HomeMy WebLinkAboutMONTAVA - PHASE G & IRRIGATION POND - BDR210013 - SUBMITTAL DOCUMENTS - ROUND 5 - SUPPORTING DOCUMENTATION (2)Sheet Number:
Project Number:Project:Client:/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWGPlot Date:9/13/2018 10:34 AM Plotted By: Matthew LambertDate Created:9/13/2018Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734 HF2MMONTAVAMONTAVAOVERALL UTILITY PLANPUD MASTER PLANDPZ CODESIGNXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X XXX X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX
X
X
XXXXXXXXX
XXXXXXXXRegional Bike Trail
Shared 2-way Trail
Potential 2-way Trail
1-way Bike Facility
Future 1-way Bike Facility
Bike Route
Future Bike Route
Key Pedestrian Connections
and Trails
Water Storage Area
Exposed Water Conveyance
Piped Water Conveyance
04/10/2023TRAIL AND STORMWATER NETWORKMAPLE HILL SUBDIVISION
FUTURE CITY OF FORT COLLINS PARK
SHARED IRRIGATION POND
FUTURE ELEMENTARY SCHOOL
STORYBOOK SUBDIVISIONMONTAVA FUTURE PHASE E
MONTAVA FUTURE PHASE H
MONTAVA FUTURE PHASE D
FUTURE CITY OF FORT COLLINS PARK
Potential future trail connection to be determined
and designed by the city. This potential alignment
connects Mountain Vista bike lanes with Phase
G shared path through the future park and north
through Maple Hill and beyond.Bar Harbor Drive (w/ bike lanes)Potential future trail connection to be
determined and designed by the city.
Mountain Vista bicycle lanes.
Mountain Vista bicycle lanes.
MOUNTAIN VISTA
Potential connection to Maple
Hill shared path.
Regional trail, future connection
to Richard’s Lake.
Phase G shared path connection
from Mountain Vista to the future
city park.
Bicycle Route
Piped stormwater from Storybook,
connected to No. 8 ditch.
WEST MONTAVA OUTFALL SYSTEM
Potential shared path along
the edge of Phase G and
Timberline to be determined
and designed by the city.
No. 8 ditch in below grade pipe.
Potential future trail connection to
be determined and designed by the
city. Alignment to be determined.
Future enhanced
pedestrian-focused crossing
Regional bike trail coincident with
No. 8 ditch pipe easement.
Pedestrian connection to future
Phase E pedestrian ways.
Shared connection to future
Phase E pedestrian ways.
Pedestrian trail connection
through park north to the
elementary school and south to
future Phase E pedestrian ways.
Pedestrian trail connections
to future Phase D
Subsurface water quality
NOTES: Pedestrian sidewalks are not indicated in this
diagram, however they are provided on both sides of
every street. Pedestrian connections indicated are
special by being enhanced for safety, being in
important locations, or provided special amenities such
as bridges to cross exposed stormwater conveyance.
The size and location of all trail and stormwater
elements a approximate. They are intended to
communicate the general location and interaction of
these elements for diagrammatic purposes.
The City is responsible for the longterm maintenance of
the regional trail within the development. Maintenance
consists of snowplowing of the paved surface,
occasional seasonal mowing 23’ adjacent to the trail
surface, repairing/replacing surface damage of the trail.
The underlying property owner is responsible for all
other landscaping maintenance within the easement.
Landscaping shall be designed in accordance with all
applicable City codes. Spray irrigation, if required,
shall be designed and maintained to avoid spray on
the trail.
Approximate 100
year flood limits