HomeMy WebLinkAbout1ST BANK AT HARMONY MARKET PUD, 4TH FILING - PRELIMINARY & FINAL - 54-87F - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY 411 c MEMORANDUM O o To: William Iwata, First Bank of Westland N Eldon Ward, Cityscape Eric Bracke, Fort Collins Transportation Division u o • M From: Matt Delich "2130ZE:) Date: August 31, 1992 O Subject: First Bank at Harmony Market PUD traffic analysis (File: 9257MEM1) z W This memorandum documents the traffic analyses related to the First Bank at Harmony Market. City staff specifically requested an analysis of the Harmony/Boardwalk and Harmony/ Lemay intersections during the Saturday peak (10: 30 AM to 1 : 30 PM) . Saturday traffic was not analyzed in the Harmony Market Site Access Study, March 1989.. It is expected that the First Bank will have Saturday business hours during this time period. In the Harmony Market Site Access Study, the land use assumed for the entire parcel was a shopping center of 425, 000 square feet. This was subsequently reduced to 332, 550 square feet, but a new site access study was not prepared. Rather, an amendment memorandum was prepared reflecting this reduction in size. Trip Generation, 4th Edition was used to estimate the traffic that would be generated at this site . The current buildings on this site (Pace, Builders ' Square, and Steele 's) will comprise approximately 244, 000 square feet considering their allowed expansion areas . This leaves 181 , 000 square feet for other uses when considering the 425, 000 square feet used in the site access study. The proposed bank has a a building envelope of 8, 800 square feet. The actual building W will likely be smaller than the building envelope size. While the trip generation rate for a free standing drive-in bank is higher than that used in the site access study for the entire site, research indicates that there are multi-destination ca o trips at diverse commercial retail centers . There are J P currently three commercial uses at Harmony Market. These W three uses attract specific trips . There is little/no shared ® trip destinations among these three uses . As more diverse a uses are developed within this site, there will likely be • trips which will have multiple destinations . Therefore, the trip rate for the bank will decrease as other uses are built. LThe assumptions made regarding the overall trip generation in �a the site access study remain sound. Table 1 shows the overall I— ►- weekday and peak hour trip generation at the Harmony Market mee as taken from the site access study. Also shown in Table 1 SE is the trip generation from an 8, 800 square foot drive-in bank. This bank trip generation is not adjusted to reflect trip sharing. It is concluded that this bank fits into the trip