Loading...
HomeMy WebLinkAboutKUM & GO #0951 - FDP230009 - DOCUMENT MARKUPS - ROUND 1 - UTILITY PLANSPROJECTLOCATIONE SHEET NUMBER:CPM: SDM: RDM:10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT 1459 Grand AvenueDes Moines, Iowa50309P: 515-226-0128F: 515-223-9873DATE:TCDGBSCALL 811 SEVENTY-TWO HOURS PRIOR TODIGGING, GRADING OR EXCAVATING FOR THEMARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013 Know what'sbelow.before you dig.CallRwww.olsson.comTEL 303.237.2072 1525 Raleigh St. Suite 400 Denver, CO 80204 DATE REVISION DESCRIPTION OF 40VICINITY MAPNOT TO SCALEBASIS OF BEARINGS:ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, ASMONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND ACONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56"EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRALZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGSCONTAINED HEREIN RELATIVE THERETO.FLOOD ZONE:1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YEAR SPRINGCREEK FLOODPLAIN.2. DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS ANDPAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTIONACTIVITY (CURB & GUTTER, PAVEMENT, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKINGLOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE SPRINGCREEK FLOODPLAIN LIMITS AS DELINEATED ON FINAL DEVELOPMENT DOCUMENTS. ALL ACTIVITIESWITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORTCOLLINS MUNICIPAL CODE.PROJECT TEAM:AGENCY CONTACTS:OWNER/DEVELOPER/APPLICANT:KUM & GO L.L.C.1459 GRAND AVENUEDES MOINES, IA 50309CONTACT: DAN GARNEAUPH: (515) 226.0128E: DAN.GARNEAU@KUMANDGO.COMENGINEER:OLSSON, INC.1880 FALL RIVER DRIVE, SUITE 200LOVELAND, CO 80538CONTACT: ERICA MORTONPH: (970) 635.3744E: EMORTON@OLSSON.COMLANDSCAPE ARCHITECT:GEOTECHNICAL ENGINEER:OLSSON, INC.5180 SMITH ROAD, UNIT FDENVER, CO 80216CONTACT: MICHAEL FLANAGANPH:(303) 237.2072E: MFLANAGAN@OLSSON.COMSURVEYOR:OLSSON, INC.5180 SMITH ROAD, UNIT FDENVER, CO 80216CONTACT: NIC SCHRADERPH: (303) 374.3114E: NSCHRADER@OLSSON.COMSANITARY SEWER:TELEPHONE:GAS:XCEL ENERGY1901 E. HORSETOOTH ROADFT. COLLINS, COCONTACT: PAT KREAGERE: PAT.KREAGER@XCELENERGY.COMCOMCAST COMMERCIAL INTERNET1-855-205-6962ACCESS AND ROADHEALTH DEPARTMENT:LARIMER COUNTY HEALTH DEPARTMENT200 PERIDOT AVENUELOVELAND, CO 80537PH: (970) 498.6700FIRE DEPARTMENT:ELECTRIC:CITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: DAN MOGENPH: (970) 305.5989E: DMOGEN@FCGOV.COMPOUDRE FIRE AUTHORITYCONTACT: MARCUS GLASGOWPH: (970) 416.2869E: MARCUS.GLASGOW@POUDRE-FIRE.ORGBUILDING PERMIT:CITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: RUSSELL HOVLANDPH: (910) 416.2341E: RHOVLAND@FCGOV.COMWATER:CITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: STEVE GILCHRISTPH: (970) 224.6175E: SGILCHRIST@FCGOV.COMSTORM SEWER:CITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: ROB IRISHPH: (970) 224.6167E: RIRISH@FCGOV.COMPLANNING DEPARTMENT:CITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: BRANDY BETHUREM HARRASPH: (970) 416.2274E: BBETHUREMHARRAS@FCGOV.COMOLSSON, INC.7878 N. 16TH STREET, SUITE 105 PHOENIX, AZ85020CONTACT: AMY SCHWENNERPH: (602) 748.1000E: ASCHWENNER@OLSSON.COMCITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: DAN MOGENE: (970) 305.5989PH: DMOGEN@FCGOV.COMLOT 5 SITE DATASTORE TYPEMARKETPLACE BISTROCANOPY / DISPENSER ARRANGEMENT4 DISPENSERS(SINGLE)TYPE OF USECONVENIENCE STOREWITH FUELHEIGHTBUILDING19'-6"PARAPET20'-0"BLADE22'-6"FUEL CANOPY20'-6"GROSS FLOOR AREA3,946 SFGROSS CANOPY AREA2,592 SFGROSS LOT AREA40,012 SF 0.919 ACBUILDING COVERAGE3,946 SF (9.9%)LANDSCAPE COVERAGE9,971 (24.9%)PARKING/DRIVE/SIDEWALK COVERAGE26,095 SF (65.2%)BICYCLE PARKING2 SPACESTOTAL EMPLOYEES16-18EMPLOYEES PER SHIFT3-5HOURS OF OPERTAION5AM-11PM 7-DAYS AWEEKREQUIRED PARKINGSTANDARD8 MIN - 16 MAXADA1TOTAL8 MIN - 16 MAXPARKING RATIO = 1 STALL/200 SFPROVIDED PARKINGSTANDARD15ADA1TOTAL16PARKING RATIO = 1 STALL/247 SFZONING INFORMATIONCURRENT: NEIGHBORHOOD COMMERCIAL DISTRICT (N-C)MINIMUM LOT AREAMINIMUM LOT WIDTHSITE AREA PER UNITFRONT YARD SETBACK NORTH (FEET)15'LEFT SIDE YARD SETBACK WEST (FEET)5'RIGHT SIDE YARD SETBACK EAST (FEET)15'REAR YARD SETBACK SOUTH (FEET)5'MAXIMUM HEIGHT (FEET)NONE SPECIFIEDMAXIMUM BUILDING COVERAGE (SF)5,000 SFMAXIMUM IMPERVIOUS COVERAGE94%FLOOR AREA RATIONONE SPECIFIEDCONFIDENTIAL DOCUMENT:INFORMATION CONTAINED IN THIS DOCUMENT ISPROPRIETARY TO KUM & GO, L.C. AND SHALL NOTBE DISTRIBUTED.COVER SHEET E. PROSPECT RDS. LEMAY AVE WHERE & MEANS MORE.UTILITY PLANS FORSTORE #0951LOT 5, EAST ACRES949 E. PROSPECT ROAD FORT COLLINS, COLEGAL DESCRIPTION:LOT 5, EAST ACRES, BEING A PORTION OF THE NORTHEAST QUARTER OF SECTION 24, TOWNSHIP 7NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OFCOLORADOThese plans have been reviewed by the Local Entity forconcept only. The review does not imply responsibility bythe reviewing department, the Local Entity Engineer, orthe Local Entity for accuracy and correctness of thecalculations. Furthermore, the review does not imply thatquantities of items on the plans are the final quantitiesrequired. The review shall not be construed in any reasonas acceptance of financial responsibility by the LocalEntity for additional quantities of items shown that may berequired during the construction phase.REFERENCE REPORT OF GEOTECHNICAL EXPLORATION PREPARED BY OLSSON ON 6/24/2021VARIANCE REQUESTS1.APPLICANT HEREBY REQUESTS TO INSTALL A 40 FT WIDEDRIVEWAY WHERE 36 FT IS THE STANDARD.City of Fort Collins, ColoradoUTILITY PLAN APPROVALAPPROVED:APPROVED:APPROVED:APPROVED:APPROVED:APPROVED:Approved SheetsApproved SheetsApproved SheetsApproved SheetsApproved SheetsApproved SheetsDateDateDateDateDateDateEnvironmental Planner,Traffic Operations,Park Planning and Development,Stormwater Utility,Water & Wastewater Utility,City Engineer,FLOOD ZONE NOTE:DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAYALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTIONACTIVITY (CURB & GUTTER, PAVEMENT, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKINGLOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE SPRINGCREEK FLOOD PLAIN LIMITS AS DELINEATED ON FINAL DEVELOPMENT DOCUMENTS. ALL ACTIVITIESWITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORTCOLLINS MUNICIPAL CODE.SHEET INDEXSheet N u m be r Sheet Titl e1C0.0COVER SHEET2C0.1GENERAL NOTES3C0.2CITY GENERAL NOTES4C0.3ALTA NSPS LAND TITLE SURVEY5C0.4ALTA NSPS LAND TITLE SURVEY6C0.5DEMOLITION PLAN7C1.0PROJECT PLAN8C2.1GRADING PLAN9C2.2DETAILED GRADING PLAN10C2.3DRAINAGE PLAN11C2.4DRAINAGE DETAILS12C2.5DRAINAGE DETAILS13C2.6DRAINAGE DETAILS14C2.7PH. 1 EROSION CONTROL PLAN15C2.8PH. 2 EROSION CONTROL PLAN16C2.9PH. 3 & 4 EROSION CONTROL PLAN17C2.10STD. EROSION CONTROL NOTES18C2.11EROSION CONTROL DETAILS19C2.12EROSION CONTROL DETAILS20C3.1UTILITY SERVICE PLAN21C3.2UTILITY DETAILS22C3.3UTILITY DETAILS23C4.1HORIZONTAL CONTROL PLAN24C4.2DETAILED HORIZONTAL CONTROLPLAN25C4.3HORIZONTAL CONTROL POINTTABLES26C4.4FLOWLINE PLAN & PROFILE27C4.5SIGNAGE AND STRIPING PLAN28C4.6ADA PLAN29C4.7PAVING DETAILS30C4.8PAVING DETAILS31C4.9PAVING DETAILS32C4.10SIGNAGE & SITE DETAILS33C5.0TRAFFIC SIGNAL PLAN34L1.0TREE REMOVAL PLAN35L1.1FINAL LANDSCAPE PLAN36L1.2HYDROZONE PLAN37L1.3LANDSCAPE DETAILS (CD)38I1.1FINAL IRRIGATION PLAN39I1.2IRRIGATION DETAILS 140I1.3IRRIGATION DETAILS 2BENCHMARKS:PROJECT BENCHMARK: NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88)SITE BENCHMARK: CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88)ELEVATIONS BROUGHT TO THE SITE VIA GPS OBSERVATIONS USING THE TRIMBLE VRS NETWORK"I hereby affirm that these final construction plans wereprepared under my supervision, in accordance with allapplicable City of Fort Collins and State of ColoradoStandards and statutes, respectively; and that I am fullyresponsible for the accuracy of all design, revisions, andrecord conditions that I noted on these plans."DATEENGINEERC0.01CITY OF FORT COLLINS281 N COLLEGE AVEFORT COLLINS, CO 80522CONTACT: DAN MOGENE: (970) 305.5989PH: DMOGEN@FCGOV.COMCity of Fort Collins Approved Plans Approved by: Date: Grading/Stormwater Certification Accepted(Certificate of Occupancy Released)Accepted by: Date: ☐Escrow washeld forCO and is now released Grading/Stormwater Plan Accepted (Building Permit Released)Accepted by: Date: Utility (Water/Sewer)Plan Approved (Building Permit Released)Approved by: Date: we Fort Collins Utilities Redlines Water, Wastewater & Stormwater Thank you for the opportunity to review these plans. I encourage you to contact me to discuss questions & revisions prior to resubmittal. dmogen@fcgov.com or 970-305-5989 Reviewed by: Date: Dan Mogen10/31/2022 SHEET NUMBER:CPM: SDM: RDM:10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT 1459 Grand AvenueDes Moines, Iowa50309P: 515-226-0128F: 515-223-9873DATE:TCDGBSCALL 811 SEVENTY-TWO HOURS PRIOR TODIGGING, GRADING OR EXCAVATING FOR THEMARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013 Know what'sbelow.before you dig.CallRwww.olsson.comTEL 303.237.2072 1525 Raleigh St. Suite 400 Denver, CO 80204 DATE REVISION DESCRIPTION OF 40CONFIDENTIAL DOCUMENT:INFORMATION CONTAINED IN THIS DOCUMENT ISPROPRIETARY TO KUM & GO, L.C. AND SHALL NOTBE DISTRIBUTED.GENERAL NOTES1.ALL WORK AND CONSTRUCTION OF THIS PROJECT ON PRIVATE PROPERTY SHALL CONFORM TO KUM &GO STANDARD SPECIFICATIONS, CITY OF FORT COLLINS, CDOT, AND THE SPECIFICATIONS/DETAILSSHOWN ON THESE PLANS.2.ALL WORK AND CONSTRUCTION WITHIN PUBLIC RIGHT OF WAY AND EASEMENTS SHALL CONFORM TOTHE TECHNICAL SPECIFICATIONS, STANDARD DETAILS, AND DESIGN CRITERIA FOR PUBLICIMPROVEMENT PROJECTS OF THE CITY OF FORT COLLINS, COUNTY OF LARIMER, CDOT, AND THEGRANTOR OF THE EASEMENT AS APPLICABLE.3.IN CASE OF A CONFLICT BETWEEN VARYING SPECIFICATIONS, THE MOST STRINGENT SHALL APPLY.4.THE CONTRACTOR SHALL OBTAIN A COPY OF THE LATEST STANDARD SPECIFICATIONS AND DETAILS OFALL AGENCIES EXERCISING JURISDICTION OVER THIS PROJECT, WHICH ARE INCORPORATED BYREFERENCE ON THESE PLANS. A COPY OF THESE SPECIFICATIONS AND DETAILS SHALL BE MAINTAINEDON THE JOBSITE AT ALL TIMES.5.THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES ONE (1) SIGNED COPY OF THE PLANS,STANDARDS, AND SPECIFICATIONS AS APPROVED BY THE APPROPRIATE GOVERNING AGENCY ANDOWNER. THE CONTRACTOR SHALL NOT CHANGE OR DEVIATE FROM THESE PLANS WITHOUT FIRSTOBTAINING WRITTEN APPROVAL FROM THE OWNER, ENGINEER, AND GOVERNING AGENCY.6.ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND FEDERAL APPLICABLE LAWS ANDREGULATIONS.7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL JOB SITE SAFETY ON THE PROJECT. THIS SHALLINCLUDE THE SAFETY OF HIS OWN PERSONNEL, SUBCONTRACTORS, ALL VISITORS TO THE SITE, ANDTHE GENERAL PUBLIC. ALL JOB SITE SAFETY SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERALREGULATIONS AND CODES, AND ENSURE COMPLIANCE INCLUDING, BUT NOT LIMITED TO, THEOCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REQUIREMENTS.8.THE CONTRACTOR SHALL CONTACT ONE CALL OF COLORADO AT #811 OR 1-800-922-1987 A MINIMUM OF72 HOURS (EXCLUDING WEEKENDS AND HOLIDAYS) IN ADVANCE OF ANY EXCAVATION.9.THE LOCATIONS OF EXISTING UTILITIES AND STRUCTURES SHOWN ON THE PLANS ARE APPROXIMATEAND HAVE BEEN SHOWN FROM AVAILABLE SURVEYS AND/OR RECORDS. THERE MAY BE ADDITIONALUTILITIES PRESENT, THE EXISTENCE OF WHICH IS NOT PRESENTLY KNOWN OR SHOWN. IT IS THECONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR EXISTENCE, EXACT LOCATION/SIZE,ADEQUATELY PROTECT/SUPPORT, AND TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALLINCLUDE, AT NO ADDITIONAL COST, ANY POTHOLING OR EXPLORATORY EXCAVATIONS NECESSARY TOLOCATE EXISTING UTILITIES. UTILITIES SHALL BE LOCATED SUFFICIENTLY AHEAD OF CONSTRUCTIONTO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY DUE TO ACTUAL LOCATION OFEXISTING FACILITIES. DAMAGE TO UTILITIES AND STRUCTURES SHALL BE REPAIRED BY THECONTRACTOR AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE GOVERNING AGENCYAND/OR THE UTILITY OWNER.10.ALL MATERIALS SHALL BE NEW UNLESS OTHERWISE INDICATED IN THE PLANS, AND SHALL BE SUBJECTTO INSPECTION AND APPROVAL BY THE OWNER OR THE OWNER'S REPRESENTATIVE.11.LOCATIONS AND ELEVATIONS OF EXISTING IMPROVEMENTS TO BE MET (OR AVOIDED) BY THEPROPOSED WORK SHALL BE CONFIRMED BY THE CONTRACTOR THROUGH FIELD EXPLORATIONS PRIORTO CONSTRUCTION. CONTRACTOR SHALL REPORT TO THE OWNER ANY DISCREPANCIES BETWEEN HISMEASUREMENTS AND THESE PLANS.12.THE CONTRACTOR SHALL CONTACT THE OWNER IMMEDIATELY UPON DISCOVERY OF ANY ERRORS ORINCONSISTENCIES SHOWN IN THE PLANS AND/OR SPECIFICATIONS. DO NOT SCALE DRAWINGS - USEONLY DIMENSIONS PROVIDED ON THESE PLANS.13.ALL ESTIMATES OF QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR ANDSUBCONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL QUANTITIES, AND SHALLPROVIDE ALL WORK AND MATERIALS NECESSARY TO CONSTRUCT THE PROJECT IN ITS ENTIRETY.14.CONTRACTOR SHALL PROTECT ALL EXISTING IMPROVEMENTS NOT DESIGNATED FOR REMOVAL ANDTHOSE IMPROVEMENTS THAT ARE OUTSIDE THE LIMITS OF THE PROPOSED CONSTRUCTION.CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE THERETO AND SHALL PROVIDE TEMPORARYFENCING, BARRICADES, SUPPORTS, RESTRAINTS, AND/OR BRACING WHERE REQUIRED TO PROTECTEXISTING IMPROVEMENTS. DAMAGE TO EXISTING IMPROVEMENTS SHALL BE REPAIRED AND/ORREPLACED TO EQUAL OR BETTER CONDITION AT THE CONTRACTOR'S EXPENSE.15.ALL GRADING AND CONSTRUCTION ACTIVITIES SHALL BE CONFINED TO THE OWNER'S PROPERTY,PUBLIC RIGHT-OF-WAY, PERMANENT EASEMENTS, AND TEMPORARY CONSTRUCTION EASEMENTS.16.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS NOT OBTAINED BY THEOWNER OR OWNER'S REPRESENTATIVES, AND PAY ALL FEES AS REQUIRED BY THE CONSTRUCTIONCOVERED IN THESE PLANS.17.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE APPROPRIATE GOVERNING AGENCIESAND LOCAL FIRE DEPARTMENT OF ALL STREET CLOSURES AND EXISTING FIRE HYDRANTS/FIRESUPPRESSION TAKEN OUT OF SERVICE AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.18.THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE SECURITY AND SHALL PROPERLY PROTECT ANDBARRICADE THE CONSTRUCTION SITE UNTIL CONSTRUCTION IS COMPLETE. STORAGE, LOSS DUE TOTHEFT, OR VANDALISM OF MATERIALS AND EQUIPMENT (SECURED OR UNSECURED) WILL BE SOLELY ATTHE CONTRACTOR'S EXPENSE.19.PRIOR TO BEGINNING THE WORK, THE CONTRACTOR SHALL OBTAIN ANY WRITTEN AGREEMENTS FORINGRESS AND EGRESS TO THE WORK FROM ADJACENT PRIVATE PROPERTY OWNERS. ACCESS TO ANYADJACENT PRIVATE PROPERTY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD,DURING ALL HOURS OF OPERATION FOR THE BUSINESS LOCATED ON THOSE PARCELS.20.FOR ANY CHANGES OR DEVIATIONS FROM THESE PLANS PROPOSED BY THE CONTRACTOR, SHOPDRAWINGS AND MATERIAL SPECIFICATIONS SHALL BE SUBMITTED TO OWNER FOR REVIEW ANDAPPROVAL PRIOR TO PLACEMENT OF MATERIAL.21.CONTRACTOR MUST COORDINATE ALL CONSTRUCTION WITH THE DESIGNATED KUM & GOCONSTRUCTION PROJECT MANAGER.22.CONTRACTOR SHALL PROTECT AND PRESERVE ALL SURVEY CONTROL AND PROPERTYMONUMENTATION. ANY DAMAGED MONUMENTS SHALL BE RESET BY A PROFESSIONAL LAND SURVEYORLICENSED IN THE PROJECT'S STATE AT THE CONTRACTOR'S EXPENSE.23.PRIOR TO MOVING OFF THE JOB SITE THE CONTRACTOR SHALL NOTIFY THE OWNER OR THE OWNER'SREPRESENTATIVE TO PERFORM THE FINAL WALK-THROUGH OF THE CONSTRUCTION SITE.24.TEMPORARY POWER, TELEPHONE, AND WATER FOR THE SITE IS THE CONTRACTOR'S RESPONSIBILITYUNLESS OTHERWISE SPECIFIED.25.CONTRACTOR SHALL REFER TO OTHER DRAWINGS ISSUED BY ARCHITECT, STRUCTURAL, ELECTRICAL,AND MECHANICAL ENGINEERS. ENSURE COORDINATION OF EXACT LOCATION AND DIMENSIONS OFBUILDINGS, EXITS, RAMPS, UTILITY ENTRANCE LOCATIONS AND GRADES AROUND THE BUILDING.IMMEDIATELY NOTIFY OWNER OF ANY DISCREPANCIES.26.NO BELOW GRADE WORK SHALL BE BACKFILLED (INCLUDING BEDDING MATERIAL ABOVE THE SPRINGLINE OF THE PIPE) UNTIL THE CONSTRUCTION HAS BEEN INSPECTED AND APPROVED FOR BACKFILLINGBY THE APPROPRIATE GOVERNING AGENCY, OWNER AND/OR OWNER'S REPRESENTATIVE.27.THE CONTRACTOR SHALL PROVIDE ALL TRAFFIC CONTROL NECESSARY TO COMPLETE THE WORK. ALLTRAFFIC CONTROL DEVICES AND METHODS OF CONTROLLING TRAFFIC THROUGH CONSTRUCTIONZONES SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE MUTCD, AND ALL REVISIONSTHERETO INCLUDING LOCAL AND STATE SUPPLEMENTS. ADDITIONAL WORK IN THE RIGHT-OF-WAY ORTRAFFIC CONTROL PERMITS MAY BE NECESSARY AND SHALL BE THE CONTRACTOR'S RESPONSIBILITY.28.IF UNANTICIPATED HAZARDOUS MATERIALS OF ANY KIND ARE ENCOUNTERED IN THE WORK, THECONTRACTOR SHALL IMMEDIATELY CEASE ALL CONSTRUCTION OPERATIONS AND NOTIFY THE OWNERAND/OR OWNER'S REPRESENTATIVE FOR FURTHER DIRECTION.29.ALL DEBRIS RESULTING FROM CONSTRUCTION AND DEMOLITION SHALL BE HAULED OFF SITE ANDDISPOSED OF PROPERLY AND LEGALLY.30.GENERAL CONTRACTOR SHALL COORDINATE WITH POSTMASTER TO DETERMINE MAILBOX LOCATION.SITE PLAN NOTES1.DIMENSIONS SHOWN ON THE SITE PLAN ARE TO FACE OF CURB LINE IN CURBED AREAS AND EXTERIORFACE OF BUILDING, UNLESS OTHERWISE SPECIFIED.2.A SEPARATE SIGN APPLICATION TO THE CITY OF FORT COLLINS IS REQUIRED FOR ALL SIGNS.DEMOLITION PLAN NOTES1.PRIOR TO BIDDING, CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH THE EXISTINGCONDITIONS OF THE PROJECT AREA AND ANTICIPATED DEMOLITION REQUIREMENTS.2.CONTRACTOR TO PROTECT ALL UTILITY, PAVING, BUILDINGS, ETC. OUTSIDE OF LIMITS OF PROPOSEDCONSTRUCTION DURING DEMOLITION OPERATIONS.3.ALL EXISTING PAVEMENT ONSITE SHALL BE REMOVED UNLESS OTHERWISE NOTED.4.CONTRACTOR SHALL REFER TO PAVING PLAN FOR DETAILS ON LIMITS OF PAVING DEMOLITION, ANDEROSION CONTROL PLAN FOR PERIMETER CONTROL.5.ALL DEMOLITION WORK ON THIS CONSTRUCTION SITE SHALL BE IN CONFORMANCE WITH LOCALSTANDARDS AND GUIDELINES.6.THIS DEMOLITION PLAN DEPICTS THE ANTICIPATED REMOVALS NECESSARY FOR CONSTRUCTION OFTHE PROJECT. MISCELLANEOUS AND MINOR REMOVALS MAY NOT BE SHOWN IN DETAIL BUT ARECONSIDERED OBLIGATORY TO THE PROJECT. ADDITIONAL REMOVALS MAY BE NECESSARY AND THECONTRACTOR WILL BE REQUIRED TO REMOVE ALL EXISTING IMPROVEMENTS THAT ARE IN CONFLICTWITH THE PROPOSED CONSTRUCTION AND AS OTHERWISE DIRECTED BY THE OWNER.7.CONTRACTOR SHALL COORDINATE DEMOLITION AND/OR RELOCATION OF EXISTING UTILITIES WITH THEAPPROPRIATE UTILITY OWNER AND IN ACCORDANCE WITH THE UTILITY OWNER'S REQUIREMENTS.INTERRUPTIONS IN SERVICE SHALL BE COORDINATED WITH THE UTILITY OWNER AND PROPERTYOWNER(S) IMPACTED. CONTRACTOR SHALL COORDINATE WITH THE RESPECTIVE UTILITY COMPANYFOR PORTIONS OF THE WORK TO BE PERFORMED BY UTILITY COMPANY'S FORCES, AND PROVIDEADEQUATE NOTICE FOR SCHEDULING. