Loading...
HomeMy WebLinkAboutSTANFORD SENIOR LIVING - FDP210017 - DOCUMENT MARKUPS - ROUND 5 - DRAINAGE REPORT FINAL DRAINAGE REPORT STANFORD SENIOR LIVING Fort Collins, Colorado March 14, 2023 Prepared for: ESL Fort Collins LLC 1550 Market Street, Suite 200 Denver, CO 80202 Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1530-002  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. March 15, 2023 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage Report for Stanford Senior Living Dear Staff: Northern Engineering is pleased to submit this Final Drainage Report for your review. This report accompanies the Final Development Review submittal for the proposed Stanford Senior Living. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM) and Urban Storm Drainage Criteria Manual. This report serves to document the stormwater impacts associated with the proposed Stanford Senior Living project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Blaine Mathisen, PE Project Engineer Stanford Senior Living Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 5 A. Major Basin Description .................................................................................................................... 5 B. Sub-Basin Description ....................................................................................................................... 5 III. DRAINAGE DESIGN CRITERIA ................................................................................... 6 A. Regulations........................................................................................................................................ 6 B. Four Step Process .............................................................................................................................. 6 C. Development Criteria Reference and Constraints ............................................................................ 7 D. Hydrological Criteria ......................................................................................................................... 7 E. Hydraulic Criteria .............................................................................................................................. 7 F. Floodplain Regulations Compliance .................................................................................................. 8 G. Modifications of Criteria ................................................................................................................... 8 IV. DRAINAGE FACILITY DESIGN .................................................................................... 8 A. General Concept ............................................................................................................................... 8 B. Specific Details ................................................................................................................................ 10 V. CONCLUSIONS ...................................................................................................... 11 A. Compliance with Standards ............................................................................................................ 11 B. Drainage Concept ............................................................................................................................ 12 References ....................................................................................................................... 13 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers B.2 – Inlets B.3 – Detention Facilities APPENDIX C – Water Quality Design Computations APPENDIX D – Erosion Control Report APPENDIX E – Additional References Stanford Senior Living Final Drainage Report LIST OF TABLES AND FIGURES: Figure 1 - Vicinity Map ........................................................................................................ 1 Figure 2 – Aerial Photograph ................................................................................................ 3 Figure 3 – Existing FEMA Floodplains .................................................................................... 4 Figure 4 – Existing City Floodplains ....................................................................................... 4 Table 1 - Pond Summary ................................................................................................... 11 Table 2 - Chamber Count Summary ..................................................................................... 11 MAP POCKET: Existing Drainage Exhibit DR1 - Drainage Exhibit Stanford Senior Living Final Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 - Vicinity Map 2. Stanford Senior Living project is located in the southwest quarter of Section 25, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located at the southwest corner of the Stanford Road and Monroe Drive intersection. 