generation assumptions used in the Harmony Market Site Access Study. - Saturday peak hour traffic counts were obtained at the Harmony/Boardwalk and Harmony/Lemay intersections on August 22, 1992 . These are shown in Figure 1 . Raw traffic data is provided in Appendix A. The cycle length at these signalized intersections was observed to be 100 seconds . The green phases were variable depending upon traffic volumes on the minor streets (Boardwalk and Lemay) . Harmony Road through traffic was allowed 55-65 percent of the green time in the cycle . At a 100 second cycle length, there are 36 cycles in a given hour. Since traffic fluctuates somewhat in the counted hour, two level of service calculations were performed at each intersection: one using 65 seconds of through green on Harmony, and one using 55 seconds of through green on Harmony. Table 2 reflects the range of operation at each of the intersections using the Saturday traffic counts and the current signal phasing. Calculation forms are provided in Appendix B. At the Harmony/Boardwalk intersection, the overall intersection operation is acceptable . Acceptable operation is defined as level of service D or better. Using 65 seconds of green on Harmony Road results in a level of service F for the northbound left turn on Boardwalk. The level of service for all movements on Harmony Road is in the A category with this timing. If 10 seconds are added to the Boardwalk phase (reducing the Harmony green to 55 seconds) , the northbound left turn on Boardwalk is at level of service D. This phasing occurs when all the actuation equipment works properly. When this occurs, the operation on Harmony Road drops to level of service B. The more time that is given to the Boardwalk movements, the more the level of service on Harmony Road will deteriorate . At the present time, there are no turn phases on Boardwalk. Adding a left-turn phase of 7+ seconds will improve the operation of the northbound and southbound left turns, but will do nothing to improve the overall operation of the other movements in the intersection. If a left-turn phase is added, additional amber time must be provided for safety. Based upon research, the warrant for the left-turn phase on Boardwalk does not exist based upon the Saturday traffic shown in Figure 1 . At the Harmony/Lemay intersection, the overall intersection operation is acceptable . Phasing at this intersection is similar to that at the Harmony/Boardwalk intersection. The number of northbound left turns on Lemay is lower, therefore the level of service for this particular movement is in the D category using 65 seconds of green on Harmony. The operation for this movement improves to level of service C with 55 seconds of green on Harmony, with a corresponding