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES ANDCHARGES, UNLESS OTHERWISE PAID BY KUM & GO PRIOR TO CONSTRUCTION. UTILITY REMOVALTRENCHES SHALL BE BACKFILLED WITH APPROVED MATERIAL AND MEET COMPACTION REQUIREMENTSPER THE GEOTECHNICAL REPORT.8.THE SITE MAY CONTAIN EXISTING FOOTINGS OR OTHER UNDERGROUND STRUCTURES THAT ARE NOTDEPICTED ON THIS PLAN. CONTRACTOR SHALL TAKE CARE TO REMOVE ALL NECESSARY STRUCTURESAND BACKFILL IN CONFORMANCE WITH THE GEOTECHNICAL REPORT. BOTTOM OF EXCAVATIONSUBGRADE SHALL BE INSPECTED BY THE GEOTECHNICAL TESTING ENGINEER AND APPROVED PRIOR TOANY BACKFILL.9.CONTRACTOR TO COMPLETELY REMOVE TREES DESIGNATED TO BE REMOVED, STUMPS, AND ROOTSYSTEMS.10.PRIOR TO DEMOLITION WORK, EROSION CONTROL DEVICES ARE TO BE INSTALLED. EROSION CONTROLMEASURES SHALL BE ADJUSTED AS DEMOLITION AND CONSTRUCTION SEQUENCING WARRANTS.11.ALL EXISTING UNUSED SERVICE LINES FOR WATER AND WASTEWATER SHALL BE REMOVED PER LOCALUTILITY COMPANY STANDARDS. ALL EXISTING UNUSED GAS, TELEPHONE, FIBER OR ELECTRICLINE/SERVICE SHALL BE COORDINATED FOR REMOVAL WITH UTILITY COMPANY.12.THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSING IN A MANNERAPPROVED BY ALL GOVERNING AUTHORITIES FOR ALL STRUCTURES, PADS, WALLS, PANS,FOUNDATIONS, PAVEMENT, UTILITIES, ETC. TO BE DEMOLISHED, SUCH THAT THE IMPROVEMENTSSHOWN ON THE PLANS CAN BE CONSTRUCTED. DEMOLITION AND DISPOSAL PERMITS SHALL BE THECONTRACTOR'S RESPONSIBILITY. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO APPROVEDGRADE AND BROUGHT UP TO PROPOSED GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THEGEOTECHNICAL REPORT.13.DURING DEMOLITION OPERATIONS, THE CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES USINGMEANS OF THEIR CHOICE.14.CONTRACTOR SHALL PRESERVE ALL LANDSCAPING NOT TO BE REMOVED FOR CONSTRUCTION.CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL AREAS DISTURBED BY CONSTRUCTION.15.SAWCUTS SHALL BE TO FULL DEPTH OF EXISTING PAVEMENT. CONCRETE PAVEMENT SHALL BEREMOVED TO NEAREST EXISTING JOINT WHEN LESS THAN 5' FROM PROPOSED SAWCUT.GRADING PLAN NOTES1.PRIOR TO ANY GRADING OPERATIONS, ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BEADEQUATELY IN PLACE. REFER TO THE EROSION AND SEDIMENT CONTROL PLAN FOR REQUIREMENTS.2.THE CONTOUR LINES, SPOT ELEVATIONS AND BUILDING FLOOR ELEVATIONS SHOWN ARE TO FINISHGRADE FOR SURFACE OF PAVEMENT, TOP OF SIDEWALKS AND CURBS, TOP OF FLOOR SLABS, ETC.REFER TO TYPICAL SECTIONS FOR MULCH, SOD, PAVING, SLAB AND AGGREGATE BASE THICKNESS TODEDUCT FOR SUBGRADE ELEVATIONS.3.ALL TOP OF CURB AND SIDEWALK ELEVATIONS SHALL BE 0.5' ABOVE GUTTER ELEVATIONS UNLESSOTHERWISE NOTED. IN AREAS WITH SIDEWALK ABUTTING BACK OF CURB, TOP OF CURB ELEVATIONSSHALL BE EQUAL TO SIDEWALK ELEVATIONS.4.THE CONTRACTOR SHALL FINISH GRADE SLOPES AS SHOWN NO STEEPER THAN ONE FOOT VERTICAL INTHREE FEET HORIZONTAL.5.CONTRACTOR SHALL GRADE LANDSCAPED AREAS TO PROVIDE POSITIVE DRAINAGE AWAY FROMBUILDINGS AND SIDEWALKS WHEN FINISH LANDSCAPE MATERIALS ARE IN PLACE. SLOPE SHALL BE A 2%MINIMUM.6.SITE AND BUILDING PAD PREPARATION, GRADING AND EXCAVATION PROCEDURES SHALL CONFORM TOTHE RECOMMENDATIONS OUTLINED IN THE REPORT OF GEOTECHNICAL EXPLORATION PREPARED BYOLSSON, PROJ. NO. 020-2883.7.IN CASE OF ANY DISCREPANCIES REGARDING EARTHWORK BETWEEN THE REPORT OF GEOTECHNICALEXPLORATION AND THE SPECIFICATIONS SHOWN IN THESE PLANS, NOTIFY THE OWNER IMMEDIATELY.8.ALL HERBACEOUS VEGETATION AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 6" (IFENCOUNTERED) AND REMOVED FROM SITE OR STOCKPILED FOR LATER USE IN LANDSCAPED AREAS.9.ALL EXISTING PAVEMENT, UTILITIES, BURIED DEBRIS, RUBBLE, AND/OR STRUCTURES/FOUNDATIONSENCOUNTERED WITHIN AREAS OF DISTURBANCE SHALL BE COMPLETELY REMOVED PRIOR TO ORDURING EARTHWORK OPERATIONS. WASTED MATERIAL SHALL NOT BE BURIED ONSITE WITHOUT THEPRIOR APPROVAL OF THE OWNER.10.THE AREA ABOVE THE SPRINGLINE OF ALL UTILITY TRENCHES IN UNPAVED AREAS SHALL BEBACKFILLED WITH COMPACTED COHESIVE SOILS. SEE REPORT OF GEOTECHNICAL EXPLORATION FORCOMPACTION AND MOISTURE RECOMMENDATIONS.11.FINAL PAVEMENT SUBGRADES SHALL BE PROOFROLLED IMMEDIATELY PRIOR TO THE PLACEMENT OFTHE PAVEMENT TO DETECT LOCALIZED AREAS OF INSTABILITY. PROOFROLLING IS NOT RECOMMENDEDIN THE AREAS OF THE NEW FUEL TANKS OR DELIVERY LINE INSTALLATION.12.SUITABLE FILL MATERIALS SHALL BE PLACED IN THIN LIFTS OF 4 TO 8 INCHES LOOSE MEASUREMENT,UNLESS OTHERWISE ALLOWED IN THE REPORT OF GEOTECHNICAL EXPLORATION.13.IF REQUIRED, THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE PERMITS AND AUTHORIZATIONTO DISCHARGE FROM DEWATERING ACTIVITIES.14.THE CONTRACTOR SHALL DEWATER ALL EXCAVATIONS AND TRENCHES AS NEEDED FOR THECONSTRUCTION OF THE PROJECT USING MEANS/METHODS OF HIS CHOICE. REFER TO THE REPORT OFGEOTECHNICAL EXPLORATION FOR ANTICIPATED LEVELS OF GROUNDWATER AND DEWATERINGRECOMMENDATIONS.15.ALL EXCAVATIONS AND TRENCHES SHALL BE SLOPED/SHORED/BRACED FOR PROTECTION OFPERSONNEL IN ACCORDANCE WITH OSHA REGULATIONS AND AT THE CONTRACTOR'S FULL DISCRETIONBASED ON THE SITE CONDITIONS. OPEN EXCAVATIONS SHALL BE ADEQUATELY PROTECTED AND/ORFENCED AS NECESSARY AND FOR THE SAFETY OF THE PUBLIC.STORMWATER MANAGEMENT AND EROSION/SEDIMENTCONTROL NOTES1.THIS PROJECT REQUIRES A PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTIONACTIVITY FROM THE STATE'S GOVERNING AUTHORITY. CONTRACTOR TO COMMENCE WORK ON THISSITE ONLY AFTER AN ACTIVE PERMIT NUMBER HAS BEEN OBTAINED FROM THE STATE'S GOVERNINGAUTHORITY. A LOCAL CONSTRUCTION STORMWATER PERMIT IS ALSO REQUIRED BY THE CITY OF FORTCOLLINS.2.THE CONTRACTOR SHALL CONTINUOUSLY PROVIDE ADEQUATE STORMWATER MANAGEMENT INACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLAN (SWMP).3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING THE PUBLIC STREETS, ACCESS ROUTES, ANDWATERWAYS IN THE VICINITY OF THE JOB SITE CLEAN AND FREE OF ROCKS, SOIL AND DEBRIS.4.THE CONTRACTOR SHALL INSTALL EROSION AND SEDIMENTATION CONTROL “BEST MANAGEMENTPRACTICES” (BMPS) PRIOR TO ANY SITE PREPARATION WORK (E.G., CLEARING, GRUBBING, DEMOLITION,OR EXCAVATION).5.THE PLACEMENT OF EROSION AND SEDIMENT BMPS SHALL BE IN ACCORDANCE WITH THE EROSION ANDSEDIMENT CONTROL PLAN PREPARED FOR THE PROJECT. CONTRACTOR TO ADJUST QUANTITY,LOCATION, AND TYPE OF EROSION AND SEDIMENT CONTROL BMPS AS NECESSARY FOR THE VARIOUSPHASES OF THE WORK AND AS ACTUAL CONDITIONS WARRANT. CONTRACTOR SHALL CONTINUOUSLYMODIFY THE EROSION AND SEDIMENT CONTROL PLAN WITH CURRENT BMPS IN ACCORDANCE WITH THECONSTRUCTION STORMWATER PERMIT REQUIREMENTS. ADDITIONAL EROSION AND SEDIMENTCONTROL BMPS EMPLOYED BY THE CONTRACTOR AT HIS DISCRETION WILL NOT BE MEASURED OR PAIDFOR SEPARATELY BUT SHALL BE INCLUDED IN THE WORK.6.A GROUNDWATER DISCHARGE PERMIT MAY BE REQUIRED FROM THE STATE GOVERNING AUTHORITYPRIOR TO DISCHARGE.7.GROUNDWATER SHALL BE SAMPLED AND SENT TO AN APPROVED LABORATORY FOR TESTING PRIOR TOBEING DISCHARGED. TESTING SHALL BE IN ACCORDANCE WITH THE PERMIT FOR STORMWATERDISCHARGE.8.APPROVED EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED AND KEPT IN GOOD REPAIRFOR THE DURATION OF THIS PROJECT. UNLESS OTHERWISE REQUIRED BY THE STATE'S CONSTRUCTIONSTORMWATER PERMIT, AT A MINIMUM THE CONTRACTOR SHALL INSPECT ALL BMPS EVERY 14 DAYS,AND AFTER ALL SIGNIFICANT PRECIPITATION EVENTS I.E. RAINFALL, SNOWMELT. ALL NECESSARYMAINTENANCE AND REPAIR ACTIVITIES SHALL BE COMPLETED AS SOON AS POSSIBLE (IMMEDIATELY INMOST CASES) AFTER DIRECTION BY THE INSPECTOR. ACCUMULATED SEDIMENT AND CONSTRUCTIONDEBRIS SHALL BE REMOVED WEEKLY FROM ALL BMPS, OR AT ANY TIME THAT SEDIMENT ORCONSTRUCTION DEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE BMPS.9.TOPSOIL AND SUITABLE EARTHEN MATERIALS SHALL BE SEGREGATED AND STOCKPILED WITHIN THELIMITS OF CONSTRUCTION FOR USE ON AREAS TO BE FILLED AND RE-VEGETATED. ANY AND ALLSTOCKPILES SHALL BE PLACED IN AN APPROVED LOCATION AND PROTECTED FROM EROSIVE ELEMENTSUSING MEASURES SPECIFIED IN THE EROSION/SEDIMENT CONTROL PLAN AND STORMWATERMANAGEMENT PLAN (SWMP).10.SOILS THAT WILL BE STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL BE MULCHED AND SEEDEDWITH A TEMPORARY OR PERMANENT GRASS COVER WITHIN FOURTEEN (14) DAYS OF STOCKPILECONSTRUCTION.11.ANY SETTLEMENT OR SOIL ACCUMULATIONS BEYOND THE LIMITS OF CONSTRUCTION DUE TO GRADINGOR EROSION SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL BEHELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS,WETLANDS, PROPERTIES, ETC. RESULTING FROM WORK DONE AS PART OF THIS PROJECT.12.A WATER SOURCE MUST BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND UTILIZED ASREQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.13.THE CONTRACTOR MUST KEEP ALL POLLUTANTS, INCLUDING SEDIMENT, CONSTRUCTION DEBRIS, ANDTRENCH BACKFILL MATERIALS FROM ENTERING THE STORM SEWER SYSTEM.14.ALL SPILLS INCLUDING, BUT NOT LIMITED TO, PETROLEUM PRODUCTS, SOLVENTS, AND CEMENT SHALLBE CLEANED UP IMMEDIATELY. THE LOCAL CITY/COUNTY AND STATE'S GOVERNING AUTHORITY SHALLBE NOTIFIED IMMEDIATELY.15.THE CONTRACTOR SHALL ENSURE THAT ALL LOADS OF CUT AND FILL MATERIAL IMPORTED TO OREXPORTED FROM THE SITE SHALL BE PROPERLY COVERED TO PREVENT LOSS OF THE MATERIALDURING TRANSPORT ON PUBLIC RIGHT-OF-WAY. ALL MATERIAL EXPORTED FROM THE SITE SHALL BEDISPOSED OF AT A SITE PERMITTED TO ACCEPT SUCH MATERIAL.16.THE USE OF REBAR, STEEL STAKES OR STEEL FENCE POSTS FOR STAKING DOWN STRAW OR HAYBALES, OR TO SUPPORT SILT FENCING USED AS AN EROSION CONTROL MEASURE, IS PROHIBITED.17.THE CLEANING OF CONCRETE DELIVERY TRUCK CHUTES IS RESTRICTED TO APPROVED LOCATIONS ONTHE JOB SITE. THE DISCHARGE OF WATER CONTAINING WASTE CEMENT TO THE STORM SEWER SYSTEMIS PROHIBITED. ALL CONCRETE WASTE SHALL BE PROPERLY CLEANED UP AND DISPOSED OF AT ANAPPROPRIATE LOCATION.18.CONTRACTOR SHALL PROVIDE A COMPLETED "NOTICE OF TERMINATION" TO OWNER, FOR OWNERSSUBMITTAL TO THE STATE'S GOVERNING AUTHORITY ONCE THE PROJECT IS COMPLETE, ALL DISTURBEDAREAS HAVE BEEN STABILIZED AND TEMPORARY BMPS HAVE BEEN REMOVED.19.THE CONTRACTOR SHALL CLEAN OUT ALL EXISTING AND PROPOSED INLETS, PIPES AND MANHOLES OFDEBRIS AND SEDIMENTATION AT COMPLETION OF SITEWORK. THIS WORK SHALL BE DONE TO THESATISFACTION OF THE OWNER AND LOCAL AUTHORITIES. ANY CONSTRUCTION DEBRIS OR MUDDROPPED INTO MANHOLES, INLETS, PIPES OR TRACKED ONTO EXISTING ROADWAYS SHALL BEREMOVED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY EXCAVATIONSOR PAVEMENT FAILURES CAUSED BY HIS CONSTRUCTION.PAVING NOTES1.ALL PAVING WORK AND SUBGRADE PREPARATION/STABILIZATION SHALL CONFORM TO THERECOMMENDATIONS OF THE REPORT OF GEOTECHNICAL EXPLORATION, PREPARED BY OLSSON, PROJ.NO. 020-2883. IN CASE OF ANY CONFLICT WITH THESE PLANS, NOTIFY OWNER IMMEDIATELY.2.UNLESS PROVIDED FOR IN THE PLANS, CONTRACTOR SHALL DEVELOP A CONCRETE PAVEMENTJOINTING PLAN USING THE PROPOSED PAVING PLAN AND SITE CONDITIONS. JOINT LAYOUT SHALL BE INACCORDANCE WITH ACI 330R “GUIDE FOR THE DESIGN AND CONSTRUCTION OF CONCRETE PARKINGLOTS,” AND STANDARD CONSTRUCTION PRACTICES. JOINT DETAILS SHALL BE IN ACCORDANCE WITHTHE DETAILS PROVIDED IN THIS PLAN SET. CONTRACTOR SHALL PROVIDE A PAVEMENT JOINTING PLANFOR OWNER APPROVAL.3.ALL CONCRETE PAVEMENT AND CONSTRUCTION SHALL MEET KUM & GO STANDARD SPECIFICATIONS.CONCRETE PAVEMENT SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI, TYPE I/IIPORTLAND CEMENT (UNLESS OTHERWISE SPECIFIED IN THE GEOTECHNICAL REPORT FOR HIGHERSULFATE RESISTANCE), A SLUMP OF 4 INCHES +/- 1 INCH, AND AN AIR CONTENT OF 6% +/- 1%.4.PAVEMENT MUST HAVE A SOLAR REFLECTANCE INDEX (SRI) OF 29 OR HIGHER.5.ALL RADIUS/LINEAL DIMENSIONS SHOWN ON THE PAVING PLAN ARE TO FACE OF CURB UNLESSOTHERWISE NOTED.6.ALL PAVEMENT MARKINGS FOR PARKING STALLS SHALL BE 4" WIDE YELLOW MARKINGS, CONFORMINGTO AASHTO M248 READY MIXED YELLOW TRAFFIC PAINT.7.THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL ACCESSIBLE AREAS AND ROUTES AREBUILT IN ACCORDANCE WITH THE PLANS AND THE “2010 ADA STANDARDS FOR ACCESSIBLE DESIGN”.THE SITE MAY BE INSPECTED BY CITY PERSONNEL FOR COMPLIANCE WITH THE STANDARDS.8.ADA ACCESSIBLE PARKING STALLS AND AISLES SHALL BE CONSTRUCTED WITH A MAXIMUM SLOPE OF2.00% IN ANY DIRECTION. ADA ACCESSIBLE ROUTES SHALL BE CONSTRUCTED WITH A MAXIMUM CROSSSLOPE OF 2.00% AND A MAXIMUM LONGITUDINAL SLOPE OF 5.00% (UNLESS RAMPS AND LANDINGS AREPROVIDED PER ADA STANDARDS). CURB RAMPS SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF8.33% (12:1). ACCESSIBLE MANEUVERING AREAS AT DOORS SHALL BE CONSTRUCTED WITH A MAXIMUM2.00% IN ANY DIRECTION. CONTRACTOR SHALL FIELD VERIFY ADA GRADES AND FORMWORK PRIOR TOPLACING ANY CONCRETE. OWNER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY SHOWN ONTHE PLANS.UTILITY NOTES1.CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITIES AT PROPOSED POINTS OF CONNECTIONAND CONFIRM EXACT LOCATIONS/SIZES OF ALL UTILITY SERVICE LINE HOOKUPS TO THE BUILDING (PERMEP PLANS) PRIOR TO UTILITIES CONSTRUCTION.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING ONSITE MEETINGS WITH THE CITY,GOVERNING AGENCIES, AND UTILITY OWNERS PRIOR TO THE START OF ANY CONSTRUCTION ORINSTALLATION OF UTILITIES.3.THE CONTRACTOR SHALL CONSTRUCT ALL WATER AND SANITARY SEWER SERVICE LINES ANDCONNECTIONS IN ACCORDANCE WITH THE APPLICABLE STANDARDS AND SPECIFICATIONS OF THE CITYOR LOCAL UTILITY PROVIDER.4.