HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONS79' (approx.)79' (approx.)August 17, 2022
October 25, 2022
December 14, 2022
March 1, 2023
SOUTH ELEVATION
WEST ELEVATION
0 5 10 20 30
0 5 10 20 30
SCALE TOP OF PARAPETMECANICAL EQUIPMENT
SCREENING - MATERIAL #3
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
STAIR TOWER
MATERIAL #1 SUN SHADING
DEVICES
ARCHITECTURAL
METAL PANEL, PREFINISHED
MATERIAL #3
MASONRY VENEER-
MATERIAL #2
STONE VENEER -
MATERIAL #1
TOP OF PARAPETVERTICAL SUN SHADES-
PREFINISED METAL
ARCHITECTURAL METAL
PANEL, PREFINISHED -
MATERIAL #4
MATERIAL # 1 -
SANDSTONE VENEER
EDGE SAWN, SPLIT (CLEFT) FACE
MATERIAL PALETTE
MATERIAL # 2 -
BRICK VENEER
(COLOR TO BE SIMULAR TO
POWERHOUSE 1 BUILDING)
MATERIAL # 3 & 4
ARCHITECTURAL METAL PANELS
RIBBED & SMOOTH TEXTURED
PREFINISHED
COLOR MATERIAL # 3
COLOR MATERIAL # 4
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSBULDING MATERIALSISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
1
OF
5
SCALE
RAMMED EARTH
RETAINING WALLS
@ RAIN GARDENS
METAL RAILING
@ PLAZAS (TYP.)
STAIR/ ELEVATOR
TOWER
STAIR TOWERS & MECHANICAL
EQUIPMENT SCREENING 79' (approx.)79' (approx.)August 17, 2022
October 25, 2022
December 14, 2022
March 1, 2023
FOLDING
OVERHEAD
DOORS
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
STAIR TOWER
MATERIAL #1
ARCHITECTURAL
METAL PANEL, PREFINISHED
MATERIAL #3
MASONRY VENEER-
MATERIAL #2
STONE VENEER -
MATERIAL #1
ARCHITECTURAL METAL
PANEL, PREFINISHED -
MATERIAL #4 SECURED COVERED
BIKE PARKING - STANDING
SEAM METAL ROOF
NORTH ELEVATION
0 5 10 20 30
SCALE
EAST ELEVATION
0 5 10 20 30
SCALE
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSCOVERED PARKINGSOLAR CANOPYISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
2
OF
5
COVERED PARKING SOLAR CANOPIES
GLU-LAM TIMBERS w/
STEEL REINFORCING
AS REQUIRED
SOLAR PANELS TOP OF PARAPETTOP OF PARAPETMASS TIMBER BUILDING FRAME
UTILITY COURT
SCREENING - MATERIAL #2
8' H. WALLTRASH ENCLOSURE -
MATERIAL #2 - 8' H. WALL
VIEW from NORTHWEST
VIEW from SOUTHWEST
SHADOW STUDY
August 17, 2022
October 25, 2022
December 14, 2022
March 1, 2023
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:AERIALPERSPECTIVESSHADOW STUDYISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
3
OF
5COLLEGE AVE.VINE ST.JEROME ST. NORTH
THE SHADOW SHOWN REPRESENTS THE SHADOW
THE BUILDING WILL CAST ON THE WINTER
SOLSTICE (DEC. 21ST) @ 12:00 P.M.
THIS SHADOW WILL BE THE LONGEST SHADOW OF THE YEAR.
VIEW from SOUTHWEST
VIEW from SOUTHEASTVIEW from NORTHEAST
August 17, 2022
October 25, 2022
December 14, 2022
March 1, 2023
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:BUILDINGPERSPECTIVESISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
4
OF
5
August 17, 2022
October 25, 2022
December 14, 2022
March 1, 2023
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:BUILDINGPERSPECTIVESISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
5
OF
5
VIEW from VINE STREET LOOKING WESTVIEW from VINE STREET LOOKING WEST
VIEW from VINE STREET LOOKING EAST VIEW from VINE STREET LOOKING EAST
8'-0"16'-9"9'-6"16'-9"8'-0"8'-0"8'-0"August 17, 2022
October 25, 2022
December 14, 2022
March 1, 2023
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:TRASH / BIKEENCLOSURESISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
6
OF
6
4'2'0'4'8'
PLAN VIEW - TRASH ENCLOSURE & BIKE STRUCTURE
SCALE NORTH
SOUTH ELEVATION
NORTH ELEVATION EAST ELEVATION
WEST ELEVATION
SECURED METAL GATE
POWER COAT FINISH
SCALESCALESCALE8' H. CONCRET BLOCK WALL
WITH BRICK VENEER
TO MATCH BUILDING AND
PREFINISHED METAL WALL CAP
WOOD FRAMING MEMEBERS
@ ROOF (4/12 SLOPE)
METAL SECURITY FENCE
w/ 40" w. SECURED GATE
STANDING SEAM
METAL ROOF
METAL SECURITY
FENCING
DBL. STEEL
DOORS
4'2'0'4'8'
SCALE
4'2'0'4'8'
SCALESCALESCALE
4'2'0'4'8'
SCALE
4'2'0'4'8'
SCALESCALESCALE