Loading...
HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (5)E. VINE DRIVEN. COLLEGE AVENUECHERRY STREET CAC H E L A P O U D R E R I V E R SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 CS1 COVER STEET1 DECEMBER 2022 CONTACT INFORMATION PROJECT TEAM: VICINITY MAP NORTH PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 1-00 ON A CATCH BASIN AT THE SOUTHEAST CORNER OF VINE DR. AND COLLEGE AVE. ELEV.=4968.74 CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN ST. BRIDGE OVER THE POUDRE RIVER, ON THE WEST SIDE OF LINDEN ST. , ON A STORM INLET. ELEV.=4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE WEST LINE LINE OF THE SOUTHWEST QUARTER OF SECTION 1-7-69 AS BEARING SOUTH 00° 38' 34" WEST (ASSUMED BEARING) AND MONUMENTED AS SHOWN ON PLAT. PROJECT BENCHMARKS: POWERHOUSE 2 PROJECT TEAM: Roger Sherman BHA Design Incorporated 1603 Oakridge Drive, Suite 100 Fort Collins, Colorado 80525 (970)223-7577 Colorado State University Bryan Willson Executive Director, CSU Energy Institute 450 N College Ave. Fort Collins, CO 80524 (970)227-5164 Northern Engineering Services, Inc. Andy Reese 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 PLANNER/ LANDSCAPE ARCHITECT OWNER/APPLICANT SITE ENGINEER SHEET INDEX A PARCEL OF LAND LOCATED IN THE SOUTHWEST QUARTER OF SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO Northern Engineering Services, Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SITE SURVEYOR TYPICAL SECTIONS 1 CS1 COVER SHEET 2 CS2 GENERAL & CONSTRUCTION NOTES 3 CS3 EROSION CONTROL NOTES 4 EX1 EXISTING CONDITIONS & DEMOLITION PLAN 5 PV1 PAVING & SIGNAGE PLAN UTILITY SHEETS 6 OU1 UTILITY PLAN SANITARY SHEETS 7 SS1 OFFSITE SANITARY SEWER PLAN & PROFILE 8 SS2 SANITARY SEWER B PLAN & PROFILE STORM SHEETS 9 ST1 POND OUTFALL PLAN & PROFILE 10 ST2 STORM DRAIN C PLAN & PROFILE 11 ST3 STORM DRAIN D PLAN & PROFILE GRADING SHEETS 12 OG1 OVERALL GRADING PLAN 13 - 14 G1 - G2 GRADING PLAN RAIN GARDEN SHEETS 15 RG1 NORTH RAIN GARDEN PLAN & DETAILS 16 RG2 SOUTH RAIN GARDEN PLAN DETAIL SHEETS 17 - 21 D1 - D5 SITE DETAILS 22 - 24 D6 - D8 UTILITY DETAILS 25 - 30 D9 - D14 DRAINAGE DETAILS DRAINAGE SHEETS 31 EC1 EROSION CONTROL PLAN 32 - 33 EC2 - EC3 EROSION CONTROL DETAILS 34 DR1 DEVELOPED DRAINAGE EXHIBIT 35 FP1 FLOODPLAIN EXHIBIT FINAL CONSTRUCTION PLANS FOR E N G I N E E R N GI EHTRON R N E N G I N E E R N GI EHTRON R N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R PROJECT LOCATION UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS-----------------Xcel Energy-----------------------------Cory Thelen (970) 225-7843 ELECTRIC--------City of Fort Collins Light & Power--Cody Snowdon (970) 416-2306 CABLE-------------Comcast----------------------------------Don Kapperman (970) 567-0425 TELECOM.--------CenturyLink-------------------------------Shelly Bergstorm (720) 501-5803 WATER------------City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 WASTEWATER--City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 STORMWATER-City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 APPROVED: City Engineer:Approved Sheets Date Water & Wastewater Utility Approved Sheets Date Stormwater Utility Approved Sheets Date Park Planning and Development Approved Sheets Date Traffic Operations Approved Sheets Date Environmental Planner Approved Sheets Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: APPROVED: APPROVED: APPROVED: APPROVED: Field Survery: Northern Engineering Services, Inc. Date: October 25, 2019 FIELD SURVEY BY: These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CTL Thompson, Inc Geotechnical Investigation Proposed Improvements Powerhouse 2 Project No. FC10223-125 Date: March 14, 2022 SUBSURFACE EXPLORATION BY: CERTIFICATION STATEMENT: Travel 69' ROW (min.) 42' Roadway 5' Walk (min.)(min.) Pkwy. 8.5' Pkwy. 5' (min.) 8.5' 11' Util. Esmt. 9' Esmt. Util. 9' (min.) Walk Travel 11' 7' Lane Bike 3'7' Lane Bike 3' Bike Lane Buffer Bike Lane Buffer 2 LANE ARTERIAL w/ PARALLEL PARKING (EAST VINE DRIVE) 2 LANE COLLECTOR (JEROME STREET) (min.) Walk 84' ROW (min.) 52' Roadway 7' Pkwy. 6' (min.) 8' Esmt. Util. 15' Center 10' Travel 11' Travel 11' 3' Lane Bike 7'3' Bike Lane Buffer Bike Lane Buffer Lane Bike (min.) Walk 84' ROW (min.) 52' Roadway 7' Walk (min.) (min.) Pkwy. 10' Pkwy. 6' (min.) 10' Util. Esmt. 15' Esmt. Util. 15' Center 10' Travel 11' Travel 11' 3' Lane Bike 7'3' Bike Lane Buffer 6' Bike Lane Buffer Lane Bike 8' Parallel Parking (min.) Walk Pkwy. 6' (min.) 8' Esmt. Util. 15' 8' Parallel Parking 2 LANE ARTERIAL (EAST VINE DRIVE) Pedestrain Access Easement Pedestrain Access Easement LAKE CANAL S D S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSSSS VAULT ELEC GGGSSSSSSSS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC ELEC WHYD ELEC ELEC VAULT ELEC C SW CS VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC ELEC ELEC M ELEC VAULT ELEC HY DT T T VAULT F.O. VAULT F.O.F.O. MMWSOMWSO D CONTROL IRR CONTROL IRR util GAS util E ELEC BRKR M T S XXXXXXXXXXXXXXXXXXXXW W W W W W W W W W W W W W W W W WEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOGGGGGGGGGWWWWWWWWWFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FOTTTTTT T T T T T TTTTTT T T T T T T T T T T T T T T T T T T T T TXXTT WWWWWWW W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOXXXXXEEEEEEGGGGGGGWWT T TEEE WEEE E EEEEEEEEE EEEEEWWWGGGFO FO FOFOE G G W ETOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHU OHU OHU OHU GGGGGGGXE WWSWO WSSS SSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSOHUOHUD FE SGGGG G STSTSTSTE E E E E/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST STFESFESFESST ST ST ST ST XXVAULT ELEC GASSSSS / / / / / / / /S D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR R1 R1 R1 R1 R1 R1 R2 R2 R2 R2 R2 R2 R2 R3 R3 R3 R3 R3 R3 R3 R4 R4 R4 JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE LAKE CANAL COMPANY EASEMENT LAKE CANAL EASEMENT PER REMOVE EXISTING MAIL BOX REMOVE EXISTING MAIL BOX REMOVE & RESET EXISTING PEDESTAL TELE. REMOVE & RELOCATE EXISTING PEDESTAL (TELE.) EXISTING FIRE HYDRANT (PROTECT IN PLACE) REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE EX-STORM LINE (CONTRACTOR TO VERIFY EXISTENCE AND LOCATION) REMOVE EXISTING SIGN REMOVE STRUCTURE REMOVE BOLLARDS REMOVE BOLLARDS REMOVE BOLLARDS AND STEEL CABLE REMOVE BOLLARDS AND STEEL CABLE REMOVE BOLLARDS AND STEEL CABLE REMOVE BOLLARDS REMOVE BOLLARD REMOVE BOLLARDS REMOVE CONCRETE WALL REMOVE CONCRETE WALL REMOVE CONCRETE WALL REMOVE TIMBER WALL REMOVE CONCRETE WALL REMOVE EXISTING FENCE REMOVE EXISTING FENCE REMOVE EXISTING FENCE REMOVE EXISTING FENCE REMOVE UNDERGROUND TELE. UTILITY REMOVE & RELOCATE EXISTING PEDESTAL. REMOVE & RELOCATE EXISTING PEDESTAL (CABLE.) REMOVE PROPANE TANK REMOVE EXISTING WATER SERVICE (SEE NOTE 4) REMOVE EXISTING WATER SERVICE REMOVE EXISTING WATER SERVICE (SEE NOTE 4) REMOVE EXISTING WATER SERVICE (SEE NOTE 4) REMOVE EXISTING METER PIT. (SEE NOTE 4) REMOVE APPROXIMATELY 165' OF EXISTING CURB & GUTTER REMOVE EXISTING METER PIT (SEE NOTE 4) REMOVE EXISTING WATER SERVICE (SEE NOTE 4) EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE REMOVED REMOVE EXISTING SIGN REMOVE EXISTING 12" Ø STUMP EXISTING 30' GAS LINE EASEMENT -REMOVE AND REPLACE EXISTING MANHOLE. -ABANDON & FLASH FILL EXISTING SANITARY MAIN THROUGH LAKE CANAL EASEMENT. -BEGIN REMOVE 12" SEWER LINE SOUTH OF LAKE CANAL EASEMENT. REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE & RE-USE EXISTING STREET LIGHT EXISTING 10' UTILITY EASEMENT EXISTING 10' UTILITY EASEMENT EAST VINE DRIVE JEROME STREETNORTH COLLEGE AVENUELAKE C A N A L SAN MH RIM=4963.99 INV IN=4956.45 (NW) INV OUT=4955.88 (S) EX-SANITARY MH RIM=4961.65 INV IN=4955.31 (NW) INV OUT=4955.27 (S) STORM MH