Loading...
HomeMy WebLinkAboutMIRAMONT TENNIS AND FITNESS CENTER PUD - PRELIMINARY - 54-87K - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSSTAFF REPORT PROJECT: Miramont Tennis and Fitness Center, Preliminary P.U.D., #54-87K APPLICANT: Mr. Clifford Buchholz c/o Vaught - Frye Architects 1113 Stoney Hill Drive Fort Collins, CO 80525 OWNER: G.T. Land Colorado, Inc. 3555 Stanford Road Fort Collins, CO 80525 PROJECT DESCRIPTION: This is a Preliminary P.U.D. fitness club, with indoor tennis four outdoor tennis courts and 7.27 acres and is located so Boardwalk Drive and Lemay Ave Planned Residential. RECOMMENDATION: Approval EXECUTIVE SUMMARY: request for a 30,450 square foot courts. The request also includes one volley ball court. The site is uth of Oak Ridge Drive, between nue. The property is zoned R-P, The request for business service use on Tract Q of the Oak - Cottonwood Farm complies with the approved Overall Development Plan. The project exceeds the minimum score on the Business Service Uses Point Chart and satisfies the All Development Criteria of the L.D.G.S. There are two distinct architectural design concepts for the indoor tennis structure associated with this Preliminary P.U.D. A condition of approval is recommended allowing public comment on the selected design at the time of Final. The project is feasible from a traffic engineering standpoint. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT • Miramont PUD, Tennis & Fitness Center - Preliminary, #54-87K November 15, 1993 P & Z Meeting Page 2 COMMENTS 1. Background• The surrounding zoning and land uses are as follows: N: R-P; Existing retail (Builders Square) S: R-P; Vacant (Tract Q, "Business Service"/"Multi-Family" Oak - Cottonwood Farm O.D.P.) E: R-P; Church and Vacant ("Business Service" OakRidge West O.D.P.) W: R-P; Vacant (Tract Q, Oak -Cottonwood Farm O.D.P.) Oak -Cottonwood Farm is a 272 acre O.D.P. which was originally approved in 1987, and subsequently amended on two occasions. Existing uses within the O.D.P. are a community regional shopping center (Harmony Market) and a single family residential project (Miramont). 2. Land Use• The 7.27 acres are located on Tract Q of the Oak -Cottonwood Farm O.D.P. This parcel is designated as "Business Services and/or Multi -Family Residential." The L.D.G.S. includes health clubs and membership clubs as activities which are considered Business Service Uses. The request, therefore, complies with the approved Oak -Cottonwood Farm O.D.P. As a business service use, the project was evaluated by the Business Service Uses Point Chart of the L.D.G.S. The Preliminary P.U.D. satisfies the absolute requirement that the project does not gain its vehicular primary access from College Avenue. The Preliminary P.U.D. scores 60% on the Point Chart which exceeds the required minimum score of 50%. Points were awarded for being located outside the South College Avenue Corridor, for being on at least two acres, for having direct vehicular and pedestrian connections to adjacent properties, and for being contiguous to existing urban development. Consequently, the request for fitness club and indoor/outdoor tennis courts is appropriate at this particular location. 3. Neighborhood Compatibility: A neighborhood meeting was held on September 22, 1993. The primary issue at the meeting was the type of exterior materials and the height of the indoor tennis court structure. Miramont PUD, Tennis & Fitness Center - Preliminary, #54-87K November 15, 1993 P & Z Meeting Page 3 At the time of the neighborhood information meeting, the proposed indoor tennis court structure was 47 feet at the highest point. The material was advertised to be a durable fabric, similar to polyvinyl chloride (PVC), that would be stretched over and secured to an aluminum frame. The color of the material had not been selected but discussions centered around white, earthtones, and green. Subsequently, fabric over frame structure has been abandoned. In its place are two different concepts, both of which are less than 40 feet. A full discussions of these two concepts is reserved for the following section. Staff believes that the overall intent of the P.U.D., a fitness club with indoor/outdoor tennis courts, is compatible with the surrounding area. Based on input from those attending the neighborhood meeting, the only substantial issue is the design of the indoor tennis court structure. In order to allow a Preliminary P.U.D. consideration of land use, layout, and design, Staff feels comfortable with the project proceeding to the Final stage, subject to the following condition: At the time of consideration of the Final P.U.D., a second neighborhood meeting shall be held to describe to the affected property owners the final design selection of the indoor tennis court facility and to receive input based on this final design. 