Powerhouse Carbon Solutions Campus
Item
Effective
BFE RFPE
Structure
Elevation Freeboard Verification Floodproofed Notes
1 Electrical Transformer 4966.44 4968.44 4968.44 0 GC N/A
2 Project Signage A 4966.44 4968.44 4974.73 6' GC N/A Mounted west wall of untility yard.
3 Project Signage B 4966.44 4968.44 4976.82 8' GC N/A Building mounted at the south lobby.
4 Trash/Recycle Dumpsters 4966.44 4968.44 4968.82 0.38' GC N/A Located in concrete block walled enclosure.
5 Secured Bike Storage Racks 4966.44 4968.44 4968.82 0.38' GC N/A Located in fenced enclosure. Racks to be anchored to concrete slab.
6 Pole Mounted Light Fixture with Concrete Base 4964.23 4966.23 4967 0.77' GC N/A All electrical junction boxes on light poles to be elevated to RFPE + 8"
7 Electric Car Charging Stations
4964.23 4966.23 4967 0.77' Manuf. N/A
EV chargers will be mounted to the structural support columns for the solar array canopies at RFPE +
8"
8 Solar Array 4964.23 4966.23 4967 0.77' Manuf. N/A Solar panels will be mounted on wood canopy structures at RFPE + 8" min.
9 Utility Yard
4966.44 4968.44 4968.73 0.29' GC N/A
Utiltiy yard will contain an unknown quanity of misc. equipent. All equipment will be located on utilty
yard concrete pad at the RFPE + 0.29'. The entire yard will be walled and gated.
10 Building Finish Floor 4966.44 4968.44 4969 0.56' GC N/A
11 Elevator Shaft Pits (2)4966.44 4968.44 4964 -5.00' GC Yes Cast in place concrete pit with liquid applied waterproof membrane.
12
13
List of Exterior Equipment - Required Flood Elevations