IN BOX RIM=4966.73 INV OUT=4961.91 REMOVE EX- STORM INLET RIM=4961.82 INV OUT=4959.79 (E) REMOVE EX-STORM INLET RIM=4961.02 INV IN=4959.36 (W) INV OUT=4959.20 (E) REMOVE EX-STORM INLET RIM=4959.91 INV IN=4958.52 (W) INV OUT=4958.46 (S) EX-STORM MH RIM=4960.31 INV IN=4957.42 (N) INV OUT=4958.42 (SE) SNOUT OPENING BTM=4953.00 WATER ELEV=4957.23 EX-SANITARY MH RIM=4961.63 INV IN=4955.49 (N) INV OUT=4955.31 (SE) REMOVE & REPLACE EX-INLET BOX w/SUMP & SNOUT EXISTING UTILITY EASEMENT TO BE VACATED REMOVE EXISTING LIGHT REMOVE EXISTING LIGHT REMOVE EXISTING FENCE EX SSMH RIM 4964.0 ± INV. IN 4958.97 (N) INV. OUT 4958.77 (S) EX SSMH RIM 4964.5 ± INV. IN 4957.66 (N) INV. OUT 4957.48 E) 60' CANAL EASEMENT EXISTING 30' GAS LINE EASEMENT EXISTING GAS LINE REMOVE & RE-USE EXISTING STREET LIGHT REMOVE & RE-USE EXISTING STREET LIGHT REMOVE & RE-USE EXISTING STREET LIGHT EDGE OF PROPOSED SAW CUT EXISTING CURB, GUTTER,TO BE REMOVED AND REPLACED EDGE OF PROPOSED SAW CUT REMOVE EX-STORM LINE (CONTRACTOR TO VERIFY EXISTENCE AND LOCATION) 12" SEWER MAIN (LINED) REMOVE APPROXIMATELY 271' OF EXISTING 12" SEWER MAIN. CAP REMAINING 12" LINE FOR PROPOSED SANITARY SERVICE TIE IN. SEWER MAY NOT BE REMOVED IN ANY WAY UNTIL THE PROPOSED OFFSITE SEWER MAIN IS CONSTRUCTED AND ACCEPTED BY THE WATER UTILITY REMOVE EXISTING LIGHT END REMOVAL OF 12" SEWER LINE. CAP REMAINING LINE FOR PROPOSED SANITARY SERVICE TIE IN REMOVE & REPLACE EX - 18" FES & 18" STORM LINE EX - 18" FES FL ELEV. = 4956.64 EX-SANITARY MH RIM=4963.47 INV IN=4957.95 (S) SERVICE INV IN=4959.56 (N) INV OUT=4956.28 (E) EX-SANITARY MH RIM=4960.52 INV IN=4955.14 (W) INV IN=4955.20 (N) INV OUT=4955.12 (E) EXISTING ELCO WATER MAIN EXISTING 6" CITY OF FORT COLLINS WATER MAIN REMOVE EXISTING LIGHT REMOVE EXISTING STREET LIGHT REMOVE & REUSE EXISTING STOP SIGN REMOVE & RELOCATE EXISTING ELECTRICAL BOX 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) REMOVE & RELOCATE EXISTING F.O. VAULT REMOVE EXISTING DEAD TREE EDGE OF PROPOSED SAW CUT FOR IRRIGATION TAP & METER CONSTRUCTION APPROXIMATELY 25' OF EXISTING CURB & GUTTER & 250 SF OF CURB RAMP TO BE REMOVED AND REPLACED REMOVE APPROXIMATELY 75' OF EXISTING CURB & GUTTER REMOVE APPROXIMATELY 21' OF EXISTING CURB & GUTTER EDGE OF PROPOSED SAW CUT FOR WATER & FIRE SERVICE REMOVE & REPLACE ±125' OF EXISTING 12" VCP SANITARY PIPE UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 EX1 DEMOLITION PLANEXISTING CONDITIONS &4 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 R1 STRUCTURE (HOUSE, BARN, SHED & SILO) TO BE REMOVED & DISPOSED OF OFF SITE, ACCORDING TO ALL LAWS & REGULATIONS. FENCE TO BE REMOVED AND DISPOSED OF OFF SITE. OVERHEAD UTILITIES & POLES SHALL BE REMOVED, & RELOCATED. COORDINATE WITH UTILITY OWNER PRIOR TO REMOVAL. GAS SERVICE SHALL BE REMOVED & DISPOSED OF OFF SITE. COORDINATE WITH UTILITY OWNER PRIOR TO REMOVAL. PROJECT DEMOLITION NOTES R2 R3 NORTHERN ENGINEERING DATED: OCTOBER 25, 2019 FIELD SURVEY BY: R4 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.EXISTING WATER AND WATER SEWER SERVICES SHALL BE REMOVED OR ABANDONED AT THE MAIN PER CITY REQUIREMENTS. 5.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. EXISTING OVERHEAD UTILITY APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL PROPOSED SAWCUT APPROXIMATE AREA OF GRAVEL/DIRT REMOVAL OHU CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSSSS VAULT ELEC GGGSSSSSSSS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELECHYD ELEC HY DT VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T S W W W W W W W W W W W W W W W W W WEEEEEEEEEEEEEEEEEEEEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOGGGGGGGGGWWWWWWWWWFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FOTTTTTT T T T T T TTTTTT T T T T T T T T T T T T T T T T T T T T T T T WWWWWWW W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOGGGGGGGEEEEEFO FO FOFO GGGGGGGXE WWSWO WSSSSS SSSSSSSSSSOHUOHUD FE SGGGG G E E E E E/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST ST VAULT ELEC GASSSSS / / / / / / / /S D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRTFTFTFTFTFTFEMGMGUGEUGEUGEUGEUGES IRFWUD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD EXISTING 30' GAS LINE EASEMENT EXISTING 30' UTILITY & DRAINAGE EASEMENT PROPOSED 30' LAKE CANAL EASEMENT 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT 30' CANAL EASEMENT PER BRUSH MOBILE HOME P.U.D. 24.1' CITY TRAIL & UTILITY EASEMENT 15' CITY TRAIL & UTILITY EASEMENT POND OUTFALL A SEE SHEET ST1 PROPOSED BUILDINGNORTH COLLEGE AVENUEJEROME STREETPROPOSED 6" FIRE CONNECTION PROPOSED 3" WATER SERVICE AND METER PIT LAKE C A N A L 15' UTILITY EASEMENT JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CONNECT TO EXISTING GAS LINE PROPOSED GAS SERVICE & METER PROPOSED POND OUTLET STRUCTURE A AREA INLET CITY OF FORT COLLINS, 740 N COLLEGE AVE EXISTING 6" WATER EXISTING ELCO WATER MAIN PROPOSED BUS STOP EXISTING 21" SANITARY SEWER EXISTING 21" CLAY SANITARY SEWER EXISTING 8" WATER EXISTING FIRE HYDRANT PROPOSED 10' TRAIL EXISTING 8" WATER EXISTING 21" SANITARY SEWER EXISTING SANITARY SERVICE EXISTING 10" CLAY, LINED SANITARY SEWER EXISTING 18" STORM EXISTING 24" STORM EAST VINE DRIVE PROPOSED CURB CUT PROPOSED OUTDOOR LANDSCAPED AMPHITHEATER PROPOSED AREA INLET PROPOSED SANITARY MANHOLE EXISTING 12" SANITARY MAIN TO CONVERT TO SEWER SERVICE WITH THIS DEVELOPMENT CONNECT TO EXISTING 8" WATER MAIN. 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE)15' UTILITY EASEMENT15' UTILITY EASEMENT PROPOSED ROW TIE INTO EXISTING ELECTRICAL VAULT PROPOSED SCOUR-STOP PROPOSED SCOUR-STOP PROPOSED FH ASSEMBLY PROPOSED 1.5" IRRIGATION TAP PROPOSED 1.5" IRRIGATION METER PROPOSED ELECTRICAL TRANSFORMERS NATURAL HABITAT BUFFER ZONE NATURAL HABITAT BUFFER ZONE LAKE C A N A L C E N T E R L I N E EMERGENCY ACCESS GATE 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) VAULT F.O. RELOCATE EXISTING F.O. VAULT TO PKWY PROPOSED TYPE R INLET W/SNOUT & SUMP APPROXIMATELY 12' OF 12" PVC SLEEVE DRAINAGE EASEMENT (WIDTH VARIES) DRAINAGE EASEMENT (WIDTH VARIES) 5.15' DRAINAGE EASEMENT 5.15' DRAINAGE EASEMENT DRAINAGE EASEMENT (WIDTH VARIES) PROPOSED 30' UTILITY EASEMENT PROPOSED SCOUR-STOP PROPOSED POND OUTLET STRUCTURE B POND OUTFALL B SEE SHEET ST1 PROPOSED AREA INLET 20' OF 16" STEEL CASING TO BE PLACED AROUND 8" SANITARY PVC PROPOSED UNDERDRAIN PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER MANHOLE PROPOSED 8" PVC SEWER (SEE NOTE 11) 15' UTILITY EASEMENT 20' UTILITY AND DITCH PERMANENT EASEMENT (ANDERSON WHITEWATER PLAT) CONNECT TO EXISTING 12" DIP STORM DRAIN RAIN GARDEN 1 SEE SHEET RG1 PROPOSED UNDERDRAIN PROPOSED 6" FIRE SERVICE STORM DRAIN D SEE SHEET ST3 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 15.17 LF 10" HDPE @ 0.50% 12.52 LF 12" HDPE @ 0.50% 40.79 LF 12" HDPE @ 0.50% 47.01 LF 12" HDPE @ 0.50% 7.45 LF 12" HDPE @ 0.50% 26.16 LF 12" HDPE @ 0.50% 34.19 LF 12" HDPE @ 0.50% 13.62 LF 12" HDPE @ 0.50% 12.57 LF 15" HDPE @ 0.50%45.73 LF 10" HDPE @ 0.50% 15.74 LF 10" HDPE @ 0.50% 7.45 LF 15" HDPE @ 0.50% 106.41 LF 15" HDPE @ 0.50% 11.96 LF 10" HDPE @ 0.50% 48.23 LF 15" HDPE @ 0.50% STORM DRAIN C SEE SHEET ST3 SANITARY SEWER B SEE SHEET SS2 OFF SITE SANITARY SEWER SEE SHEET SS1 EXISTING GAS LINE 16.88 LF 15" HDPE @ 0.50% ROOF DRAIN CONNECTION E4 INV. IN=4965.87 (W) INV. OUT=4965.88 (E) ROOF DRAIN CONNECTION E3 INV. IN=4965.80 (W) INV. OUT=4965.80 (E) ROOF DRAIN CONNECTION E2 INV. IN=4965.57 (W) INV. OUT=4965.57 (E) ROOF DRAIN CONNECTION E1-7 INV. IN=4965.32 (E) INV. OUT=4965.32 (W) ROOF DRAIN CONNECTION E1-5 INV. IN=4965.02 (E) INV. OUT=4965.02 (W) ROOF DRAIN CONNECTION E1-1 INV. IN=4964.40 (E) INV. OUT=4964.40 (W) FES E INV. IN=4963.19 (S) DRAIN BASIN E5 (10'' Ø) E5 INV. OUT=4965.95 (E) DRAIN BASIN E1 (18'' Ø) INV. IN=4965.51 (W) INV. IN=4964.16 (E) INV. OUT=4963.72 (N) ROOF DRAIN CONNECTION E1-2 INV. IN=4964.46 (E) INV. OUT=4964.46 (W) DRAIN BASIN E1-10 (12'' Ø) INV. OUT=4965.66 (W) DRAIN BASIN E1-9 (15'' Ø) INV. IN=4965.53 (E) INV. OUT=4965.53 (N) DRAIN BASIN E1-3 (18'' Ø) INV. IN=4964.75 (S) INV. OUT=4964.50 (W) DRAIN BASIN E1-6 (12'' Ø) INV. IN=4965.08 (E) INV. OUT=4965.08 (W) DRAIN BASIN E1-4 (15'' Ø) INV. IN=4964.81 (E) INV. OUT=4964.81 (N) DRAIN BASIN E1-8 (15'' Ø) INV. IN=4965.49 (S) INV. OUT=4965.49 (W) FES F INV. IN=4960.50 (NW) FES F1 INV. OUT=4960.58 (SE) INLET G1 INV. OUT=4958.48 (S) 4.24 LF 12" HDPE @ 0.50% FES G INV. IN=4958.46 (N) UPHAM FREDERICK M KUNDLA TODD J 209 E. VINE DRIVE PROPOSED 88.5' ROW ELECTRIC METER STORM DRAIN G STORM DRAIN F STORM DRAIN E PROPOSED UNDERDRAIN CONNECT UNDERDRAIN TO STORM DRAIN C SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 OU1 UTILITY PLAN6 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS UTILITIES WATER AND WASTEWATER DESIGN CRITERIA MANUAL. 