4. Currently the site is vacant on the north side of the lot with native grasses and patches of gravel. The south half of the project site is currently an asphalt parking lot with landscaped medians that the Marriot Hotel is currently utilizing for guest parking. The undeveloped portion of the site drains via overland flow at an average grade of 3.50% to the south towards the existing parking lot. In general, the site conveys stormwater runoff from the north to the south where it is collected by a customized inlet in the southeast corner of the existing parking lot. 5. In the existing condition most of the site is being captured by a custom inlet in the southeast corner of the parking lot that was designed per Strachan Subdivision 3rd Filing. A small portion of the existing drive entrance aisle is being conveyed via curb and gutter to existing inlets at the northwest corner of the Stanford Road and Horsetooth Road intersection. Both the custom inlet in the parking lot and inlets at Stanford Senior Living Final Drainage Report 2 the intersection tie into existing 30”x36” HERCP pipes. From there the runoff is routed via the HERCP pipes into Warren Lake which is located at the southeast corner of the Stanford Road and Horsetooth Road intersection. 6. “Stanford Senior Living is in the Foothills Drainage Basin Master Plan that was prepared by Resource Consultants, Inc. and dated July 1980. The Strachan Subdivision Third Filing was developed in 1980 and was divided into two basins. The Southerly Basin, which contains 17.9 acres and drains to the corner of Horsetooth Road and Stanford Road. Mitchell and Co. were the developers, and they paid the Warren Lake Company for storm water detention rights in Warren Lake for Strachan Subdivision 1st, 2nd, and 3rd Filings. These filings correspond to the area between Monroe Drive and Horsetooth Road and between College Avenue and Stanford Road. They also developed the Strachan Continental Subdivision at the southwest corner of Horsetooth Road and J.F.K Parkway. Its detention was also paid for in Warren Lake.” – Final Drainage Report for J.F.K. Office P.U.D 7. According to the Final Drainage Report for J.F.K. Office P.U.D the HERCP pipes in the southeast corner of the parking lot were sized to carry the 10-year event (48 cfs) for the Strachan Subdivision while the 100-year event overtopped Horsetooth Road and sheet flowed to Warren Lake. Due to the report being 40 years old it is important that the Stanford Senior Living project does not adversely impact downstream infrastructure but is still allowed to utilize the Warren Lake Company agreement to some degree. Therefore, the Stanford Senior Living project will detain the difference between the historic 10-year runoff and the proposed 100-year runoff. By utilizing this approach, the Stanford Senior Living center will be reducing the historic flows to the existing inlet at the corner of the parking lot. Additionally, the downstream infrastructure will not be adversely impacted, and the Stanford Senior Living center will no longer contribute to the 100-year flows that currently overtop Horsetooth Road during the major event. B. Description of Property 1. The Stanford Senior Living project has a total acreage of 3.79 acres. However, the Stanford Senior Living project only plans on developing 2.50 acres and leaving the existing parking lot in place. The existing parking lot (1.29 acres) historically sheet flows to the southeast to the custom inlet box as previously described. Therefore, Stanford Senior Living will only be detaining and treating 2.50 acres. The proposed flows to the existing inlet will be reduced because the Stanford Senior Living Center is detaining the difference between the 10-year historic and 100-year developed. The 10-year historic rate is also a conservative release because it assumed that there is no pervious area currently on the 2.50 acres that is proposed with this development. However, that is not the case as there is existing hardscape on the property. These areas include a drive aisle and some gravel roads that are currently being undetained and untreated. Please refer to Appendix A for the runoff calculations. Stanford Senior Living Final Drainage Report 3 Figure 2 – Aerial Photograph 2. The Stanford Senior Living project will consist of a new assisted living and memory care center. It will be a four-story building with underground parking. There is an existing parking lot that is currently being used by the Marriot Hotel for overflow guest parking which will now serve as the Stanford Senior Living parking lot. