Loading...
HomeMy WebLinkAboutMIRAMONT TENNIS AND FITNESS CENTER PUD - PRELIMINARY - 54-87K - CORRESPONDENCE - STAFF'S PROJECT COMMENTSand Environmental4ervices Planning Department City .of Fort Collins October 19, 1993 Mr. Joe Frye Vaught -Frye Architects 1113 Stoney Hill Drive Fort Collins, CO 50525 Dear Joe: Staff has coordinated its interdepartmental review for Miramont Tennis and Fitness Center, Preliminary P.U.D., and offers the following comments: 1. The plat document will require a legal description, basis of bearings, monumentation, and additional curve data:. At the time of Final, the plat must also include ownership and attorney certification and City approval blocks. 2. The access points onto Oak Ridge Drive will have to align with the future re -aligned Builder's Square curb cut. Information of the location of this curb cut should be forthcoming in the near future. Otherwise access points must be sufficiently offset for safe turning movements. . 3. The internal access connection with Evangelical Covenant Church/Heritage Christian Church should be indicated. Staff is aware that there is a complex ownership situation and that this internal connection will require cooperation from multiple parties. As a Preliminary P.U.D., however, the connection should be shown. 4. The Poudre Fire Authority cautions that both large buildings exceed the 150 foot access distance which will require automatic fire extinguishing systems. 5. . U.S. West states that the owner is responsible for provision of all conduit and street crossings for telephone facilities within the project, and the owner provides terminal room space (usually 4' x 4') and power for the main terminal at one building, generally in a janitor's closet 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (303) 221-6750 Vaught -Frye October 19, 1993 Page 2 or utility room. The owner's vendor provide all facilities beyond the main terminal. Please contact U.S. West engineer for conduit specifications for the main telephone entrance cable. Any relocation of existing telephone facilities required by such plans will be paid for by the developer. 6. At the time of Final, the plat needs to dedicate an eight foot minimum width utility easement adjoining the southerly right-of-way line along Oak Ridge Drive. Also, the planting of street trees must be coordinated closely with the Public Service Company. Trees are not allowed within four feet of underground gas lines. 7. It. is suggested that additional bike racks be added. The size of the rack indicated appears insufficient for health club. Perhaps some data or market survey would indicate a. suitable amount of bike parking for a health club facility. 8. With a height that exceeds 40 feet, the Preliminary P.U.D. should be accompanied by an analysis of the impacts of the proposed height of 48 feet. Please refer to Chapter 6.28 of the Development Manual for the applicable review criteria that must be addressed. 9. Is there a need for a separate service entrance for the health club? Or, do all deliveries and service needs use the front entrance? Please clarify. 10. It appears that the outdoor tennis courts will be screened by chain link fencing that is equipped with green fabric for background. Is this the same fencing for other perimeter areas? The P.U.D. is not clear on the materials and height of other perimeter fencing. 11. Please be aware that the drop-off and loading area at the front entrance.meets the A.D.A. requirements. 12. Please add dimensions for the Fitness Building. 13. The Transportation Department would like some clarification regarding the future status of Rule Drive. Conceptually, it is appropriate for Rule Drive to terminate and transition into a private parking lot situation. Such a transition, however, must be designed so that it does not confuse the general public into thinking that onsite parking lot drive aisles are a continuation of the public street system. Is Rule Drive only needed for temporary fire access? When would the "temporary" condition change to a permanent condition? It is not clear who would build the Rule Drive connection sothat it connects back to Lemay Avenue.. Please clarify. 14. Generally, the Site and Landscape Plan look very good. It will be helpful to view the three dimensional model of the indoor tennis facility as it is difficult to visualize at this time. `4 Vaught -Frye October 19, 1993 Page 3 This concludes Staff comments at this time. Engineering and Drainage comments have been sent to the civil engineer consultant under separate cover. In order to remain on schedule for the November 15, 1993 Planning and Zoning Board meeting, please note the following deadlines: . Plan revisions are due October 28, 1993. P.M.T.'s, 10 prints, renderings are due November 8, 1993. As always, please call if there are any questions or concerns regarding these comments. Sincerely: Ted Shepard Senior Planner xc: Sherry Albertson -Clark, Chief Planner Kerrie Ashbeck, Civil Engineer