3.ALL SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS SANITARY SEWER DESIGN TECHNICAL CRITERIA MANUAL, LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.ALL WATERLINES SHALL HAVE A MINIMUM OF 4.5' AND MAXIMUM OF 5.5' WATER LINE COVER FROM FINISHED GRADE TO TOP OF PIPE. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 9.ALL MANHOLE RIM ELEVATIONS (EXISTING & PROPOSED) ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 10.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11.APPLICANT AND STAFF ARE CURRENTLY WORKING TO DETERMINE AN IMPROVEMENT OF THE EXISTING SEWER LINE THAT WOULD HAVE LESS IMPACT ON EXISTING FACILITIES INCLUDING OPTIONS THAT WOULD REDUCE THE TOTAL LENGTH OF THE NEW 8” PVC PIPE. ONCE AN ALTERNATIVE AGREEABLE BY BOTH CITY AND OWNER IS FOUND, IT WILL BE INCORPORATED DURING FINAL DESIGN. EXISTING LOT LINE EASEMENT LINE SPROPOSED SEWER SERVICE WPROPOSED WATER SERVICE EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPERTY BOUNDARY EXISTING TELEPHONE PEDESTAL PROPOSED STREET LIGHT W SS PROPOSED LOT LINE PROPOSED ROW EXISTING ROW EXISTING CABLE CTV PROPOSED UNDERDRAIN UD PROPOSED UNDERGROUND ELECTRICAL UGE UGE SWALE FLOW LINE PROPOSED LANDSCAPING ROCK & ROCK WALL NATURAL HABITAT BUFFER ZONE (NHBZ) CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R FDC SSSSSSSS SS SS SS SOHUOHU FE SE E E E/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /SSSSEX SSMH A1 STA 12+06.07 N: 134751.03 E: 195091.73 206.07 L F 1 2 " P V C @ 0 . 2 6 % EX SSMH A STA 10+00.00 N: 134704.63 E: 195292.51 EXISTING 30' UTILITY & DRAINAGE EASEMENT 30' CANAL EASEMENT PER BRUSH MOBILE HOME P.U.D.LAKE C A N A L JEROME STREET STATION LLC, 742 N COLLEGE AVE EXISTING 21" CLAY SANITARY SEWER PROPERTY BOUNDARY 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) PROPOSED 50' LAKE CANAL EASEMENT PROPOSED 30' UTILITY EASEMENT EXISTING 10" CLAY, LINED SANITARY SEWER EXISTING 21" CLAY SANITARY SEWER 4945 4950 4955 4960 4965 4970 4975 4980 4985 4945 4950 4955 4960 4965 4970 4975 4980 4985 9+5010+0011+0012+0012+50 EX SSMH ASTA 10+00.00RIM 4964.5±INV. IN 4958.23 (W)INV. IN 4957.66 (N)INV. OUT 4957.48 (E)206.07 LF 12" PVC @ 0.26%EX SSMH A1STA 12+06.07RIM 4964.0±INV. IN 4958.97 (N)INV. OUT 4958.77 (E)EXISTING GROUND EXISTING 21" CLAY @ 0.50% SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 SS1 PLAN & PROFILEOFF SITE SANITARY SEWER7 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROFILE SCALE: OFF SITE SANITARY SEWER EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL SANITARY CONSTRUCTION SHALL BE PER CITY OF FORT COLLINS UTILITIES WATER AND WASTE WATER DESIGN CRITERIA MANUAL, LATEST EDITION. 3.MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STROM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 6.ALL SANITARY MANHOLES TO BE 4'Ø UNLESS NOTED OTHERWISE. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. W EXISTING STORM SEWER SPROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED AREA STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY W EASEMENT LINE PROPOSED RIGHT OF WAY PROPOSED COMBO STORM INLET PROPOSED TYPE-R STORM INLET PROPOSED WATER SERVICE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS SS1 S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSHYDT W W W W W W W W W W W W W W W W WEEEEEEEE FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOTTTTTTT TT T T T T T T T T T T T T T T T T T T T T T T T WWW W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOGGEEGG XXE WWSWO WSSSSS S/ / / / / / / /D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR UD UD UD UD UD UDUDUD CITY OF FORT COLLINS 405 N COLLEGE AVE EAST VINE DRIVE EX-SANITARY MH RIM=4961.65 INV IN=4955.31 (NW) INV OUT=4955.27 (S) EX - 18" FES FL ELEV. = 4956.64 EX-SANITARY MH RIM=4960.52 INV IN=4955.14 (W) INV IN=4955.20 (N) INV OUT=4955.12 (E) UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE POND OUTFALL A SEE SHEET ST1 CITY OF FORT COLLINS 405 N COLLEGE AVE EXISTING 6" WATER EXISTING ELCO WATER MAIN PROPOSED AREA INLET 15' UTILITY EASEMENT PROPOSED TYPE R INLET W/SNOUT & SUMP POND OUTFALL B SEE SHEET ST1 PROPOSED AREA INLET 20' OF 16" STEEL CASING TO BE PLACED AROUND 8" SANITARY PVC PROPOSED ROW 88.5' 15' UTILITY EASEMENT 20' UTILITY AND DITCH PERMANENT EASEMENT (ANDERSON WHITEWATER PLAT) SSMH B1 STA 13+21.82 N: 134316.75 E: 195612.46 125.00 LF 8" PVC @ 0.20%SSMH B2 STA 14+46.82 N: 134318.36 E: 195487.47 401.17 LF 12" PVC @ 0.20%401.17 LF EXISTING 12" VCP @ 0.20% EXMH B3 STA 18+47.98 N: 134323.53 E: 195086.33 EXMH B STA 10+00.00 N: 134312.61 E: 195934.24 321.82 LF EXISTING 12" VCP @ 0.20% EXISTING 30' GAS LINE EASEMENT 15' UTILITY EASEMENT 96.53' EXISTING ROWJEROME STREETMORAK KAREN LLC 622 N COLLEGE AVE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRICAL LINE CONNECT TO EXISTING 12" VITRIFIED CLAY PIPE (VCP) CONNECT TO EXISTING 12" VITRIFIED CLAY PIPE (VCP) 4940 4945 4950 4955 4960 4965 4970 4975 4980 4940 4945 4950 4955 4960 4965 4970 4975 4980 9+5010+0011+0012+0013+0014+0015+0016+0017+0018+0019+00 EXMH B3STA 18+47.98RIM 4962.4±INV. IN 4956.37 (N)INV. IN 4957.95 (S)INV. OUT 4956.28 (E)401.17 LF EXISTING 12" VCP @ 0.20%SSMH B2STA 14+46.82RIM 4960.2±INV. IN 4955.49 (W)INV. OUT 4955.49 (E)125.00 LF 8" PVC @ 0.20%SSMH B1STA 13+21.82RIM 4960.1±INV. IN 4955.24 (W)INV. OUT 4955.24 (E)321.82 LF EXISTING 12" VCP @ 0.20%EXMH BSTA 10+00.00RIM 4961.1±INV. IN 4954.60 (W)INV. OUT 4954.46 (E)20.00 LF 16" STEEL CASING @ 0.20% 12" HDPE STORM STA.=13+51.84 INV.=4956.89 12" DIP STORM STA.=15+02.11 INV.=4957.86 EXISTING 21" PVC EXISTING GROUND SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 SS2 PLAN & PROFILESANITARY SEWER B8 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROFILE SCALE: SANITARY SEWER B EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL SANITARY CONSTRUCTION SHALL BE PER CITY OF FORT COLLINS UTILITIES WATER AND WASTE WATER DESIGN CRITERIA MANUAL, LATEST EDITION. 3.MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STROM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 6.ALL SANITARY MANHOLES TO BE 4'Ø UNLESS NOTED OTHERWISE. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. W EXISTING STORM SEWER SPROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED AREA STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY W EASEMENT LINE PROPOSED RIGHT OF WAY PROPOSED COMBO STORM INLET PROPOSED TYPE-R STORM INLET PROPOSED WATER SERVICE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS SS2 SSSSWWWWWEEEEEFOFOFOFOFOTTTTTTTTTWWWWWFOFOFOFOFOGGGGGGGGX X X XEWWSWO G CTVCTVCTVGGGCTVCTVCTVCTVCTVCONTROLIRRCONTROLIRRCONTROLIRRCONTROLIRRCONTROLIRRIRUDUDUDUDUDUDUDFES OA STA 10+00.00 N: 134264.05 E: 195586.82 EX - 18" FES FL ELEV. = 4956.64EAST VINE DRIVEINLET OA1 STA 10+30.64 N: 134294.69 E: 195587.43 EXISTING 12" VCP SANITARY SEWER EXISTING 6" CITY OF FORT COLLINS WATER MAIN EXISTING ELCO WATER MAIN INLET OA2 STA 10+94.85 N: 134357.36 E: 195573.48 30.64 LF 18" HDPE @ 0.40% 64.20 LF 12" HDPE @ 0.50% 37.47 LF 12" HDPE @ 0.50% OUTLET A STA 11+32.32 N: 134394.83 E: 195573.94 EAST VINE DRIVEPROPOSED UNDERDRAIN 4940 4945 4950 4955 4960 4965 4970 4975 4940 4945 4950 4955 4960 4965 4970 4975 9+5010+0011+0012+00 INLET OA2STA 10+94.85FL. EL 4959.5±INV. IN 4957.09 (N)INV. OUT 4957.09 (S)FES OASTA 10+00.00INV. 4956.65 (N)12" WATER STA.