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, 100 percent of the site consists of Nunn clay loam, which fails into Hydrologic Soil Group C 4. No irrigation facilities or major drainageways are within the property limits. 5. The project site is within a General Commercial District (C-G) Zoning District. The proposed use is permitted within the zone district. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. 2. The FEMA Panel 08069C0987G illustrates that this project site is not near any FEMA delineated regulatory floodplain. Stanford Senior Living Final Drainage Report 4 Figure 3 – Existing FEMA Floodplains Figure 4 – Existing City Floodplains Stanford Senior Living Final Drainage Report 5 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Stanford Senior Living project is in the Foothills Basin which is centrally located in Fort Collins. The basin is mostly developed with commercial development along College Avenue and mixed-use residential in the remainder of the basin. The basin drains from west to east through open channels or a storm sewer system to the Fossil Creek Reservoir. B. Sub-Basin Description 1. The property historically drains from the northwest to the southeast corner of the existing parking lot via overland flow. The existing parking lot was developed as a part of the Strachan Subdivision 3rd Filing and is currently being used by the Marriot Hotel and Merrill Lynch Wealth Management. As previously described, there is a custom inlet in the southeast corner of the parking lot that has three 30”x36” HERCP that currently routes the 10-year storm event east across Stanford Road to a junction box that then routes the runoff south across Horsetooth Road where it is ultimately discharged into Warren Lake. The 100-year event has historically overtopped Horsetooth Road and overland flowed south to Warren Lake. There are two on-grade inlets at the northwest corner of the intersection of Horsetooth Road and Stanford Road that collects additional flows. These additional flows are then routed to the existing 30”x36” HERCP pipes crossing Stanford Road. 2. A historic rational calculation was performed for the 2.50 acres that will be getting disturbed during the construction of the Stanford Senior Living project. According the FCSCM Chapter 6 developments are only responsible for detaining any newly installed impervious areas. Since the parking lot is existing, and downstream of the new development, the Stanford Senior Living project will not be detaining or treating any runoff that has historically drained to the custom inlet at the southeast corner of the parking lot. Additionally, the Stanford Senior Living project is maintaining the existing drainage patterns within Stanford Road and Monroe Drive. Therefore, no runoff generated on the adjacent streets will be routed through the proposed detention and water quality facility. 3. Following FCSCM requirements for rational calculations the 10-year runoff generated by the existing 2.50 acres is 2.23 cfs. Therefore, Stanford Senior Living can have a max release rate of 2.23 cfs. Traditionally, Fort Collins requires the 2-year event dictate the max release rate but since there is a historic agreement in place with Warren Lake Company to detain all runoff from Strachan Subdivision Third Filing this new development can release at a higher release rate than current FCSCM requirements. By releasing at the historic 10-year event it ensures that downstream infrastructure is not adversely impacted while also allowing the developers to use their agreement with Warren Lake Company to some extent. See Section IV.A.4 below for a more detailed description of the project’s proposed drainage patterns. 4. No offsite drainage is being routed through the property. 5. Please refer to the Appendix for additional information about the existing conditions. Stanford Senior Living Final Drainage Report 6 III. DRAINAGE DESIGN CRITERIA A. Regulations There are optional provisions outside of the FCSCM proposed with the Stanford Senior Living project. Stanford Senior Living project will be detaining the difference between the historic 10-year event and proposed 100-year event. This deviates from the standard historic 2-year and proposed 100-year difference for detention requirements set forth in the FCSCM. B. Four Step Process The overall stormwater management strategy employed with Stanford Senior Living project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low-Impact Development (LID) strategies including: Providing vegetated open areas along the north, south, east and west portion of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing runoff through the drain rock within the underground detention facility to increase time of concentration, promote infiltration, and provides water quality via the isolator rows. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff and provide the necessary BMPs required for water quality. All runoff that is captured on site will be routed through isolator rows within Stormtech chambers. The isolator rows will remove sediment and other pollutants through filtration. Step 3 – Stabilize Drainageways As stated in Section I.B.4, above, there are no major drainageways in or near the subject site. While this step may not seem applicable to Stanford Senior Living, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Once again, site selection has a positive effect on stream stabilization. By detaining the difference between the 10-year and 100-year events there will be less stress on the downstream infrastructure. Combining detention with LID reduces the likelihood of bed and bank erosion within Warren Lake. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments and is not necessarily applicable for this project. However, a localized trash collection system that is stored externally to the building and in a sump condition will reduce the potential impacts of garbage making its way downstream. Stanford Senior Living Final Drainage Report 7 C. Development Criteria Reference and Constraints 1. There are existing drainage studies for this area. They were completed as part of the Strachan Continental Subdivision as well as the J.F.K Office P.U.D. These reports can be found in the Appendix and serve as the basis for the 10-year release rate. Only the pertinent information was pulled from these reports and highlighted. For the complete reports please refer to the Fort Collins erecords website. 2. The subject property is an "in-fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during this analysis that will impact the proposed drainage system including: Existing elevations along the northern and eastern right-of-ways make it difficult to capture all the flow along these edges. However, it should be noted that the areas that are freely discharging to either Monroe Drive or Stanford Road are associated with the vegetated parkways. Therefore, runoff impacts are minor, and it still maintains the historic conveyance path for these areas. As previously mentioned, overall drainage patterns within the Master Drainage Plan for Strachan Continental Subdivision will be maintained. The conveyance path that runoff is using is the same as it historically has been. There are issues with the Strachan Continental master plan as it is no longer compliant with Fort Collins codes and standards. However, at the time of this report there are no known issues with this existing master drainage plan. The city has not identified the intersection of Horsetooth Road and Stanford Road as a problem intersection and there are currently no future plans to revitalize this intersection. However, the Stanford Senior Living Center is proposing detaining and treating 2.50 acres of runoff in order to help alleviate some of the downstream infrastructure. For additional information on detention and water quality please see Section IV.B of this report. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for detention requirements, is the 10-year recurrence interval. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to the custom inlet at the southeast corner of the existing parking lot. From there, the runoff is routed via a Stanford Senior Living Final Drainage Report 8 series of elliptical pipes to Warren Lake where it has been historically detained and treated for water quality. 2. All drainage facilities proposed with the Stanford Senior Living project are designed in accordance with criteria outlined in the FCSCM and/or the Mile High Flood Control District’s Urban Storm Drainage Criteria Manual. 3. As stated in Section I.C.1, above, the subject property is not located within any regulatory floodplain. 4. Stanford Senior Living project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year or City floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed Stanford Senior Living development is requesting a modification at this time. As previously stated, the original Strachan Thrid Filing included this area as part of the agreement with Warren Lake Company to detain and provide water quality treatment for developed stormwater runoff. However, to meet current FCSCM requirements Stanford Senior Living can no longer allow the 100-year event to overtop Horsetooth Road. Therefore, to meet current FCSCM criteria while also utilizing the Warren Lake agreement to the fullest extent possible Stanford Senior Living will be detaining the difference between the historic 10-year event and proposed 100-year event. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of Stanford Senior Living drainage design are to improve the surrounding stormwater infrastructure while also maintaining historic drainage patterns. 