4. Indoor Tennis Court Structure: Two Design Options: The applicant is requesting that the Planning and Zoning Board consider two options for the indoor tennis court structure. The reason for seeking approval of two options is that the final design has not yet been selected due to ongoing investigations regarding costs, wind load, snow load, aesthetics, and compliance with the Uniform Building Code and Poudre Fire Code. Approval of these two options at the Preliminary stage would allow time for further analysis and, when selected, the final design would not come as a surprise to the Planning and Zoning Board. The two options are as follows: A. Air Supported Structure This option uses an air supported fabric structure. While no such example of this type of construction exists in Fort Collins, these structures are often found in mountain resort communities. One example that may be familiar is located on the west side of I-25, Miramont PUD, Tennis & Fitness Center - Preliminary, ##54-87K November 15, 1993 P & Z Meeting Page 4 just south of 120th Avenue, in Westminster. The P.U.D. proposes that this option would have a color combination of green on the lower level and white on the upper half. This structure has a rounded shape. Anticpated height is approximately 39 feet at the peak. This option represents a non-traditional look and closely approximates the fabric over aluminum frame option that was presented at the neighborhood meeting. B. Permanent Structure This option uses two materials. On the lower portion, for a height of approximately 12 feet, the building would be constructed of concrete block, in a color to match the fitness club. The balance, approximately 26 feet, would be prefinished metal panels. The roof would be standing seam metal with fascia, also constructucted of pre -finished metal panels, with skylights. The roof is pitched on the east and west sides. This option represents a look that is more familiar and recognizable and yet appears slighty bulkier with more mass. Staff supports the option of allowing the two designs to be fully investigated prior to final selection. The Preliminary P.U.D. allows the architect the flexibility to construct models and design the landscaping and buffering elements appropriately. With the aforementioned condition of bringing the final option back to the affected property owners, Staff believes the process of allowing citizen input remains valid. 5. Other Desian Considerations: The site is being planned for two phases. Areas for future expansion of both the fitness club and indoor tennis courts are set aside. There are no immediate plans to build in these areas. Landscaping and buffering surrounds the site but there is an emphasis on the easterly property line. This is the sensitive side given the visibility from Lemay Avenue. Parking, circulation, and drives are designed to tie into the expansion for Evangelical Church and align with the future new curb cut anticpated with the Builders Square expansion. Berming and street trees along OakRidge Drive will continue the attractive streetscaping established by Harmony Market P.U.D. 0 • Miramont PUD, Tennis & Fitness Center - Preliminary, #54-87K November 15, 1993 P & Z Meeting Page 5 6. Transportation: A traffic study was performed to analyze the impacts associated with the fitness and tennis club. The study indicates that the traffic generated by the club can be accommodated on the area streets. In the short range future (1997) with the fitness and tennis center, the key intersections generally operate acceptably. In the long range, key intersections will continue to operate acceptably. It is expected that Harmony Road will have six lanes by/after the year 2010. A single lane in each direction, with a continuous two-way left -turn lane is recommended for OakRidge Drive between Lemay Avenue and Boardwalk Drive. RECOMMENDATION: Staff finds that the request for a fitness and tennis club, with indoor and outdoor courts, is defined as business service use and, therefore, complies with the Oak -Cottonwood Farm O.D.P. The Preliminary P.U.D. scores 60% on the Business Service Uses Point Chart and satisfies the All Development Criteria of the L.D.G.S. The request for Preliminary P.U.D. approval of two architectural design concepts is appropriate to allow further feasibility studies. Staff, therefore, recommends approval of Miramont Tennis and Fitness Center, Preliminary P.U.D., #54-87K, subject to the following condition: 1. At the time of consideration for Final P.U.D., the architectural concept for the indoor tennis structure shall be reviewed with the affected property owners for review and comment. 