Loading...
HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONS79' (approx.)79' (approx.)August 17, 2022 October 25, 2022 December 14, 2022 March 1, 2023 SOUTH ELEVATION WEST ELEVATION 0 5 10 20 30 0 5 10 20 30 SCALE TOP OF PARAPETMECANICAL EQUIPMENT SCREENING - MATERIAL #3 MECANICAL EQUIPMENT SCREENING - MATERIAL #3 STAIR TOWER MATERIAL #1 SUN SHADING DEVICES ARCHITECTURAL METAL PANEL, PREFINISHED MATERIAL #3 MASONRY VENEER- MATERIAL #2 STONE VENEER - MATERIAL #1 TOP OF PARAPETVERTICAL SUN SHADES- PREFINISED METAL ARCHITECTURAL METAL PANEL, PREFINISHED - MATERIAL #4 MATERIAL # 1 - SANDSTONE VENEER EDGE SAWN, SPLIT (CLEFT) FACE MATERIAL PALETTE MATERIAL # 2 - BRICK VENEER (COLOR TO BE SIMULAR TO POWERHOUSE 1 BUILDING) MATERIAL # 3 & 4 ARCHITECTURAL METAL PANELS RIBBED & SMOOTH TEXTURED PREFINISHED COLOR MATERIAL # 3 COLOR MATERIAL # 4 The Neenan Company 3325 S. Timberline Rd. Fort Collins, CO 80525 www.neenan.com POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSBULDING MATERIALSISSUE DATE: APRIL 13, 2022 REVISIONS: SHT. # 1 OF 5 SCALE RAMMED EARTH RETAINING WALLS @ RAIN GARDENS METAL RAILING @ PLAZAS (TYP.) STAIR/ ELEVATOR TOWER STAIR TOWERS & MECHANICAL EQUIPMENT SCREENING 79' (approx.)79' (approx.)August 17, 2022 October 25, 2022 December 14, 2022 March 1, 2023 FOLDING OVERHEAD DOORS MECANICAL EQUIPMENT SCREENING - MATERIAL #3 MECANICAL EQUIPMENT SCREENING - MATERIAL #3 STAIR TOWER MATERIAL #1 ARCHITECTURAL METAL PANEL, PREFINISHED MATERIAL #3 MASONRY VENEER- MATERIAL #2 STONE VENEER - MATERIAL #1 ARCHITECTURAL METAL PANEL, PREFINISHED - MATERIAL #4 SECURED COVERED BIKE PARKING - STANDING SEAM METAL ROOF NORTH ELEVATION 0 5 10 20 30 SCALE EAST ELEVATION 0 5 10 20 30 SCALE The Neenan Company 3325 S. Timberline Rd. Fort Collins, CO 80525 www.neenan.com POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSCOVERED PARKINGSOLAR CANOPYISSUE DATE: APRIL 13, 2022 REVISIONS: SHT. # 2 OF 5 COVERED PARKING SOLAR CANOPIES GLU-LAM TIMBERS w/ STEEL REINFORCING AS REQUIRED SOLAR PANELS TOP OF PARAPETTOP OF PARAPETMASS TIMBER BUILDING FRAME UTILITY COURT SCREENING - MATERIAL #2 8' H. WALLTRASH ENCLOSURE - MATERIAL #2 - 8' H. WALL VIEW from NORTHWEST VIEW from SOUTHWEST SHADOW STUDY August 17, 2022 October 25, 2022 December 14, 2022 March 1, 2023 The Neenan Company 3325 S. Timberline Rd. Fort Collins, CO 80525 www.neenan.com POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:AERIALPERSPECTIVESSHADOW STUDYISSUE DATE: APRIL 13, 2022 REVISIONS: SHT. # 3 OF 5COLLEGE AVE.VINE ST.JEROME ST. NORTH THE SHADOW SHOWN REPRESENTS THE SHADOW THE BUILDING WILL CAST ON THE WINTER SOLSTICE (DEC. 21ST) @ 12:00 P.M. THIS SHADOW WILL BE THE LONGEST SHADOW OF THE YEAR. VIEW from SOUTHWEST VIEW from SOUTHEASTVIEW from NORTHEAST August 17, 2022 October 25, 2022 December 14, 2022 March 1, 2023 The Neenan Company 3325 S. Timberline Rd. Fort Collins, CO 80525 www.neenan.com POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:BUILDINGPERSPECTIVESISSUE DATE: APRIL 13, 2022 REVISIONS: SHT. # 4 OF 5 August 17, 2022 October 25, 2022 December 14, 2022 March 1, 2023 The Neenan Company 3325 S. Timberline Rd. Fort Collins, CO 80525 www.neenan.com POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:BUILDINGPERSPECTIVESISSUE DATE: APRIL 13, 2022 REVISIONS: SHT. # 5 OF 5 VIEW from VINE STREET LOOKING WESTVIEW from VINE STREET LOOKING WEST VIEW from VINE STREET LOOKING EAST VIEW from VINE STREET LOOKING EAST 8'-0"16'-9"9'-6"16'-9"8'-0"8'-0"8'-0"August 17, 2022 October 25, 2022 December 14, 2022 March 1, 2023 The Neenan Company 3325 S. Timberline Rd. Fort Collins, CO 80525 www.neenan.com POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:TRASH / BIKEENCLOSURESISSUE DATE: APRIL 13, 2022 REVISIONS: SHT. # 6 OF 6 4'2'0'4'8' PLAN VIEW - TRASH ENCLOSURE & BIKE STRUCTURE SCALE NORTH SOUTH ELEVATION NORTH ELEVATION EAST ELEVATION WEST ELEVATION SECURED METAL GATE POWER COAT FINISH SCALESCALESCALE8' H. CONCRET BLOCK WALL WITH BRICK VENEER TO MATCH BUILDING AND PREFINISHED METAL WALL CAP WOOD FRAMING MEMEBERS @ ROOF (4/12 SLOPE) METAL SECURITY FENCE w/ 40" w. SECURED GATE STANDING SEAM METAL ROOF METAL SECURITY FENCING DBL. STEEL DOORS 4'2'0'4'8' SCALE 4'2'0'4'8' SCALESCALESCALE 4'2'0'4'8' SCALE 4'2'0'4'8' SCALESCALESCALE