2. As previously mentioned, there are no off-site flows draining onto the existing property. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The Stanford Senior Living project is composed of nine major drainage basins, designated as Basins A, B, C, D, E, F, G, H, and OS. The drainage patterns for each major basin are further described below. Basin H has 12 minor drainage basins associated with the breakdown of the roofline. Basin A Basin A represents the area in the northwest corner of the site. It consists of a small portion of concrete walk and patio but most of the area is landscaping. Runoff from this basin will enter the storm sewer and be conveyed to the Stormtech chambers. Stanford Senior Living Final Drainage Report 9 Basin B Basin B encompasses a small area near the trash enclosure. Runoff generated in Basin B will enter the storm sewer system via an area inlet and be conveyed to the Stormtech chambers. Basin C Basin C is associated with the memory care garden near the northeast corner of the site. Runoff in Basin C will be collected via area inlets and be routed via storm sewer to the Stormtech chambers. Basin D Basin D consists of a small amount of concrete walk and the rest being landscaping with a swale conveying stormwater runoff to an area drain near the drive entrance of the site. Runoff from Basin D will be conveyed to the Stormtech chambers via a storm sewer. Basin E Basin E is associated with the area in front of the building. This area consists of concrete walks, asphalt drive aisles, and landscaped islands. Runoff from Basin E is collected via a series of area drains. Once runoff is collected in the area drains the runoff is routed to the Stormtech chambers via the storm sewer. Basin F Basin F is associated with the drive entrance that will flow east and be captured by an on-grade inlet. Runoff will then be routed to the Stormtech chambers via the storm sewer. Basin G Basin G is a swath of land along southwest boundary near the Marriot Hotel. Runoff generated in Basin G will flow along the property line in a landscape swale and then be routed to an area inlet that is located at the entrance to the garage. From there the runoff will be conveyed via the storm sewer to the Stormtech chambers. Basin H (Basins H1-H12) Basin H encompasses the entire building and consists of 12 minor basins. Runoff from Basins H1-H11 will be collected in roof leaders and conveyed to the Stormtech chambers via the storm sewer. There is also an internal courtyard (Basin H12) in the center of the building which will generate a small amount of runoff. Runoff from the courtyard will be collected by area drains which will then be conveyed via storm sewer that runs through the building and connects to the external storm sewer that runs adjacent to the building. All runoff from Basin H will be routed to the Stormtech chambers. Stanford Senior Living Final Drainage Report 10 Basin OS Basin OS is a small amount of landscaping and concrete area that cannot be captured on site because of topographic constraints. Runoff from Basin OS (0.48 cfs) sheet flows north offsite to Monroe Drive where it then flows east towards Stanford Road. Once in Stanford Road it flows south to the inlet at the northwest corner of the Horsetooth Road and Stanford Road intersection. Because Basin OS is releasing undetained, the Stanford Senior Living project will include the undetained flow as part of the allowable release rate, and thus will throttle the release from the Stormtech chambers. By reducing the overall release rate by the undetained flows from Basin OS (0.48 cfs), that ensures that Stanford Senior Living is in fact releasing no more than the historic 10-yr release rate of 2.23 cfs and all downstream infrastructure is not adversely impacted. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. The release rate for the proposed development was established by calculating the 10- year historic runoff rate of the area proposed for development minus the 100-year developed flow from Basin OS as previously discussed. As mentioned in section III.G this is a modification to the FCSCM. By utilizing a reduced historic 10-year peak runoff the Stanford Senior Living project will maintain downstream infrastructure while also utilizing their agreement with Warren Lake Company to detain this site’s runoff. 2. The Stanford Senior Living project area will no longer be contributing to the spill that overtops Horsetooth Road during the major event because the project is detaining the difference between the historic 10-year and developed 100-year runoff. 3. These release rates were utilized in the FAA method for design of the pond. (Refer to Appendix B for these calculations). 