0 • �o. Sroutmon P k , o Y ♦ Westshore �� Ct. 8re 1yyob0r �I dot eye �. r�z cS�� wo/k a .c \ Dr. Shot o° Song Cove Revere C t Pavilion Lr: i Q _ Wa o Wheatcn L 1 1 t5 t v U CD n �U) ' cn X a board Ln. u � ' Irp HARMONY ROAD Z 7 Nicklaus ' Q LU Y t. of Gr Q < a i \ 7 m 00kr' 1 t O O C Rule Dr. C San reed z. n. �airway Ln. e 60 � •Live Red m ckwa Sawto_,th White OaK 0 �. : ■ Spanish OaM CL 1 U $ v �_ ■ u L Dr G — Twinberry Oak Leaf ITEM:MIRAMONT PUD - Preliminary�� Tennis &Fitness Center Noah NUMBER: 54-87K BUILDERS SQ.ARE I I e e e e ,I UNDEVELOPED - I I_______---- -in a _ I I I STEELE 5 EVANG€LICA� j COVENANT j' cuuRcu is SCJ i - ------------ Y 7yy7 1$ i 6 3 t-- -NDEVELOPED I I f 20' DRAINAGE EASEMENT UNDEVELOPED FUTURE BILE DRIVE CONNECTION R ! LAND USE BREAKDOWN � w I mI Q PLANNING AND ZONR4G ! BOARD APPROVAL GENERAL NOTES ATTORNEV'S OWNER'S CERTIFICATION — _ ACCHT FRYE MIRAMONT TENNIS _�..� & FITNESS CENTER PRELAWARV ABBREVIATIONS E M n e e, FORT COLLINS, COLORADO WE PLAN 0 • \\ STEELE'S BUILDER'S SQUARE II m=-- I II `� _ w—�-- rc UNDE /E�OPED� Lm�n __J UNDEVELOPED 1 tg UNDEVELOPED 33� uaM°"° von. rEo um� .uoee sn.en�a W Z a a w I I I I I I I I T 9TFBOL LECaET1D VAUG MIRAMONT TENNIS & FITNESS CENTER -- ------ rn FORT COLLINS, COLORADO �IP e.w.uw PLAN FUTURE RULE DRIVE CONVECTION Q 'U��, � i �lp@ urbon deign, inc. ,uwo n� aiessz ^w �°� PROJECT NO. '818 SCAIE: .50. • 0 All t - NORTH ELEVATIONm EAST ELEVATION VAT ?i MIRAMONT TENNIS M r & FITNESS CENTER ELEVATIONS FORT COLLINS, COLORADO 9 • ® ® r 77 T- FLEE LIEST ELEVATION IF SOUTH ELEVATION VFRYET MIRAMONT TENNIS & FITNESS CENTER FORT COLLINS, COLORADO J 0 0 0 PLANNING OBJECTIVES MIRAMONT TENNIS AND FITNESS CENTER Miramont Tennis and Fitness Center is located on a 7.27 acre parcel on Oakridge Drive, just south of the existing Harmony Market Shopping Center. The Center contains indoor fitness facilities, both indoor and outdoor tennis courts, and several outdoor amenities, including a sand volleyball court, recreational pool, wading pool, and children's play area. A primary goal of the center is to provide services to family oriented membership. Currently, no facility of this type exists in the southeast Fort Collins area. A need has been established to serve the residents of the surrounding neighborhoods. A secondary goal of the Center is to provide tennis facilities for the growing membership of the existing Fort Collins Indoor Tennis Center. The Fitness building will contain space for free weights, cardiovascular, selectomatic equipment, aerobics, child care, and other indoor amenities. An interior connection leads to the indoor tennis building, an aluminum rigid frame structure, with PVC coated polyester skin. All perimeter areas will be fenced with colored chain link. A decorative wood fence encloses the patio, pool, and volleyball areas. Pedestrian access is gained from a 5' sidewalk along Oakridge Drive. A circular drive for drop-off/loading is located at the front entrance. Seven handicap accessible ramped spaces have been provided, along with bicycle and motorcycle parking, also located at the front of the building. The parking lot will contain pole - mounted lighting for security. All exterior lights will be cut-off to reduce glare and will not exceed 30' in height. In addition, potential access to Rule Drive is indicated. A 40' wide landscape/buffer strip along Oakridge Drive will have berms and planting material similar to that of surrounding development. Tr✓nn I'-s men ter P'I /�_Ah9oivi_7r�'Nnr Is t �'� i �l �s's CEi�iTER PREL//'�1, ALL DEVELOPMENT; NUMBERED CRITERIA CHART ALL CRITERIA APPLICABLE CRITERIA ONLY - CRITERION IS Ine Criterion pDOhCcole, wdd the pderion be sah5hed° If no, please explain Yes No NEIGHBORHOOD COMPATABILITY 1. Social Comool0blity V 2 Neighborhood