Loading...
HomeMy WebLinkAboutTRIPLE CROWN SPORTS EXPANSION - MA220144 - SUBMITTAL DOCUMENTS - ROUND 3 - ELEVATIONS100' -0" (E) Level 1 111' -1" (E) Level 2 124' -0" (E) T.O. Masonry 99' -0" (N) Restroom Floor 96' -6" (N) Training Floor 126' -5 1/4" New Roof Peak R2 W2 W1 13 5 6 8 2 1 1 4 3 11 99 111 7 10 16 F5 6 15 10 6 5 6 8 6 17 18 18 17 18 18 18 25 24 24 100' -0" (E) Level 1 100' -0" (E) Level 1 111' -1" (E) Level 2 120' -0" (E) Roof Bearing 124' -0" (E) T.O. Masonry 96' -6" (N) Training Floor 123' -1" New Roof Bearing 126' -5 1/4" New Roof Peak W2 1/4" 1'-0" R2 S1 W1 113' - 4" 4 1 1 6 5 13 11 1313 14 131313 7 8 Proposed AdditionExisting Building 15 18 F1 Exterior concrete slab-on-grade with light broom finish. Refer to Civil for grading. F2 Interior concrete slab-on-grade. F3 Interior 3/4" Plywood over TJI floor structure. F4 Tigerwood decking over P.T. sleepers ripped to level roof slope. F5 Tigerwood decking over P.T. joists. R1 TPO roof membrane over tappered insulation over flat TJI structure. R2 S1 Prefinished metal soffit panels. W1 Brick veneer over wood framing, General Shale Color: Autumn Leaf Grain. See elevations for banding details. W2 Architectural metal panel over wood framing, Prefinished: Charcoal Gray TPO roof membrane over insulation over engineered roof trusses. 2026 Lowe Street 2032 Lowe Street 1021 N. Shields St. Fort Collins, Colorado 80521 www.ArnettArchitect.com (303) 775-1701 RNE DESIGN STUDIO, INC. Issued Drawings Project Number: Sheet: Project Team: for: Scale Accordingly if Reduced Contact: David King Email: David@triplecrownsports.com Triple Crown Sports Phone: # Fort Collins, CO 80525 3930 Automation Way Owner Contact: Sam Eliason Email: sam.eliason@unitedcivil.com United Civil Group Phone: (970) 530-4044 Fort Collins, CO 80524 1501 Academy Court, Suite 203 Civil Engineer Contact: Cathy Mathis Email: cathy@tbgroup.us TB Group Phone: (970)532-5891 Berthoud, CO 80531 444 Mountain Avenue Planning & Landscape Contact: Blake Larsen Email: blake@larsensd.com Larsen Structural Design Phone: (970) 568-3355 Fort Collins, CO 80521 320 Maple St., Suite 120 Structural Engineer Contact: Josh Miller Email: Josh-m@int-mech.com Integrated Mechanical Phone: (970) 556-0570 Fort Collins, CO 80521 320 Maple St. #110 Mech/Plumbing Engineer Contact: Chuck Polson Email: chuck@apsinc.biz APS, Inc. Phone: (970) 381-7462 Timnath, CO 80547 3135 Laminar Court Electrical Engineer Submittal No.1 Submittal No.2 Submittal No.3 1 2 3 12/7/2022 2/8/2023 3/15/2023 Triple Crown Sports Submittal No.3 ADS 22.02 ARCH-1 3930 Automation Way Fort Collins, Colorado 80525 Architectural Building Elevations 1/8" = 1'-0" Building Elevation - North3 1/8" = 1'-0" Building Elevation - East1 3D Aerial View - Building Addition Keynote Legend Key Value Keynote Text 1 Aluminum storefront window system with Low-E glass and Black prefinished frame. 2 Aluminum storefront swinging door with Low-E glass and Black prefinished frame. 3 Steel channel roof fascia, painted black. 4 Steel channel accent, painted black. 5 Steel stair with grating treads and landings, painted black. 6 Steel guardrail/handrail, painted black. 7 Exposed steel structure, painted black. 8 Brick accent banding. 9 Precast concrete banding/sill. 10 Flush hollow metal door and frame, insulated, painted gray. 11 Flood proof flush hollow metal double door and frame, insulated, painted gray. 13 Mechanical HVAC condenser/heat pump, set on concrete pad. 14 Mechanical HVAC ventilation unit, set on concrete pad. 15 Existing building exterior, CMU finish. 16 Concrete stairs with steel handrails painted black. 17 Wall mounted recreational light fixture with dimming and countdown timer controls. 18 Wall mounted low wattage egress light fixture (B:1, U:0, G:0) permitted in LC1. 24 Sports field lighting pole and fixtures by Musco Lighting, refer to photometrics and specifications. 