decrease in the level of service for the Harmony Road movements . A separate left-turn phase is not warranted for the Lemay Avenue left turns at this intersection. It is concluded that both the Harmony/Boardwalk and Harmony/Lemay intersections operate acceptably during the Saturday 411 peak hours . Provision of 10+ seconds of additional green time for the minor street will reduce/eliminate the delay to the northbound left turn on Boardwalk. This additional time to the minor street will be at the expense of Harmony Road green time with a subsequent slight deterioration in level of service on the major road. Figure 2 shows the Saturday peak hour traffic with the additional bank generated traffic shown in Table 1 , Trip Generation. Table 3 shows the overall intersection operation at each of the intersections . Calculation forms are provided in Appendix C. Table 3 is comparable to Table 2 and Appendix C is comparable to Appendix B. With the additional bank traffic added to these intersections, acceptable level of service will result. The conclusions pertaining to the existing traffic as stated in the previous paragraphs apply to the traffic and operation with the proposed bank traffic added. It is concluded that the addit.iona.l. bank traffic can be accommodated on the street system with the existing controls . Phasing should be adjusted to eliminate unacceptable operation for particular minor street movements . Table 1 Trip Generation Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out Harmony Market Shopping 21 , 130 128 85 808 808 Center - 425 . 0 KSF First Bank - 8 . 8 KSF 2, 560 34 26 118 122 (on Saturday) (435) (97) (97) Table 2 Saturday Peak Hour Operation (Existing Traffic) Level of Service Intersection (Delay, Sec/Veh) Harmony/Boardwalk Harmony Phase - 65 seconds C (15 .7) Harmony Phase - 55 seconds B (11 .0) Harmony/Lemay Harmony Phase _ 65 seconds B (10.4) Harmony Phase - 55 seconds B (10 .6) Table 3 Saturday Peak Hour Operation (Existing and Bank Traffic) Level of Service Intersection (Delay, Sec/Veh) Harmony/Boardwalk Harmony Phase 65 seconds C (18 . 5) Harmony Phase - 55 seconds B (11 . 2) Harmony/Lemay Harmony Phase - 65 seconds B (12 . 9) Harmony Phase- 55 seconds B (11 . 2) • • 7 N mo J - 3 } O 1.2 m h \97 00 i ---39 `D b = 692 c' 705 58 HARMONY ) L. T-114 59 f r 110 f r 594 o in 548 cg 142--\ ��"' 76m 18 `° SATURDAY (1992) PEAK HOUR TRAFFIC Figure 1 N J C O W o> ^ \—97 �� 39 c° Co .= 726 0� a_705 -58 HARMONY + 129 59 110 628� � �1;3 � 548 142-- ^ `3 76--\ SATURDAY PEAK HOUR TRAFFIC WITH FIRST BANK Figure 2 APPENDIX A E 1` t>0 0 M a° « E E « aa Q�Er I- to kn N 9 —. 6M3 o a- n1 N F- 'I' (4\ d 4 tt v) co 1p f- Nr � N r (1) J ' . — — — — — 0 ''') tli _j 0° tl (3- 0 0 N E � _ � _ _ — O - -- _ U O d re) (h aj NI ± lI _ -- -____= =—.