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING UTILITY SERVICE CONNECTIONS WITH THEAPPROPRIATE UTILITY COMPANY/OWNER, AND TO OBTAIN ALL PERMITS AND PAY ALL FEES ASREQUIRED FOR SERVICE CONNECTIONS TO UTILITY MAINS.5.UTILITY TRENCHES AND STRUCTURE EXCAVATIONS ARE TO BE SLOPED OR BRACED AND SHEETED ASNECESSARY FOR THE SAFETY OF THE WORKMEN AND THE PROTECTION OF OTHER UTILITIES INCOMPLIANCE WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL REQUIREMENTS.6.UNLESS OTHERWISE NOTED, CONTRACTOR SHALL PROVIDE TRENCHING FOR ALL UTILITY SERVICELINES.7.CONTRACTOR TO SET AND ADJUST ALL PROPOSED UTILITY STRUCTURES, CLEANOUTS, VALVES, METERPITS, ETC. TO FINISH GRADE. EXISTING ITEMS AFFECTED BY THE WORK SHALL BE ADJUSTED ASREQUIRED TO MATCH FINISH GRADE.8.THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPARTMENT TO ENSUREADEQUATE FIRE PROTECTION IS CONSTANTLY AVAILABLE TO THE SITE AND ADJACENT PROPERTIES.CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED WATER MAIN SHUTOFFS WITH THE CITY DURING CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFSWILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT HIS EXPENSE.STORM SEWER NOTES1.STORM SEWER PIPE MATERIALS SHALL BE HDPE DOUBLE-WALL, SMOOTH INTERIOR PIPE (ADS N-12 ORAPPROVED EQUAL) UNLESS OTHERWISE SPECIFIED IN THE PLANS. ALL JOINTS AND STRUCTURECONNECTIONS SHALL BE SOIL-TIGHT (MINIMUM).2.STORM SEWER PIPE SHALL BE BEDDED, INSTALLED, AND BACKFILLED IN ACCORDANCE WITH THEDETAILS INCLUDED IN THE PLANS, MANUFACTURER'S INSTALLATION REQUIREMENTS, AND/ORSTANDARD DETAILS INCLUDED BY REFERENCE.3.ALL CAST-IN-PLACE CONCRETE DRAINAGE STRUCTURES SHALL HAVE A MINIMUM 28 DAY COMPRESSIVESTRENGTH OF 4,000 PSI, TYPE II CEMENT (UNLESS OTHERWISE SPECIFIED) WITH AIR ENTRAININGADMIXTURES AND SHALL CONFORM TO THE LOCAL CITY'S SPECIFICATIONS.4.SMALL DIAMETER STORM SEWER CONNECTIONS (12 INCH DIAMETER AND LESS) SHALL BE MADE WITHREDUCING WYE'S, 45 DEGREE BENDS, AND REDUCING COUPLERS, UNLESS OTHERWISE INDICATED.REFER TO PLAN AND DETAILS FOR SYSTEM LAYOUT.5.ALL CAST-IN-PLACE AND PRE-FABRICATED DRAINAGE STRUCTURES WITHIN PAVED AREAS MUST BEINSTALLED TO MEET (AT A MINIMUM) AASHTO H-20/HS-20 LOAD RATING. THE GENERAL CONTRACTORSHALL CONSULT WITH THE MANUFACTURER OF ANY PRE-FABRICATED STRUCTURE TO CONFIRMINSTALLATION MEASURES REQUIRED TO ENSURE THE AFOREMENTIONED LOAD RATING IS ACHIEVED.FOR ALL PRE-FABRICATED NYLOPLAST® DRAIN BASINS, THE GENERAL CONTRACTOR SHALL POUR ACONCRETE COLLAR UNDER THE FRAME/GRATE/HOOD ASSEMBLY IN THE MINIMUM DIMENSIONSSPECIFIED ON THE MANUFACTURER’S STANDARD DETAIL DRAWINGS TO ACHIEVE H-20/HS-20 LOADRATING. THE GENERAL CONTRACTOR SHALL CONTACT OWNER FOR ADDITIONAL DIRECTION IFH-20/HS-20 INSTALLATION GUIDELINES CANNOT BE OBTAINED FROM THE MANUFACTURER OF ANYPROPOSED PRE-FABRICATED STRUCTURE.GENERAL NOTESC0.12I don't believe any is proposed but this pipe is not allowed on public infrastructure or in the ROW, and I want to double check to ensure none is proposed. HP Storm is typically allowed.All public storm/ storm within theROW is listed as RCP (keynote#25, sheet C2.3) SHEET NUMBER:CPM: SDM: RDM:10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT 1459 Grand AvenueDes Moines, Iowa50309P: 515-226-0128F: 515-223-9873DATE:TCDGBSCALL 811 SEVENTY-TWO HOURS PRIOR TODIGGING, GRADING OR EXCAVATING FOR THEMARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013 Know what'sbelow.before you dig.CallRwww.olsson.comTEL 303.237.2072 1525 Raleigh St. Suite 400 Denver, CO 80204 DATE REVISION DESCRIPTION OF 40GENERAL NOTES1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OREXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREASTREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICTBETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOSTRESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCALENTITY.2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAIDSTANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARSFROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THEEXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIORTO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOESHEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER’SWORK,FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESEPLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPAREDTHESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THEENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITSOFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAYARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER ANDOTHER “DRY” UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS ANDSPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER.6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATEWHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFYTHE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORKBEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWNUNDERGROUND UTILITIES.7.THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVEALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH /IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE.UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THATCONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION ANDFOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGSREQUIRED.9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATIONIS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGNMODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION.10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITYCOMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITHA MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, INADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THEUTILITY COMPANIES.11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATERSYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUMOF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATERUTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OFANY WORK.12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZEPOTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BECONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESSOTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY.14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IFDEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORMSEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FORSTORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROLDIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN.16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGEFACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BETHE RESPONSIBILITY OF THE PROPERTY OWNER(S).17.PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THEDRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THESTORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATERUTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OFOCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BESUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASEOF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THEDEVELOPMENT AGREEMENT.18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THISDEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROMGROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE ORINJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITSWATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.19.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE REPORT FOR THE PROJECT SHALL BE FOLLOWEDAND IMPLEMENTED.20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THEEROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIRBY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARDSURFACE OR LANDSCAPING.21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKEDONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURSBY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-ENDLOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL ARIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALLAPPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFYTHE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITYEROSION CONTROL INSPECTOR (FORT COLLINS – 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THESTART OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OFCONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THEENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THEIMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLICRIGHTOF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE ANDPRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINALSOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINALGEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECTPAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY’S DEFAULT PAVEMENTTHICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGNREPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALLBE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASEAND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTILTHE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT.25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THECONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALLINTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THEENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONSCONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THELETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE ORASPHALT WILL BE ALLOWED ON THE STREETS.26.26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUSTBE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESESTANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALLSERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THEEXCAVATION NECESSARY FOR BUILDING CONNECTIONS.27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAINRESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESEDISTRICTS.28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE INACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREAMITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THELOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING APERMIT.30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITEDTO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHAPUBLICATION 2226, EXCAVATING AND TRENCHING.31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITHMUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FORAPPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THEDEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAYBE REQUIRED BY THE CONSTRUCTION ACTIVITIES.32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANYTYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHOWILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IFTHE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THELABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNINGAND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS.IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPINGRELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLYAPPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS ORHOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THECOMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BEPROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE.36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IFPERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, ANDANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS,ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITSAND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38. IF, DURING THE CONSTRUCTION PROCESS,CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THEPLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITYENGINEER IMMEDIATELY.39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OFRECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’SINSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMITRECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.40.THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OFTHE NEAREST SURVEY BENCHMARKS (2) FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THEINFORMATION SHALL BE AS FOLLOWS:BENCHMARKS—LOCAL ENTITY SURVEY.NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88)CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88)41.ALL STATIONING IS BASED ON FLOWLINE OF ROADWAYS UNLESS OTHERWISE NOTED.42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTINGFENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, ANDIMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT,SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISEINDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/ORPRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITIONEQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BEDOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE.PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THEFINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALLBE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE,AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THEDETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEERAND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITIONEQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES ANDCONDITION AS REQUIRED BY THESE PLANS.45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T”INTERSECTIONS.46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALLBE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIODOF TWO YEARS FROM THE DATE OF ACCEPTANCE.47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY ANDAPPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THEFOLLOWING PRIVATE STREETS:N/A48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: 40' DRIVEWAY WIDTHSITE PLAN NOTES1.REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORMDRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREETIMPROVEMENTS.2.REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONSOF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION.3.THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THEPLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANYCHANGES TO THE PLANS.4.ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEWFROM ADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS DO NOTACCOMPLISH SUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THEPREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH ASCONDUIT, METERS AND PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDINGBUILDING SURFACES.5.ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS APHASING PLAN IS SHOWN WITH THESE PLANS.6.ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS INSECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCEWITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE ANDUNNECESSARY DIFFUSION.7.SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BEAPPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITYSIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY.8.FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUSTPROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM.9.ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED.10.ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSABLE RAMPS MUST BEPROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKINGSPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALLACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORETHAN 1:48 CROSS SLOPE.11.COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, ANDTRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BYTHE PROPERTY OWNER OF THE COMMON AREA. THE PROPERTY OWNER IS RESPONSIBLE FOR SNOWREMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS.12.DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAYSHALL BE IN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITHTHE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THEOWNER/DEVELOPER.13.THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALLSTREET SIDEWALKS ADJACENT TO EACH RESIDENTIAL LOT.14.PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATERESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BECREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OFXERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANYESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS), ODOR-CONTROLLEDCOMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOTBE PLANTED IN TURF GRASS.15.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL ASSTREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TOCONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINSSTANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETEDIMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.16.FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIREOFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THEFIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NOPARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCHROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATEDSHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED ORREPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY.17.PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BYTHE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OFOCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TOALLOW WAY-FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS ORAPPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROMTHE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX-INCHNUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD ANDTHE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN ORMEANS SHALL BE USED TO IDENTIFY THE STRUCTURE.STREET TREE NOTES1.A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTEDON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDESZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALLAPPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS AVIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSORESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.2.CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OFEACH PHASE OF THE DEVELOPMENT. ALL MUST BE INSTALLED AS SHOWN ON THE LANDSCAPE PLAN.APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE.3.STREET LANDSCAPING, INCLUDING STREET TREES, SHALL BE SELECTED IN ACCORDANCE WITH ALLCITY CODES AND POLICIES. ALL TREE PRUNING AND REMOVAL WORKS SHALL BE PERFORMED BY A CITYOF FORT COLLINS LICENSED ARBORS WHERE REQUIRED BY CODE.STREET TREES SHALL BE SUPPLIEDAND PLANTED BY THE DEVELOPER USING A QUALIFIED LANDSCAPE CONTRACTOR.4.THE DEVELOPER SHALL REPLACE DEAD OR DYING STREET TREES AFTER PLANTING UNTIL FINALMAINTENANCE INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS FORESTRY DIVISION. ALLSTREET TREES IN THE PROJECT MUST BE ESTABLISHED, WITH AN APPROVED SPECIES AND OFACCEPTABLE CONDITION PRIOR TO ACCEPTANCE.5.SUBJECT TO APPROVAL BY THE CITY FORESTER -- STREET TREE LOCATIONS MAY BE ADJUSTED TOACCOMMODATE DRIVEWAY LOCATIONS, UTILITY SEPARATIONS BETWEEN TREES, STREET SIGNS ANDSTREET LIGHTS. STREET TREES TO BE CENTERED IN THE MIDDLE OF THE LOT TO THE EXTENTFEASIBLE. QUANTITIES SHOWN ON PLAN MUST BE INSTALLED UNLESS A REDUCTION IS APPROVED BYTHE CITY TO MEET SEPARATION STANDARDS.TREE PROTECTION NOTES1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREABUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL.2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER AFOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THEDISTURBANCE.3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRYSTANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS ACURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTEDEXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET INHEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUCK ORONE-HALF (12) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE ORMOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE.5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THECLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCHAS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TOTHE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES.6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION ORLAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF"RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION(G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY(50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDEPERIMETERS OF SUCH AREAS BEING CLEARED.8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRINGEXCAVATION DEEPER THAN SIC (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOTSYSTEM OF PROTECTED EXISTING TREES AT A MINIUMUM DEPTH OF TWENTY-FOUR (24) INCHES. THEAUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROMTREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW:9.ALL TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD SEASON (FEB1-JULY 31)OR CONDUCT A SURVEY OF TREES ENSURING NO ACTIVE NESTS IN THE AREA.GENERAL LANDSCAPE NOTES1.PLANT QUALITY: ALL PLANT MATERIAL SHALL BE A-GRADE OR NO. 1 GRADE - FREE OF ANY DEFECTS, OFNORMAL HEALTH, HEIGHT, LEAF DENSITY AND SPREAD APPROPRIATE TO THE SPECIES AS DEFINED BYTHE AMERICAN ASSOCIATION OF NURSERYMEN (AAN) STANDARDS. ALL TREES SHALL BE BALL ANDBURLAP OR EQUIVALENT.2.IRRIGATION: ALL LANDSCAPE AREAS WITHIN THE SITE INCLUDING TURF, SHRUB BEDS AND TREE AREASSHALL BE IRRIGATED WITH AN AUTOMATIC IRRIGATION SYSTEM. THE IRRIGATION PLAN MUST BEREVIEWED AND APPROVED BY THE CITY OF FORT COLLINS WATER UTILITIES DEPARTMENT PRIOR TOTHE ISSUANCE OF A BUILDING PERMIT. ALL TURF AREAS SHALL BE IRRIGATED WITH AN AUTOMATICPOP-UP IRRIGATION SYSTEM. ALL SHRUB BEDS AND TREES, INCLUDING IN NATIVE SEED AREAS, SHALLBE IRRIGATED WITH AN AUTOMATIC DRIP (TRICKLE) IRRIGATION SYSTEM, OR WITH AN ACCEPTABLEALTERNATIVE APPROVED BY THE CITY WITH THE IRRIGATION PLANS. THE IRRIGATION SYSTEM SHALLBE ADJUSTED TO MEET THE WATER REQUIREMENTS OF THE INDIVIDUAL PLANT MATERIAL. IRRIGATIONSYSTEMS TO BE TURNED OVER TO THE CITY PARKS DEPARTMENT FOR MAINTENANCE MUST BEAPPROVED BY THE PARKS MANAGER AND MEET PARKS IRRIGATION STANDARDS. DESIGN REVIEWSHALL OCCUR DURING UTILITIES DEPARTMENT IRRIGATION REVIEW PRIOR TO THE ISSUANCE OF ABUILDING PERMIT AND CONSTRUCTION OBSERVATION AND INSPECTION BY PARKS SHALL BEINCORPORATED INTO THE CONSTRUCTION PROCESS.3.TOPSOIL: TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTIONACTIVITY SHALL BE CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION ANDLANDSCAPING.4.SOIL AMENDMENTS: SOIL AMENDMENTS SHALL BE PROVIDED AND DOCUMENTED IN ACCORDANCE WITHCITY CODE SECTION 12-132. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS,SHALL BE THOUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN EIGHT(8) INCHES AND SOILAMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO ADEPTH OF AT LEAST SIX(6) INCHES BY TILLING, DISCING OR OTHER SUITABLE METHOD, AT A RATE OF ATLEAST THREE (3) CUBIC YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OFLANDSCAPE AREA. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, A WRITTENCERTIFICATION MUST BE SUBMITTED TO THE CITY THAT ALL PLANTED AREAS, OR AREAS TO BEPLANTED, HAVE BEEN THOROUGHLY LOOSENED AND THE SOIL AMENDED, CONSISTENT WITH THEREQUIREMENTS SET FORTH IN SECTION 12-132.5.INSTALLATION AND GUARANTEE: ALL LANDSCAPING SHALL BE INSTALLED ACCORDING TO SOUNDHORTICULTURAL PRACTICES IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT ANDHEALTHY GROWTH. ALL LANDSCAPING FOR EACH PHASE MUST BE EITHER INSTALLED OR THEINSTALLATION MUST BE SECURED WITH AN IRREVOCABLE LETTER OF CREDIT, PERFORMANCE BOND,OR ESCROW ACCOUNT FOR 125% OF THE VALUATION OF THE MATERIALS AND LABOR PRIOR TOISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY BUILDING IN SUCH PHASE.6.MAINTENANCE: TREES AND VEGETATION, IRRIGATION SYSTEMS, FENCES, WALLS AND OTHERLANDSCAPE ELEMENTS WITH THESE FINAL PLANS SHALL BE CONSIDERED AS ELEMENTS OF THEPROJECT IN THE SAME MANNER AS PARKING, BUILDING MATERIALS AND OTHER SITE DETAILS. THEAPPLICANT, LANDOWNER OR SUCCESSORS IN INTEREST SHALL BE JOINTLY AND SEVERALLYRESPONSIBLE FOR THE REGULAR MAINTENANCE OF ALL LANDSCAPING ELEMENTS IN GOOD CONDITION.ALL LANDSCAPING SHALL BE MAINTAINED FREE FROM DISEASE, PESTS, WEEDS AND LITTER, AND ALLLANDSCAPE STRUCTURES SUCH AS FENCES AND WALLS SHALL BE REPAIRED AND REPLACEDPERIODICALLY TO MAINTAIN A STRUCTURALLY SOUND CONDITION.7.REPLACEMENT: ANY LANDSCAPE ELEMENT THAT DIES, OR IS OTHERWISE REMOVED, SHALL BEPROMPTLY REPLACED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS.8.THE FOLLOWING SEPARATIONS SHALL BE PROVIDED BETWEEN TREES/SHRUBS AND UTILITIES:40 FEET BETWEEN CANOPY TREES AND STREET LIGHTS15 FEET BETWEEN ORNAMENTAL TREES AND STREETLIGHTS10 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER MAIN LINES6 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER SERVICE LINES.4 FEET BETWEEN SHRUBS AND PUBLIC WATER AND SANITARY AND STORM SEWER LINES4 FEET BETWEEN TREES AND GAS LINES9.ALL STREET TREES SHALL BE PLACED A MINIMUM EIGHT (8) FEET AWAY FROM THE EDGES OFDRIVEWAYS AND ALLEYS PER LUC 3.2.1(D)(2)(A).10.PLACEMENT OF ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE SIGHT DISTANCE CRITERIA ASSPECIFIED BY THE CITY OF FORT COLLINS. NO STRUCTURES OR LANDSCAPE ELEMENTS GREATERTHAN 24" SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENTS WITH THEEXCEPTION OF DECIDUOUS TREES PROVIDED THAT THE LOWEST BRANCH IS AT LEAST 6' FROM GRADE.ANY FENCES WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENT MUST BE NOT MORE THAN 42" INHEIGHT AND OF AN OPEN DESIGN.11.THE FINAL LANDSCAPE PLAN SHALL BE COORDINATED WITH ALL OTHER FINAL PLAN ELEMENTS SO THATTHE PROPOSED GRADING, STORM DRAINAGE, AND OTHER DEVELOPMENT IMPROVEMENTS DO NOTCONFLICT WITH NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THISPLAN.12.MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION -- ASREQUIRED BY SITE CONDITIONS OR PLANT AVAILABILITY. OVERALL QUANTITY, QUALITY, AND DESIGNCONCEPT MUST BE CONSISTENT WITH THE APPROVED PLANS. IN THE EVENT OF CONFLICT WITH THEQUANTITIES INCLUDED IN THE PLANT LIST, SPECIES AND QUANTITIES ILLUSTRATED SHALL BEPROVIDED. ALL CHANGES OF PLANT SPECIES AND LOCATION MUST HAVE WRITTEN APPROVAL BY THECITY PRIOR TO INSTALLATION.13.ALL PLANTING BEDS SHALL BE MULCHED TO A MINIMUM DEPTH OF THREE INCHES.NATURAL AREA BUFFER NOTES1.STANDARDS FOR PROTECTION DURING CONSTRUCTION - THE DIRECTOR SHALL ESTABLISH A "LIMITS OFDEVELOPMENT" ("LOD") LINE(S) TO ESTABLISH THE BOUNDARY OF THE PROJECT OUTSIDE OF WHICH NOLAND DISTURBANCE ACTIVITIES WILL OCCUR DURING THE CONSTRUCTION OF THE PROJECT.2.SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE BUFFER ZONE.3.CONSTRUCTION SHALL BE ORGANIZED AND TIMED TO MINIMIZE THE DISTURBANCE OF SENSITIVESPECIES OCCUPYING OR USING ON-SITE AND ADJACENT NATURAL HABITATS OR FEATURES.4.CONSTRUCTION OF BARRIER FENCING SHALL BE PROVIDED AT THE LIMITS OF THE DEVELOPMENTDURING CONSTRUCTION.FLOODPLAIN AND FLOODWAY NOTES1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YEAR SPRING CREEKFLOODPLAIN.2.DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALLAPPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(CURB & GUTTER, PAVEMENT, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS,UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE SPRING CREEKFLOODPLAIN LIMITS AS DELINEATED ON FINAL DEVELOPMENT DOCUMENTS. ALL ACTIVITIES WITHIN THEFLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPALCODE.3.CONSTRUCTION OF RESIDENTIAL STRUCTURES IS NOT ALLOWED IN THE 100 YEAR FLOODWAY.4.RESIDENTIAL STRUCTURES ARE ALLOWED IN THE 100 YEAR HIGH RISK FLOOD FRINGE PROVIDED THEYMEET ALL ELEVATION REQUIREMENTS OF CHAPTER 10 OF THE CITY MUNICIPAL CODE.5.NON-STRUCTURAL DEVELOPMENT (FENCES, DETENTION PONDS, HARD SURFACE PATHS, FILL,DRIVEWAYS, PARKING AREA, VEGETATION, ETC.) IS ALLOWED WITHIN THE 100 YEAR FLOODWAY,PROVIDED THE DEVELOPMENT WILL NOT CAUSE A RISE IN THE BASE FLOOD ELEVATION OR A CHANGETO THE FLOODWAY OR FLOOD FRINGE BOUNDARIES. NON-STRUCTURAL DEVELOPMENT IS NOTRESTRICTED IN THE FLOOD FRINGE.CONFIDENTIAL DOCUMENT:INFORMATION CONTAINED IN THIS DOCUMENT ISPROPRIETARY TO KUM & GO, L.C. AND SHALL NOTBE DISTRIBUTED.CITY GENERAL NOTESC0.23TREE DIAMETER OR BREAST HEIGHT (INCHES)AUGER DISTANCE FROM FACE OF TREE (FT)0-213-425-9510-141015-1912OVER1915I believe there are some utility and storm notes missing from these LCUASS notes. Please include with future submittal.Section D and E from LCUASSAppendix E-2 have been added PARCEL No. 9724135000OWNER: N/A-DUNLAP PARCEL 2-PARCEL No. 9724105001ADDRESS: 949 E PROSPECT ROADOWNERS: DUNLAP RICHARD WCITY ZONING: N-CFLOOD ZONE X1.46 Acres (63,549 sq.ft.) Gross1.20 Acres (52,347 sq.ft.) Net*Prospect Road(70' Right-of-Way Width)-35MPH Speed Limit--SUBJECT PROPERTY-LOT 5, EAST ACRESPARCEL No. 9724106004OWNER: MATLOCK JAMES J-DUNLAP PARCEL 1-PARCEL No. 9724106017ADDRESS: 947 E PROSPECT ROADOWNERS: DUNLAP RICHARD W AND PAMELA SCITY ZONING: N-CFLOOD ZONE X-CITY OF FORT COLLINS PARCEL-PARCEL No. 9724106905ADDRESS: 945 E PROSPECT ROADOWNERS: CITY OF FORT COLLINSCITY ZONING: N-CFLOOD ZONE X & AE-DUNLAP PARCEL 3-PARCEL No. 9724106016ADDRESS: 1607 S LEMAY AVENUEOWNERS: DUNLAP RICHARD WCITY ZONING: N-CFLOOD ZONE X & AEPARCEL No. 9724132000OWNER: N/APARCEL No. 9724106006OWNER: RHT LLCPARCEL No. 9724106030OWNER: RHT LLCPARCEL No.8719233006OWNER: PARK CENTRAL OWNERS ASSNPARCEL No.8719233001OWNER: BRUNNER KENTON H (1/2)PARCEL No. 8718332004OWNER: SURGERY CENTEROF FORT COLLINS LLCPARCEL No. 9713408192OWNER: PRD PROPERTIES LLCPARCEL No. 9713408193OWNER: PLAUT JOSETTE MLake Street Lemay Avenue (Right-of-Way Width Varries) -35MPH Speed Limit- REVISIONS DATE REVISION DESCRIPTIONSHEET NUMBER:CPM: SDM: RDR:11/24/2020#951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT ST, FORT COLLINS 6400 Westown ParkwayWest Des Moines, Iowa50266P: 515-226-0128F: 515-223-9873DATE:ROBERT FIEBIG IIIRYAN HALDERDAN GARNEAUCALL 811 SEVENTY-TWO HOURS PRIOR TODIGGING, GRADING OR EXCAVATING FOR THEMARKING OF UNDERGROUND MEMBER UTILITIES.Know what'sbelow.before you dig.CallRALTA/NSPS LAND TITLE SURVEY1 OF 2ALTA/NSPS LAND TITLE SURVEYKUM & GO #951Lot 5, East Acres, Being a Portion of the Northeast Quarter of Section 24,Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of ColoradoVICINITY MAPLEGENDPROSPECT ROADLEMAY AVENUESTUART STREETPITKIN STREETRIVERSIDE STREETELIZABETH STREET Prospect Road(70' Right-of-Way Width)-35MPH Speed Limit-Lake Street DDAADCDDCAAAAABBBCBBCAACBDBDDBDDCCAABBCBBBAABADADDDDDDDDDCDBABBAABCACBCBBBLemay Avenue (Right-of-Way Width Varries) -35MPH Speed Limit- REVISIONS DATE REVISION DESCRIPTIONSHEET NUMBER:KG PROJECT TEAM:6400 Westown ParkwayWest Des Moines, Iowa50266P: 515-226-0128F: 515-223-9873DATE:CALL 811 SEVENTY-TWO HOURS PRIOR TODIGGING, GRADING OR EXCAVATING FOR THEMARKING OF UNDERGROUND MEMBER UTILITIES.Know what'sbelow.before you dig.CallRALTA/NSPS LAND TITLE SURVEYKUM & GO #951Lot 5, East Acres, Being a Portion of the Northeast Quarter of Section 24,Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins,County of Larimer, State of ColoradoLEGENDDETAIL B11/24/2020#951 - FORT COLLINS, CO 949 E PROSPECT ST, FORT COLLINS ALTA/NSPS LAND TITLE SURVEY2 OF 2DETAIL ACPM: SDM: RDR:ROBERT FIEBIG IIIRYAN HALDERDAN GARNEAU E. PROSPECT RD LEMAY AVEPROPERTY BOUNDARY EXISTING CURB AND GUTTER LEGEND BARBED WIRE FENCEX MINOR CONTOUR MAJOR CONTOUR EXISTING WATER LINE EXISTING UNDERGROUND POWER EXISTING GAS LINE EXISTING FIBER OPTIC LINEFO GAS GAS UGE UGE W W SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 FLAG NOTES: REMOVAL OF ENTIRE EXISTING BUILDING STRUCTURE, ROOF, FLOORS, WALLS, STAIRS, FOOTINGS, AND STRUCTURAL COLUMNS IN THEIR ENTIRETY. REMOVE ALL PAVEMENT, SIDEWALKS, WATER SERVICE LINES, CURB STOPS, SANITARY SEWER SERVICE LINES, AND CLEANOUTS. REMOVE ALL APPURTENANCES AND UTILITIES FOUND WITHIN THE PROPOSED AND EXISTING BUILDING AREAS. UTILITIES SHALL BE REMOVED PER RESPECTIVE UTILITY COMPANY'S REQUIREMENTS, I.E. ALL UTILITY SERVICES SHALL BE REMOVED TO THE MAIN LINE AND CAPPED. REMOVE ALL BUILDING CONTENTS, DEBRIS, ETC. WITHIN BUILDING. CONTRACTOR TO COORDINATE UTILITY REMOVALS WITH RESPECTIVE UTILITY COMPANIES TO ENSURE CORRECT REMOVAL AND SHUTOFF. ALL MATERIAL SHALL BE REMOVED FROM SITE AND LEGALLY DISPOSED OF PER LOCAL CODES AND REGULATIONS. EXISTING UNDERGROUND ELECTRIC LINE TO BE REMOVED OR RELOCATED, COORDINATE WITH LOCAL PROVIDER EXISTING ELECTRIC STRUCTURE TO BE REMOVED OR RELOCATED, COORDINATE WITH LOCAL PROVIDER EXISTING ABOVE GROUND ELECTRIC LINE TO BE REMOVED, COORDINATE WITH LOCAL PROVIDER, SEE NOTE 1 EXISTING UNDERGROUND FIBER OPTIC LINE TO BE REMOVED, COORDINATE WITH LOCAL PROVIDER, SEE NOTE 1 EXISTING CURB & GUTTER TO BE REMOVED, LENGTH PER PLAN EXISTING FUEL PUMP, UNDERGROUND STORAGE TANK, AND LIDS TO BE REMOVED EXISTING GAS LINE TO BE REMOVED, SEE NOTE 1 EXISTING GAS STRUCTURE TO BE REMOVED, COORDINATE WITH LOCAL PROVIDER EXISTING GRAVEL TO BE REMOVED EXISTING LANDSCAPING EDGE TO BE REMOVED EXISTING WOODEN FENCE TO BE REMOVED EXISTING SITE WALL TO BE REMOVED EXISTING POST TO BE REMOVED EXISTING SIGN TO BE REMOVED EXISTING TREE TO BE REMOVED EXISTING PAVEMENT TO BE REMOVED, AREA PER PLAN EXISTING WATERLINE TO BE REMOVED AND CAPPED AT MAIN, COORDINATE WITH LOCAL PROVIDER 100-YEAR SPRING CREEK FLOODPLAIN PROTECT TREES IN PLACE EXISTING STREET CUT, REMOVE ASHPALT AREA PER PLAN EXISTING STORM INLETS TO BE REMOVED EXISTING TRAIL TO BE REMOVED TO PROPERTY BOUNDARY EXISTING STRUCTURE TO REMAIN AND BE PROTECTED IN PLACE EXISTING SANITARY SEWER TO BE ABANDONED AT MAIN EXISTING STORM INLET TO BE PROTECTED IN PLACE EXISTING STORM PIPE TO BE REMOVED, LENGTH PER PLAN EXISTING FIBER OPTIC STRUCTURE TO BE REMOVED OR RELOCATED, COORDINATE WITH LOCAL PROVIDER POWER POLE TO BE REMOVED OR RELOCATED PER CITY FINAL ELECTRIC DESIGN ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. BASIS OF BEARINGS:DEMOLITION PLANNOTES: 1. CONTRACTOR TO LOCATE ALL EXISTING WATER AND SANITARY SEWER SERVICE LINES AND ABANDON AT MAIN PER CITY STANDARD. 2. NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. C0.5 6 For final plan, I will be looking for more detail about how these pipes will be disconnected at these junctions and what will remain. All to be shown at final. Please contact me if assistance is needed with numbers and approximate locations of w/ww services. Keynotes have been revised per discussion between Olsson & COFC. Keynote 1 has been revised to not include demolition information on the existing utilities. COFC has provided additional information on the approximate location of all water and sanitary sewer service lines. This information has been added and listed as demolition where necessary. VAN 11 E PROSPECT RD S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 SECTION 1 4945 4950 4955 4960 4965 4970 4975 4945 4950 4955 4960 4965 4970 4975 0+00 1+00 1+20.16 SECTION 2 4945 4950 4955 4960 4965 4970 4975 4945 4950 4955 4960 4965 4970 4975 0+00 1+00 1+31.34DOCUMENT REVISION DATE: JULY 2013EXISTING PROPERTY LINE BASIS OF BEARING: ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO.PROJECT PLANPROPERTY BOUNDARY PROPOSED SETBACK LINE EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER ADA ACCESSIBLE ROUTE COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURESTORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR PROPOSED BOLLARD PROPOSED TRANSFORMER SIGHT TRIANGLE GUY WIRE POWER POLE LEGEND GRATED STORM INLET SAWCUT LINE SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 FLAG NOTES: PROPOSED 40' FLAGPOLE WITH 8'x12' AMERICAN FLAG (SEE DETAIL SHEET C4.7) PROPOSED 7' MONUMENT SIGN, OWNER SUPPLIED & CONTRACTOR INSTALLED (SEE DETAIL SHEET C4.7) PROPOSED BIKE RACK, OWNER SUPPLIED & CONTRACTOR INSTALLED (SEE DETAIL SHEET C4.7) PROPOSED 15' X 25' TRASH ENCLOSURE WITH NICHIHA (SEE ARCHITECTURAL PLANS FOR DETAILS) PROPOSED AIR MACHINE ON 4' X 4' PAD (SEE DETAIL SHEET C4.5) PROPOSED 4" BUILDING SIDEWALK (SEE SHEET C4.6) PROPOSED INTEGRAL CURB (SEE SHEET C4.5) PROPOSED ZERO CURB WITH BOLLARDS, 5' SPACING (TYP) (SEE SHEET C4.5) PROPOSED ADA RAMP (SEE SHEET C4.5) PROPOSED FIRE HYDRANT (SEE SHEET C3.1) PROPOSED PORTLAND CEMENT CONCRETE PAVEMENT (SEE SHEET C4.1) PROPOSED UNDERGROUND DETENTION PAINT CURB ALONG FRONT OF TANKS YELLOW PROPOSED SITE SIDEWALK PROPANE CAGE (SEE SHEET C4.9) ICE MERCHANDISE FIREWOOD MISCELLANEOUS MERCHANDISE PROPOSED 4'X8' TREE GRATE PROPOSED RIGHT TURN LANE (SEE SHEETS C4.4 & C4.5) PROPOSED CITY CURB & GUTTER (SEE SHEETS C4.4 & C4.5) 10' PROPOSED SIDEWALK/BIKE LANE (SEE SHEETS C4.1) PROPOSED FULL MOVEMENT ACCESS 100-YEAR SPRING CREEK FLOODPLAIN EXISTING LOT FOR CITY HISTORICAL HOUSE TO REMAIN CONNECT TO EXISTING CURB & GUTTER CONNECT TO EXISTING SIDEWALK SIGHT DISTANCE TRIANGLE LENGTH PER PLAN REMOTE FILL LIDS (SEE PETRO PLANS FOR DETAILS) PROPOSED 6" ROLLOVER CURB (SEE SHEET C4.5) 12' X 60' DELIVERY VEHICLE LOADING ZONE (SEE SHEET C4.1) PROPOSED ELECTRIC TRANSFORMER WITH BOLLARDS (SEE SHEET C3.1) TRANSITIONS FROM ROLLOVER TO VERTICAL CURB IN 3' SAWCUT LINE, CONTRACTOR TO SAWCUT EXISTING ASPHALT TO A CLEAN STRAIGHT EDGE PROPOSED SITE LIGHT POLE (SEE SHEET C3.1) PROPOSED 8'X30' BUS STOP PAD PROPOSED FIRE LANE SIGN (SEE SHEET C4.10) PROPOSED DRAINAGE EASEMENT PROPOSED SCREENWALL (SEE SHEET L1.3 OF THE PSP) PROPOSED 2' CURB CUT PROPOSED FENCE (SEE SHEET L1.3 OF THE PSP) NOTES: 1.FIRE LANES SHALL BE DESIGNED AS A FLAT, HARD, ALL WEATHER DRIVING SURFACE CAPABLE OF SUPPORTING 40 TONS. C1.0 7 T EV EV VAN T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 FLOOD ZONE: 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YEAR SPRING CREEK FLOODPLAIN. 2. DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (CURB & GUTTER, PAVEMENT, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE SPRING CREEK FLOODPLAIN LIMITS AS DELINEATED ON FINAL DEVELOPMENT DOCUMENTS. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. BENCHMARKS: PROJECT BENCHMARK: NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) SITE BENCHMARK: CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) ELEVATIONS BROUGHT TO THE SITE VIA GPS OBSERVATIONS USING THE TRIMBLE VRS NETWORK GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE NOTE: NOTES: 1.ALL POINTS REFER TO TOP BACK OF CURB UNLESS OTHERWISE NOTED. 2.TOP OF ISLAND TO BE 2" ABOVE HIGHEST ELEVATION OF SURROUNDING PAVEMENT - TYP. (SEE PETROLEUM PLANS) 3.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 4.ON SITE STORM STRUCTURE INSERTION POINTS REFERENCE TOP OF GRATE OR SOLID COVER ELEVATION AT CENTER OF GRATE OR SOLID COVER. 5.FOR ROAD DESIGN, SEE SHEETS C4.4 & C4.5 GRADING PLANLOD LEGEND TC=TOP BACK OF CURB TS=TOP OF SLAB SW=SIDEWALK ME=MATCH EXISTING FG=FINISHED GRADE FFE=FINISHED FLOOR ELEVATION FL=FLOWLINE RIM=RIM TI= TOP OF INLET TG = TOP OF GRATE C2.1 8 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 FLOOD ZONE: 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YEAR SPRING CREEK FLOODPLAIN. 2. DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (CURB & GUTTER, PAVEMENT, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE SPRING CREEK FLOODPLAIN LIMITS AS DELINEATED ON FINAL DEVELOPMENT DOCUMENTS. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE NOTE: DETAIL 1 SCALE: 1"=5'DETAILED GRADING PLANLOD LIMITS OF DISTURBANCE PROPOSED PROPERTY LINE EXISTING CURB AND GUTTER GRADE BREAK COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB LEGEND EXISTING BOUNDARY SWALE FLOWLINE NOTES: 1.ALL POINTS REFER TO TOP BACK OF CURB UNLESS OTHERWISE NOTED. 2.ALL UNDERGROUND TANK LIDS IN DRIVE SHALL BE PLACED 1" ABOVE SURROUNDING PAVEMENT. ELEVATIONS PROVIDED AT THE UNDERGROUND TANK LIDS REFERENCE THE TOP OF PAVEMENT. 3.INSTALL CONCRETE STEPS, EACH STEP SHALL BE 12" RUN AND 7" RISE. ALL ST SPOTS ARE AT THE TOP OF THE STAIR. 4.STORM INLETS WITHIN RIGHT-OF-WAY REFERENCE POINTS MATCH TOP OF INLET BOX. DETAIL 2 SCALE: 1"=5' DETAIL 3 SCALE: 1"=5' TC=TOP BACK OF CURB TS=TOP OF SLAB SW=SIDEWALK ME=MATCH EXISTING FG=FINISHED GRADE FFE=FINISHED FLOOR ELEVATION FL=FLOWLINE RIM=RIM TI= TOP OF INLET TG = TOP OF GRATE BENCHMARKS: PROJECT BENCHMARK: NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) SITE BENCHMARK: CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) ELEVATIONS BROUGHT TO THE SITE VIA GPS OBSERVATIONS USING THE TRIMBLE VRS NETWORK C2.2 9 VAN 11 S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 T EV EV STORM STRUCTURE TABLESTORM PIPE TABLE DOCUMENT REVISION DATE: JULY 2013SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 DRAINAGE PLANEXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR LIMITS OF DISTURBANCELOD PROPOSED STORM SEWER EXISTING STORM SEWER LEGEND: EXISTING BOUNDARY PROPOSED PROPERTY LINE EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB ROAD CENTERLINE GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE BREAK IN GRADE NOTE: FLOOD ZONE: BENCHMARKS: PROJECT BENCHMARK - NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YEAR SPRING CREEK FLOODPLAIN. 2. DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (CURB & GUTTER, PAVEMENT, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE SPRING CREEK FLOODPLAIN LIMITS AS DELINEATED ON FINAL DEVELOPMENT DOCUMENTS. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. NOTES: 1.REFERENCE POINTS FOR STRUCTURES ARE AS FOLLOWS: ·CENTER OF LID FOR MANHOLES/CLEANOUTS ·CENTER OF INLET FACE AT TOP OF CURB FOR CURB INLETS ·CENTER OF INLET GRATE FOR GRATED INLETS ·CENTER AT INVERT OF INCOMING PIPE TO FLARED END SECTION 2.STORM SEWER PIPE LENGTHS ARE MEASURED AS FOLLOWS: ·CENTER OF MANHOLES/CLEANOUTS ·INSIDE WALL OF CURB INLET ·CENTER OF GRATE INLET ·LENGTHS LISTED ARE 2D MEASUREMENTS 3.ALL PROPOSED DRAINAGE STRUCTURES AND PIPES ON THIS SITE ARE PRIVATELY OWNED AND MAINTAINED. DRAINAGE STRUCTURES AND PIPES BECOME PUBLICLY OWNED ONCE THEY CONNECT TO THE EXISTING MANHOLE. 4.ALL PROPOSED PIPES ARE HDPE, EXCEPT AS NOTED. 5.ALL PROPOSED ONSITE INLETS ARE TO BE EQUIPPED WITH FLEXSTORM INSERTS (SEE SHEET C2.6) FLAG NOTES: INSTALL STORM SEWER PIPE; LENGTH SIZE AND SLOPE PER TABLE INSTALL NYLOPLAST 12" DRAIN BASIN w/ TRAFFIC RATED SOLID LID, SEE DETAIL SHEET C2.4 INSTALL NYLOPLAST 2X3 CURB INLET WITH HIGH FLOW GRATE AND FLEXSTORM FILTER BAGS. SEE DETAIL SHEET C2.6 INSTALL STORMTECH OUTLET STRUCTURE (SEE SHEET C2.5) CONNECT TO CANOPY DOWNSPOUT, SEE DETAIL SHEET C2.4 CONNECT TO BUILDING DOWNSPOUT, SEE ARCHITECTURAL PLANS FOR DOWNSPOUT LOCATIONS INSTALL 45° STORM SEWER BEND INSTALL 90° STORM SEWER BEND INSTALL 8" INSERTA TEE (SEE SHEET C2.4) INSTALL 6" INSERTA TEE (SEE SHEET C2.4) INSTALL STORMTECH INLET STRUCTURE (SEE SHEET C2.5) INSTALL PRIVATE UNDERGROUND DETENTION FACILITY (SEE SHEET C2.5) CONNECT TO EXISTING MANHOLE, GROUT AND SEAL CONNECTION INSTALL ADS 8" DURASLOT VARIABLE HEIGHT SLOTTED DRAIN. LENGTH, SLOPE, TOP OF GRATE ELEVATIONS, & INVERTS PER PLAN (SEE SHEET C2.6) INSTALL NYLOPLAST 8" DRAIN BASIN w/ LANDSCAPE DOME GRATE AND SNOUT, SEE DETAIL SHEET C2.6 INSTALL 48" MANHOLE INSTALL NYLOPLAST 15" DRAIN BASIN w/ TRAFFIC RATED SOLID LID, SEE DETAIL SHEET C2.4 100-YEAR SPRING CREEK FLOODPLAIN EXISTING STORM INLET TO BE PROTECTED IN PLACE INSTALL CLEANOUT INSTALL 5' CDOT TYPE R INLET (SEE SHEET C2.4) PROPOSED DRAINAGE EASEMENT PROPOSED SPILL CONTAINMENT STRUCTURE (SEE SHEET C2.6) SPILL CONTAINMENT STRUCTURE VALVE (SEE SHEET C2.6) INSTALL REINFORCED CONCRETE STORM SEWER PIPE; LENGTH SIZE AND SLOPE PER TABLE C2.3 10 Please review info needed on the drainage plan for final including basins, summary tables, etc. This sheet has been renamed to "STORM SEWER PLAN" to better reflect what is shown. The described "drainage plan" requirements are included within the drainage report's drainage basin map. SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 DRAINAGE DETAILSHDPE PIPE BEDDING DETAILEND OF RUN “”PLAN VIEW C2.4 11 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 DRAINAGE DETAILSPROJECT NO: DRAWN BY: DATE: STORMTECH INLET MANHOLE 020-2883 06/10/2022 MWB WEIR CONFIGURATION PROJECT NO: DRAWN BY: DATE: STORMTECH OUTLET MANHOLE 020-2883 06/10/2022 MWB WEIR CONFIGURATION C2.5 12 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 DRAINAGE DETAILSDESCRIPTION DRAWING NUMBER DATE SCALE SOLIDS SETTLE ON BOTTOM ANTI-SIPHON DEVICE OIL- DEBRIS HOOD SPECIFICATION AND INSTALLATION (TYPICAL) 09/08/15 NONE OUTLET PIPE SNOUT OIL-DEBRIS HOOD HOOD SPECIFICATION FOR CATCH BASINS AND WATER QUALITY STRUCTURES MOUNTING FLANGE 1" PVC ANTI-SIPHON PIPE ADAPTER REMOVABLE WATERTIGHT ACCESS PORT, 6"-10" OPENING OUTLET PIPE (HIDDEN) CONFIGURATION DETAIL TYPICAL INSTALLATION FOAM GASKET W/ PSA BACKING (TRIM TO LENGTH) MOUNTING FLANGE DETAIL B GASKET COMPRESSED BETWEEN HOOD AND STRUCTURE (SEE DETAIL B) INSTALLATION NOTE: POSITION HOOD SUCH THAT BOTTOM FLANGE IS A DISTANCE OF 1/2 OUTLET PIPE DIAMETER (MIN.) BELOW THE PIPE INVERT. MINUMUM DISTANCE FOR PIPES < 12" I.D. IS 6". STAINLESS BOLT ANCHOR SHIELD EXPANSION CONE (NARROW END OUT) DRILLED HOLE DETAIL A ANCHOR W/ BOLT (SEE DETAIL A) 1/2 D INSTALLATION DETAILNOTES: 1. ALL HOODS AND TRAPS FOR CATCH BASINS AND WATER QUALITY STRUCTURES SHALL BE AS MANUFACTURED BY: BEST MANAGEMENT PRODUCTS, INC. 53 MT. ARCHER RD. LYME, CT 06371 (860) 434-0277, (860) 434-3195 FAX TOLL FREE: (800) 504-8008 OR (888) 434-0277 WEB SITE: www.bmpinc.com OR PRE-APPROVED EQUAL 2. ALL HOODS SHALL BE CONSTRUCTED OF A GLASS REINFORCED RESIN COMPOSITE WITH ISO GEL COAT EXTERIOR FINISH WITH A MINIMUM 0.125" LAMINATE THICKNESS. 3. ALL HOODS SHALL BE EQUIPPED WITH A WATERTIGHT ACCESS PORT, A MOUNTING FLANGE, AND AN ANTI-SIPHON VENT PIPE AND ELBOW AS DRAWN. (SEE CONFIGURATION DETAIL) 4. THE SIZE AND POSITION OF THE HOOD SHALL BE DETERMINED BY OUTLET PIPE SIZE AS PER MANUFACTURER'S RECOMMENDATION (SNOUT SIZE ALWAYS LARGER THAN PIPE SIZE). 5. THE BOTTOM OF THE HOOD SHALL EXTEND DOWNWARD A MINIMUM DISTANCE EQUAL TO 1/2 THE OUTLET PIPE DIAMETER WITH A MINIMUM DISTANCE OF 6" FOR PIPES <12" I.D. 6. THE ANTI-SIPHON VENT SHALL EXTEND ABOVE HOOD BY MINIMUM OF 3" AND A MAXIMUM OF 12" ACCORDING TO STRUCTURE CONFIGURATION. 7. THE SURFACE OF THE STRUCTURE WHERE THE HOOD IS MOUNTED SHALL BE FINISHED SMOOTH AND FREE OF LOOSE MATERIAL AND PIPE SHALL BE FINISHED FLUSH TO WALL. 8. ALL STRUCTURE JOINTS SHALL BE WATERTIGHT. 9. THE HOOD SHALL BE SECURELY ATTACHED TO STRUCTURE WALL WITH 3/8' STAINLESS STEEL BOLTS AND OIL-RESISTANT GASKET AS SUPPLIED BY MANUFACTURER. (SEE INSTALLATION DETAIL) 10. INSTALLATION INSTRUCTIONS SHALL BE FURNISHED WITH MANUFACTURER SUPPLIED INSTALLATION KIT. INSTALLATION KIT SHALL INCLUDE: A. INSTALLATION INSTRUCTIONS B. PVC ANTI-SIPHON VENT PIPE AND ADAPTER C. OIL-RESISTANT CRUSHED CELL FOAM GASKET WITH PSA BACKING D. 3/8" STAINLESS STEEL BOLTS E. ANCHOR SHIELDS OIL AND DEBRIS D FRONT VIEW SIDE VIEW SP-SN SNOUT OIL-WATER-DEBRIS SEPARATOR US Patent # 6126817, 7951294, 7857966, 8512556 Canada Patent # 2285146, 2690156, 2690156 others pending *NOTE- SUMP DEPTH OF 36" MIN. FOR UP TO 12" ID PIPE. OUTLET. FOR PIPES 15" ID AND ABOVE SUMP DEPTH OF 2.5 TO 3 TIMES PIPE ID RECOMMENDED (E.G. 5' DEEP for 24" PIPE) SEE NOTE* INLET PIPE FINISHED GRADEVALVE BOX ACCESS LID GATE VALVE INSTALL HANDWHEEL SHUT OFF 6-9" FROM VALVE BOX LID 6"-9" MODIFIED SPILL CONTROL STRUCTURE C2.6 13 Will look for final details, dimensions at final. Thank you. Dimensions provided. SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SFSFSF SFSFSFSF SFSFSF100-YEAR SPRING CREEK FLOODPLAIN 100-YEAR SPRING CREEK FLOODPLAINLOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 PH. 1 EROSION CONTROL PLANNOTE: EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR LEGEND: PROPERTY BOUNDARY EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE EXISTING LOT LINE ROAD CENTERLINE LOD LIMITS OF DISTURBANCE PROPOSED STORM SEWERSDSD EXISTING STORM SEWERSDSD INSTALL VEHICLE TRACKING PAD, PER DETAIL, SEE SHEET C2.11 INSTALL SILT FENCE, PER SILT FENCE DETAIL, SEE SHEET C2.11 SF INSTALL INLET PROTECTION, PER DETAIL, SEE SHEET C2.12 EROSION CONTROL NOTES: 1) ALL STREET, SANITARY SEWER, STORM SEWER AND WATER CONSTRUCTION SHALL CONFORM TO CITY STANDARDS AND SPECIFICATIONS CURRENT AT DATE OF EXECUTION OF THE DEVELOPMENT AGREEMENT PERTAINING TO THIS DEVELOPMENT. ANY CONSTRUCTION OCCURRING THREE YEARS AFTER THE EXECUTION OF THE DEVELOPMENT AGREEMENT SHALL REQUIRE RE-EXAMINATION OF THE PLANS BY THE DIRECTOR WHO MAY REQUIRE THAT THEY BE MADE TO CONFORM TO STANDARDS AND SPECIFICATIONS CURRENT AT THAT TIME. 2) THE TYPE, SIZE, LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE AS SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNKNOWN UNDERGROUND UTILITIES. 3) THESE PLANS HAVE BEEN REVIEWED BY THE CITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY ENGINEER, OR THE CITY FOR ACCURACY OR CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT THE QUANTITIES OF THE ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE CITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. 4) MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNERS. 5) IF FILL OR DREDGED MATERIAL IS DISCHARGED INTO WATERS OF THE UNITED STATES, A USACE 404 PERMIT IS REQUIRED. 6) IF CONSTRUCTION AFFECTS ANY COLORADO HIGHWAY, A COLORADO DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PERMIT IS REQUIRED. 7) DOWNSTREAM INLETS AT 1629 S. LEMAY AVE. MUST BE PROTECTED WITH ROCK SOCK INLET BMP'S. 8) CONTRACTOR TO ENSURE ROCK SOCK INLET BMP'S ON ARTERIAL STREETS DO NOT BLOCK VEHICLE TRAVEL LANES. 9) NO TRACKING OF DEBRIS OR SEDIMENT SHALL BE ALLOWED ON CITY STREETS, IF ANY TRACKING DOES OCCUR IT SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. INSTALL WATTLES, PER DETAIL, SEE SHEET C2.12 CONSTRUCTION & EROSION CONTROL SCHEDULE: 1.SILT FENCE SHALL BE INSTALLED IN THE PROPOSED LOCATIONS FOR PERIMETER CONTROL. 2.EROSION CONTROL SHALL BE INSPECTED AND MAINTAINED UNTIL FINAL GRADING, LANDSCAPING, AND STABILIZATION IS ACHIEVED. ONCE FINAL STABILIZATION HAD BEEN ACHIEVED, TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED. 3.ALL EROSION CONTROL MEASURES TO BE INSTALLED PER DETAILS AND SPECIFICATIONS SHOWN WITHIN THESE PLANS AND THE STORMWATER MANAGEMENT PLAN (SWMP) REPORT. 4.ALL DISTURBED AREAS NOT COVERED BY PAVEMENT OR SEED/MULCH SHALL BE PERMANENTLY LANDSCAPED ACCORDING TO THE LANDSCAPE PLAN. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THIS PLAN THROUGHOUT CONSTRUCTION AND PERFORMING INSPECTIONS/MAINTENANCE PER THE CDPHE PERMIT, UNTIL SUCH TIME THE PERMIT IS CLOSED. CONSTRUCTION SEQUENCE CHART: SITE INFORMATION TOTAL DISTURBED AREA 1.35 AC TOTAL ON-SITE DISTURBED AREA 0.92 AC TOTAL OFF-SITE DISTURBED AREA 0.43 AC TOTAL STAGING/STORAGE AREA STABILIZED STAGING AREA: 2,910.93 SF STOCKPILE MANAGEMENT AREA: 1,020.13 SF ESTIMATED % EXPOSED 100% ESTIMATED % VEGETATIVE 30% SOIL INFORMATION HYDROLOGIC SOIL GROUP C: NUNN CLAY AND SATANA LOAM WITH SHORT PASTURED/LAWN AND GRASSES WITH SHRUBS AND TREES GOUNDWATER DEPTH HIGHEST RECORDED DEPTH FROM EXISTING GRADE: 7.1' LOWEST RECORDED DEPTH FROM EXISTING GRADE: 13.7 NUMBER OF PHASES 3 PHASES TOTAL VOLUME OF IMPORT/EXPORT 1,692.5 CUBIC YARDS OF FILL STEEPEST SLOPE 4:1 RECEIVING WATERS SPRING CREEK 100 YEAR RUNOFF COEFFICIENT (AFTER CONSTRUCTION)C2 = 0.77 C100 = 0.96 SURFACE COVERAGE (AFTER CONSTRUCTION) PAVEMENT AREA = 40,040.47 SF ROOF AREA = 6,658 SF LANDSCAPE AREA = 11,988 SF (REFER TO LANDSCAPE PLAN BREAKDOWN OF SOD/SEED) OWNER/DEVELOPER/APPLICANT: ENGINEER: THE OWNER WILL COMPLY WITH THE REQUIREMENTS OF THE EROSION AND STORMWATER QUALITY CONTROL PLAN INCLUDING TEMPORARY BMP INSPECTION REQUIREMENTS AND FINAL STABILIZATION REQUIREMENTS. I ACKNOWLEDGE THE RESPONSIBILITY TO DETERMINE WHETHER THE CONSTRUCTION ACTIVITIES ON THESE PLANS REQUIRE COLORADO DISCHARGE PERMIT SYSTEM (CDPS) PERMITTING FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. DEVELOPER/OWNER SIGNATURE: ______________________________________ NAME OF DEVELOPER/OWNER: RYAN HALDER DATE: _____________ DBA: KUM & GO, L.C. PHONE: 515.457.6232 TITLE: SITE DEVELOPMENT MANAGER EMAIL: RYAN.HALDER@KUMANDGO.COM ADDRESS: 1459 GRAND AVEUNE, DES MOINES, IA 50309 FAX: 515.226.1595 DEVELOPER/OWNER'S STATEMENT THIS EROSION AND STORMWATER QUALITY CONTROL/GRADING PLAN WAS PREPARED UNDER MY DIRECTION AND SUPERVISION AND IS CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. IF SUCH WORK IS PERFORMED IN ACCORDANCE WITH THE GRADING AND EROSION CONTROL PLAN, THE WORK WILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY, OR ADVERSELY AFFECT THE SAFETY, USE, OR STABILITY OF A PUBLIC WAY, DRAINAGE CHANNEL, OR OTHER PROPERTY. SIGNATURE: _________________________________ DATE: ________ PRINTED NAME: ______________________________ ENGINEER'S STATEMENT SWMP ADMINISTRATOR OLSSON, INC. 1880 FALL RIVER DRIVE, SUITE 200 LOVELAND, CO 80538 CONTACT: ERICA MORTON PH:(970) 635.3700 E:EMORTON@OLSSON.COM KUM & GO 1904, L.L.C. 1459 GRAND AVENUE DES MOINES, IA 50309 CONTACT: DAN GARNEAU PH: (515)226.0128 E: DAN.GARNEAU@KUMANDGO.COM SAME INFO AS OWNER/DEVELOPER/APPLICANT BASIS OF BEARINGS: ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. BENCHMARKS: PROJECT BENCHMARK: NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) SITE BENCHMARK: CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) ELEVATIONS BROUGHT TO THE SITE VIA GPS OBSERVATIONS USING THE TRIMBLE VRS NETWORK C2.7 14 T EV EV SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SFSFSF SFSFSFSF SFSFSFSF SF SF SF S F SFSF100-YEAR SPRING CREEK FLOODPLAIN 100-YEAR SPRING CREEK FLOODPLAINLOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 PH. 2 EROSION CONTROL PLANNOTE: EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR LEGEND: PROPERTY BOUNDARY EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE EXISTING LOT LINE ROAD CENTERLINE LOD LIMITS OF DISTURBANCE PROPOSED STORM SEWERSDSD EXISTING STORM SEWERSDSD INSTALL VEHICLE TRACKING PAD, PER DETAIL, SEE SHEET C2.11 INSTALL SILT FENCE, PER SILT FENCE DETAIL, SEE SHEET C2.11 SF INSTALL 35' x 100' STABILIZED STAGING AREA PER DETAIL, SEE SHEET C2.11 INSTALL CONCRETE WASHOUT AREA PER DETAIL, SEE SHEET C2.12 INSTALL INLET PROTECTION, PER DETAIL, SEE SHEET C2.12 EROSION CONTROL NOTES: 1) ALL STREET, SANITARY SEWER, STORM SEWER AND WATER CONSTRUCTION SHALL CONFORM TO CITY STANDARDS AND SPECIFICATIONS CURRENT AT DATE OF EXECUTION OF THE DEVELOPMENT AGREEMENT PERTAINING TO THIS DEVELOPMENT. ANY CONSTRUCTION OCCURRING THREE YEARS AFTER THE EXECUTION OF THE DEVELOPMENT AGREEMENT SHALL REQUIRE RE-EXAMINATION OF THE PLANS BY THE DIRECTOR WHO MAY REQUIRE THAT THEY BE MADE TO CONFORM TO STANDARDS AND SPECIFICATIONS CURRENT AT THAT TIME. 2) THE TYPE, SIZE, LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE AS SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNKNOWN UNDERGROUND UTILITIES. 