=10+63.34 TOP=4956.32 12" WATER STA.=10+79.58 TOP=4955.26 INLET OA1STA 10+30.64FL. EL 4959.1±INV. IN 4956.77 (N)INV. OUT 4956.77 (S)PROPOSED GROUND EXISTING GROUND 6.5" INSTALL SNOUT 53.9" DEEP SUMP STORM DRAIN JOINTS SHALL BE WRAPPED WITH BUTYL ADHESIVE TAPE WITHIN 10' OF THE WATER MAIN OR SEWER MAIN PER FCU WATER, WASTEWATER, STORMWATER DEVELOPMENT CONSTRUCTION STANDARDS. STORM DRAIN SHALL BE INSTALLED SUCH THAT A JOINT IS NOT DIRECTLY ABOVE THE SANITARY SEWER SERVICE. 37.47 LF (2)-12" HDPE @ 0.50%OUTLET ASTA 11+32.32RIM 4959.4±INV. IN 4957.28 (N)INV. OUT 4957.28 (S)64.20 LF (2)-12" HDPE @ 0.50% 30.64 LF 18" HDPE @ 0.40% 16" STEEL CASING STA.=10+53.64 INV.=4954.95 4" UNDERDRAIN @ 0.50% 6.8" STA.=10+75.25 TOP=4958.20 FoCO ELEC. STA.=10+68.99 TOP=4958.31 DUCT BANK EXPOSE WATER MAIN & FLOW FILL WATER MAIN 10' BOTH SIDES OF CROSSING 100-YEAR HGL SSSSSSSSWWWWWEFOFOFOFOTTTTTTTTTWWWWWFOFOFOFOFOWWSWO DG CTVCTVCTVGGGCTVCTVCTVCTVVAULTCABLEUDUDUDUDUDUDUDUDUDUDEXISTING 6" CITY OF FORT COLLINS WATER MAIN EXISTING ELCO WATER MAIN INLET OB1 STA 10+61.20 N: 134359.14 E: 195431.38 OUTLET B STA 10+96.82 N: 134394.76 E: 195431.82 MARMAC COUPLER CONNECTION 12" DIP STORM PIPE STA 10+52.33 N: 134350.27 E: 195431.55 EX. INLET STA 10+00.00 N: 134297.95 E: 195432.60 35.62 LF 12" HDPE @ 0.35% 8.88 LF 12" DIP @ 2.10% 52.33 LF OF EXISTING 12" DIP @ 2.10% EXISTING 12" VCP SANITARY SEWEREAST VINE DRIVEPROPOSED UNDERDRAIN 4940 4945 4950 4955 4960 4965 4970 4975 4940 4945 4950 4955 4960 4965 4970 4975 9+5010+0011+0011+50 35.62 LF 12" HDPE @ 0.35% 8.88 LF 12" DIP @ 2.10% 52.33 LF OF EXISTING 12" DIP @ 2.10%OUTLET BSTA 10+96.82FL. EL 4960.4±INV. OUT 4958.83 (S)MARMAC COUPLER CONNECTIONSTA 10+52.33INV. 4958.52 (N)INV. 4958.52 (S)EX. INLETSTA 10+00.00FL. EL 4960.3±INV. IN 4957.42 (N)EXISTING GROUND PROPOSED GROUND INLET OB1STA 10+61.20FL. EL 4960.0±INV. IN 4958.71 (N)INV. OUT 4958.71 (S)13" 12" PVC SANITARY STA.=10+21.13 INV.=4955.60 100-YEAR HGL SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 ST1 PLAN & PROFILEPOND OUTFALL A & B9 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROFILE SCALE: POND OUTFALL A EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM DRAINS LABELED AS HDPE SHALL BE HP STORM BY ADS (OR APPROVED EQUAL) 6.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). PROPOSED RIGHT OF WAY KEYMAP T GAS OUTFALL A CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R PROFILE SCALE: POND OUTFALL B OUTFALL B SSSSSSSSWWWWWEFOFOFOFOFOTTTTTTTTTTWWWWWFOFOFOFOFOWSWO DG CTVCTVCTVGGGCTVCTVCTVVAULTCABLEUDUDUDUDUDUDUDUDUDUDUDHEADWALL C STA 10+00.00 N: 134438.84 E: 195432.62 141.59 LF 2 - 14" x 23" HEP CLASS 4 RCP @ 0.25% INLET C1 STA 11+41.59 N: 134579.95 E: 195444.34 24' EMERGENCY ACCESS EASEMENT PROPOSED SCOUR-STOP NATURAL HABITAT BUFFER ZONE DRAINAGE EASEMENT (WIDTH VARIES) PROPOSED UNDERDRAIN STORM DRAIN D SEE SHEET ST3 POND OUTFALL B SEE SHEET ST1 SANITARY SEWER B SEE SHEET SS2 EAST VINE DRIVE15' UTILITY EASEMENTPROPOSED DETENTION POND 6' PED. ACCESS EASEMENT4945 4950 4955 4960 4965 4970 4975 4980 4985 4945 4950 4955 4960 4965 4970 4975 4980 4985 9+5010+0011+0012+00 HEADWALL CSTA 10+00.00INV. 4959.29 (N)141.59 LF 2 - 14" x 23" HEP, CLASS 4 RCP @ 0.25%INLET C1STA 11+41.59FL. EL 4961.7±INV. IN 4959.65 (N)INV. OUT 4959.65 (S)EXISTING GROUND PROPOSED GROUND 100-YR HGL SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 ST2 PLAN & PROFILESTORM DRAIN C10 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROFILE SCALE: STORM DRAIN C EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM DRAINS LABELED AS HDPE SHALL BE HP STORM BY ADS (OR APPROVED EQUAL) 6.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). PROPOSED RIGHT OF WAY CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS ST2 ST3 S SS SS SS SS SS SS SS SSSST VAULT F.O.F.O. W W W W W W W W W W W E EEEEEEEEEEEFOFOFOFOFOFOGGGWWWFOFOFOFOFO FO FO FO FO FO FO FO FOTTTTTTTTT TTTTT T T T T T T T TT TTT W W W W W W W W W W W W WFOFOFOFOFOFOFOFOFOFOFOFOFOEEEEFO FO FO WSWO WSSSSD D GCTV CTV CTVGGG CTV CTV CTV CTV VAULT CABLE SFW UD UD UD UD UDUDUD UD UD UD UD FES D STA 10+00.00 N: 134396.94 E: 195351.90 95.63 LF 15" PERFORATED HDPE @ 0.50% 27.84 LF 12" HDPE @ 0.50% 70.96 LF 12" PERFORATED HDPE @ 0.50% 70.96 LF 12" PERFORATED HDPE @ 0.50% 33.57 LF 12" HDPE @ 0.50% 43.52 LF 12" PERFORATED HDPE @ 0.50% 56.64 LF 23"x14" HEP CLASS 4 RCP @ 0.50% 59.35 LF 6" HDPE @ 0.50% 24.19 LF 6" HDPE @ 0.50% 20.30 LF 6" HDPE @ 0.50% DRAINA BASIN D10 STA 15+02.95 N: 134479.29 E: 194929.49 INLET D6 STA 13+55.60 N: 134398.90 E: 194996.32 INLET D7 STA 13+99.11 N: 134399.38 E: 194952.80 INLET D5 STA 13+22.03 N: 134398.54 E: 195029.88 INLET D3 STA 11+80.11 N: 134396.98 E: 195171.80 INLET D4 STA 12+51.07 N: 134397.76 E: 195100.84 DRAIN BASIN D8 STA 14+23.30 N: 134399.65 E: 194928.62 INLET D2 STA 11+52.27 N: 134396.68 E: 195199.63 INLET D1 STA 10+56.64 N: 134397.13 E: 195295.26 ROOF DRAIN CONNECTION D9 STA 14+43.60 N: 134419.94 E: 194928.84 15' UTILITY EASEMENT EXISTING 6" WATER EXISTING ELCO WATER MAIN EXISTING 8" WATER EXISTING 18" STORM EAST VINE DRIVE PROPOSED CURB CUT 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) PROPOSED ROW PROPOSED SCOUR-STOP PROPOSED FH ASSEMBLY APPROXIMATELY 12' OF 12" PVC SLEEVE 5.15' DRAINAGE EASEMENT 5.15' DRAINAGE EASEMENT 4.65' DRAINAGE EASEMENT POND OUTFALL B SEE SHEET ST1 PROPOSED UNDERDRAIN 4945 4950 4955 4960 4965 4970 4975 4980 4985 4945 4950 4955 4960 4965 4970 4975 4980 4985 9+5010+0011+0012+0013+0014+0015+0016+00 56.64 LF 23"x14" HEP CLASS 4 RCP @ 0.50%INLET D1STA 10+56.64FL. EL 4964.9±INV. IN 4960.94 (W)INV. OUT 4960.13 (E)95.63 LF 15" PER FORATED HDPE @ 0.50%INLET D2STA 11+52.27FL. EL 4964.9±INV. IN 4961.67 (W)INV. OUT 4961.42 (E)27.84 LF 12" HDPE @ 0.50% 70.96 LF 12" PER FORATED HDPE @ 0.50%INLET D3STA 11+80.11FL. EL 4967.8±INV. IN 4962.73 (W)INV. OUT 4961.81 (E)INLET D4STA 12+51.07FL. EL 4967.8±INV. IN 4963.08 (W)INV. OUT 4963.08 (E)70.96 LF 12" PER FORATED HDPE @ 0.50%INLET D5STA 13+22.03FL. EL 4967.8±INV. IN 4963.43 (W)INV. OUT 4963.43 (E)33.57 LF 12" HDPE @ 0.50%INLET D6STA 13+55.60FL. EL 4968.6±INV. IN 4963.60 (W)INV. OUT 4963.60 (E)43.52 LF 12" PER FORATED HDPE @ 0.50% 24.19 LF 6" HDPE @ 0.50%INLET D7STA 13+99.11FL. EL 4968.6±INV. IN 4965.06 (W)INV. OUT 4963.82 (E)DRAIN BASIN D8STA 14+23.30FL. EL 4966.8±INV. IN 4965.18 (N)INV. OUT 4965.18 (E)20.30 LF 6" HDPE @ 0.50%ROOF DRAIN CONNECTION D9STA 14+43.60INV. 4965.28 (N)INV. 4965.28 (S)59.35 LF 6" HDPE @ 0.50%DRAINA BASIN D10STA 15+02.95RIM 4967.8±INV. OUT 4965.58 (S)FES DSTA 10+00.00INV. 4959.84 (W)PROPOSED GROUND EXISTING GROUND S. RG 1 S. RG 2 S. RG 3 100-YEAR HGL SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 ST3 PLAN & PROFILESTORM DRAIN D11 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROFILE SCALE: STORM DRAIN D EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM DRAINS LABELED AS HDPE SHALL BE HP STORM BY ADS (OR APPROVED EQUAL) 6.