---. -- ._ klt- n1M� r U 6 o f' N N n( 0 — - —-- — — —— i Utti A - -`oNa- - Ui 0 co rSNF- a- UN8 Lj- //�Ynn ¢ r kn -1. t� W op ® v' p N NI NI NI o-- go' n� r M �np _I_ �9a` c060 M g M g _ — r opt E en — o Q- p O 1— y f- ‘9S- `9 NI 1- IL a z J N — — — Y Zta g y N (. `900 �' m N r • -- - CA "3" 7 I- F- CO • - . . • 0 IA 0 Co r, N) ... 0... f2 e = 1- kn ln tn Iso NI ir a 3 li II ii NI a: to4-J U V 1g 3 (r-(Y/ 60 NI • a,f) • VI (Y) 4 -cl- ti) J E 60 Ng 0" q-1 M J . - 1-• N. El, Pu —'--- — —N i___1 r.__ 0____ _ _. ___ ..._ _ _ __ _ _._ ___ _._ ___ M Sf— — - v< •-••. — An 0 . 0-- N—0 —0 — — — — — — — ---- — — R =-_-_-_ __-,-,_ =_--_ ___ -, ,..__ __To,, IA ':) ....9 .„,..5 ,,A,. •P ..e f N t Z .. . E5 N 4r 6 ..1tr- N ,..;K N N9 60 eo 0 tL -- --- /-1___=-.•_ , til le < > ‘ Cr (I) X,. , _.• N N 60 60 r`• _ ___ i (15 N N N 0 CC % E 1/4_ 'cl• 0-- I . i °‹ .B t in n ..i •• -- o _ ..._ a: .s ki, c-• c>0 .9 . ___ _ _ ___ _.._ ___ it< kb I V) 60 to b0 Cr- 0 cy-- I-- ...9 r•-• r-- w o — tn o oo g --I 8 E _ Cr' In 0 0- ct) i 1 e to z \) .... E N) tc a- mCO — — — —\::----- ——- ———— — —-__-=rz..—__ =r t-._=--.___- t M -- 111 Z i Li' 0 " kr) 41 Zt F. Ili 03 •-... - —. --- ...„ APPENDIX B III 411 1985 HCM: SIGNALIZED INTERSECTIONS SUMMARY REPORT INTERSECTION harmony/boardwlk AREA TYPE OTHER ANALYST mjd DATE 8 24/92 TIME 00141D0 bank COMMENT VOLUMES GEOMETRY EB WB NB SB : EB WB NB SB LT 59 58 174 117 : L 12 .0 L 12 . 0 L 12 .0 L 12.0 TH 594 692 120 71 : T 12. 0 T 12 .0 T 12 .0 TR 12 . 0 RT 142 97 25 69 : T 12 .0 T 12 . 0 R 12 .0 12 .0 RR 28 19 5 0 : R 12 . 0 R 12 .0 12 .0 12 .0 . 12 .0 12 .0 12 .0 12 .0 . 12 .0 12 .0 12 .0 12 .0 ADJUSTMENT FACTORS GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE (%) (%) Y/N Nm Nb Y/N min T EB 0 .00 2 . 00 N 0 0 0. 90 5 Y 22 . 8 3 WB 0.00 2 .00 N 0 0 0. 90 5 Y 22 . 8 3 NB 0 .00 0 . 00 N 0 0 0 . 90 5 Y 31 . 8 3 SB 0.00 0 .00 N 0 0 0. 90 5 Y 31 .8 3 SIGNAL SETTINGS CYCLE LENGTH = 100.0 PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4 EB LT X X NB LT X TH X TH X. RT X RT X PD X PD X WB LT X X SB LT X TH X TH X RT X RT X PD X PD X GREEN 7 .0 65 .0 0.0 0 . 0 GREEN 15 .0 0. 0 0 .0 0.0 YELLOW 3 .0 5 . 0 0 . 0 0 . 0 YELLOW 5 .0 0 . 0 0 . 0 0 . 0 LEVEL OF SERVICE LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS EB L 0. 059 0 . 770 2 . 1 A 4. 1 A T 0 . 290 0.670 4.4 A R 0 . 125 0.670 3 . 8 A WB L 0 .059 0. 770 2 . 1 A 4. 3 A T 0 . 338 0 . 670 4.6 A R 0 .086 0.670 3 .7 A NB L 1 . 040 0 . 170 95 .9 F 64 . 0 F T 0 .436 0. 170 24. 6 C R 0 . 084 0. 170 22 .6 C SB L 0.698 0 . 170 37 .0 D 31 . 0 D TR 0. 550 0 . 170 26 . 0 D INTERSECTION: Delay = 15 .7 (sec/veh) V/C = 0.435 LOS = C - ' 1985 HCM: SIGNALIZED INTERSECTIONS SUMMARY REPORT INTERSECTION'. 