3) THESE PLANS HAVE BEEN REVIEWED BY THE CITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY ENGINEER, OR THE CITY FOR ACCURACY OR CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT THE QUANTITIES OF THE ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE CITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. 4) MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNERS. 5) IF FILL OR DREDGED MATERIAL IS DISCHARGED INTO WATERS OF THE UNITED STATES, A USACE 404 PERMIT IS REQUIRED. 6) IF CONSTRUCTION AFFECTS ANY COLORADO HIGHWAY, A COLORADO DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PERMIT IS REQUIRED. 7) DOWNSTREAM INLETS AT 1629 S. LEMAY AVE. MUST BE PROTECTED WITH ROCK SOCK INLET BMP'S. 8) PROVIDE TEMPORARY SEEDING AND MULCHING IN ALL AREAS UNTIL PHASES 3 AND 4 ARE CONSTRUCTED. INSTALL WATTLES, PER DETAIL, SEE SHEET C2.12 INSTALL INLET PROTECTION, PER DETAIL, SEE SHEET C2.12 CONSTRUCTION & EROSION CONTROL SCHEDULE: 1.SILT FENCE SHALL BE INSTALLED IN THE PROPOSED LOCATIONS FOR PERIMETER CONTROL. 2.EROSION CONTROL SHALL BE INSPECTED AND MAINTAINED UNTIL FINAL GRADING, LANDSCAPING, AND STABILIZATION IS ACHIEVED. ONCE FINAL STABILIZATION HAD BEEN ACHIEVED, TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED. 3.ALL EROSION CONTROL MEASURES TO BE INSTALLED PER DETAILS AND SPECIFICATIONS SHOWN WITHIN THESE PLANS AND THE STORMWATER MANAGEMENT PLAN (SWMP) REPORT. 4.ALL DISTURBED AREAS NOT COVERED BY PAVEMENT OR SEED/MULCH SHALL BE PERMANENTLY LANDSCAPED ACCORDING TO THE LANDSCAPE PLAN. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THIS PLAN THROUGHOUT CONSTRUCTION AND PERFORMING INSPECTIONS/MAINTENANCE PER THE CDPHE PERMIT, UNTIL SUCH TIME THE PERMIT IS CLOSED. INSTALL TEMPORARY SEED AND MULCH INSTALL STOCKPILE MANAGEMENT MEASURES, PER SHEET C2.11 CONSTRUCTION SEQUENCE CHART: SITE INFORMATION TOTAL DISTURBED AREA 1.35 AC TOTAL ON-SITE DISTURBED AREA 0.92 AC TOTAL OFF-SITE DISTURBED AREA 0.43 AC TOTAL STAGING/STORAGE AREA STABILIZED STAGING AREA: 2,910.93 SF STOCKPILE MANAGEMENT AREA: 1,020.13 SF ESTIMATED % EXPOSED 100% ESTIMATED % VEGETATIVE 30% SOIL INFORMATION HYDROLOGIC SOIL GROUP C: NUNN CLAY AND SATANA LOAM WITH SHORT PASTURED/LAWN AND GRASSES WITH SHRUBS AND TREES GOUNDWATER DEPTH HIGHEST RECORDED DEPTH FROM EXISTING GRADE: 7.1' LOWEST RECORDED DEPTH FROM EXISTING GRADE: 13.7' NUMBER OF PHASES 3 PHASES TOTAL VOLUME OF IMPORT/EXPORT 1,692.5 CUBIC YARDS OF FILL STEEPEST SLOPE 4:1 RECEIVING WATERS SPRING CREEK 100 YEAR RUNOFF COEFFICIENT (AFTER CONSTRUCTION)C2 = 0.77 C100 = 0.96 SURFACE COVERAGE (AFTER CONSTRUCTION) PAVEMENT AREA = 40,040.47 SF ROOF AREA = 6,658 SF LANDSCAPE AREA = 11,988 SF (REFER TO LANDSCAPE PLAN BREAKDOWN OF SOD/SEED) OWNER/DEVELOPER/APPLICANT: ENGINEER: THE OWNER WILL COMPLY WITH THE REQUIREMENTS OF THE EROSION AND STORMWATER QUALITY CONTROL PLAN INCLUDING TEMPORARY BMP INSPECTION REQUIREMENTS AND FINAL STABILIZATION REQUIREMENTS. I ACKNOWLEDGE THE RESPONSIBILITY TO DETERMINE WHETHER THE CONSTRUCTION ACTIVITIES ON THESE PLANS REQUIRE COLORADO DISCHARGE PERMIT SYSTEM (CDPS) PERMITTING FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. DEVELOPER/OWNER SIGNATURE: ______________________________________ NAME OF DEVELOPER/OWNER: RYAN HALDER DATE: _____________ DBA: KUM & GO, L.C. PHONE: 515.457.6232 TITLE: SITE DEVELOPMENT MANAGER EMAIL: RYAN.HALDER@KUMANDGO.COM ADDRESS: 1459 GRAND AVEUNE, DES MOINES, IA 50309 FAX: 515.226.1595 DEVELOPER/OWNER'S STATEMENT THIS EROSION AND STORMWATER QUALITY CONTROL/GRADING PLAN WAS PREPARED UNDER MY DIRECTION AND SUPERVISION AND IS CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. IF SUCH WORK IS PERFORMED IN ACCORDANCE WITH THE GRADING AND EROSION CONTROL PLAN, THE WORK WILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY, OR ADVERSELY AFFECT THE SAFETY, USE, OR STABILITY OF A PUBLIC WAY, DRAINAGE CHANNEL, OR OTHER PROPERTY. SIGNATURE: _________________________________ DATE: ________ PRINTED NAME: ______________________________ ENGINEER'S STATEMENT SWMP ADMINISTRATOR OLSSON, INC. 1880 FALL RIVER DRIVE, SUITE 200 LOVELAND, CO 80538 CONTACT: ERICA MORTON PH:(970) 635.3700 E:EMORTON@OLSSON.COM KUM & GO 1904, L.L.C. 1459 GRAND AVENUE DES MOINES, IA 50309 CONTACT: DAN GARNEAU PH: (515)226.0128 E: DAN.GARNEAU@KUMANDGO.COM SAME INFO AS OWNER/DEVELOPER/APPLICANT BASIS OF BEARINGS: ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. BENCHMARKS: PROJECT BENCHMARK: NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) SITE BENCHMARK: CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) ELEVATIONS BROUGHT TO THE SITE VIA GPS OBSERVATIONS USING THE TRIMBLE VRS NETWORK C2.8 15 VAN 11 E PROSPECT RD S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 T EV EV SFSFSF100-YEAR SPRING CREEK FLOODPLAIN UNDERGROUND WATER QUALITY TREATMENT SYSTEM (STORM TECH) 100-YEAR SPRING CREEK FLOODPLAINLOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 PH. 3 & 4 EROSION CONTROL PLANNOTE: EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR LEGEND: PROPERTY BOUNDARY EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE EXISTING LOT LINE ROAD CENTERLINE LOD LIMITS OF DISTURBANCE PROPOSED STORM SEWERSDSD EXISTING STORM SEWERSDSD OWNER/DEVELOPER/APPLICANT: ENGINEER: THE OWNER WILL COMPLY WITH THE REQUIREMENTS OF THE EROSION AND STORMWATER QUALITY CONTROL PLAN INCLUDING TEMPORARY BMP INSPECTION REQUIREMENTS AND FINAL STABILIZATION REQUIREMENTS. I ACKNOWLEDGE THE RESPONSIBILITY TO DETERMINE WHETHER THE CONSTRUCTION ACTIVITIES ON THESE PLANS REQUIRE COLORADO DISCHARGE PERMIT SYSTEM (CDPS) PERMITTING FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. DEVELOPER/OWNER SIGNATURE: ______________________________________ NAME OF DEVELOPER/OWNER: RYAN HALDER DATE: _____________ DBA: KUM & GO, L.C. PHONE: 515.457.6232 TITLE: SITE DEVELOPMENT MANAGER EMAIL: RYAN.HALDER@KUMANDGO.COM ADDRESS: 1459 GRAND AVEUNE, DES MOINES, IA 50309 FAX: 515.226.1595 DEVELOPER/OWNER'S STATEMENT THIS EROSION AND STORMWATER QUALITY CONTROL/GRADING PLAN WAS PREPARED UNDER MY DIRECTION AND SUPERVISION AND IS CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. IF SUCH WORK IS PERFORMED IN ACCORDANCE WITH THE GRADING AND EROSION CONTROL PLAN, THE WORK WILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY, OR ADVERSELY AFFECT THE SAFETY, USE, OR STABILITY OF A PUBLIC WAY, DRAINAGE CHANNEL, OR OTHER PROPERTY. SIGNATURE: _________________________________ DATE: ________ PRINTED NAME: ______________________________ EROSION CONTROL NOTES: ENGINEER'S STATEMENT SWMP ADMINISTRATOR OLSSON, INC. 1880 FALL RIVER DRIVE, SUITE 200 LOVELAND, CO 80538 CONTACT: ERICA MORTON PH:(970) 635.3700 E:EMORTON@OLSSON.COM KUM & GO 1904, L.L.C. 1459 GRAND AVENUE DES MOINES, IA 50309 CONTACT: DAN GARNEAU PH: (515)226.0128 E: DAN.GARNEAU@KUMANDGO.COM SAME INFO AS OWNER/DEVELOPER/APPLICANT CONSTRUCTION & EROSION CONTROL SCHEDULE: BASIS OF BEARINGS: ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. 1.SITE GRADING SHALL BE COMPLETED AND FOLLOWED UP BY UTILITY AND PAVING CONSTRUCTION ALONG WITH REDISTRIBUTION OF STRIPPINGS. IF UTILITY AND PAVING CONSTRUCTION IS DELAYED, TEMPORARY COVER CROP SHALL BE SEEDED. 2.ONCE STORM SEWER IS FINISHED, INLET PROTECTION SHALL BE INSTALLED. 3.EROSION CONTROL SHALL BE INSPECTED AND MAINTAINED UNTIL FINAL GRADING, LANDSCAPING, AND STABILIZATION IS ACHIEVED. ONCE FINAL STABILIZATION HAD BEEN ACHIEVED, TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED. 4.ALL EROSION CONTROL MEASURES TO BE INSTALLED PER DETAILS AND SPECIFICATIONS SHOWN WITHIN THESE PLANS AND THE STORMWATER MANAGEMENT PLAN (SWMP) REPORT. 5.ALL DISTURBED AREAS NOT COVERED BY PAVEMENT OR SEED/MULCH SHALL BE PERMANENTLY LANDSCAPED ACCORDING TO THE LANDSCAPE PLAN. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THIS PLAN THROUGHOUT CONSTRUCTION AND PERFORMING INSPECTIONS/MAINTENANCE PER THE CDPHE PERMIT, UNTIL SUCH TIME THE PERMIT IS CLOSED. 1) ALL STREET, SANITARY SEWER, STORM SEWER AND WATER CONSTRUCTION SHALL CONFORM TO CITY STANDARDS AND SPECIFICATIONS CURRENT AT DATE OF EXECUTION OF THE DEVELOPMENT AGREEMENT PERTAINING TO THIS DEVELOPMENT. ANY CONSTRUCTION OCCURRING THREE YEARS AFTER THE EXECUTION OF THE DEVELOPMENT AGREEMENT SHALL REQUIRE RE-EXAMINATION OF THE PLANS BY THE DIRECTOR WHO MAY REQUIRE THAT THEY BE MADE TO CONFORM TO STANDARDS AND SPECIFICATIONS CURRENT AT THAT TIME. 2) THE TYPE, SIZE, LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE AS SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNKNOWN UNDERGROUND UTILITIES. 3) THESE PLANS HAVE BEEN REVIEWED BY THE CITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY ENGINEER, OR THE CITY FOR ACCURACY OR CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT THE QUANTITIES OF THE ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE CITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. 4) MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNERS. 5) IF FILL OR DREDGED MATERIAL IS DISCHARGED INTO WATERS OF THE UNITED STATES, A USACE 404 PERMIT IS REQUIRED. 6) IF CONSTRUCTION AFFECTS ANY COLORADO HIGHWAY, A COLORADO DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PERMIT IS REQUIRED. 7) DOWNSTREAM INLETS AT 1629 S. LEMAY AVE. MUST BE PROTECTED WITH ROCK SOCK INLET BMP'S. 8) UNDERGROUND WATER QUALITY TREATMENT SHALL BE DONE AS PART OF THE LAST SEQUENCE IN CONSTRUCTION TO MINIMIZE SEDIMENTATION POTENTIAL. 9) FINAL SITE STABILIZATION SHALL BE DONE IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLAN FOR THIS PROPERTY. FINAL STABILIZATION TO BE ROCK MULCH AND TURF GRASS, INSTALLED PER LANDSCAPING SPECIFICATIONS. SEE SHEET L1.1 CONSTRUCTION SEQUENCE CHART: SITE INFORMATION TOTAL DISTURBED AREA 1.35 AC TOTAL ON-SITE DISTURBED AREA 0.92 AC TOTAL OFF-SITE DISTURBED AREA 0.43 AC TOTAL STAGING/STORAGE AREA STABILIZED STAGING AREA: 2,910.93 SF STOCKPILE MANAGEMENT AREA: 1,020.13 SF ESTIMATED % EXPOSED 100% ESTIMATED % VEGETATIVE 30% SOIL INFORMATION HYDROLOGIC SOIL GROUP C: NUNN CLAY AND SATANA LOAM WITH SHORT PASTURED/LAWN AND GRASSES WITH SHRUBS AND TREES GOUNDWATER DEPTH HIGHEST RECORDED DEPTH FROM EXISTING GRADE: 7.1' LOWEST RECORDED DEPTH FROM EXISTING GRADE: 13.7' NUMBER OF PHASES 3 PHASES TOTAL VOLUME OF IMPORT/EXPORT 1,692.5 CUBIC YARDS OF FILL STEEPEST SLOPE 4:1 RECEIVING WATERS SPRING CREEK 100 YEAR RUNOFF COEFFICIENT (AFTER CONSTRUCTION)C2 = 0.77 C100 = 0.96 SURFACE COVERAGE (AFTER CONSTRUCTION) PAVEMENT AREA = 40,040.47 SF ROOF AREA = 6,658 SF LANDSCAPE AREA = 11,988 SF (REFER TO LANDSCAPE PLAN BREAKDOWN OF SOD/SEED) BENCHMARKS: PROJECT BENCHMARK: NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) SITE BENCHMARK: CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) ELEVATIONS BROUGHT TO THE SITE VIA GPS OBSERVATIONS USING THE TRIMBLE VRS NETWORK C2.9 16 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 GENERAL EROSION CONTROL REQUIREMENTS 1) THE PROPERTY OWNER, OWNER'S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL CONTRACTOR, SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER REFERRED TO AS THE DEVELOPER) HAS PROVIDED THESE EROSION CONTROL MATERIALS IN ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE MANUAL AS AN ATTEMPT TO IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THESE CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE PROJECT SITE AS AN ILLICIT DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL UNDER CHAPTER 4: CONSTRUCTION CONTROL MEASURES AND SHOULD BE USED TO IDENTIFY AND DEFINE WHAT IS NEEDED ON A PROJECT. 2) THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE CONTENT OF THE SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT, THE EROSION CONTROL MATERIALS COMPILED FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL THESE MATERIALS ARE APPLICABLE TO THIS PROJECT. 3) THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL POLLUTANTS FROM THE START OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE CONSTRUCTION SITE. 4) THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DESIRED START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW ADEQUATE TIME FOR ON-SITE CONFIRMATION (INITIAL INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT PROTECTED FROM SEDIMENT AND POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO SCHEDULE THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT DEMOLITION, CLEARING, GRUBBING, TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN ON-SITE CONFIRMATION BEFORE CONSTRUCTION ACTIVITIES COMMENCE IS AN AUTOMATIC “NOTICE OF VIOLATION” AND CAN RESULT IN FURTHER ENFORCEMENT ACTIONS. 5) THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT DAMAGE TO ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT LIMITED TO: TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS, STREAMS, RIVERS, AND UTILITIES THAT ARE NOT DESIGNED FOR REMOVAL, RELOCATION, OR REPLACEMENT IN THE COURSE OF CONSTRUCTION. 6) AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES ARE DESIGNED, SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY REMOVED IN ORDER TO PREVENT AND CONTROL EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT. 7) ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE PROJECT SHALL BE INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING. 8) AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION) IN THE FIELD MAY WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT IS SHOWN ON THESE PLANS, THE DEVELOPER SHALL AT ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE AND PROGRESS OF CONSTRUCTION. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AND/OR AS DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INSURE THAT ALL EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT SITE CONDITIONS, WITH UPDATES BEING INITIALED AND DATED. THESE SITE INSPECTIONS AND SITE CONDITION UPDATES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY. 9) ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE ARTICULATED IN THIS OR OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO THE EROSION CONTROL REPORTS, DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE LANGUAGE FOR CITY, COUNTY, STATE, AND FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND OTHER POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH ALL OF THESE AFOREMENTIONED LAWS AND REGULATIONS. 10) THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER ACT, ARMY CORPS OF ENGINEERS' 404 WETLANDS MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY. 11) THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCE TO AID THE EROSION CONTROL INSPECTORS OF MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF THE CONTROL MEASURES INVOLVED IN THE CONSTRUCTION ACTIVITIES. 12) THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT MAY ARISE DUE TO INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE CONDITIONS AROUND THE SELECTED CONTROL MEASURES BY CONTACTING THE EROSION CONTROL INSPECTOR. THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR ANY EXPLANATIONS, INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS. 13) ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL. 14) THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS WARRANT, TO THE EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY. 15) AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION CONTROL STANDARDS ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES, A VARIANCE TO THESE STANDARDS MAY BE APPLIED FOR PURSUANT TO THE TERMS, CONDITIONS, AND PROCEDURES OF THE MANUAL. 16) INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL MEASURES AT A MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN 24 HOURS FOLLOWING A PRECIPITATION EVENT. DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND RETAINED BY THE CONTRACTOR. 17) ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS NECESSARY IN ORDER TO ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGE WAY. 18) ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG AS THAT CONTROL MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE ORIGINAL CONTROL MEASURE THAT WAS TO BE USED IN THAT LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES HAVE SHOWN TO BE AN INEFFECTIVE SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A CONSTRUCTION FENCE TO PREVENT VEHICLE TRAFFIC. 19) ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD CONTROL, OR ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND ACCEPTANCE BY THE CITY EROSION CONTROL STAFF BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS PROJECT. THESE CONTROL MEASURES' DETAILS SHALL BE SUBMITTED, REVIEWED AND ACCEPTED TO BE IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE FUNCTIONALITY AND EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND HYDROLOGICAL PRACTICES. LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS 20) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. OFF ROAD STAGING AREAS OR STOCKPILES MUST BE PREAPPROVED BY THE CITY. DISTURBANCES BEYOND THESE LIMITS WILL BE RESTORED TO ORIGINAL CONDITION. 21) PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING CONSTRUCTION ACTIVITIES IN A WAY SO THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT GRADING TO SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE SCHEDULE ON STABILIZATION ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY AFTER GRADING HAS OCCURRED. VEGETATION EFFORTS SHALL START AS SOON AS POSSIBLE TO RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE AREAS SHOULD AVOID CLEARING AND GRADING ACTIVITIES AS MUCH POSSIBLE. 22) ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE CONTROL MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING THE SITE. 23) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY EQUIPMENT TRACKING, SCARIFYING OR DISKING THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. 24) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING, AND DOWN GRADIENT PERIMETER CONTROLS. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE §12-150. ALL STOCKPILES SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO LATER THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT OF THE PROJECT. ALL OFF-SITE STOCKPILE STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE CITY ENGINEERING DEPARTMENT PRIOR TO USING THE AREA TO STORE MATERIAL. IF FREQUENT ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. 25) ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 26) ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE POTENTIALLY IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL MEASURES. MATERIAL ACCUMULATED FROM THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES SHALL BE THOROUGHLY CLEANED OUT. 27) ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS SHALL BE PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF CONTROL MEASURES. 28) ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR HAS THE ABILITY TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM OF EFFECTIVE SEDIMENT CONTROL AS THE, OR AS PART OF THE, PERIMETER CONTROL. 29) ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V) SHALL BE PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL MEASURES. 30) NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS AFTER ACTIVITY HAS CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS TEMPORARILY HALTED AND NO IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE APPROVED BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED. 31) ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND ANY DOWN GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE CASES WHERE HOUSES ARE ALONG A POND OR DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED PROTECTION ON THAT DOWN GRADIENT SIDE TO PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT DETAILS FOR FURTHER CLARIFICATION. VEHICLE TRACKING 32) AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI- HARDSCAPE (CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST ONE STRUCTURAL TRACKING CONTROL MEASURE TO PREVENT VEHICLE TRACKING. ALL AREAS NOT PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED A POINT WHERE VEHICLES EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES). 33) IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE TRACKING, COLLECTION AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS LOCATED NEAR ACCESS POINTS AND AFFECTED BY TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM. 34) CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE. CITY MUNICIPAL CODE, §26-498, AMONG OTHER THINGS, PROHIBITS THE DISCHARGE OF POLLUTANTS ON PUBLIC OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR MIGRATION OF SUCH POLLUTANT. THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE NOT PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND LEGALLY DISPOSED OF BY THE DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE CURB-LINES ARE NOT EXEMPT TO THESE SECTIONS OF CODE AND SHALL NOT BE PERMITTED IN THE STREET RIGHT OF WAY (PUBLIC OR PRIVATE). 35) IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING CONTROLS MAY BE REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR. LOADING AND UNLOADING OPERATIONS 36) THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC) IMPACTS AND PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE WORK AREA OR IMMEDIATELY INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS TO DISTURBED AREAS, VEHICLE TRACKING, AND SEDIMENT DEPOSITION THAT COULD IMPACT WATER QUALITY. OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS 37) ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS. 38) ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT IN DISCHARGE WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS, SOLVENTS, DETERGENTS, FERTILIZERS, CHEMICAL SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD BE STORED INSIDE (VEHICLE, TRAILER, CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER RUNOFF. WHERE NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH SPOTS OR ON PALLETS), COVERED (PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION. THE SECONDARY CONTAINMENT OR OTHER CONTROL MEASURE SHALL BE ADEQUATELY SIZED, LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING 39) PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE AREA OF THE SITE TO MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE. SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS 40) THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING CONSTRUCTION AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT IN FUGITIVE DUST SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO ADJACENT PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED PRACTICES SHALL BE IMPLEMENTED AND ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE SITES AND DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS DETERMINED BY ANY CITY INSPECTORS. CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT 41) ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE TO THE VOLUME OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE AREAS SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM LEAVING THE CONTROL MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL MEASURE IS TO OCCUR, A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES SHALL BE FREQUENTLY CLEANED OUT. 42) THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE APPROPRIATE CONTROL MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER ON TO THE DIRT OR OTHER UNCONTROLLED LOCATIONS. DEDICATED ASPHALT AND CONCRETE BATCH PLANTS 43) DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES WITHIN THE CITY OF FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO REDUCE POLLUTANTS ASSOCIATED WITH THAT TYPE OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INFORM THE EROSION CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH PLANTS THAT IS TO BE USED ON SITE. CONCRETE SAW CUTTING MATERIALS 44) SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS AND ALL WATER APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM LEAVING THE IMMEDIATE SITE AND COLLECTED. THESE CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL DISPOSAL. WASTE MATERIALS STORAGE AND SANITARY FACILITIES 45) TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT ABLE TO COVER, LOCATING SAID AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW MAXIMUM LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS REQUIRED TO PRACTICE GOOD HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS, AND LEAKING CONTAINERS. 46) SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE GROUND OR LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED AS FAR AS PRACTICAL FROM AN INLET, CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO PREVENT MATERIAL TRANSPORT FROM LEAVING THE LOCAL AREA. THIS CONSISTS OF THE FACILITY BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS. OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS 47) SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE'S REPORTABLE QUANTITY FOR SPILLS, STAY WITHIN THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS SPILLS, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN NOTIFIED AND IS ON ROUTE, COUNTY HEALTH DEPARTMENT (LCDHE) HAS BEEN NOTIFIED THROUGH LARIMER COUNTY SHERIFF DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED 1-877-518-5608. WRITTEN DOCUMENTATION SHALL BE PROVIDED TO THE CITY WITHIN 5 DAYS OF THE EVENT. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY. 48) SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT WILDLIFE, SUCH AS SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE ENTRAPMENT ISSUES. FINAL STABILIZATION AND PROJECT COMPLETION 49) ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE OWNER, HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY. 50) ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL, CHAPTER 4: CONSTRUCTION CONTROL MEASURES. 51) ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR LANDSCAPED AS SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL GRADING. 52) SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL COMPLY WITH ALL REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF THE CITY MUNICIPAL CODE, AS WELL AS SECTION 3.8.21 FOR THE CITY LAND USE CODE. 53) ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES AND DEPTHS REQUIREMENTS. 54) ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST SEEDING SHALL BE APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND SHALL BE LIGHTLY HAND RAKED AFTER APPLICATION. HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT PRACTICAL TO DRILL SEED AND CRIMP AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES OF SEEDING AND TACKIFICATION. 55) ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL BE MECHANICALLY CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED MULCH OR TACKIFIER MAY REQUIRE MULTIPLE RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN ESTABLISHED. AREAS OF EMBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN EROSION MAT OR APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE STEEP SLOPES. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED ALONG WITH, OR UNTIL, TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED. 56) THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING SEASONS AFTER INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN ESTABLISHED, WHICHEVER IS LONGER AND MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION CONTROL MEASURES. 57) THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL MEASURES UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES MUST REMAIN UNTIL SUCH TIME AS ALL UPSTREAM CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE IS REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM THAT CONTROL MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED STABILIZED AND VERIFIED BY CITY EROSION CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED. 58) THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF SECURITY FOR THE EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED AND 2) ALL CONTROL MEASURES AND/OR BMPS HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL BE CONSIDERED COMPLETED AND ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE PARTIES STANDARD EROSION CONTROL NOTES:STD. EROSION CONTROL NOTESC2.10 17 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 EROSION CONTROL DETAILSC2.11 18 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 EROSION CONTROL DETAILSC2.12 19 VAN E PROSPECT RD S LEMAY AVET SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 T EV EV 1.PROPOSED TRANSFORMER PAD AREA TO BE EXCAVATED, PREPARED AND POLE FOR C/T AND METER SET BY CONTRACTOR, PAD & TRANSFORMER TO BE INSTALLED BY LIGHT & POWER. CONTRACTOR SHALL TRENCH & INSTALL CONDUIT BETWEEN POINT OF CONNECTION & TRANSFORMER & INSTALL POLE FOR C/T AND METER, ELECTRICAL CONTRACTOR SHALL PULL CONDUCTORS. 2.ALL PROPOSED SITE LIGHTING WILL CONSIST OF FULL CUT-OFF DESIGN, SEE MEP PLANS FOR SITE LIGHTING ELECTRICAL PLAN AND POLE BASE DETAIL. DISTANCE FROM CENTER OF POLE TO BACK OF CURB = 4' UNLESS NOTED OTHERWISE. 3.CONTRACTOR SHALL MAINTAIN MINIMUM 18" VERTICAL SEPARATION AT ALL UTILITY CROSSINGS, UNLESS NOTED OTHERWISE. 4.ALL PROPOSED DOMESTIC WATER SERVICE PIPING SHALL BE TYPE K COPPER UNLESS NOTED OTHERWISE. 5.ALL PROPOSED SANITARY SEWER SERVICE PIPING SHALL BE PVC SDR35 UNLESS NOTED OTHERWISE. 6.ALL PROPOSED DRY UTILITY CONDUIT PIPING SHALL BE PVC SCH40 UNLESS NOTED OTHERWISE. 7.PROPOSED 1000 GALLON GREASE INTERCEPTOR WITH SAMPLE PORT, WATERTIGHT TRAFFIC RATED LIDS, AND 2-WAY 4" CLEANOUTS AT INLET AND OUTLET OF INTERCEPTOR, SEE SHEET C3.2 FOR DETAIL. 8.ALL PROPOSED SANITARY SERVICE CLEANOUTS (CO) SHALL HAVE WATER TIGHT LIDS. 9.CONTRACTOR SHALL COORDINATE FLOW TESTING OF PROPOSED FIRE HYDRANT WITH CITY OF FORT COLLINS PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 10.CONTRACTOR SHALL COORDINATE INSTALLATION OF PRIMARY POWER WITH LIGHT & POWER UPON CONSTRUCTION KICKOFF. 11.CONTRACTOR TO PATCH & REPLACE ASPHALT IN-KIND FOR ALL UTILITY STREET CUTS. 12.CONTRACTOR TO VERIFY EXISTING INVERT OF EXISTING 6" STEEL SANITARY SERVICE & REPORT TO ENGINEER WITH ANY DISCREPANCY IN DESIGN TIE ELEVATION. 13.CITY OF FORT COLLINS POWER DEPARTMENT WILL SET A NEW VAULT ON THE SE CORNER OF LEMAY & PROSPECT AND WILL DIRECTIONAL BORE A CONDUIT AND WIRE UNDER LEMAY AND WILL SET TRANSFORMER. PRIVATE UTILITY NOTES: NOTE: CO CLEANOUT SS SANITARY SEWER BOP BOTTOM OF PIPE TOP TOP OF PIPE UGE UNDERGROUND ELECTRICEXISTING WATER LINE EXISTING SANITARY SEWER EXISTING UNDERGROUND POWER EXISTING STORM SEWER EXISTING GAS LINE EXISTING OVERHEAD POWER EXISTING FIBER OPTIC LINE PROPOSED BOUNDARY EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER PROPOSED INTEGRAL CURB LEGEND GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE UTILITY SERVICE PLANSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 NGS DESIGNATION "T-402" - PUBLISHED ELEV:4982.93' (NAVD88) CP-99, SET 12" SPIKE - ELEV: 4948.1' (NAVD88) BENCHMARKS: C3.1 20 CROSSING TABLE #1 PRO ELECTRIC BOP = 4948.15 PRO STORM TOP =4946.58 CLEAR = 1'-7" #2 PRO FIBER BOP = 4946.80 PRO ELECTRIC TOP = 4946.30 CLEAR = 0'-6" #3 PRO ELECTRIC BOP = 4947.60 PRO STORM TOP = 4946.91 CLEAR = 0'-8" #4 PRO ELECTRIC BOP = 4946.10 PRO STORM TOP = 4944.78 CLEAR = 1'-4" #5 PRO SANITARY BOP = 4947.31 PRO IRRIGATION TOP = 4945.81 CLEAR = 1'-5" #6 PRO SANITARY BOP = 4946.96 PRO WATER TOP = 4945.46 CLEAR = 1'-5" #7 PRO ELECTRIC BOP = 4947.17 PRO IRRIGATION TOP =4945.17 CLEAR = 2'-0" #8 PRO ELECTRIC BOP = 4947.22 PRO WATER TOP = 4945.22 CLEAR = 2'-0" #9 PRO ELECTRIC BOP = 4946.85 PRO SANITARY TOP = 4941.77 CLEAR = 5'-1" #10 EX STORM BOP = 4942.57 PRO SEWER TOP = 4941.44 CLEAR = 1'-2" #11 EX GAS BOP = 4945.98 PRO SANITARY TOP = 4941.37 CLEAR = 4'-7" #12 EX WATER BOP = 4944.23 PRO SANITARY TOP = 4941.24 CLEAR = 3'-0" *DRY UTILITIES WITHOUT BURY DEPTH ARE ASSUMED AT AN APPROX. 