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). PROPOSED RIGHT OF WAY CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS ST2 ST3 STT D GAS XOHUOHUD FE S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SFE SFE SST STST STST ST GAS / / / / / / / /DTFTFTFTFTFTFEMGM JEROME STREET LLC, 216 E OAK ST EAST VINE DRIVENORTH COLLEGE AVENUEJEROME STREETJEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE PROPOSED BUILDING (SEE SHEET G1 - G2 FOR DETAILED GRADING) PROPOSED POND OUTLET STRUCTURE A CITY OF FORT COLLINS, 740 N COLLEGE AVE G S UD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD EXISTING 30' GAS LINE EASEMENT EXISTING 30' UTILITY & DRAINAGE EASEMENT LAKE CANAL EASEMENT 15' UTILITY EASEMENT LAKE CANAL EASEMENT DETENTION POND PROPERTY BOUNDARY 30' LAKE CANAL EASEMENT PROPOSED OUTDOOR LANDSCAPED AMPHITHEATER 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT 24.1' CITY TRAIL & UTILITY EASEMENT 15' CITY TRAIL & UTILITY EASEMENT15' UTILITY EASEMENT100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE)100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) NATURAL HABITAT BUFFER ZONE 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) PROPOSED 50' LAKE CANAL EASEMENT PROPOSED 30' UTILITY EASEMENT PROPOSED POND OUTLET STRUCTURE B PROPOSED CURB CUT PROPOSED COMBINATION INLET POND OUTFALL A SEE SHEET ST1 POND OUTFALL B SEE SHEET ST1 RAIN GARDEN 1 SEE SHEET RG1 STORM DRAIN D SEE SHEET ST3 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 STORM DRAIN C SEE SHEET ST3 STORM DRAIN E SEE SHEET OU1 STORM DRAIN G SEE SHEET OU1 UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE PROPOSED 88.5' ROW 15' UTILITY EASEMENT SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 OG1 OVERALL GRADING PLAN12 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE FLOW LINE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 6.GROUND WATER ELEVATION WAS MEASURED AT APPROXIMATELY ELEV = 4957.025', ON JULY 29, 2022. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED UNDERDRAIN UD NATURAL HABITAT BUFFER ZONE (NHBZ) KEYMAP T GAS G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R D D FE S TFTFTFTFTFTFEM UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD EAST VINE DRIVENORTH COLLEGE AVENUE(63.13)(6 7 . 0 0 ) (66.59)(66.75)(6 7 . 0 2 ) EXISTING 30' UTILITY & DRAINAGE EASEMENT LAKE CANAL EASEMENT PROPOSED 10' CONCRETE PAN AREA INLET (TYP.) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE)500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 30' CANAL EASEMENT PER BRUSH MOBILE HOME P.U.D. 15' UTILITY EASEMENT15' UTILITY EASEMENTPROPOSED OUTDOOR LANDSCAPED AMPHITHEATER 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT PROPOSED BUILDING FFE=4969.0068.8268.9068.8268.9068.5364.0863.7263.7663.5068.79 68. 8 9 6 9 . 0 2 69.141.2%1.9%1.3%1.5%1.5%0.5%0.5%66.1566.0966.84 68.122.1% 4.2%3.7%4.0%3.7%3.2%3.9% 4.1%3.2%5.4%2.9%6.6%6.2%1.3% 2.0% 1.5% 3.1% 3.5% 1. 5%2.1%2.8%2.4%2.1%62.5362.3162.3362.1062.1962.1561.3461.6061.3761.7761.7661.8361.9162.0961.8462.0962.3662.5263.1663.3462.8662.84 62.5162.5962.5961.1561.2261.7261.81 60.80 60. 9 1 61.2761.1861.4661.6361.66 61.5161.5460.6260.7860.9462.1366.8165.11 61.49 64.22 63.31 61.26 60.72 60.58 61.59 60.50 67. 3 0 6 7 . 4 2 67.3867.5467. 5 0 66.9666.6066.6866. 7 4 66.5067.2467.2567.41 67.586 7 . 4 667.4067.4467.32 67.6968.1767.8168.05 68.24 (68 . 3 8 )(68.43)62.8362.92 63.15 62.6562.8363.26 62.7862.9061.8662.2361.97 62.0261.8161. 8 0 61. 8 5 6 7 . 0 6 62.69 62.6562.2162.5861.3961.2561.1361.00NATURAL HABITAT BUFFER ZONE 59.8161.526 7 . 2 7 67.17 67.08 67.2865.2165.1069. 0 0 68.4668.9367.3367.4367.3862.86 62.8668.8268.9066.3268.6562.00 62.18 PROPOSED 50' LAKE CANAL EASEMENT PROPOSED 30' UTILITY EASEMENT PROPOSED CURB CUT 67.48 67.3867.07 67.0568.00 67.5867.5867.7267.73 68. 8 8 68. 9 0 68. 9 068.90 8.0% 8.2% 6.9% 8.0%1.5%1.5%1.5%1.5%1.5%1.5%1.5%3.7%1.5%3.2% 2.0% 1.5%1.8%1.6% RAIN GARDEN 1 SEE SHEET RG1 STORM DRAIN D SEE SHEET ST3 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 STORM DRAIN E SEE SHEET OU1 3.9%67.9867.5068.8268.7965.7465.7566. 4 769.0068.7968.7968.7968. 8 6 68.8768.8966.21 66.31 66.00 63. 5 9 67.26 66.21 UD-S CO1 INV. OUT=4958.45 (E)68.7968.7968.7969.0068.8268.8268.82 68.826 8 . 2 6 66. 0 166.0168.04 68.5568.6566.8766.7868.5368.6266.6566.746 8 . 3 6 68.21 66.8966.6963.266 3 . 3 564.8664.9565.0264.9365.8465.8463.8463.8463.3563.3963.2963.2564.6264.8264.586 8 . 4 3 6 8 . 4 068.756 8 . 6 8 67.35 6 7 . 2 767.1567.23 64.7564.8367.2467.41 68.7168.57 61.4261. 4 4 61.4968.8268. 8 2 68. 8 366.4566.8166.8167.0767.0767.1767.18 67.5467.4267.1167.2667.2767.24 67.23 67.0567.05 66.8667.0066.8166.4462.2962.0362.0561.9662.9666.0768.8168.8268.8368.82SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 G1 GRADING PLAN13 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE FLOW LINE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 6.GROUND WATER ELEVATION WAS MEASURED AT APPROXIMATELY ELEV = 4957.025', ON JULY 29, 2022. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED UNDERDRAIN UD NATURAL HABITAT BUFFER ZONE (NHBZ) KEYMAP T GAS G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R GAS FE SFE S FE S ST ST ST ST ST ST ST ST ST ST ST ST GAS / / / / / / / // / / / / / / /CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV / / / / / / / / UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD PROPOSED POND OUTLET STRUCTURE A EXISTING 30' GAS LINE EASEMENT PROPOSED 8' CONCRETE PAN AREA INLET PROPOSED AREA INLET 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 15' CITY TRAIL & UTILITY EASEMENT 15' UTILITY EASEMENT 24' EMERGENCY ACCESS EASEMENT 62.1762.6162.6062.1562.1462.5962.2262.582.6%2.6%1.3%1.3%1 . 5% 1 . 6%1.6%1.7%2.8% 2.8%3.8%2.5%2.2% 2.2%2.2% 1.5%2.4%1.8%1.6%1.8% 1. 5 % 1 . 4%2.6%2.2%2.0%1.6%3.1%2.1%1. 5 % 62.14 62.5362.3162.3362.1062.1962.1562.1362.1562.1762.1162.04 61.8761.8661.8961.9661.55 61.566 1 . 6 0 61.89 62.0361.7962.1562.23 62.4962. 3 9 62.4862.2862.3562.5762.5962.5762.5062.9662.9362.8662.8362.8663.0861.3461.29 6 1 . 5 6 61.60 61.6561.6361.3561.536 1 . 5 4 61.5161.43 61.2561.1161.4061.5261.9962.9262.7362.7662.9262.03 62.44 63.45 63.1662.9762.6862.6662.1962.4260.6760.80 60. 9 1 61.2761.1858. 1 159.1760.7361.4661.6361.66 61.5161.5460.6259.9660.21 60.09 59.6759.7859.8559.4560.4559.7760. 6 1 60.7761. 0 5 61. 3 5 6 1 . 7 2 61.21 60. 8 360.6860.5660.32 60.2760.36 60.43 63.0262.8763.4263.2659.60 60.5360.9861.0561.0561. 0 8 60.9360.9660.9360.87 60.27 60.39(62.97)(63.49)(62.68)(61.71)(60.63)(60.69)(60.41)60.1760.3460.45NATURAL HABITAT BUFFER ZONE POND OVER FLOW 58.8658.5658.26 58.1959.4259.8161.5260. 9 5 5 9 . 8 4 59.31PROPOSED 50' LAKE CANAL EASEMENT COMBINATION INLET 6.3%6.8%12.4%21.6%1.1% 1.0%60.36PROPOSED POND OUTLET STRUCTURE B PROPOSED AREA INLET60.0260.6560.60 NATURAL HABITAT BUFFER ZONE POND OUTFALL A SEE SHEET ST1 POND OUTFALL B SEE SHEET ST1 RAIN GARDEN 1 RG1 STORM DRAIN C SEE SHEET ST3 STORM DRAIN G SEE SHEET OU1 UD-S CO1 INV. OUT=4958.45 (E) 46.58 L F 4 " H D P E @ 0. 5 0 % UD-S BEND 4 INV. IN=4958.21 (W) INV. OUT=4958.21 (E) 54.59 LF 4" HDPE @ 0.50% UD-S BEND 3 INV. IN=4957.94 (W) INV. OUT=4957.94 (E) 52.69 L F 4 " H D P E @ 0 . 5 0 % 68.26 LF 4" HDPE @ 0.50% UD-S BEND 2 INV. IN=4957.68 (W) INV. OUT=4957.68 (E) UD-S BEND 1 INV. IN=4957.34 (W) INV. OUT=4957.34 (S) 10.84 LF 4" HDPE @ 0.50%61.4261. 4 4 61.49PROPOSED 2' CHASE SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 G2 GRADING PLAN14 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE FLOW LINE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 6.GROUND WATER ELEVATION WAS MEASURED AT APPROXIMATELY ELEV = 4957.025', ON JULY 29, 2022. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED UNDERDRAIN UD NATURAL HABITAT BUFFER ZONE (NHBZ) KEYMAP T GAS G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R UD UD UD UD UD UD UD UD UD UD UD UD AREA INLET PROPOSED OUTDOOR LANDSCAPED AMPHITHEATER 3.7%2.8%12.2%22.6%25.0%1. 