'harmony/huardwlk AREA TYPE. ' ' ' 'OTMER ANALYST m]d DATE ' 8 /24/92 TIME ��N�� ��� bank n�N�p~ COMMENT' . - ' ' VOLUMES' GEOMETRY EB WD N8 S8 ED WD ND SD LT 59 58 174 117 L 12 . 0 L 12 . 0 L 12 ' 0 L 12 . 0 TH 594 692 120 71 T 12 ' 0 T 12 . 0 T 12 ' 0 TR 12 ' 0 RT 142 97 �5 69 T 12 . 0 T 13 . 0 R 12 . 0 12 ' 0 RR 28 19 5 O R 12 ' 0 R 12 ' 0 12 . 0 12 . 0 � 12 . 0 12 . 0 12 . 0 12 . 0 � 12 . 0 12 . 0 12 ' 0 12 . 0 ADJUSTMENT FACTORS GRADE MV ADJ PK�-,; BUSES PUF PEDS PED ' BUT . ARR . TYPE (%) (%) YIN Nm Nb YIN min T [R O ' UO 2 . 00 N O U 0 . 90 5 Y 22 ' 8 S W8 0 ., 00 2 ' 00 N O O O . qU 5 Y 22 - 8 3 N8 0 . 00 0 . 00 N O O 0 . 90 5 Y 31 ' 8 5 SG 0 . 00 0 . 00 N O U 0 ' 90 5 Y 51 ' 8 Z) -------------- ----------- SIG,NAL SETTINGS CYCLE LENGTH = 100 ' 0 PH-1 PH-2 PH-3 PM-4 PM-1 PM-2 PM-3 PH-4 E13, LT X X W8 LT x TH X TH X RT X RT X PD X PD X WR LT X X S8 LT X TH x TH x RT X RT x PD X PD X GREEN 7 . 0 55 ' 0 0 ' 0 O ' O SAEEN 25 . 0 0 . 0 0 . 0 O ' O YELLOW 3 . 0 5 ' 0 O ' U 0 . 0 YELLOW 5 ' 0 0 . 0 O ' O 0 . 0 LEVEL OF SERVICE LANE SRP ' V/C G/C DELAY L0S APP . DELAY APP ., LW.:., E8 L 0 ' 05g 0 ' 670 4 ' 3 A 7 - 1 B T 0 . 341 0 ' 570 7 . 4 B R 0 ' 147 0 ' 570 5 ' 5 8 WO L 0 , 059 0 . 670 4 -3 A 7 ' 4 D T O ' 97 0 . 570 7 . 8 B R 0 ' 101 0 . 570 6 '3 B NB L 0 ' 600 0 ' 270 26 ' 4 D 22 . 9 C T 0 ' 274 0 . 270 18 . 7 C R 0 ' 05-3 0 . 270 17 '5 C S8 L 0 ' 403 0 ' 270 23 ' 2 C 21 ' 0 C TR 0 . 346 0 ' 270 19 . 2 C _______________ INTERSECTlON : Delay = 11 . 0 (sec/veh) V/C = 0. 420 L0S = G ` ® I 1985 HCM: SIGNALIZED INTERSECTIONS. SUMMARY REPORT ***.*************.*.*.*.*:********:*.******.*****.*. ******.****.*.********.*.**:***.**:***:*:*. INTERSECTION harmony/lemay AREA TYPE OTHER ANALYST mjd DATE. . . . . 8/24/92 TIME. . . .. . . . . . ra{. (T) bank COMMENT VOLUMES GEOMETRY EB WB NB SB :: EB WB NB SB LT 110 114 107 48 : L 12 . 0 L 12 . 0 L 12 . 0 L 12 . 0 TH 548 705 146 153 : T 12 . 0 T 12 .. 0 T 12 . 0 T 12 . 0 RT 76 39 66 98 : T 12 . 0 T 12 . 0 TR 12 . 0 TR 12 . 0 RR 15 7 0 0 : R 12 . 0 R 12 . 0 12 . 0 12 . 0 . 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 .. 0 12 . 0 ADJUSTMENT FACTORS GRADE HV ADJ PKG BUSES PHF PEDS PED . BUT . ARR. . TYPE, (%) ('%) • 1'/N Nm Nb Y/N min T EB 0 . 00 2 . 00 N 0 0 0 . 90 5 Y 20 . 5 3 WB 0 . 00 2 . 00 N 0 0 0 . 90 5 Y 20 . 5 3 NB 0 . 00 0 . 00 N 0 0 0 . 90 5 Y 26 . 5 3 `_ B 0 . 00 0 . 00 N 0 0 0 . 90 5 Y 26 . 5 3 SIGNAL SETTINGS CYCLE LENGTH = 100 .. 0 PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4 ER LT X X NB LT X TM X TH X RT X RT X PD X PD X WB LT X X SB LT X TH X TH X RT X RT X PD X PD X GREEN 7 . 0 65 . 0 0 .. 0 0 . 0 GREEN 15 . 0 0 . 0 0 . 0 0 . 0 YELLOW 3 . 0 5 . 0 0 . 0 0 . 0 YELLOW 5 . 0 0 . 0 0 . 0 0 . 0 LEVEL.. OF SERVICE LANE GRP . V/C O/C DELAY LOS APP . DELAY APP . LOS EB L 0 . 