4. Detention Pond Calculations Pond Calculations were completed for the underground pond, based on the proposed land use characteristics of Basins A, B, C, D, E, F, G, and H with a release rate of 1.75 cfs, indicates a detention volume of 19,271 cu. ft. The 1.75 cfs was calculated by taking the historic 10-yr runoff rate of 2.23 cfs and subtracting Basin OS 100-yr runoff rate of 0.48 (2.23-0.48=1.75 cfs). Based on Stormtech specifications in order to achieve 19,271 cu. ft. of detention it will require 103 MC-3500 chambers. However, based on the Stormtech system layout Stanford Senior Living will be providing 20,002 cu. ft. of detention. 5. Water Quality Pond Calculations Pond The Stanford Senior Living project will be providing 100% of their water quality capture volume in the form of isolator rows within the Stormtech system. Isolator rows qualify as a BMP measure and therefore 100% of the water quality capture volume will be provided in the form of low impact development (LID). Isolator rows Stanford Senior Living Final Drainage Report 11 are designed to retain sediment and filter out the first flush of any storm event. At the end of each isolator row is a Nyloplast Basin that allows for routine and easy maintenance so that the entire system can be maintained for its design life. Basin OS (0.15 acres) cannot be captured but water quality is still be provided for in Warren Lake per the offsite detention/water quality agreement with the Warren Lake Company, as it historically has been. Following FCSCM requirements yields a WQCV of 2,272 cu. ft. Utilizing available chamber sizing and infiltration data provided by Stormtech requires 18 additional MC-3500 chambers to meet the required WQCV. 6. Pond Summary Pond The Stanford Senior Living project will be utilizing 121 MC-3500 Stormtech chambers to fulfill their stormwater detention and treatment requirements. Stanford Senior Living will be providing 100% WQCV using LID measures. Required Detention (cu. ft.) Provided Detention (cu. ft.) Required WQCV (cu. ft.) Provided WQCV (cu. ft.) Required Total Volume (cu. ft.) Provided Volume (cu. ft.) 19,271 20,002 2,272 2,275 21,543 22,277 Table 1 - Pond Summary MC-3500 Chamber Counts Detention WQCV Total 103 18 121 Table 2 - Chamber Count Summary V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with Stanford Senior Living project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with Stanford Senior Living project complies with the City of Fort Collins’ Master Drainage Plan for the Foothills Basin. 3. The drainage design proposed with Stanford Senior Living project complies with the Master Drainage Plan for Strachan Continental Subdivision. 4. There are no regulatory floodplains associated with the Stanford Senior Living development. 5. The drainage plan and stormwater management measures proposed with the Stanford Senior Living development are compliant with all applicable State and Federal regulations governing stormwater discharge. Stanford Senior Living Final Drainage Report 12 B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. The drainage design proposed with this project will be utilizing the agreement with the Warren Lake Company to some extent. 2. The Stanford Senior Living project will detain the difference between the historic 10- year event and the developed 100-year event. 3. The Stanford Senior Living project will be providing 100% WQCV using an LID measure. Stanford Senior Living Final Drainage Report 13 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 159, 2018, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. 6. Final Drainage Report For J.F.K Office P.U.D, January 9, 1995, Vaught-Frye Architects 7. Strachan Continental Subdivision Storm Drainage Report, July 3, 1981, James H. Stewart & Associates, INC APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE1: Percentage Impervious 2-yr Runoff Coefficient 10-yr Runoff Coefficient 100-yr Runoff Coefficient Developed Asphalt .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 0.95 1.00 Concrete .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 0.95 1.00 Rooftop .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………90%0.95 0.95 1.00 Gravel .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 0.50 0.63 Pavers .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 0.50 0.63 Landscape or Pervious Surface Playgrounds .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………25%0.35 0.35 0.44 Lawns Clayey Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.25 0.25 0.31 Lawns Sandy Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.15 0.15 0.19 Notes: Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Rooftop (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Playgrounds (ac) Area of Lawns (ac) Composite % Imperv. 