25 Existing building signage to remain. Material Legend 1" = 1'-0" Neighboring Building Photos2 No. Description Date 100' -0" (E) Level 1 111' -1" (E) Level 2 120' -0" (E) Roof Bearing 124' -0" (E) T.O. Masonry 15 19 2020 2020 21 22 23 100' -0" (E) Level 1 100' -0" (E) Level 1 111' -1" (E) Level 2 111' -1" (E) Level 2 120' -0" (E) Roof Bearing 124' -0" (E) T.O. Masonry 99' -0" (N) Restroom Floor 123' -1" New Roof Bearing 126' -5 1/4" New Roof Peak R2 S1 W2 W1 Proposed Addition Existing Building 1/4" 1'-0" 153 1 1 4 6 5 6 10 8 7 10 6 7 5 6 18 18 24 18 19 21 22 26 23 27 25 28 F1 Exterior concrete slab-on-grade with light broom finish. Refer to Civil for grading. F2 Interior concrete slab-on-grade. F3 Interior 3/4" Plywood over TJI floor structure. F4 Tigerwood decking over P.T. sleepers ripped to level roof slope. F5 Tigerwood decking over P.T. joists. R1 TPO roof membrane over tappered insulation over flat TJI structure. R2 S1 Prefinished metal soffit panels. W1 Brick veneer over wood framing, General Shale Color: Autumn Leaf Grain. See elevations for banding details. W2 Architectural metal panel over wood framing, Prefinished: Charcoal Gray TPO roof membrane over insulation over engineered roof trusses. 1021 N. Shields St. Fort Collins, Colorado 80521 www.ArnettArchitect.com (303) 775-1701 RNE DESIGN STUDIO, INC. Issued Drawings Project Number: Sheet: Project Team: for: Scale Accordingly if Reduced Contact: David King Email: David@triplecrownsports.com Triple Crown Sports Phone: # Fort Collins, CO 80525 3930 Automation Way Owner Contact: Sam Eliason Email: sam.eliason@unitedcivil.com United Civil Group Phone: (970) 530-4044 Fort Collins, CO 80524 1501 Academy Court, Suite 203 Civil Engineer Contact: Cathy Mathis Email: cathy@tbgroup.us TB Group Phone: (970)532-5891 Berthoud, CO 80531 444 Mountain Avenue Planning & Landscape Contact: Blake Larsen Email: blake@larsensd.com Larsen Structural Design Phone: (970) 568-3355 Fort Collins, CO 80521 320 Maple St., Suite 120 Structural Engineer Contact: Josh Miller Email: Josh-m@int-mech.com Integrated Mechanical Phone: (970) 556-0570 Fort Collins, CO 80521 320 Maple St. #110 Mech/Plumbing Engineer Contact: Chuck Polson Email: chuck@apsinc.biz APS, Inc. Phone: (970) 381-7462 Timnath, CO 80547 3135 Laminar Court Electrical Engineer Submittal No.1 Submittal No.2 Submittal No.3 1 2 3 12/7/2022 2/8/2023 3/15/2023 Triple Crown Sports Submittal No.3 ADS 22.02 ARCH-2 3930 Automation Way Fort Collins, Colorado 80525 Architectural Building Elevations Keynote Legend Key Value Keynote Text 1 Aluminum storefront window system with Low-E glass and Black prefinished frame. 3 Steel channel roof fascia, painted black. 4 Steel channel accent, painted black. 5 Steel stair with grating treads and landings, painted black. 6 Steel guardrail/handrail, painted black. 7 Exposed steel structure, painted black. 8 Brick accent banding. 10 Flush hollow metal door and frame, insulated, painted gray. 15 Existing building exterior, CMU finish. 18 Wall mounted low wattage egress light fixture (B:1, U:0, G:0) permitted in LC1. 19 Existing CMU trash enclosure to remain. 20 Existing mechanical condenser to remain. 21 Existing electrical gear to remain. 22 Existing bike rack to remain. 23 Existing 50kva single phase transformer to be replaced per Fort Collins Light & Power as required. 24 Sports field lighting pole and fixtures by Musco Lighting, refer to photometrics and specifications. 25 Existing building signage to remain. 26 Existing fire department connection to remain. 27 New building address numbers 8 inch minimum height, contrasting with CMU walls. 28 New Knox Box mounted to existing fence for fire department access. 1/8" = 1'-0" Existing Building Elevation - South1 1/8" = 1'-0" Building Elevation - West2 3D View Looking Eastward Material Legend No. Description Date