059 0 . 770 2 . 1 A 3 . 9 A T 0 . 263 0 . 670 4 . 3 A R 0 . 067 0 . 670 3 . 7 A WB L 0 . 059 0 . 770 2 .. 1 A 4 . 2 • A T 0 . 344 0 . 670 4 . 6 A. R 0 . 035 0 . 670 3 . 6 A NB L 0 . 645 0 . 170 34 . 5 D 27 . 6 D TR 0 . 424 0 . 170 24 . 2 C SB L 0 . 264 0 . 170 27 . 6 D 25 .3 D TR 0 . 509 0 . 170 24 . 9 C INTERSECTION :: Delay = 10 . 4 (:sec_/veh) V/C = 0 .368 LOS = B ® I 1985 HCM: SIGNALIZED INTERSECTIONS SUMMARY REPORT ***********?K*********.**:*********:************.*.*.****.***:***.****'.******** *.**** INTERSECTION . .harmony/l emay AREA TYPE. . . .. . OTHER ANALYST _.mjd DATE -.. r 2 4/9 2 TIME 7.at 4110 bank COMMENT. . .. . .. , .. VOLUMES GEOMETRY EB WB NB SB : EB WB NB SB LT 110 114 107 48 : L 12 . 0 L 12 . 0 L 12 . 0 L 12 . 0 TH 548 705 146 153 T 12 . 0 T 12 . 0 T 12 . 0 T 12 . 0 RT 76 39 66 98 : T 12 . 0 T 12 . 0 TR 12 . 0 TR 12 . 0 RR 15 7 0 0 : R. 12 . 0 R. 12 . 0 12 . 0 12 . 0 . 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 12 . 0 ADJUSTMENT FACTORS GRADE HV ADJ PKG BUSES PHF PEDS PEP . BUT . ARR . TYPE (%) (V) Y/N Nm Nb Y/N min T EB 0 . 00 2 . 00 N 0 0 0 . 90 5 Y 20 . 5 3 WB 0 . 00 2 . 00 N 0 0 0 . 90 5 Y 20 . 5 3 NB 0 . 00 0 . 00 N 0 0 0 . 90 5 Y 26 . 5 3 SB 0 . 00 0 . 00 N 0 0 0 . 90 5 Y 26 . 5 3 SIGNAL SETTINGS CYCLE LENGTH = 100 .. 0 PH-1 PH-2 PH--3 PH-4 PH- 1 PH-2 PH-3 PH-4 EB LT X X NB LT X TH X TH X RT - X RI X PD X PD X WB LT X X SB LT X TH X TH X RT X RT X PD X PD X GREEN 7 . 0 55 . 0 0 . 0 0 .. 0 GREEN 25 . 0 .0 . 0 0 . 0 0 . 0 YELLOW 3 . 0 5 .. 0 0 . 0 0 . 0 YELLOW 5 . 0 0 . 0 0 . 0 0 . 0 LEVEL. OF SERVICE LANE GRP . V/C 0/C DELAY LOS APP .. DELAY APP . LOS EB L 0 . 059 0 . 670 4 . 3 A 6 . 8 B T 0 . 315 0 . 570 7 . 3 B R 0 , 078 0 . 570 6 . 3 B WB L 0 . 059 0 . 670 4 . 3 A 7 .. 3 • B T 0 . 405 0 . 570 7 . 8 B R 0 .. 041 0 . 570 6 . 1 B NB L 0 . 389 0 . 270 23 . 1 C 20 . 0 C TR 0 . 267 0 . 270 18 .. 6 C SB L. 0 . 163 0 . 270 21 . 2 C 19 .3 • C TR 0 .. 320 0 . 270 18 . 9 C INTERSECTION : Delay = 10 . 6 (sec/veh) V/C = 0 . 363 LOS = B APPENDIX C �0�� �� �� 1985 HCM: SIGNALIZED INTERSECTIONS SUMMARY REPORT lNTERSECTI0N ' 'harmony/boardwlk AREA TYPE 0T1--iER ANALYST m]d DATE . ' 8 2- TIME COMMENT ' . ' ' ' ' VOLUMES GEOMETRY EB WR ND SG : EB WD SD LT 59 58 174 117 : L 12 . 0 L 12 . 0 L 12 ' 0 L 72 . 0 TH 028 726 155 86 T 12 ' 0 T 12 . D T 12 . 0 TR 12 ' 0 RT 142 97 35 69 T 12 . 0 T 12 ' 0 R 12 ' 0 12 ' 0 RR 28 19 5 O R 12 . 0 R 12 ' 0 12 . 0 12 ' 0 � 12 . 0 12 . 0 12 . 0 12 ' 0 � 12 ' 0 12 ' 0 12 ' 0 12 . 0 ADJUSTMENT FACTORS GRADE MV ADJ PKS BUSES PHF PEDS PED . BUT. ARR . TYPE (T,) (%) Y/N Nm Nb Y/N min T E8 O ' OO 2 ' 00 N O O 0 ' 90 5 Y 22 8 3 WB 0 . 00 2 . 00 N O O 0 ' 90 5 Y 22 . 8 3 N8 0 . 00 O ' OO W O 0 0 ' 90 5 Y 31 ' 8 3 SB O ' UO O . UO N D O 0 ' 90 5 Y 51 . 