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient H 2.50 0.00 0.00 0.00 0.00 0.00 0.00 2.50 2%25%25%31% HISTORIC BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2) Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Chapter 3. Table 3.2-1 and 3.2-2 1) Percentage impervious taken from the Fort Collins Stormwater Criteria Manual, Chapter 5, Table 4.1-2 and Table 4.1-3 Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Total Time of Concentration : T c is the lesser of the values of Tc calculated using T c = T i + T t C2 C100 Length, L (ft) Slope, S (%) Ti2 Ti100 Length, L (ft) Slope, S (%) Roughness Coefficient Assumed Hydraulic Radius Velocity, V (ft/s) Tt (min)Tc (Eq. 3.3-5) Tc2 = Ti +Tt Tc100 = Ti +Tt Tc2 Tc100 h H 0.25 0.31 310 2.75%20.0 18.6 0 N/A N/A N/A N/A N/A 11.7 20.0 18.6 11.7 11.7 HISTORIC TIME OF CONCENTRATION Channelized Flow Design Point Basin Overland Flow Time of Concentration Frequency Adjustment Factor: (Equation 3.3-2 FCSCM) (Equation 5-5 FCSCM) (Equation 5-4 FCSCM) (Equation 3.3-5 FCSCM) Table 3.2-3 FCSCM Therefore Tc2=Tc10 Rational Method Equation: Rainfall Intensity: h H 2.50 11.7 11.7 0.25 0.31 2.09 3.57 7.29 1.31 2.23 5.65 Tc100 (min) Intensity, i2 (in/hr) Intensity, i100 (in/hr) HISTORIC RUNOFF COMPUTATIONS Design Point Basin(s)Area, A (acres) Tc2 (min) Flow, Q2 (cfs) Flow, Q100 (cfs) C2 C100 IDF Table for Rational Method - Table 3.4-1 FCSCM Intensity, i10 (in/hr) Flow, Q10 (cfs) AiCCQf BASIN TOTAL AREA (acres) Tc2 (min) Tc100 (min) C2 C100 Q2 (cfs) Q10 (cfs) Q100 (cfs) H 2.50 11.7 11.7 0.25 0.31 1.31 2.23 5.65 Rational Flow Summary | Historic Basin Flow Rates 6/8/202110:28 AM P:\1530-002\Drainage\Hydrology\1530-002_Historical Rational Calcs (FCSCM).xlsx\Summary Tables CHARACTER OF SURFACE1: Percentage Impervious 2-yr Runoff Coefficient 10-yr Runoff Coefficient 100-yr Runoff Coefficient Developed Asphalt .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 0.95 1.00 Concrete .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 0.95 1.00 Rooftop .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………90%0.95 0.95 1.00 Gravel .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 0.50 0.63 Pavers .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 0.50 0.63 Landscape or Pervious Surface Playgrounds .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………25%0.35 0.35 0.44 Lawns Clayey Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.25 0.25 0.31 Lawns Sandy Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.15 0.15 0.19 Notes: Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Rooftop (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Playgrounds (ac) Area of Lawns (ac) Composite % Imperv. 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient A 0.12 0.00 0.02 0.00 0.00 0.00 0.00 0.11 17% 0.36 0.36 0.42 B 0.05 0.00 0.04 0.00 0.00 0.00 0.00 0.01 82% 0.82 0.82 0.87 C 0.09 0.00 0.09 0.00 0.00 0.00 0.00 0.00 100% 0.95 0.95 1.00 D 0.41 0.00 0.07 0.00 0.00 0.00 0.00 0.34 19% 0.37 0.37 0.43 E 0.27 0.21 0.02 0.00 0.00 0.00 0.00 0.05 84% 0.83 0.83 0.88 F 0.05 0.03 0.01 0.00 0.00 0.00 0.00 0.01 79% 0.80 0.80 0.85 G 0.19 0.03 0.02 0.00 0.00 0.00 0.00 0.15 26% 0.42 0.42 0.48 H1 0.05 0.00 0.00 0.05 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H2 0.11 0.00 0.00 0.11 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H3 0.05 0.00 0.00 0.05 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H4 0.11 0.00 0.00 0.11 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H5 0.05 0.00 0.00 0.05 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H6 0.04 0.00 0.00 0.04 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H7 0.04 0.00 0.00 0.04 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H8 0.06 0.00 0.00 0.06 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H9 0.19 0.00 0.00 0.19 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H10 0.19 0.00 0.00 0.19 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H11 0.09 0.00 0.00 0.09 0.00 0.00 0.00 0.00 90% 0.95 0.95 1.00 H12 0.16 0.00 0.15 0.00 0.00 0.00 0.00 0.02 90% 0.88 0.88 0.93 OS 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.14 5% 0.27 0.27 0.33 Basins A-OS 2.50 0.27 0.42 0.99 0.00 0.00 0.00 0.82 64% 0.72 0.72 0.77 DEVELOPED BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2) Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Chapter 3. Table 3.2-1 and 3.2-2 1) Percentage impervious taken from the Fort Collins Stormwater Criteria Manual, Chapter 5, Table 4.1-2 and Table 4.1-3 Combined Basins Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Total Time of Concentration : T c is the lesser of the values of Tc calculated using T c = T i + T t C2 C100 Length, L (ft) Slope, S (%) Ti2 Ti100 Length, L (ft) Slope, S (%) Roughness Coefficient Assumed Hydraulic Radius Velocity, V (ft/s) Tt (min)Tc (Eq. 3.3-5) Tc2 = Ti +Tt