Character 3. Land Use Conflicts V. G Adverse Traffic Impact ✓ PLANS AND POLICIES 5 Comorenensive Plan ✓ PUBLIC FACILITIES & SAFETY 6 Street Cacacity ✓ 7 Utility Caoocity ,/ t/ 8 Design Standards t/ o Emeraency Access 10 Security L;ghhng 11 :eater Hazoras ✓ RESOURCE PROTECTION 12. Sods & Slooe Hazard V/ 13 Significant Vegetation 14 'v^Jildiife Haoitat 15. Historical Landmark 16 Mineral Deoosit 17 Eco-Sensitive Areas v 18 Agricultural Lands ENVIRONMENTAL STANDARDS 19 Air Quality 20 Water Quality 21 Noise v/ 22 Glare & Heat 23 Vibrations 24, Exterior Lignnng 25 Sewages & Wastes ✓ v' SITE DESIGN 26 Community Organization v 27 Site Organization V/ ✓ 28 Natural Features t/ / 29. Energy Conservation 30. Snodows 31. Solar Access V/ ✓ 32 Privacy 33 Open Space Arrangement 34 Building Height ✓ 35 Vehicular Movement ✓ 36. Venicular Design 37. Parking ✓ ,/ 38. Active Recreational Areas V/ 39 Private Outdoor Areas / 40. Pedestrian Convenience j 41. Pedestrian Conflicts `," 42. Lcnascaptng/Open Areas 43. Lana scaping/Buildings �! 44 Landscaping/Screening ✓ 45. Public Access 46. Signs nlcr ACTIVITY Business Service DEFINITION Uses E Those activities which are predominantly retail, office, and service uses which would not qualify as or be a part of a neighborhood or community/regional shopping center. Uses include: retail shops; offices; personal service shops; financial institutions; hotels/ motels; medical clinics; health clubs; membership clubs; standard and fast-food restaurants; hospitals; mortuaries; indoor theatres; retail laundry and dry cleaning outlets; limited indoor recreation uses; small animal veterinary clinics; printing and newspaper offices; neighborhood convenience center; and, other uses which are of the same general character. CRITERIA ' Each of the following applicable criteria must be answered "yes" and implemented within the development plan. Yes No NA 1. Does the project gain its primary vehicular access LJ from a street other than South College Avenue? l._►J 2. DOES THE PROJECT EARN AT LEAST 50% OF THE MAXIMUM POINTS AS CALCULATED ON "POINT CHART E" FOR THE t FOLLOWING CRITERIA: a. Is the activity contiguous to an existing transit route (not applicable for uses of less than 25,000 sq. ft. GLA or with less than 25 employees) or located in the Central Business District? b. Is the project located outside of the "South College Avenue Corridor"? c. Is the project contiguous to and functionally a part of a neighborhood or community/regional shopping center, an office or industrial park, located in the Central Business Dis- trict or in the case of a single user, employ or will employ a total of more than 100 full-time employees during a single 8-hour shift? d. Is the project on at least two acres of land or located in the Central Business District? 22 E /"►/ comonl r 7"Eiviva t )r-7jTNESs cElvw'< 10e441r'A1"` r BUSINESS SERVICE USES POINT CHART E For All Criteria Applicable Criteria Only Criterion rre Criterion Applicable Yes No I II III IV C;rc,e me Correct Score Mumpder Points carnea zll Mcx;mum Appllconle Poinrs a. Transit Route �JXJ 2 0 2 — — b. South College Corridor X X 0 4 $ 8 c. Part of Center X X 2 3 0 6 d. Two Acres or More Ph X X 0 3 (0 6 e. Mixed -Use X X 2 0 3 Q 6 f, Joint Parking 1 U2 0 3 g. Energy Conservation A1 2 3 4 0 1 2 Q 8 h. Contiguity X X a 0 5 p 10 i. Historic Preservation 1 2 0 2 j. 1 2 0 k. 1 2 0 I. 1 1 2 0 Totals 30 So V V Percentage Earned of Maximum Applicable Points V/VI = VII % Vii • NEIGHBORHOOD INFORMATION MEETING PROJECT: Miramont Tennis and Fitness Center DATE: September 22, 1993 APPLICANT: Fort Collins Indoor Tennis Center c/o Mr. Tom Smith ARCHITECT: Joe Frye, Vaught -Frye Architects and Planners PLANNER: Ted Shepard QUESTIONS, CONCERNS, COMMENTS 1. Is the 47 foot height comparable to the "crystal cathedral" component of the office in Oak Ridge Business Park? RESPONSE: Yes, these heights are roughly comparable. By way of further comparison, Pace Warehouse is 32 feet high. 2. Does the fabric material come in any other colors beside standard white and green? RESPONSE: Yes, custom colors, such as earth tones, can be ordered but are more expensive. 3. Why is green a standard color? RESPONSE: Green is a traditional color for a tennis club. The owner desires to create a certain "club image" that separates a membership facility from a public facility. 