. 3.00 $100.00 $300.00
S.Y. 20337 $5.00 $101,685.00
L.F. 156.8 $2.00 $313.60
L.F. 443.2 $20.00 $8,864.00
L.F. 81.25 $36.00 $2,925.00
E.A. 3 $1,000.00 $3,000.00
Sub-Total: $159,523.60
1.5 x Sub-Total: $239,285.40
Amount of security: $239,285.40
Total Acres x Price/acre: $131,625.00
$2,500.00 Sub-Total: $131,625.00
1.5 x Sub-Total: $197,437.50
Amount to Re-seed: $197,437.50
Minimum escrow amount: $1,500.00
Erosion Control Escrow:$239,285.40
Example Erosion and Sediment Control Escrow/Security
Calculation for The City of Fort Collins
BMP Amount
Diversion Ditch (DD)
RRB for Culvert Protection (RRC)
Sediment Basin (SB)
The Foothills
Construction Fence (CF)
Temporary Stream Crossing (TSC)
Concrete Washout Area (CWA)
Miniumum Escrow Amount
Unit Price of Seeding per acre:
Inlet Protection (IP)
Reinforced Check Dam (RCD)
Vehicle Tracking Control (VTC)
Curb Sock (CS)
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three
thousand dollars ($3,000) for commercial development”
Check Dam (CD)
Construction Markers (CM)
Final Escrow Amount
Erosion Control Blanket (ECB)
Reseeding Amount
Silt Fence (SF)
Stabilized Staging Area (SSA)
3/29/2023 12:18 PM K:\19002763\Project Documents\Engineering-Planning-Power and Energy\Reports\SWMP\Appendix B\Escrow