5 %62.9661.3761.7760.63 60.79 60.72 60.58 60.50 60.50 60.67 60.53NATURAL HABITAT BUFFER ZONE PROPOSED 50' LAKE CANAL EASEMENT DRAINAGE EASEMENT (WIDTH VARIES) STORM DRAIN C SEE SHEET ST2 STORM CULVERT F SEE SHEET OU1 UD-N CO2 INV. OUT=4957.64 (E) 77.35 LF 4" HD P E @ 0 . 2 0 % UD-N BEND 2 INV. IN=4957.49 (W) INV. OUT=4957.49 (E) 48.33 LF 4" HDPE @ 0.20% UD-N BEND 1 INV. IN=4957.39 (W) INV. OUT=4957.39 (E) 114.29 LF 4" HD P E @ 0 . 2 0 % 4.98 LF 4" HDPE @ -49.94% UD-N TEE 1 INV. IN=4957.16 (E) INV. IN=4957.16 (W) INV. OUT=4957.16 (S)19.47 LF 4" HDPE @ 0.20% UD-N CO1 INV. OUT=4957.20 (W) INLET C1 INV. IN=4959.65 (N) INV. OUT=4959.65 (S) SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 RG1 PLAN & DETAILSNORTH RAIN GARDEN15 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 KEYMAP T GASRG1 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH RAIN GARDEN PART 1 - GENERAL A.Bioretention Sand Media (BSM) shall be uniformly mixed, uncompacted, free of stones, stumps, roots, or other similar objects larger than two inches. No other materials or substances shall be mixed or dumped within the bioretention area that may be harmful to plant growth or prove a hindrance to the facility's function and maintenance. B.BSM shall be free of plant or seed material of non-native, invasive species, or weeds. C.Fully mixed BSM shall be tested prior to installation and meet the following criteria: 1.P-Index of less than 30 2.pH of 5.5-6.5. Should pH fall outside of the acceptable range, it may be modified with lime (to raise) or iron sulfate plus sulfur (to lower). The lime or iron sulfate must be mixed uniformly into the BSM prior to use in the bioretention facility. 3.Cation Exchange Capacity (CEC) greater than 10 4.Phosphorous (Phosphate, P2O5) not to exceed 69 ppm 5.BSM that fails to meet the minimum requirements shall be replaced at the Contractor's expense. D.BSM shall be delivered fully mixed in a drum mixer. Onsite mixing of piles will not be allowed. Mixing of the BSM to a homogeneous consistency shall be done to the satisfaction of the Owner. PART 2 - SOIL MATERIALS A.Sand 1.BSM shall consist of 60-70% sand by volume meeting ASTM C-33. B.Shredded Paper 1.BSM shall consist of 5-10% shredded paper by volume. 2.Shredded paper shall be loosely packed, approximate bulk density of 50-100 lbs/CY. 3.Shredded paper shall consist of loose leaf paper, not shredded phone books, and shall be thoroughly and mechanically mixed to prevent clumping. C.Topsoil 1.BSM shall consist of 5-10% topsoil by volume. 2.Topsoil shall be classified as sandy loam, loamy sand, or loam per USDA textural triangle with less than 5% clay material. 3.Onsite, native material shall not be used as topsoil. 4.Textural analysis shall be performed on topsoil, preferably at its source, prior to including topsoil in the mix. Topsoil shall be free of subsoil, debris, weeds, foreign matter, and any other material deleterious to plant health. 5.Topsoil shall have a pH range of 5.5 to 7.5 and moisture content between 25-55%. 6.Contractor shall certify that topsoil meets these specifications. D.Leaf Compost 1.BSM shall consist of 10-20% leaf compost by volume. 2.Leaf compost shall consist of Class 1 organic leaf compost consisting of aged leaf mulch resulting from biological degradation and transformation of plant-derived materials under controlled conditions designed to promote aerobic decomposition. 3.The material shall be well composted, free of viable weed seeds and contain material of a generally humus nature capable of sustaining growth of vegetation, with no materials toxic to plant growth. 4.Compost shall be provided by a local US Composting Council Seal of Testing Assurance (STA) member. A copy of the provider's most recent independent STA test report shall be submitted to and approved by the Owner prior to delivery of BSM to the project site. 5.Compost material shall also meet the following criteria: a.100 percent of the material shall pass through a 1/2 inch screen b.PH of the material shall be between 6.0 and 8.4 c.Moisture content shall be between 35 and 50 percent d.Maturity greater than 80 percent (maturity indicator expressed as percentage of germination/vigor, 80+/80+) e.Maturity indicator expressed as Carbon to Nitrogen ration < 12 f.Maturity indicator expressed as AmmoniaN/NitrateN Ratio <4 g.Minimum organic matter shall be 40 percent dry weight basis h.Soluble salt content shall be no greater than 5500 parts per million or 0-5 mmhos/cm i.Phosphorus content shall be no greater than 325 parts per million j.Heavy metals (trace) shall not exceed 0.5 parts per million k.Chemical contaminants: meet or exceed US EPA Class A standard, 40 CFR 503.13, Tables 1 & 3 levels l.Pathogens: meet or exceed US EPA Class A standard, 40 CFR 503.32(a) levels PART 3 - EXECUTION A.General 1.Refer to project specifications for excavation requirements. B.Placement Method 1.BSM material shall be spread evenly in horizontal layers. 2.Thickness of loose material in each layer shall not exceed 9-inches. 3.Compaction of BSM material is not required. BIORETENTION SAND MEDIA100 APPROVED: DRAWN BY:DETAILS CONSTRUCTION DATE REVISED: DETAILSTORMWATER BIORETENTION DECEMBER 2018 HEM D-53 1.CONTRACTOR SHALL INSTALL BIORETENTION BASINS ACCORDING TO THE APPROVED PLANS AND/OR CONSTRUCTION SPECIFICATIONS. 2.PRE-CONSTRUCTION 2.1.CONTRACTOR SHALL AVOID COMPACTION OF THE BIORETENTION BASIN AREA TO PRESERVE EXISTING INFILTRATION RATES. 2.2.CONTRACTOR SHALL CALL FOR CITY INSPECTIONS AT THE INTERVALS STIPULATED IN THE "DURING CONSTRUCTION INSPECTION CHECKLISTS". 3.DURING CONSTRUCTION: 3.1.CONTRACTOR SHALL PROVIDE CONSTRUCTION OBSERVATION DURING CONSTRUCTION OF THE BIORETENTION BASIN TO ENSURE COMPLIANCE WITH THE APPROVED PLANS AND DESIGN SPECIFICATIONS. 3.2.LOOSE MATERIALS SHALL NOT BE STORED ON THE BIORETENTION AREA. 3.3.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS AND DIRT FROM ANY SOURCE FROM ENTERING THE BIORETENTION SYSTEM. 4.GEOTEXTILE LINERS: 4.1.WHERE USED, GEOTEXTILE LINERS (PERMEABLE OR IMPERMEABLE AS PER PLAN) SHALL BE INSTALLED ALONG PERIMETER OF CROSS-SECTION OF THE BIORETENTION CELL. 4.2.WHERE USED, GEOTEXTILE LINERS SHALL BE PLACED IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDATIONS. ALL SEAMS AND OPENINGS IN THE LINER SHALL BE SEALED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS. 4.3.WHERE USED, IMPERMEABLE GEOMEMBRANE SHEET / LINER SHALL BE 40 MIL THICK, HIGH-DENSITY POLYETHYLENE DESIGNED SPECIFICALLY FOR FLEXIBLE GEOMEMBRANE APPLICATIONS. ADJACENT STRIPS OF IMPERMEABLE LINER SHALL OVERLAP A MINIMUM OF 18", OR PER MANUFACTURER'S SPECIFICATION. 4.4.WHERE USED, CONTRACTOR TO PLACE LINER IN A WAY THAT ENSURES ENOUGH SLACK IN THE LINER TO ALLOW FOR BACKFILL AND SETTLING WITHOUT TEARING THE LINER. 5.AGGREGATES AND BSM: 5.1.ALL AGGREGATES SHALL BE ANGULAR, CRUSHED, WASHED ROCK, CLEAN OF DEBRIS AND WITH NO MORE THAN 1% FINES. 5.2.RESERVOIR AGGREGATE SHALL BE GRADATION ASTM #57 OR #67. 5.3.DIAPHRAGM AGGREGATE SHALL BE "PEA GRAVEL", WITH GRADATION ASTM #8, #89 OR #9. 