4. Since the upper portion is transparent, will it glow in the dark like an illuminated dome? RESPONSE: No, the fabric is translucent to the degree that it allows natural light to filter in. This allows daylight to be used which saves on electricity. At night, the fabric diffuses the internal illumination so that the structure will not light up like a dome. The fabric is not transparent. 5. Will the structures be designed to match the architectural character established by Pace, Builders Square, and Steele's? RESPONSE: The final exterior materials have not been decided upon yet. Red brick accents could be used to tie into Harmony Market. There is always a question of how much compatibility is desired throughout a given area. Keep in mind that this property is not considered a part of Harmony Market shopping center and should not be held to the same compatibility standard as if it were. 0 i The owners desire a "club appearance" but it could be possible to pick up some of the colors that are used in Harmony Market. 6. Is membership open to anyone willing to pay the fee? RESPONSE: Yes, membership is considered open. 7. When do plan on opening? RESPONSE: Spring of 1995. 8. Will the indoor courts be environmentally controlled? RESPONSE: Yes, the indoor courts will be heated in the winter. There are ventilation panels and air pumps for outside air circulation in the summer. The use of swamp coolers for summer cooling is being investigated. There will be no air conditioning for summer cooling. 9. What about traffic impacts? RESPONSE: A traffic impact analysis has been prepared to look at traffic impacts in accordance with the requirements of the City's Transportation Department. This report will be available after the submittal day on September 27th. Basically, the finding of the report is that there will be two peak times associated with a tennis and fitness center. These are at noon and 5:00 p.m. The amount of traffic generated at these times can be accommodated on the present street system. This development does not trigger a signal at Lemay and Oak Ridge Drive at this time. 10. Will the outdoor courts be illuminated? RESPONSE: No. 11. Will there be tournaments or other events? RESPONSE: Yes, the club offers recreational tournaments for its membership and, once per year, offers a state -sanctioned senior tournament that draws competitors from outside the membership. 12. What other programs are offered? RESPONSE: The club offers a variety of youth programs, daycare, and other instructional programs for its members. 13. Will the pool be available for neighborhood membership? RESPONSE: Yes, there will likely be limited "pool -only" memberships available during the summer. 14. How big will the pool be? RESPONSE: The pool will be a recreational pool that provides four lanes for swimming laps. Total surface area is about 4,000 square feet. (By way of comparison, the Fort Collins Club pool is 2,400 square feet.) There will also be a wading area. 15. It seems there should be more evergreens for screening. RESPONSE: The use of deciduous trees is for parking lot screening. We can look at placing more evergreens along the east property line for additional screening. 16. What is the status of the City Neighborhood Park? RESPONSE: The City is still in the process of acquiring a Neighborhood Park on Parcel P of the Oak -Cottonwood Farm Overall Development Plan, located between Collinwood Hospital and Boardwalk Drive. 17. Will there be early morning activity? RESPONSE: Yes, the club will open at 6:00 a.m. 18. Will a sidewalk be constructed along Oak Ridge Drive? RESPONSE: Yes. 19. I am concerned about the strength of the green color. Perhaps more use of the translucent fabric or earth tones would be more appropriate for the surrounding property owners. RESPONSE: This is a good comment. We will be constructing a model so we can play around with colors and materials in a three dimensional scale. If there is an excessive amount of green that is overpowering, then it can be reduced. 20. As neighbors, we encourage the developer to construct a larger pool so that the neighborhood has a recreational amenity. 21. Will there he a fabric cover over the pool for winter use? RESPONSE: This is often seen in mountain communities and has been considered at this facility. It is likely, however, that there will not be a cover over the pool due to costs. 