3' DEPTH *EXISTING WATER UTILITIES WITHOUT BURY DEPTH ASSUMED AT A DEPTH OF 5'-6" *CAUTION CROSSING: UNKNOWN DEPTH OF UTILITY, MAINTAIN 1'-6" VERTICAL SEPARATION MINIMUM *FOR CROSSINGS 11 & 12 EXISTING GRADE ELEVATION IS ASSUMED BASED ON GUTTER ELEVATION ADN 2% STANDARD ROADWAY CROSS SLOPE Noting, we can discuss this either prior to or after round 1 FDP - send me an email or I'll just look at it with submittal. Thanks! .. any new valves on the main to be discussed during final plan. Please contact me with any questions. This will likely just be a wet tap / tapping saddle, but I will verify at final. Noting, potholing to be completed with final. Thank you. Per discussions between Olsson and COFC, these will be wet taps/tapping saddles. Per discussions between Olsson and COFC, additional potholing will not be required. The proposed sanitary sewer will run underneath the existing water line. The existing waterline has been assumed at a depth greater than the typical COFC standard and still provides 3' of clearance. VAN 11 UTILITY DETAILSSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 UTILITY SERVICE CONNECTION 1" = 5'CROSSING TABLE #1 PRO ELECTRIC BOP = 4948.15 PRO STORM TOP =4946.58 CLEAR = 1'-7" #2 PRO FIBER BOP = 4946.80 PRO ELECTRIC TOP = 4946.30 CLEAR = 0'-6" #3 PRO ELECTRIC BOP = 4947.60 PRO STORM TOP = 4946.91 CLEAR = 0'-8" #4 PRO ELECTRIC BOP = 4946.10 PRO STORM TOP = 4944.78 CLEAR = 1'-4" #5 PRO SANITARY BOP = 4947.31 PRO IRRIGATION TOP = 4945.81 CLEAR = 1'-5" #6 PRO SANITARY BOP = 4946.96 PRO WATER TOP = 4945.46 CLEAR = 1'-5" #7 PRO ELECTRIC BOP = 4947.17 PRO IRRIGATION TOP =4945.17 CLEAR = 2'-0" #8 PRO ELECTRIC BOP = 4947.22 PRO WATER TOP = 4945.22 CLEAR = 2'-0" #9 PRO ELECTRIC BOP = 4946.85 PRO SANITARY TOP = 4941.77 CLEAR = 5'-1" #10 EX STORM BOP = 4942.57 PRO SEWER TOP = 4941.44 CLEAR = 1'-2" #11 EX GAS BOP = 4945.98 PRO SANITARY TOP = 4941.37 CLEAR = 4'-7" #12 EX WATER BOP = 4944.23 PRO SANITARY TOP = 4941.24 CLEAR = 3'-0" *DRY UTILITIES WITHOUT BURY DEPTH ARE ASSUMED AT AN APPROX. 3' DEPTH *EXISTING WATER UTILITIES WITHOUT BURY DEPTH ASSUMED AT A DEPTH OF 5'-6" *CAUTION CROSSING: UNKNOWN DEPTH OF UTILITY, MAINTAIN 1'-6" VERTICAL SEPARATION MINIMUM *FOR CROSSINGS 11 & 12 EXISTING GRADE ELEVATION IS ASSUMED BASED ON GUTTER ELEVATION ADN 2% STANDARD ROADWAY CROSS SLOPE C3.2 21 I need to verify connection and avoiding bend on the hydrant lead. I believe this needs to remain straight thru the water meter vault and then any bends, etc will need to be outside the vault, can verify for final. Can also have less separation between the W/IRR lines after the meters. Bend removed from inside of the meter, separation of lines past meter has been lessened. Per discussions between Olsson and COFC, all waterlines revised to be perpendicular to the main. In order to meet this requirement, the separations between the service lines has been lessened to <5' (per COFC recommendations) SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 UTILITY DETAILSC3.3 22 T EV EV VAN S LEMAY AVET SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH THE SURVEYOR DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. THIS INCLUDES PRIVATE AND PUBLIC UTILITIES. NOTE:HORIZONTAL CONTROL PLANLOD LIMITS OF DISTURBANCE PROPOSED PROPERTY LINE EXISTING CURB AND GUTTER STAMPED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE LEGEND EXISTING BOUNDARY SWALE FLOWLINE TC=TOP BACK OF CURB TS=TOP OF SLAB SW=SIDEWALK ME=MATCH EXISTING FG=FINISHED GRADE FFE=FINISHED FLOOR ELEVATION FL=FLOWLINE RIM=RIM NOTES: 1.ALL POINTS REFER TO TOP BACK OF CURB UNLESS OTHERWISE NOTED. 2.TOP OF ISLAND TO BE 2" ABOVE HIGHEST ELEVATION OF SURROUNDING PAVEMENT - TYP. (SEE PETROLEUM PLANS) NOT TO SCALE SUBGRADE-SCARIFIED AND COMPACTED TO 95% OF ITS MAXIMUM DRY DENSITY PER ASTM D-698 (SEE GEOTECHNICAL REPORT FOR MORE INFORMATION) P.C. CONCRETE PAVEMENT, PAVEMENT MUST HAVE A SOLAR REFLECTANCE INDEX (SRI) OF 29 OR HIGHER 12" (MIN) STANDARD DUTY CONCRETE PAVEMENT SECTION 4.5" GRADE BREAK 4" C4.1 23 TT 2 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 DETAIL 2 SCALE: 1"=5' DETAIL 4 SCALE: 1"=5' DETAIL 1 SCALE: 1"=5'DETAILED HORIZONTAL CONTROL PLANDETAIL 3 SCALE: 1"=5'DETAIL 5 SCALE: 1"=5' LOD LIMITS OF DISTURBANCE PROPOSED PROPERTY LINE EXISTING CURB AND GUTTER GRADE BREAK COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR LID PROPOSED BOLLARD PROPOSED TRANSFORMER GUY WIRE POWER POLE LEGEND EXISTING BOUNDARY SWALE FLOWLINE TC=TOP BACK OF CURB TS=TOP OF SLAB SW=SIDEWALK ME=MATCH EXISTING FG=FINISHED GRADE FFE=FINISHED FLOOR ELEVATION FL=FLOWLINE RIM=RIM THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH THE SURVEYOR DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. THIS INCLUDES PRIVATE AND PUBLIC UTILITIES. NOTES: 1.ALL POINTS REFER TO TOP BACK OF CURB UNLESS OTHERWISE NOTED. NOTE: C4.2 24 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 HORIZONTAL CONTROL POINT TABLESTHE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH THE SURVEYOR DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. THIS INCLUDES PRIVATE AND PUBLIC UTILITIES. NOTE: TS=TOP OF SLAB SW=SIDEWALK ME=MATCH EXISTING FG=FINISHED GRADE GR=GRATE FL=FLOWLINE FFE=FINISHED FLOOR ELEVATION RIM=RIM LP=LOW POINT ST=STEPS EP=EDGE OF PAVEMENT C4.3 25 VAN 11 E PROSPECT RD S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 4945 4950 4955 4960 4945 4950 4955 4960 -0+25 0+00 1+00 2+00 3+00 4+00 5+00 5+75 -0.52% -0.74% -2.01% -0.63%-0.58%-0.50% -1.22%-0.74%0.04% -0.70%1.23% -0.81% BASIS OF BEARING: ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO.FLOWLINE PLAN & PROFILESHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 C4.4 26 E PROSPECT RD T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 E PROSPECT RD BASIS OF BEARING: ASSUMING A PORTION OF THE SOUTHERLY RIGHT-OF-WAY LINE OF PROSPECT ROAD, AS MONUMENTED BY A #4 REBAR WITH 1" RED PLASTIC CAP SP ILLEGIBLE AT THE WEST END AND A CONCRETE NAIL WITH A 1" BRASS TAG LS 38479 AT THE EAST END, AS BEARING NORTH 89°49'56" EAST BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983, A DISTANCE OF 848.92 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO.SIGNAGE AND STRIPING PLANSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40MATCHLINESEE BELOWMATCHLINESEE ABOVER3-7R 30"X36" R1-2 36"X36"X36"C4.5 27 VAN 11 S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1DOCUMENT REVISION DATE: JULY 2013ADA PLANPROPERTY BOUNDARY EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER PROPOSED INTEGRAL CURB ADA PATH OF TRAVEL AT 5'-0" WID, 2% MAX. CROSS SLOPE; 5% MAX. RUNNING SLOPE. AREAS WILL BE FIELD VERIFIED BY OWNER. AREAS OUT OF COMPLIANCE WILL BE REMOVED AND REPLACED BY THE CONTRACTOR AT NO COST TO KUM & GO. (SEE PAVING PLAN FOR DETAILS.) ADA LANDING AREA, 2% MAX. SLOPE IN ALL DIRECTIONS. AREAS WILL BE FIELD VERIFIED BY OWNER. AREAS OUT OF COMPLIANCE WILL BE REMOVED AND REPLACED BY THE CONTRACTOR AT NO COST TO KUM & GO. (SEE PAVING PLAN FOR DETAILS.) ADA RAMPS, AREA INDICATES A 2% MAX. CROSS SLOPE AND 1:12 MAX. RUNNING SLOPE. RAMP SIDE SLOPES SHALL NOT EXCEED 1:10 MAX. FOR BUILDING SIDEWALK RAMPS. AREAS WILL BE FIELD VERIFIED BY OWNER. AREAS OUT OF COMPLIANCE WILL BE REMOVED AND REPLACED BY THE CONTRACTOR AT NO EXPENSE TO KUM &GO. (SEE PAVING PLAN FOR DETAILS.) 5' X 5' LANDING AREA, 1% MAX. 5' X 5' RAMP LANDING AREA, 2% MAX. GENERAL NOTES: 1.CHANGES TO THE ADA COMPLIANCE PLAN MUST FOLLOW THE RFI PROCESS PRIOR TO FIELD CHANGES INCLUDING CHANGES REQUESTED BY GOVERNING AUTHORITIES. 2.REFER TO GRADING PLAN FOR SPOT ELEVATIONS. CLARIFICATION OR REQUEST FOR ADDITIONAL INFORMATION MUST FOLLOW THE RFI PROCESS. 3.SIDEWALK REPLACEMENT MUST MEET THE CURRENT FEDERAL ADA REQUIREMENTS. 4.SEALANT WITHIN JOINTS MUST NOT EXCEED 1 4" MAX. DEPTH OF PROJECTION FOR INSTALLATION IN ADA ROUTES. SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 C4.6 28 DOCUMENT REVISION DATE: JULY 2013PAVING DETAILSPAVING DETAILSSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 C4.7 29 DOCUMENT REVISION DATE: JULY 2013PAVING DETAILSNOTES: 1. ALL ACCESSIBLE STALL PAVEMENT MARKINGS SHALL BE 4" WIDE YELLOW STRIPES. 2. ACCESSIBLE AISLE SHALL BE 8' WIDE FOR VANS. 3. ACCESSIBLE PARKING AREA SURFACE SHALL NOT EXCEED 2% SLOPE IN ANY DIRECTION. 4. A SIGN MUST MARK ACCESSIBLE PARKING. THE SYMBOL ON THE PAVEMENT IS NOT ADEQUATE. 8'8'9' PROPOSED ADA VAN ACCESSIBLE STALL SYMBOL PROPOSED ADA STALL BOLLARD-MOUNTED ADA SIGN 1. 5% 2. 0% M A X . 1. 5% 2'-6" O.C. YELLOW STRIPING, 45° CROSS HATCHMA X . VAN 19 ' NOTE: THIS ILLUSTRATION IS NOT TO SCALE AND IS INTENDED TO REPRESENT A CONCEPTUAL IMAGE OF THE BUILDING. 2. 5 'MA X . ( A N Y D I R E C T I O N ) 8'8'9' 8'4.5' 8' 4. 5 ' SOLID BLUE BACKGROUND 3" WHITE PAINT 4" WHITE BORDER SLOPE GUTTER TO MATCH SLOPE OF ADJACENT PAVEMENT 6"6"R1/4" R2" R2" REF. PAVEMENT DETAILS FOR THICKNESS NOTE: START PLACEMENT OF BOLLARDS BASED OFF CENTERLINE OF MAIN ENTRY. VAN 2.5' 5' TYP CL PLAN VIEW ISOLATION JOINT SAW CUT CONSTRUCTION JOINT 40' TYP. 30' MIN.ENTRANCE THROAT DEPTHPROPOSED APPROACH 3' (UNLESS OTHERWISE NOTED ON PLANS) HEAVY BROOM FINISHED CONCRETE (SEE DETAIL L - SHEET C4.6) CURB R2' R2' EXTEND 1' BEYOND CURB RETURN EDGE OF ROLLOVER TO BE FLUSH WITH EDGES OF SIDEWALK 3' TRANSITION (TYP) ROLLOVER CURB SLOPE GUTTER TO MATCH SLOPE OF ADJACENT PAVEMENT R9" R4" 3"11" REF. PAVEMENT DETAILS FOR THICKNESS 6"3' UNLESS NOTED OTHERWISE 4" INTEGRAL COLORED CONCRETE 4" MIN ASTM D448 #57 STONE OR APPROVED ALTERNATIVE PROPOSED SUBGRADE CONSTRUCTION JOINT WITH 12" #4 DOWELS @ 24" O.C. PER SPECIFICATIONS DEPTH TO MATCH THAT OF ADJACENT CONCRETE SECTION JOINT SEALING MATERIAL PAVING DETAILSSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 C4.8 30 Ø4.70" I.D. NOMINAL WALL: 0.125" R1" Ø4.95" O.D 3.25" 1" 10" 3' NOTE: BOLLARD COVERS SUPPLIED BY OWNER AND INSTALLED BY CONTRACTOR BLACK PROTECTIVE BOLLARD COVER MADE OF HDPE INSTALLATION: 1) UTILIZE GREAT STUFF PROTM WALL AND FLOOR ADHESIVE TO ADHERE BOLLARD COVER TO STEEL BOLLARD. FOLLOW PRODUCT INSTRUCTIONS 2) SPRAY PRODUCT INSIDE BOLLARD COVER (DO NOT DRILL HOLES) 3) INSTALL BOLLARD COVER OVER STEEL BOLLARD 4) FACE PRODUCT INFORMATION LABEL TOWARDS BUILDING “” “” INNOPLAST BOLLARD (TYP.) CANOPY COLUMN WRAP CANOPY COLUMN WRAP "ZIP STRIP" FOAM EXPANSION MATERIAL OR APPROVED EQUAL "ZIP STRIP" FOAM EXPANSION MATERIAL OR APPROVED EQUAL FUEL DISPENSER NOTE: SAW CUT, SOFT CUT OR HAND TOOL ALL EXPANSION JOINTS AS SHOWN. NOTE: SEALANT SHALL BE USED AT ALL JOINTS CONCRET JOINT RUNS ALONG OUTSIDE EDGE OF BOLLARDS24'STARTING GATE CANOPY CONFIGURATION 4.16' 10" X 10" CANOPY COLUMN 10" X 10" CANOPY COLUMN COLORED CONCRETE (SEE DETAIL, THIS SHEET) FLAG POLE PAVING DETAILSSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 PROPANE CAGE BOLLARD PROTECTION C4.9 31 STOP SIDE VIEWFRONT VIEW A fresh take on convenience! Go Fresh OPENING (MONTH) (DATE)! NOW HIRING. Visit kumandgo.com ELEVATION We’re Hiring Apply at careers.kumandgo.com A fresh take on convenience! Go Fresh OPENING SOON! NOW HIRING. Visit kumandgo.com PRODUCT NO. *Available in powder coat and DuraCoat finishes BP4-02-SM-PF 3 1 2 4 36" 4.88"4.5"3 X Ø 0 . 5 6 "SIGNAGE & SITE DETAILSSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 20 ft C4.10 32 E PROSPECT RD S LEMAY AVEE PROSPECT RDS LEMAY AVEDOCUMENT REVISION DATE: JULY 2013FLAG NOTES: EXISTING TRAFFIC SIGNAL AND MAST ARM EXISTING UNDERGROUND TRAFFIC SIGNAL BOX ADA RAMPS EXISTING ABOVE GROUND TRAFFIC SIGNAL CABINET EXISTING STORM INLET EXISTING STORM LINE EXISTING WATER LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING FIBER OPTIC LINE EXISTING GAS LINE PROPOSED PEDESTRIAN CROSSING BUTTON. EXISTING PROPERTY LINE SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 TRAFFIC SIGNAL PLANPROPERTY BOUNDARY EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER PROPOSED INTEGRAL CURB GAS METER WATER VALVE FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE SIGN POWER POLE LEGEND EXISTING WATER LINE EXISTING SANITARY SEWER EXISTING UNDERGROUND POWER EXISTING STORM SEWER EXISTING GAS LINE EXISTING OVERHEAD POWER EXISTING FIBER OPTIC LINE EXISTING UNDERGROUND TRAFFIC BOX EXISTING ABOVE GROUND TRAFFIC CABINET NOTE: 1.ALL EXISTING TRAFFIC SIGNALS ARE TO REMAIN AND ARE TO BE PROTECTED IN PLACE. C5.0 33 VAN 11 S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1DOCUMENT REVISION DATE: JULY 2013EXISTING PROPERTY LINE PROPERTY BOUNDARY PROPOSED SETBACK LINE EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER ADA ACCESSIBLE ROUTE COLORED CONCRETE PAVEMENT PROPOSED INTEGRAL CURB PARKING COUNT GAS METER WATER VALVE CONTROL POINT FIRE HYDRANT LIGHT POLE TRAFFIC SIGNAL ARM FIBER OPTIC MANHOLE SANITARY SEWER STRUCTURE STORM SEWER STRUCTURE VEGETATION SIGN GREASE INTERCEPTOR PROPOSED BOLLARD PROPOSED TRANSFORMER SIGHT TRIANGLE GUY WIRE POWER POLE LEGEND GRATED STORM INLET SAWCUT LINE TREE INVENTORY TOTALS TREE PROTECTION1 L1.0 TREE REMOVAL PLANTREE REMOVAL NOTE: NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. 34 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 VAN 11 S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 T EV EV 6,365 sf RM 6,434 sf RM TL 489 sf TL 870 sf RM 815 sf 1,013 sf TL 1,200 sf TL RM 326 sf SS 1 6 SS PP 3 1 GT 1 UA 1 QM 8 KF 8 CJ 8 CB 3 SMO CJ 5 SMO 6 CF 2 EC 3 SV 5 PM 5 LV 17 9 LP 16 KF 6 CJ EC 7 CF 7 1 QM QM 2 6 RW 3 LP TL 196 sf RM 635 sf CJ 4 KF 16 DK 3 2 GT EC 4 LP 6 169 sf TL KF 19 GT 1 PLANT SCHEDULE DOCUMENT REVISION DATE: JULY 2013FLAG NOTES: LEGEND L1.1 FINAL LANDSCAPE PLANTREE REMOVAL NOTE: NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. LANDSCAPE-UTILITY SEPARATION: NO TREES SHALL BE PLANTED WITHIN 10 FEET OF WATER AND SEWER MAINS OR WITHIN 6 FEET OF SERVICE LINES. NO SHRUBS SHALL BE PLANTED WITHIN 4 FEET OF WATER AND SEWER MAINS OR SERVICE LINES. 35 A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. NOTES: TREES SHOULD BE PLANTED WITH THE ROOT FLAIR AN INCH OR TWO ABOVE FINAL GRADE. IN ADDITION TO THIS, TREES NEED TO BE MULCHED WITH A MULCH RING THAT IS 4-6' IN DIAMETER AND 2-4" DEEP. CRITICAL ROOT ZONE (CRZ) IS ASSUMED TO BE A MINIMUM OF 24" BELOW GRADE FOR ALL TREES. CRZ IS SHOWN ON PLAN AT 12" DIA PER 1" TRUNK CALIPER. PLANT SCHEDULE TABLE NOTES: "CODE PQ/XQ" IN THE TABLE REFERS TO THE PROPOSED QUANTITY/EXISTING QUANTITY OF THE SPECIFIC PLANTING. SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 VAN 11 S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 HYDROZONE CHART DOCUMENT REVISION DATE: JULY 2013L1.2 HYDROZONE PLANSHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 4036 OLSSON LANDSCAPE NOTES SINGLE TRUNK TREE PLANTING1 EVERGREEN TREE PLANTING2 TREE STAKING - PLAN VIEW3 SHRUB PLANTING4 GROUNDCOVER SPACING5 MULCH APPLICATION6 STEEL EDGING7 TREE PROTECTION XXXXX X X8 L1.3 LANDSCAPE DETAILS37 SCREEN WALL ELEVATION 9 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 T EV EV VAN 11 S LEMAY AVE2 3 T SQUARE FOOTAGE: 4,066 BISTRO-RP-2021V1 RFC FS MV BF F D 3 4"3 4" 8 8 8 8 8 8 8 8 15 15 15 15 15 1515 15 15 15 15 15 15 15 51 81 81 81 15 15 15 51 81 12 12 12 1212 12 12 12 12 12 12 12 12 12 12 12 1212 12 12 12 12 12 12 12 12 12 12 3 4" 3 4"3 4" 3 4" 3 4"1"3 4" 3 4" 3 4"3 4"1" 3 4" 1" 3 4" 3 4"1" 1" 111.4 1" 26.76 1" 52.40 1" 61.80 1" 711.7 1" 910.4 1" 101.9 1" 1.911 1" 88 8 8 8 8 8 8 8 312.0 1" 3 4" 46.98 1" F F F F di di di di dc dc dc dc dc dc dc dc dc dc M 3 4" 3 4" 3 4" 3 4"3 4"1" 89.1 1" dc 1"3 4" 3 4"1" 1" 1" 1" 1" 1"1"1"1" 1" 1" 1"1" 1" 1" 1" FHTQ 8 8 8 8 Q TQ FHT 12 12 12 12 12 Q TQ FHT 15 15 15 15 15 10468 12 15 18 4 6 8 01 21 51 81 F di 0.6 1.0 2.0 MV D BF C dc RF FS M #" ## IRRIGATION SCHEDULE CRITICAL ANALYSIS VALVE SCHEDULEDOCUMENT REVISION DATE: JULY 2013SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 FINAL IRRIGATION PLANNOTE: FLAG NOTES: I1.1 38 Max allowable design for a 3/4" irrigation meter is 15 GPM. Kum & Go prefers the 1" irrigation meter. Revised. Per previous discussion, a 1" meter has a max allowable design of 25 GPM 7 DAY WATERING SCHEDULE (FOR ESTABLISHMENT ONLY) 3 DAY WATERING SCHEDULERUNTIME SCHEDULE SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 IRRIGATION DETAILS 1GENERAL IRRIGATION NOTES EXTEND 18" BEYOND EDGE OF PAVEMENT 6" MIN. BELOW PAVEMENT 5 PIPE SLEEVE NOT TO SCALE 1 QUICK COUPLER VALVE MODEL 5RC SERIESNOT TO SCALE 4 POP-UP SPRAY SPRINKLER 1806 WITH SWING PIPENOT TO SCALE 3 ELECTRIC REMOTE-CONTROL VALVE PEBS SERIESNOT TO SCALE 1 2 3 4 5 6 7 8 9 10 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2 XCZ-100-PRB-LC 1" LIGHT COMMERCIAL CONTROL ZONE KIT NOT TO SCALE I1.2 39 SHEET NUMBER: CPM: SDM: RDM: 10/12/2022#0951 - FORT COLLINS, COKG PROJECT TEAM:949 E PROSPECT1459 Grand Avenue Des Moines, Iowa 50309 P: 515-226-0128 F: 515-223-9873 DATE: TC DG BS CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.DOCUMENT REVISION DATE: JULY 2013Know what's below. before you dig.CallR www.olsson.comTEL 303.237.20721525 Raleigh St. Suite 400Denver, CO 80204DATEREVISION DESCRIPTION OF 40 I1.3 IRRIGATION DETAILS 240 ROOF RAIN BIRD WR2-RFS RAIN SENSOR 2 NOT TO SCALE MASTER CONTROL VALVE ASSEMBLY5 MANUAL DRAIN VALVE6 MULTI-PORT DRIP EMITTER8 THRUST BLOCK THRUST BLOCK MINIMUM BEARING SURFACE AREA FITTING SIZE 22.5° BEND 45° BEND 90° BEND TEE/ PLUG 3"0.43 0.84 1.52 1.08 4"0.70 1.37 2.49 1.77 6"1.51 2.95 5.39 3.83 8"2.56 5.02 9.16 6.50 10"3.97 7.79 14.21 10.10 12"5.60 10.96 20.00 14.21 3 GATE / BALL SHUT-OFF VALVE4 EMITTER SIZING SCHEDULE PLANT SIZE FLOW / PLANT EMITTER # OF EMITTERS 9 PIPE LAYOUT - SERVICE LINE CONNECTION7 TRENCHING DEPTH10 ELEVATION SECTION ET Pro3 2-Wire WeatherTRAK WEATHERTRAK ET PRO3 2-WIRE WALL MOUNT1