3 5 SIGNAL SETTINGS CYCLE LENGTH = 100 . 0 PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH PH-4 EB LT X X NB LT X TH X TH X RT X RT X PD X PD X WD LT X ' X SD LT X TM X TH X RT X RT % PD x PD X SAEEN 7 ' 0 65 ' 0 O ' O O . O GREEN 15 ' 0 0 . 0 O ' O 0 . 0 YELLOW 3 ' 0 5 . 0 O ' O 0 . 0 YELLOW 5 ' 0 0 . 0 0 . 0 O ' O _--________ ____ _____ _______ _______ _ LEVEL OF SERVICE LANE SRP ' V/C S/C DELAY LOS APP . DELAY APP . L0S E.B L U O59 0 . 770 2 ' 1 A 4 ' 2 A T 0 . 1O7 0 ' 670 4 . 4 A R 0 - 125 0 . 670 8 , 0 A WB L 0 . 059 0 ' 770 2 ' 1 A 4 . 4 A T 0 ' 355 0 . 670 4 ' 6 A R 0 . 086 0 ' 670 3 ' 7 A NB L 1 . 118 0 . 170 132 ' 0 F 81 . 6 F T 0 . 490 0 ' 170 25 ' 1 D R 0 ' 084 0 . 170 22 ' 0 ' C SB L 0 . 730 0 ' 170 41 . 0 E 33 ' 0 D TR 0 ' 604 0 . 170 27 . 0 D ____________________ lNTERSFCTION : Delay = 18 . 5 (seo/veh) V/C = 0 ' 461 L0S = C ~ ~ 1985 HCMz SIGNALIZED INTERSECTIONS SUMMARY REPORT ***********�*14,********�**�����������������*�m������m�����������*���*������ INTERSECTION . . harmohy/boardwlk AREA TYPE . ' ' . ' 0THER. ANALYST m]d DATE' . ' . 8/24/92 TIME JI��� -�~_ C0MMENT ' . . . ' ' . -�-~----- V0LUMES GEOMETRY ED WD ND SB : ED WD NB SR LT 59 58 174 117 : L 12 ' 0 L 12 ' 0 L 12- 0 L 12 ' 0 TH 620 726 135 86 : T 12 ' 0 T 12 ' 0 T 12 . 0 TR 12 . 0 RT 142 97 25 hg ; T 12 . 0 T 12 O R 12 ' 0 12 . 0 RR 28 19 5 O : R 12 ' 0 R 12 ' 0 12 ' 0 12 ' 0 � 12 . 0 12 - 0 12 ' D 12 . 0 � 12 . 0 12 . 0 12 . 0 12 . O ADJUSTMENT FACTORS GRADE MV ADJ PKG BUSES PHF PEDS PED . BUT . ARR . TYPE (%) M Y/N Nm Nb Y N min T ER 0 . 00 2 ' 00 N O O 0 . 90 5 Y 22 ' 8 8 W8 0 . 00 2 ' 00 N O O 0 . 90 5 Y 22 ' 8 3 ND O ' UO 0 . 00 N U 0 O ' gO 5 Y 51 ' 8 3 SD 0 . 00 O . 00 N O O 0 ' 90 5 Y 31 . 8 5 ------------------------------------- - --------- SIONAL SETTINGS CYCLE LEN62TH = 100 . O PM-1 PM-2 PH-8 PH-4 PH-1 PH-2 PH-3 PM-4 EB LT x X NB LT X TH X TM X RT X RT X PD X PD x WD LT X X SB LT x TM X TH X RT X RT X PD X PD X GREEN 7 . 0 55 ' 0 O ' O 0 ' 0 GREEN 25 ' O U ' O 0 . 0 0 . 0 YELLOW 3 . 0 5 . 0 O ' U 0 . 0 YELLOW 5 . 0 0 . 0 0 . 0 0 . 0 ___________________ LEVEL OF SERVICE LANE SRP . V/C DELAY LOS APP , DELAY APP . LOS ED L 0 ' 059 0 ' 670 4 ' 5 A 7 . 2 8 T 0 .361 0 . 570 7 , 5 D R 0 . 147 0 ' 570 6 . 5 B WD L 0 ' 05g 0 . 670 4 . 3 A 7 ' 5 D T 0 . 417 0 ' 570 7 . 9 8 R 0 . 101 0 . 570 115 ' 3 B NB L 0 . 626 0 . 270 27 . 2 D 23 ' 2 C T 0 ' 309 0 ' 270 18 ' 9 C R 0 ' 053 0 . 270 17 ' 5 C S9 L 0 ' 421 0 . 270 23 ' 4 C ' 21 ' 1 C TR 0 ' 380 0 . 270 19 ' 4 C INTERSECTION - Delay = 11 . 2 (sec/veh) V/C = 0 ' 439 LOS = B III 411 1985 HCM: SIGNALIZED INTERSECTIONS SUMMARY REPORT :k*"****.********.****.* Y•.***.*******;************:*******.*******.*.******.*.**.