22. What about drainage? RESPONSE: Drainage will have to conform to the design specifications for the overall area. Since Harmony Market and Miramont have been through the review process, the drainage patterns, release rates, and detention requirements have been established. Development of this property will conform to existing 0 9 plans and meet the requirements of the City's Stormwater Utility. Basically, drainage goes to the south into detention ponds that have been sized to accept upstream developed flows. Drainage than goes east under Lemay Avenue via existing culverts. 21. Why is there so much parking (250 stalls)? RESPONSE: At ultimate build -out, the club will need 250 spaces. These spaces will be phased in over time as the club expands. There are peak times when parking is needed. The club does not want members parking on the surrounding streets. The number of spaces was arrived at based on market surveys. 22. Will there be food service? RESPONSE: Yes, there will be a health food bar and a vending area but not a full service kitchen. There is no internal restaurant serving club members. Ll MIRAMONT TENNIS AND FITNESS CENTER SITE ACCESS STUDY FORT COLLINS, COLORADO SEPTEMBER 1993 Prepared for: Vaught*Frye, Architects 1113 Stoney Hill Drive Fort Collins, CO 80525 Prepared by: MATTHEW J. DELICH, P.E. 3413 Banyan Avenue Loveland, CO 80538 Phone: 303-669-2061 i 9 I. Introduction The Miramont Tennis and Fitness Center (Tennis Center) is proposed to be developed over the next few years. The Tennis Center is located south of Oakridge Drive, approximately 700 feet west of Lemay Avenue in Fort Collins, Colorado. The site location is shown in Figure 1. "Oak/Cottonwood Farm Site Access Study," May 1992, addressed the overall traffic impacts on the adjacent streets and intersections. The Tennis Center is within the area covered by that traffic study. "Oak Ridge PUD Site Access Study," March 1989 and the "Oak Ridge, Parcel A Site Access Study," February 1993 also address the traffic impacts in this area, especially along Lemay Avenue. Since the Tennis Center has been proposed, the Evangelical Covenant Church has proposed an expansion which includes a private high school facility. This consultant has been retained to prepare the traffic study for that development. That study will follow the Tennis Center traffic study by one month. The Tennis Center traffic study will not contain reference to the church expansion due to timing of the projects. However, the traffic study for the church expansion will contain reference to the Tennis Center. Therefore, this traffic study will not contain long range traffic analysis. The traffic study for the Evangelical Covenant Church will cover the long range analysis for both the church expansion and the Tennis Center. The primary streets that will be impacted by development of the Tennis Center are: Harmony Road, Lemay Avenue, Oakridge Drive, and Boardwalk Drive. Harmony Road is classified as a major arterial on the Fort Collins Master Street Plan. The segment between Lemay Avenue and Boardwalk Drive has a four lane plus left -turn lane at appropriate intersections cross section. There is a depressed median and right -turn auxiliary lanes. There is signal control at the Harmony/Lemay and Harmony/Boardwalk intersections. Lemay Avenue is classified as an arterial street. It has a four lane plus center turn lane cross section. Approaching Harmony Road, Lemay Avenue also has right -turn lanes. Traffic on Lemay Avenue, south of Harmony Road, will grow as a function of development in the area. Oakridge Drive and Boardwalk Drive are public streets within the Oak/Cottonwood Farm development. Oakridge Drive is not classified by the City of Fort Collins, but functions as a minor collector. Oakridge Drive has stop sign control at Lemay Avenue. Boardwalk Drive is classified as a collector street. Currently, Boardwalk Drive does not extend south of Oakridge Drive. In the future, Boardwalk Drive will connect to Lemay Avenue across from Keenland Drive. 1 • u LJL ar` - Coosa- �' `_s 11L]f_. J' - • —'LJl _1L Il 1L Jt Ur11- ][ 71 1� )f 11 YY ( 1[ x )fDi —I�I pI' l r L1.' Roselwn-- \ �. •,II1 Cem Arrctnh �!� ` / �lr- fVl_ lir�LJI LAJL ',1131� ��+�n;..1C.lUL�CJfJ __If _�L�l U ��+ PM4954 I j 15rw"�, �• i � Ir"�ui- 1f J! �UL_JIl �C _ . 1 UNR R.Ity, _- f L �'� 1'7 i��p P . 17 Ji t. _ �r5u x �` ''�[<J❑�=1f� Ut- = if f _ � lU n --' Gravel Pit I , _ a L���I= _ Ij jj�I 1 JgLJLJL �---!f� Radio _.,=brave=, hJL]O ~.' Tow�rs 1. I I- 22 _� ( IMER 234 Theat —j`_ , J r--- -%. �c� 19 \ ` I LAR. l .