Loading...
HomeMy WebLinkAboutIMPALA REDEVELOPMENT - FDP230001 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTNORTHERNENGINEERING.COM | 970.221.4158 FORT COLLINS | GREELEY FINAL DRAINAGE REPORT: IMPALA REDEVELOPMENT APPENDIX APPENDIX B HYDRAULIC COMPUTATIONS NORTHERNENGINEERING.COM | 970.221.4158 FORT COLLINS | GREELEY FINAL DRAINAGE REPORT: IMPALA REDEVELOPMENT APPENDIX APPENDIX C LID & WATER QUALITY EXHIBITS Project Number:Project: Project Location: Calculations By:Date: Sq. Ft. Acres 100 111,708 2.56 72%Rain Garden 1 Rain Garden 2,158 80,430 101 36,520 0.84 9%n/a n/a 0 3,287 200 (NEW or Modified)11,638 0.27 100%n/a n/a 877 11,638 OS1 10,135 0.20 72% n/a n/a 0 7,297 OS5 590 0.01 100% n/a n/a 0 590 Total 170,591 1.31 103,242 LID Summary Project Number:Project: Project Location: Calculations By:Date: LID Summary per LID Structure Sq. Ft. Acres Rain Garden 1 111,708 2.56 72%101 Rain Garden 1,798 2,158 80,430 Total 111,708 2.56 2,158 80,430 170,591 ft2 103,242 ft2 10,584 ft2 77,431 ft2 80,430 ft2 77.90% LID Summary AreaBasin ID Treatment TypePercent Impervious LID ID Impala Redevelopment 1/11/2023 1914-001 Fort Collins, Colorado S. Ritchie Total Impervious Area (ft2) Required Volume (ft3) LID Summary per Basin Area Weighted % Impervious 1914-001 Fort Collins, Colorado S. Ritchie Impervious Area (ft2) Vol. w/20% Increase per Fort Collins Manual (ft3) Impala Redevelopment 1/11/2023 Subbasin ID Treatment TypeLID ID Volume per UD-BMP (ft3) Total Treated Area Percent Impervious Treated by LID O1-O7 75% Requried Minimum Area to be Treated LID Site Summary - New Impervious Area Total Area of Current Development Total Impervious Area Total Impervious Area without LID Treatment