Tc100 = Ti +Tt Tc2 Tc100 a A 0.36 0.42 50 11.00%4.4 4.0 0 N/A N/A N/A N/A N/A 10.3 4.4 4.0 5.0 5.0 b B 0.82 0.87 25 5.20%1.5 1.2 0 N/A N/A N/A N/A N/A 10.1 1.5 1.2 5.0 5.0 c C 0.95 1.00 30 4.00%1.0 0.6 0 N/A N/A N/A N/A N/A 10.2 1.0 0.6 5.0 5.0 d D 0.37 0.43 20 15.00%2.5 2.3 260 2.23%0.025 0.45 5.23 0.8 11.6 3.3 3.1 5.0 5.0 e E 0.83 0.88 37 4.76%1.8 1.5 19 0.50%0.013 0.15 2.29 0.1 10.3 2.0 1.6 5.0 5.0 f F 0.80 0.85 25 2.24%2.1 1.8 35 3.43%0.013 0.15 5.99 0.1 10.3 2.2 1.9 5.0 5.0 g G 0.42 0.48 25 12.00%2.8 2.5 75 5.00%0.025 0.45 7.83 0.2 10.6 2.9 2.7 5.0 5.0 h1 H1 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h2 H2 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h3 H3 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h4 H4 0.95 1.00 20 0.67%1.4 1.0 0 N/A N/A N/A N/A N/A 10.1 1.4 1.0 5.0 5.0 h5 H5 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h6 H6 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h7 H7 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h8 H8 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h9 H9 0.95 1.00 30 0.67%1.8 1.2 0 N/A N/A N/A N/A N/A 10.2 1.8 1.2 5.0 5.0 h10 H10 0.95 1.00 30 0.67%1.8 1.2 0 N/A N/A N/A N/A N/A 10.2 1.8 1.2 5.0 5.0 h11 H11 0.95 1.00 15 0.67%1.2 0.8 0 N/A N/A N/A N/A N/A 10.1 1.2 0.8 5.0 5.0 h12 H12 0.88 0.93 25 0.67%2.3 1.8 0 N/A N/A N/A N/A N/A 10.1 2.3 1.8 5.0 5.0 os OS 0.27 0.33 10 21.00%1.8 1.7 0 N/A N/A N/A N/A N/A 10.1 1.8 1.7 5.0 5.0 Stormtech Basins A-OS 0.72 0.77 20 2.25% 2.4 2.1 15 1.20% 1.30% 15.00% 0.35 0.7 10.2 3.1 2.8 5.0 5.0 Combined Basins DEVELOPED DIRECT TIME OF CONCENTRATION Channelized Flow Design Point Basin Overland Flow Time of Concentration Frequency Adjustment Factor: (Equation 3.3-2 FCSCM) (Equation 5-5 FCSCM) (Equation 5-4 FCSCM) (Equation 3.3-5 FCSCM) Table 3.2-3 FCSCM Therefore Tc2=Tc10 Rational Method Equation: Rainfall Intensity: a A 0.12 5.0 5.0 0.36 0.42 2.85 4.87 9.95 0.13 0.22 0.52 b B 0.05 5.0 5.0 0.82 0.87 2.85 2.85 9.95 0.12 0.12 0.46 c C 0.09 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.24 0.24 0.90 d D 0.41 5.0 5.0 0.37 0.43 2.85 2.85 9.95 0.43 0.43 1.76 e E 0.27 5.0 5.0 0.83 0.88 2.85 2.85 9.95 0.65 0.65 2.40 f F 0.05 5.0 5.0 0.80 0.85 2.85 2.85 9.95 0.11 0.11 0.43 g G 0.19 5.0 5.0 0.42 0.48 2.85 2.85 9.95 0.23 0.23 0.93 h1 H1 0.05 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.14 0.14 0.51 h2 H2 0.11 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.28 0.28 1.05 h3 H3 0.05 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.13 0.13 0.48 h4 H4 0.11 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.29 0.29 1.08 h5 H5 0.05 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.14 0.14 0.50 h6 H6 0.04 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.12 0.12 0.45 h7 H7 0.04 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.12 0.12 0.44 h8 H8 0.06 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.17 0.17 0.61 h9 H9 0.19 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.53 0.53 1.93 h10 H10 0.19 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.53 0.53 1.94 h11 H11 0.09 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.24 0.24 0.87 h12 H12 0.16 5.0 5.0 0.88 0.93 2.85 2.85 9.95 0.41 0.41 1.51 os OS 0.15 5.0 5.0 0.27 0.33 2.85 2.85 9.95 0.11 0.11 0.48 Stormtech Basins A-OS 2.50 5.0 5.0 0.72 0.77 2.85 2.85 9.95 5.13 5.49 19.17 Combined Basins Tc100 (min) Intensity, i2 (in/hr) Intensity, i100 (in/hr) DEVELOPED RUNOFF COMPUTATIONS Design Point Basin(s)Area, A (acres) Tc2 (min) Flow, Q2 (cfs) Flow, Q100 (cfs) C2 C100 IDF Table for Rational Method - Table 3.4-1 FCSCM Intensity, i10 (in/hr) Flow, Q10 (cfs) ()()()AiCCQf= BASIN TOTAL AREA (acres) Tc2 (min) Tc100 (min) C2 C100 Q2 (cfs) Q100 (cfs) A 0.12 5.0 5.0 0.36 0.42 0.13 0.52 B 0.05 5.0 5.0 0.82 0.87 0.12 0.46 C 0.09 5.0 5.0 0.95 1.00 0.24 0.90 D 0.41 5.0 5.0 0.37 0.43 0.43 1.76 E 0.27 5.0 5.0 0.83 0.88 0.65 2.40 F 0.05 5.0 5.0 0.80 0.85 0.11 0.43 G 0.19 5.0 5.0 0.42 0.48 0.23 0.93 H1 0.05 5.0 5.0 0.95 1.00 0.14 0.51 H2 0.11 5.0 5.0 0.95 1.00 0.28 1.05 H3 0.05 5.0 5.0 0.95 1.00 0.13 0.48 H4 0.11 5.0 5.0 0.95 1.00 0.29 1.08 H5 0.05 5.0 5.0 0.95 1.00 0.14 0.50 H6 0.04 5.0 5.0 0.95 1.00 0.12 0.45 H7 0.04 5.0 5.0 0.95 1.00 0.12 0.44 H8 0.06 5.0 5.0 0.95 1.00 0.17 0.61 H9 0.19 5.0 5.0 0.95 1.00 0.53 1.93 H10 0.19 5.0 5.0 0.95 1.00 0.53 1.94 H11 0.09 5.0 5.0 0.95 1.00 0.24 0.87 H12 0.16 5.0 5.0 0.88 0.93 0.41 1.51 OS 0.15 5.0 5.0 0.27 0.33 0.11 0.48 Basins A-OS 2.50 5.0 5.0 0.72 0.77 5.13 19.17 Rational Flow Summary | Developed Basin Flow Rates Combined Basins 5/31/20222:11 PM P:\1530-002\Drainage\Hydrology\1530-002_Proposed Rational Calcs (FCSCM).xlsx\Summary Tables APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Inlets B.3 – Detention Facilities APPENDIX B.1 STORM SEWERS STORM LINE A - OUTFALL STORM LINE A