`�� '• 1 Drakes _771 26 lilt 25 l Ome a r r ;IC,J SOBS s l n 9 _7)l'_ k - ==Vi 34 !• 35 \�` Y - 7 = 36 <99/ I •pit 1 Yx 5, r jI Me Clellands n L--�__- — IiC Il �1Y ROAD, .� • _ -ate=r;m Marmon i•_ _'`' 1503 a930 _S �__ 4p 5pcc __-- WZ MIR ON TENNIS & - FITN SS ENTER 11 W • 4916 10 - -- ll ; 1498 ! 1 7 R \ ,/ u e P2d „ Ti Ib-v ;iRO 4923 r��• •III � II' I ' _� 1 i NO SCALE SITE LOCATION Figure I 0 0 Land uses in the immediate area are commercial, residential, and vacant. Retail uses are north of the site. Office uses are/ will be located east of Lemay Avenue within OakridgP PUD. The Evangelical Covenant Church is east of the Tennis Center. Residential uses are proposed to the south of the Tennis Center. There is vacant land to the southeast of the Tennis Center. Land in the area is flat. The center of Fort Collins is north of the Oak/Cottonwood Farm. II. Existing Conditions Peak hour intersection counts were obtained in 1992 and 1993 and are shown in Figure 2. These counts are provided in Appendix A. Peak hour traffic at the Harmony/Lemay intersection was synthesized from previous counts and the 1993 counts. with the existing control and geometry at the key intersections, the peak hour operation is shown in Table 1. The operation is deemed acceptable at all intersections. Acceptable operation is defined as level of service D or better. Descriptions of level of service from the 1985 Highway Capacity Manual for signalized and unsignalized intersections are provided in Appendix B. Calculation forms for the operation shown in Table 1 are provided in Appendix C. III. Proposed Development The Tennis Center is proposed to be developed as a fitness center and tennis center. A schematic site plan is shown in Figure 3. It is proposed that there will be two driveway accesses to Oakridge Drive. The east driveway to the Tennis Center is near the land that is proposed for expansion of the Evangelical Covenant Church. Discussions are underway concerning shared use of this driveway by both parties. This traffic study reflects only the Tennis Center's use of this driveway. The traffic study for the church expansion will reflect the results of the discussions. Trip Generation Trip generation estimates for the proposed uses were obtained from Trip Generation, 5th Edition, ITE and data collected at an athletic club in Fort Collins. Table 2 shows the trip generation used for the Tennis Center. Background Traffic Background traffic is defined as the traffic that is and/or will be on the area streets but is not related to the proposed 2 0 0 1992 �h CD -145/191 � d N 568/926 /51 551 95/85 } 855//7752 — 27/132 r, c-4 Cc LO o N AM / PM N O 39/159 N — 524/1047 HARMONY + 53/111 40/129 -� } 1026/540 — 80/117 Synthesized from previous counts. Site 411k. N 1993 `D 7/73 O ' 0/3 I� jr /� 1 %-1 /4 4/1 } I 8 0 i Ln o r7 11 53� N�-q- N CO i` N } 2E w _I RECENT PEAK HOUR TRAFFIC COUNTS Figure 2 0 Table 1 1993 Peak Hour Operation Level of Service Intersection AM PM Harmony/Lemay (signal) C C Harmony/Boardwalk (signal) B B Lemay/Oakridge (stop sign) EB LT B B EB T A A EB RT A A WB LT B B WB T A A WB RT A A SB LT A A NB LT A A Table 2 Trip Generation Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out Miramont Tennis and 775 39 23 87 42 Fitness Center SITE PLAN Figure 3 development. Background traffic was projected to increase at the rate of 3 percent per year to the future year considered in this study. The site generated traffic is added to the background traffic. Traffic projections from the "Oak Ridge, Parcel A Site Access Study" were used in this traffic study. Trip Distribution Trip distribution was determined based upon an evaluation of trip productions and the most likely routes available to travel from those productions. The directional distribution of the approaching and departing traffic generated at the Tennis Center is a function of: - Geographic location within the City of Fort Collins; - Location of employment/business centers and residential uses which are likely to produce trips; - Access to the site. Figure 4 illustrates the trip distribution percentages used in the subsequent traffic assignments. Traffic Assignment and Intersection Operation Using the vehicular trip generation estimates presented in Table 2, the site generated traffic was assigned to the area street network. The analyzed intersections were Harmony/Lemay, Lemay/ Oakridge, and Boardwalk/Harmony. In the short range future, there will