Loading...
HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - SUBMITTAL DOCUMENTS - ROUND 2 - VARIANCE REQUEST (8) NORTHERNENGINEERING.COM | 970.221.4158 VARIANCE REQUEST: POWERHOUSE 2 FORT COLLINS | GREELEY 1 | 1 VARIANCE REQUEST March 1, 2023 City of Fort Collins Development Review 281 N College Ave. Fort Collins, CO 80524 RE: POWERHOUSE 2 PROJECT VINE DRIVE ON-STREET PARKING VARIANCE REQUEST NORTHERN PROJECT #207-030 To whom it may concern: Northern Engineering would like to present this request for a variance for the Powerhouse 2 project. General information about the project is presented below, and detailed information about the nature of this request follows. General Information The project site is located at the northeast corner of College Ave. and Vine Dr. in north Fort Collins. The site currently houses an auto repair shop and is proposed to be developed into a non-residential development, including a multi-story building utilized by the Colorado State University Energy Institute for office space, education, and research purposes, among others. The size of the combined site contains just under 5 acres and includes the Josh Ames Ditch on the north edge of the site. Vine Drive On-Street Parking Vine Drive runs along the south edge of the property. Vine Drive is classified in the City’s Master Street Plan as a 2-lane arterial street. Larimer County Urban Street Standards (LCUASS) Figure 7-3F dictates that 2-lane arterial streets should feature a center turn lane, two travel lanes (one each direction), and a bike lane on each side; on-street parking is not generally provided. We are proposing a variance from the standard 2-lane arterial section to allow on-street parking along the north side of Vine Drive along the frontage of the project (between College Ave. and Jerome St.). We believe the current design standard would not be negatively impacted because the standard 2-lane arterial section would still be provided, as well as the parkway/greenbelt and sidewalk (these features would be “pushed” out in the locations where on-street parking stalls are included); the ROW would remain as designed. The site’s proximity to the intersection with College Ave. (westbound) will inevitably result in lower travel speeds as vehicles approach the intersection, enhancing the ability for vehicle movement in/out of the on-street parking. Further, the parking spaces would be protected from travelling vehicles by bump outs, mimicking the on-street parking that is already provided on the south side of Vine Dr. along this same stretch of roadway. Finally, we feel the public good would be positively served by allowing on-street parking in this area by increasing accessibility to the recently completed Poudre River Whitewater Park immediately to the south. If you have any questions, please feel free to contact me directly. Sincerely, NORTHERN ENGINEERING SERVICES, INC. AUSTIN SNOW, PE Project Engineer austin@northernengineering.com APPROVED Brad Buckman, City Engineer 03/08/2023