Loading...
HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - SUBMITTAL DOCUMENTS - ROUND 2 - STORMWATER-RELATED DOCUMENTSResponse to Comment 2 - Department: Stormwater Floodplain Powerhouse Carbon Solutions Campus Item Effective BFE RFPE Structure Elevation Freeboard Verification Floodproofed Notes 1 Electrical Transformer 4966.44 4968.44 4968.44 0 GC N/A 2 Project Signage A 4966.44 4968.44 4974.73 6' GC N/A Mounted west wall of untility yard. 3 Project Signage B 4966.44 4968.44 4976.82 8' GC N/A Building mounted at the south lobby. 4 Trash/Recycle Dumpsters 4966.44 4968.44 4968.82 0.38' GC N/A Located in concrete block walled enclosure. 5 Secured Bike Storage Racks 4966.44 4968.44 4968.82 0.38' GC N/A Located in fenced enclosure. Racks to be anchored to concrete slab. 6 Pole Mounted Light Fixture with Concrete Base 4964.23 4966.23 4967 0.77' GC N/A All electrical junction boxes on light poles to be elevated to RFPE + 8" 7 Electric Car Charging Stations 4964.23 4966.23 4967 0.77' Manuf. N/A EV chargers will be mounted to the structural support columns for the solar array canopies at RFPE + 8" 8 Solar Array 4964.23 4966.23 4967 0.77' Manuf. N/A Solar panels will be mounted on wood canopy structures at RFPE + 8" min. 9 Utility Yard 4966.44 4968.44 4968.73 0.29' GC N/A Utiltiy yard will contain an unknown quanity of misc. equipent. All equipment will be located on utilty yard concrete pad at the RFPE + 0.29'. The entire yard will be walled and gated. 10 Building Finish Floor 4966.44 4968.44 4969 0.56' GC N/A 11 Elevator Shaft Pits (2)4966.44 4968.44 4964 -5.00' GC Yes Cast in place concrete pit with liquid applied waterproof membrane. 12 13 List of Exterior Equipment - Required Flood Elevations