5.4.THE BIORETENTION SOIL SHALL MEET THE CITY BIORETENTION SAND MEDIA ("BSM") SPECIFICATION FOUND AT:https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/ NOTES: 8" MIN 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 2" MIN 30" MIN 12.0000 MAX1 GEOTEXTILE LINER (AS PER PLAN) MAXIMUM ALLOWABLE PONDING DEPTH IS 12" FROM THE TOP OF THE MULCH 4 MAX NON-FLOATABLE MULCH (AS PER PLAN) 3" PONDING DEPTH MUST NOT EXCEED FLOWLINE ELEVATION OF ADJACENT GUTTER FOREBAY IS REQUIRED TO BE PLACED AT ALL INFLOW LOCATIONS; WITH A MINIMUM 3" DROP FROM GUTTER FLOWLINE TO FOREBAY 4" MIN DEPTH OF DIAPHRAGM AGGREGATE 8" MIN DEPTH OF RESERVOIR AGGREGATE 18" MIN DEPTH OF BIORETENTION SAND MEDIA 8" MIN DEPTH THICKENED CURB ADJACENT TO VEHICULAR PAVEMENTS OVERFLOW RISER OPTION (AS PER PLAN) 8" MIN DEPTH THICKENED CURB ADJACENT TO VEHICULAR PAVEMENTS STANDARD CROSS-SECTION 1 2 WALLED CROSS-SECTION PONDING DEPTH MUST NOT EXCEED FLOWLINE ELEVATION OF ADJACENT GUTTER 18" MIN 4" 12" MAX 30" MIN 36" MIN BASIN WIDTH COVER PLATE 8" SIDEWALK CHASE 18" MIN OVERFLOW RISER OPTION (AS PER PLAN) REINFORCED CONCRETE WALLS (AS PER PLAN) 4" MIN DEPTH OF DIAPHRAGM AGGREGATE 8" MIN DEPTH OF RESERVOIR AGGREGATE 18" MIN DEPTH OF BIORETENTION SAND MEDIA MAXIMUM ALLOWABLE PONDING DEPTH IS 12" FROM THE SURFACE OF THE MULCH 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 6.UNDERDRAIN: 6.1.UNDERDRAIN PIPE TO BE PERFORATED OR SLOTTED. PERFORATIONS OR SLOTS TO BE SMALLER THAN SURROUNDING AGGREGATE TO ENSURE AGGREGATE DOES NOT FALL INTO OR CLOG THE OPENINGS. 6.2.DO NOT WRAP UNDERDRAIN WITH GEOTEXTILE OR SOCK. 6.3.UNDERDRAIN PIPE MUST OUTFALL BY GRAVITY AND MUST TIE INTO A STORMWATER PIPE, INLET OR SYSTEM AND THE LOCATION MUST BE APPROVED BY THE CITY. THE UNDERDRAIN TIE-IN SHALL MEET ALL REQUIRED PIPE SIZE, TYPES, AND COVER REQUIREMENTS THAT MAY APPLY TO PIPING THAT EXTENDS BEYOND THE LIMITS OF THE BIORETENTION CELL AND ENCROACHES INTO PUBLIC RIGHT-OF-WAY OR OTHER PROPERTY. 7.OVERFLOW INLET: 7.1.AN OVERFLOW INLET OR RISER PIPE SHALL BE PROVIDED. 7.2.ALL OVERFLOW RISER PIPE SHALL BE CAPPED WITH A DOME-SHAPED GRATE. 7.3.AN EMERGENCY OVERFLOW ROUTE SHALL BE PROVIDED AND THE LOCATION SHALL BE IDENTIFIED ON THE PLANS. 8.CLEANOUTS: 8.1.PROVIDE CLEANOUTS (AS PER PLAN) TO ALLOW INSPECTION (BY CAMERA) OF THE UNDERDRAIN SYSTEM DURING AND AFTER CONSTRUCTION. 8.2.CLEANOUTS SHALL BE PROVIDED AT EACH BEND GREATER THAN OR EQUAL TO 90° AND EVERY 100' ALONG A STRAIGHT RUN. CLEANOUT SHALL BE INSTALLED PER THE APPROVED PLANS. 8.3.CLEANOUTS SHALL BE A SOLID WALL PVC STRUCTURE FOR ALL VERTICAL SECTIONS WITH FITTINGS TO CONNECT TO DISTRIBUTION AND UNDERDRAIN PIPING MATERIALS, AS REQUIRED. 9.FOREBAY: 9.1.THE FOREBAY SHALL BE EASILY ACCESSIBLE WITH A HARD SURFACED BOTTOM FOR MAINTENANCE PURPOSES. 10.LANDSCAPE MATERIALS 10.1.CONTRACTOR SHALL NOT PLACE WEED BARRIER ANYWHERE WITHIN THE BIORETENTION BASIN. IF MULCH IS PLACED IN THE BIORETENTION BASIN, IT MUST BE NON-FLOATABLE. 10.2.IF MULCH OR COBBLES ARE PLACED IN THE BIORETENTION BASIN, THE MAXIMUM ALLOWABLE WATER DEPTH OF 12" AND REQUIRED BASIN VOLUME MUST BE MEASURED FROM THE TOP SURFACE OF THE MULCH OR COBBLE. 10.3.ROLLED TURF OR SOD IS NOT AN ALLOWABLE LANDSCAPE MATERIAL FOR BIORETENTION BASINS. LOW WATER CONSUMPTION LANDSCAPE PLANTINGS ARE PREFERRED FOR BIORETENTION BASINS. 10.4.LANDSCAPE PLANTINGS SHALL NOT BE PLACED TO IMPEDE DRAINAGE INTO OR OUT OF THE BIORETENTION BASIN. 10.5.TEMPORARY IRRIGATION MAY BE INSTALLED TO ESTABLISH LANDSCAPING OR SEED IN THE BIORETENTION BASIN. 2" MIN 8" MIN 4" 8" NATIVE SOIL ZONE FLAT EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 6.REFER TO CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS ON BIORETENTION SAND MEDIA, DIAPHRAGM AGGREGATE, AND RESERVOIR AGGREGATE. PROPOSED RIGHT OF WAY PROPOSED SPOT ELEVATION 2.0% (47.45 ) EXISTING SPOT ELEVATION 33.43 NATURAL HABITAT BUFFER ZONE PROPOSED SLOPES FLAT BOTTOM AREA PROPOSED 6" PERFORATED PVC UD RG2 RG3 RG4 SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 D6 DETAILSUTILITY22 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 D7 DETAILSUTILITY23 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 D8 DETAILSUTILITY24 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 LOWER LIMIT OF TRENCH WALL SLOPING INITIAL LIFT * 12 IN. MIN. PIPE O.D. 4 IN. MIN. TRENCH WIDTH AS SPECIFIED IN SECTION 02221 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 * BEDDING REQUIRMENTS WW-1 0.015 STAINLESS STEEL STRAPS (TO BE USED WITH REDWOOD SKIDS) NOTE: CASING SPACERS MAY BE EITHER REDWOOD OR STAINLESS STEEL WITH POLYMER RUNNERS. TRANSMISSION LINE SUPPORTED BY CASING SPACERS. CASING SEAL CARRIER PIPE STEEL CASING 1/4 IN. MIN. CARRIER PIPE CASING SPACERS BELL OF PIPE STEEL CASING STEEL CASING DETAIL WW-2 ALTERNATE BASE POURED INVERT PRECAST MANHOLE BASE2 IN. MIN.SLOPE 1 IN. MIN. 8 IN. MIN. 6 IN. 15 IN. OR LESS 48 IN. 60 IN.18 IN. TO 30 IN. 72 IN.OVER 30 INCHES MIN. MANHOLE MINIMUM INSIDE DIAMETER OF DIAMETER MANHOLE SHALL BE AS FOLLOWS: PIPE SIZE5 FT. MIN. DEPTHCONCRETE ADJUSTMENT SHIMS GROUTED INSIDE ASTM C-478 ECCENTRIC CONE PRE-FORMED PLASTIC GASKET ASTM C-478 MANHOLE SECTIONS GROUT BASE TO BARREL SECTION ON INSIDE PRE-FORMED PLASTIC GASKET CAST-IN-PLACE CONCRETE BASE 16 IN. MAX. FINISHED GRADE 30 IN. MIN.48 IN. MAX.VARIABLE28 IN. MAX. 24 IN. SEE TABLE 6 IN. 12 IN. SLOPE 1 IN./FT. 18 IN. MAX. MANHOLE RUNGS 12 IN. O.C. 8 IN. MIN STANDARD MANHOLE WW-3 SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 D12 DETAILSDRAINAGE28 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R DETAILS CONSTRUCTION DETAILSTORMWATER BIORETENTION - UPTURNED ELBOW OUTFALL D-53A TYPICAL BIORETENTION OR SAND FILTER CROSS-SECTION 18" MIN UPTURNED ELBOW DAYLIGHT ELEVATION MUST BE A MINIMUM OF 18" BELOW THE WATER SURFACE OF THE LID FEATURE UNDERDRAIN @ 0.50% MIN SLOPE 1.CONTRACTOR SHALL INSTALL BIORETENTION BASINS ACCORDING TO THE APPROVED PLANS AND/OR CONSTRUCTION SPECIFICATIONS. 2.THIS DETAIL SHALL BE USED IN CONJUNCTION WITH DETAIL D-53 OR D-54. 3.THIS OPTION IS ONLY FOR USE WITH SYSTEMS THAT DO NOT HAVE AN IMPERMEABLE LINER. NOTES: 30" MIN 12" MAX UNDISTURBED SOIL SUBGRADE 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 1' MIN 6" TOPSOIL EDGE RESTRAINT (CONCRETE APRON OPTION) EDGE RESTRAINT (CURB AND GUTTER OPTION) 0" MIN 6" 6" MIN CLEANOUTS WITH CONCRETE COLLAR (AS PER PLAN) PERFORATED UNDERDRAIN @ 0.50% MIN SLOPE GEOTEXTILE LINER (AS PER PLAN) 1' MIN CROSS-SECTION DETAIL 2' MIN 6" PREPARED SUBGRADE @ 0.50% MIN SLOPE 1' MIN DEPTH OF SUB-BASECOURSE 6" DEPTH OF BASECOURSE GRAVEL SURFACE @ 0.50% MIN OR 3.00% MAX SLOPE GRAVEL LID PAVING SECTIONS1201 SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 D14 DETAILSDRAINAGE30 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R CC A A B B SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE PLAN GENERAL NOTES SECTION D-D D D A A ABBREVIATIONS LEGEND Outlet Summary Pond 1 ELEV A.4958.11 ELEV B.4958.89 ELEV C.4959.89 ELEV D.4957.28 Dwq (FT.)0.78 Ls (FT.)4 Ws (FT.)4 Wo (IN.)6 WQ PLATE HOLE DIA. (IN.) 13/16 # OF ROWS 2 # OF COLUMNS 1 404 INLET SCHEDULE INLET ID TYPE OA2 AREA INLET DOUBLE OUTLET B STANDARD TYPE C OB1 AREA INLET C1 AREA INLET DOUBLE D1 NYLOPLAST 15" STANDARD D2 NYLOPLAST 15" STANDARD D3 NYLOPLAST 15" STANDARD D4 NYLOPLAST 15" STANDARD D5 NYLOPLAST 15" STANDARD D6 NYLOPLAST 15" STANDARD D7 NYLOPLAST 15" STANDARD G1 COMBINATION INLET G UGEUGE UGE UGE UGES UD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD VAULT ELEC GGGVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC T VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T SGGGGGGGG GGGGGGGGGGGGGGGXOHUOHUD FE SGGGG G/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST ST VAULT ELEC GAS / / / / / / / /D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRTFTFTFTFTFTFEMGMSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SFSFSFSF SF SF SF SF S F SF SF SF SF SF SF SF SF SF SF SF SFSF SF EAST VINE DRIVECOLLEGE AVENUEJEROME STREETLAKE C A N A L JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE NORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER BENCHMARK/BASIS OF BEARING: SILT FENCE ROCK SOCK SCOUR-STOP 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.REFER TO THE PRELIMINARY DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. GENERAL NOTES: WATTLE DIKE CONCRETE WASH AREA BALE OUTLET PROTECTION LEGEND: INLET PROTECTION VEHICLE TRACKING CONTROL PAD SF SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 EC1EC1 31 BENCHMARK: #1 CITY OF FORT COLLINS BENCHMARK 1-00 Elevation=4968.74 BENCHMARK: #2 CITY OF FORT COLLINS BENCHMARK 3-13 Elevation=4962.27 Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on Plat. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R AREA INLET PROTECTION SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 EC3EROSION CONTROL DETAILS32 001 002 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SECTION G-G G PLAN G BOP BALE OUTLET PROTECTION PLANTED RIPRAP INSTALLATION RP D STT VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS XOHUOHUOHUD FE S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST ST GAS / / / / / / / /D CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRFLOODWAY ZONE AE 930 72312351341 4967 (NAVD88)4965 (NAVD88)4966 (NAVD88)4962 (NAVD88)4964.34966.04967.64964.2 FFE=69.00 JEROME STREET LLC, 216 E OAK ST FORT COLLINS JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE TFTFTFTFTFTFEM GM68.8968.90JEROME STREETCOLLEGE AVENUEVINE DRIVE 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 35 ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 FP1FP1 35 NORTH LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPOSED STORM INLET PROPOSED CONCRETE CROSS PAN (TYP.) PEDESTRIAN ACCESS RAMPS PROPERTY BOUNDARY CROSS-SECTION (CSU CLOMR) 2446 NOTES: 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION 2.THIS PROJECT IS LOCATED WITHIN A FEMA DESIGNATED 100-YEAR FLOODPLAIN FRINGE AND MUST COMPLY WITH CHAPTER 10 OF THE CITY CODE. 3.ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER THE CITY OF FORT COLLINS VERTICAL CONTROL DATUM (NAVD 88). 4.ANY ITEMS LOCATED IN THE FLOODPLAIN ON THE POUDRE RIVER THAT CAN FLOAT (E.G., PICNIC TABLES, BIKE RACKS, ETC.) MUST BE ANCHORED. 5.A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION. 6.A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODPLAIN (I.E., CURB CUT REMOVAL, LANDSCAPING). 7.NO OVERNIGHT STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODPLAIN, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE FLOODPLAIN. 8.REFER TO THE FINAL DRAINAGE REPORT, DATED DECEMBER 14, 2022 FOR ADDITIONAL INFORMATION. 9.A POST-CONSTRUCTION ELEVATION CERTIFICATE INCLUDING COMPONENTS LIKE TRANSFORMER, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, ELEVATOR, HVAC EQUIPMENT, EMERGENCY VEHICLE ACCESS GATE, OTHER ELECTRICAL AND MECHANICAL SYSTEMS, ETC. MUST BE APPROVED BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED. 10.TRANSFORMER, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, ELEVATOR, HVAC EQUIPMENT, EMERGENCY VEHICLE ACCESS GATE, OTHER ELECTRICAL AND MECHANICAL SYSTEMS ARE TO BE PLACED AT OR ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION. 11.FURNITURE OR SITE COMPONENTS WILL BE SECURELY ANCHORED TO GRADE WITH A SYSTEM TO BE 4" LAGS BOLTS EPOXIED INTO GROUND BASE CONCRETE OR STONE WITH STRAPS AND/OR CHAINS SECURED TO ELEMENTS TO PREVENT FLOTATION. ANCHORING DETAILS WILL BE SUPPLIED AT THE TIME OF THE FLOODPLAIN USE PERMIT. 12.ALL ELEVATORS INSTALLED BELOW THE RFPE IN THE PROJECT WILL COMPLY WITH FEMA NFIP TECHNICAL BULLETIN 4 JUNE, 2019 AND THE 2021 IBC. 13.HORIZONTAL CONTROL: CITY OF FORT COLLINS GROUND MASTER CONTROL. 14.CRITICAL FACILITIES ARE PROHIBITED IN THE FLOODPLAIN, INCLUDING HAZARDOUS MATERIAL, GOVERNMENT SERVICES, ESSENTIAL SERVICES AND AT-RISK POPULATION CRITICAL FACILITIES. THIS INCLUDES SCHOOLS AND AFTER SCHOOL PROGRAMS/DAY CAMPS FOR GRADES K-12. 15.AN EMERGENCY RESPONSE AND PREPAREDNESS PLAN (ERPP) WILL BE REQUIRED BY THE CITY OF FORT COLLINS PRIOR TO A FLOODPLAIN OR BUILDING PERMIT BEING ISSUED. 16.OUTDOOR CLASSROOM AS AN INFORMAL OUTDOOR GATHERING SPACE TO BE USED FOR SITE TOURS AND OUTDOOR LEARNING. THESE SPACES WILL BE CONSTRUCTED USING LARGE BOULDERS AND CRUSHED-FINE SURFACING. 17.THE QUANTITIES LISTED BELOW AND THE REMOVAL OF HYDROGEN STORAGE FROM THE SITE, WILL REMOVE THE DESIGNATION OF A “CRITICAL FACILITY', AS PER DEFINED BY CHAPTER 10 OF CITY CODE, FROM THE PROJECT. MATERIAL STORAGE RESTRICTIONS WILL BE REMOVED WITH THE APPROVAL OF THE LOMR. THE FOLLOWING OUTLINES THE HANDLING AND STORAGE PROCESSES OF HYDROGEN FOR RESEARCH PROCEDURES ANTICIPATED AT THE PROPOSED POWERHOUSE II FACILITY: ·HYDROGEN PRODUCED BY HYDROLYSIS OR SIMILAR METHOD WILL BE DISPOSED OF AS PRODUCED VIA VENTING OUTDOORS (AS PER ANY CODE REQUIREMENTS), BURNED IN OUTDOORS IN A NON-VISIBLE FLARE, CONSUMED BY FUEL CELL OR SIMILAR DEVICE. ·ONSITE STORAGE OF HYDROGEN WILL REMAIN AT OR BELOW QUANTITIES REGULATED BY INTERNATIONAL FIRE SAFETY CODE OR “HOUSEHOLD LEVELS” ·HYDROGEN FUELED VEHICLES, SUCH AS AUTOMOBILES, LIGHT AND MEDIUM DUTY TRUCKS, AND TRANSIT BUSES WILL BE TESTED ONSITE AND ADHERE TO ALL FIRE SAFETY CODES AND DOT REGULATIONS REGARDING HYDROGEN FUELED VEHICLES. NO VEHICLES WILL BE STORED OUTSIDE OVERNIGHT PER THE FLOATABLE MATERIALS REQUIREMENTS IN CHAPTER 10 OF CITY CODE. ·H2 STORAGE TANKS WILL REMAIN AT POWERHOUSE I UNTIL APPROVAL OF THE LOMR. FLAMMABLE MATERIALS: ·ACETYLENE : 1 COMMERCIAL CYLINDER AT 300 OR LESS STD. CU. FT. VOLUME. ·OXYGEN : 1 COMMERCIAL CYLINDER AT 300 OR LESS STD. CU. FT. VOLUME. NON-REACTIVE GASES: ·COMPRESSED AIR : 500 GAL. TANK ·COMPRESSED NITROGEN : 2000 L. CRYOGENIC TANK, LIQUID ·COMPRESSED ARGON : 2000 L. CRYOGENIC TANK, LIQUID ·COMPRESSED HELIUM : <20 - 300 STD. CU FT, STEEL CYLINDERS ·COMPRESSED ARGON : <20 - 300 STD. CU FT, STEEL CYLINDERS ·COMPRESSED CO2 : <20 - 300 STD. CU FT, STEEL CYLINDERS 18.THE PROPOSED POWERHOUSE II BUILDING IS PROJECTED TO HOUSE SEVERAL TYPES OF ORGANIZATIONS: RETAIL, PRIVATE COMPANIES WORKING IN ENERGY INDUSTRY, AND COLORADO STATE UNIVERSITY (CSU) FUNCTIONS RELATING TO SPONSORED RESEARCH. THE CSU SPACE WILL BE ASSIGNED TO RESEARCHERS TO CONDUCT SPONSORED RESEARCH FOR INDUSTRY AND GOVERNMENT (LOCAL, CITY, STATE AND FEDERAL) SPONSORS. THESE SPACES WILL NOT BE USED FOR TRADITIONAL EDUCATIONAL FUNCTIONS SUCH AS CLASSROOM INSTRUCTION OR LABORATORY INSTRUCTION. WHILE UNIVERSITY EMPLOYEES (RESEARCHERS, STAFF, AND STUDENT EMPLOYEES) WILL BE USING THE SPACE THEY WILL NOT BE ENGAGED IN INSTRUCTIONAL ACTIVITIES. GOVERNMENT SERVICES FACILITIES INCLUDE ESSENTIAL STRUCTURES SUCH AS DORMITORIES, OFFICES, CLASSROOMS, AND LABORATORIES FOR PUBLIC HIGHER EDUCATION FACILITIES. POWERHOUSE II WILL NOT BE USED FOR DORMITORY HOUSING. NOR WILL IT HAVE INSTRUCTIONAL CLASSROOMS AND THE LABORATORY AND OFFICE SPACES WILL BE USED SOLELY FOR SPONSORED RESEARCH ACTIVITIES. GIVEN THIS DEFINITION AND PURPOSES, POWERHOUSE II SHOULD NOT BE CLASSIFIED AS A GOVERNMENT SERVICES FACILITY PER CHAPTER 10 OF CITY CODE AND THE RESTRICTIONS ASSOCIATED WITH THIS DESIGNATION. BENCHMARKS: 5000ELEVATION NGVD 88 BASE FLOOD ELEVATION (CSU CLOMR) 100-YR FLOODPLAIN - (PER CSU CLOMR) PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 1-00 ON A CATCH BASIN AT THE SOUTHEAST CORNER OF VINE DR. AND COLLEGE AVE. ELEV.=4968.74 CITY OF FORT COLLINS BENCHMARK 3-13 APPROX.40 FT SOUTH OF THE LINDEN ST. BRIDGE OVER THE POUDRE RIVER, ON THE WEST SIDE OF LINDEN ST. , ON A STORM INLET. ELEV.=4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE WEST LINE LINE OF THE SOUTHWEST QUARTER OF SECTION 1-7-69 AS BEARING SOUTH 00° 38' 34" WEST (ASSUMED BEARING) AND MONUMENTED AS SHOWN ON PLAT. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R MINIMUM FINISHED FLOOR ELEVATION (RFPE) ELEVATION = C BASE FLOOD ELEVATION (BFE) = A MINIMUM MECH./ELEC. EQUIPMENT ELEVATION = B (RFPE) BASE FLOOD ELEVATION (BFE) = A MECH. / ELEC. EQUIPMENT FLOOD ELEVATION DETAIL NTS SLAB-ON-GRADE BUILDING SUMMARY ELEV. DESIGNATION PROJECT ELEV. (NAVD 88) A 4966.61 FT B 4968.61 FT C 4969.00 FT REGULATORY FLOOD PROTECTION ELEVATION 4968.61 FT FIELD SURVEY BY: NORTHERN ENGINEERING DATED: OCTOBER 25, 2019