be low traffic volumes on Oakridge Drive. Therefore, the Oakridge Drive/Tennis Center driveway intersections were not analyzed in detail. A cursory review of the peak hour traffic volumes indicates that operation will be acceptable with stop sign control. Figure 5 shows the 1997 peak hour traffic assignment. This assignment also includes the increase in background traffic as described earlier in this report and the traffic generated by the Tennis Center. Table 3 shows the peak hour operation at the key intersections. Calculation forms are provided in Appendix D. All of the analyzed intersections will operate acceptably. It is recommended that Oakridge Drive be striped as a two lane street with a continuous two-way left -turn lane between Lemay Avenue and Boardwalk Drive. Oakridge Drive is 50 feet wide. Therefore, the excess width can be used for on -street parking or bike lanes. However, provision for an eastbound left -turn lane at Lemay Avenue must be accommodated. Operation at the two driveway accesses along Oakridge Drive will be at level of service A. 3 11 TRIP DISTRIBUTION Figure 4 • LO o o^ C) LO, 70/220 LO LO r- N f 660/1270 -10/60 110/100 1090/770 — 40/170 N V1 � � N HARMONY f Site AM / PM Rounded to nearest 5 vehicles. LO a �,Cc �o � 45/180 cn 570/1145 } /—80/155 45/145 f 1150/610 — o Ln cD 175/245��� oo� o N CN LO LO 65/175 U-) o LO `14 `� '- — 15/25 j� �-15/20 20/25 --,#' ) } r 25/15 — o o to 25/70 —� o o N rn ry } w J 4� SHORT RANGE PEAK HOUR TRAFFIC Figure 5 0 • Table 3 Short Range Peak Hour Operation Level of Service Intersection AM PM Harmony/Lemay (signal) C C Harmony/Boardwalk (signal) B C Lemay/Oakridge (stop sign) EB LT C D EB T C B EB RT A A WB LT C C WB T C C WB RT A A SB LT A A NB LT A A 0 • A long range analysis was not performed. As stated earlier in this report, the Evangelical Covenant Church is proposing an expansion of their facility, which will include the high school portion of the Heritage Christian School. This church property is adjacent to the Miramont Tennis and Fitness Center. Due to the timing of these two developments, it is appropriate that the long range analysis be included in the traffic study for the church expansion. In addition to this, a site access study was prepared for the entire Oak/Cottonwood Farm area in May 1992. The Tennis Center use is compatible with the mixed use area shown in that study. The long range analysis, which will be included in the church expansion study will include general data from the "Oak/ Cottonwood Farm Site Access Study" and specific uses such as the Tennis Center and the church expansion. The Executive Summary from the "Oak/Cottonwood Farm Site Access Study," May 1992 is included in Appendix E. I, III. Conclusions I, The following summarizes the significant findings as a result of this study: - The Miramont Tennis and Fitness Center traffic can be accommodated on the area streets. It is expected that approximately 775 daily trip ends will be generated by the proposed use. - Current traffic operation at the area intersections is acceptable. - In the short range future (1997) with the Tennis Center, the key intersections generally operate acceptably. This indicates full development and membership of the Tennis Center. In realty, the Tennis Center may not reach full membership by this time. - The long range future is addressed in the "Oak/Cottonwood Farm Site Access Study," May 1992. Key intersections will operate acceptably. It is expected that Harmony Road will have a six lane cross section by/after the year 2010. In addition, a long range analysis, which will include the Tennis Center traffic, will be conducted in the traffic study for the Evangelical Covenant Church expansion. The church site is east of and adjacent to the Tennis Center. - A single lane in each direction with a continuous two-way left -turn lane is recommended for Oakridge Drive between Lemay Avenue and Boardwalk Drive. 4 0 0 Sroutman P o �� 3 BrevQIbo� �o� ts/ rye o wa�� f � v \ Dr. Shoe 0. �oP o Sand Cove �,o. C1 Revere a Pavilion L\ ° °�f o o = Whecitcn L I �� °D n ° x 3 board Ln. u I 0 ' `-' a HARMONY ROAD z , z W r CDCt. Nicklaus ' Q V` A • ,� Q uP P,f � G.- p o C e O cn 1 ( v = pule Dr. � n. �airway Ln. o San r d' Ct. IbLive 00 eo:6 `Red ■ rkWra Sawto_,th Cf. . White OoK c ei ■ Spanish OaG V �SS ■ u CL — 3 L Twinberry U o � o s D Dr , Oak Leaf ITEM:MIRAMONT PUD - Preliminary Tennis &Fitness Center North NUMBER: 54-87K