******** INTERSECT ION harmony/lemay AREA TYPE OTHER ANALYST mjd DATE 8/2..4/92 TIME: 4310 e7 banb, COMMENT .. . . .. . .. . VOLUMES _ GEOMETRY EB WB NB SB : EB WB NB SB LT 110 129 141 48 : L 12 . 0 L 12 . 0 L. 12 . 0 L 12 . 0 TH 548 705 175 182 : T 12 . 0 T 12 . 0 T 12 . 0 T 12 . 0 RT 76 39 81 98 : T 12 . 0 T 12 . 0 TR 12 . 0 TR 12 . 0 ' RR 15 7 0 0 - R 12 . 0 R 12 . 0 12 . 0 12 .. 0 12 . 0 12 . 0 12 . 0 12 . 0 .. 12 . 0 12 . 0 12 . 0 12 . 0 ADJUSTMENT FACTORS GRADE HV ADJ PKG BUSES PHF PEDS RED . BUT . ARR . TYPE (%) (V) Y/N Nm Nb Y/N min T EB 0 . 00 2 . 00 N 0 0 0 . 90 5 Y 20 . 5 3 WB 0 . 00 2 . 00 N 0 0 0 . 90 5 Y 20 . 5 3 NB 0 . 00 0 . 00 N 0 0 0 . 90 5 Y 26 . 5 3 SB 0 . 00 0 . 00 N 0 0 0 . 90 5 Y 26 . 5 3 SIGNAL SETTINGS CYCLE LENGTH = 100 . 0 PH- 1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4 EB LT X X NB LT X TH X TH X RT X RT X PD : X PD X WB LT X X SB LT X TH X TH X RT X RT X PD X PD X GREEN 7 . 0 65 . 0 0 . 0 0 . 0 GREEN 15 . 0 0 . 0 0 . 0 0 . 0 YELLOW 3 0 5 . 0 0 . 0 0 . 0 YELLOW 5 . 0 0 . 0 0 . 0 0 . 0 LEVEL. OF SERVICE LANE GRP .. V/C O/C DELAY LOS APP . DELAY APP. LOS EB L 0 . 059 0 . 770 2 . 1 A 3 . 9 A T 0 . 268 0 . 670 4 . 3 A R 0 . 067 0 . 670 3 . 7 A WB L 0 . 059 0 . 770 2 . 1 A 4 . 2 A T 0 .344 0 . 670 4 . 6 A R 0 . 035 0 . 670 3 . 6 A NB L 0 . 913 0 . 170 62 . 3 F 37 . 8 D TR 0 .. 513 0 . 170 24 . 9 C SB L 0 . 293 0 . 170 27 . 8 D 25 . 8 D TR 0 . 564 0 . 170 25 .4 0 INTERSECTION : Delay = 12 .. 9 (sec/veh) V/C = 0 . 417 LOS = B - ' 1985 HCM: SIGNALIZED I1\11'ERSECTI0NS SUMMARY REPORT lNTERSECTION ' 'hermony/lemay AREA TYPE' ' ' ' 'OTHER ANALYST mjd DATE 8/24 2 TIME ��x bank �� � COMMENT . . _______________________________ VOLUMES GEOMETRY ED WB ND SB : ED WD NB 5B LT 110 129 141 48 : L 12 . 0 L 12 ' O L 12 ' 0 L 12- 0 TH 548 705 175 182 : T 12 ' 0 T 12 . 0 T 12 . 0 T 12 ' 0 RT 76 30 81 98 : T 12 . 0 T 12 ' 0 TR 12 . 0 TR 12 ' 0 RR 15 7 O O : R 12 . 0 R 12 . 0 12 . 0 12 . 0 � 12 . 0 12 . 0 12 ' 0 12 . O � 12 ' 0 12 ' 0 12 . 0 12 ' 0 _ ADJUSTMENT FACTORS GRADE MV ADJ PKG BUSES PHF PEDS PED ' BUT . ARR . TYPE (%) (%) Y/N Nm Nb Y/N min T ER 0 ' 00 2 . 00 N O O 0 ' 90 5 Y 20 . 5 3 W8 0 ' 00 2 . 00 N D O 0 ' 90 5 Y 20 ' 5 5 ND O ' OO O ' OO N U O 0 . 90 5 Y 26 . 5 3 SB 0 . 00 0 . 00 N O O 0 ' 90 5 Y 26 ' 5 3 ` ---- -------------------SIGNAL SETTINGS SETTING8 CYCLE LENGTH lOO ' O PM-1 PH-2 PM-3 PH-4 PH- 1 PH-2 PM-5 PH-4 ED LT X X N8 LT X TH X TH X RT X RT x PD x PD x W8 LT X X SB LT X TM x TM X RT X RT X PD X PD X SREFN 7 . 0 55 . 0 0 ' 0 0 , 0 GREEN 25 ' 0 O . O 0 . 0 O ' O YELLOW 3 ' 0 5 ' 0 0 . 0 0 . 0 YELLOW 5 ' 0 0 . 0 0 . 0 0 . 0 LEVEL OF SERVICE LANE GRP ' V/C o/c DELAY LOS APP ., DELAY APP . L0S E8 L 0 . 059 0 . 670 4 '3 A 6 ' 8 D T 0 ' 515 0 ' 570 7 '3 D R 0 . 078 0 ' 570 6 '5 D WD L 0 ' 059 0 . 670 4 '3 A 7 . 3 B T 0 ' 405 O . 57O 7 .8 B R 0 . 041 0 ' 570 6 . 1 8 NB L 0 . 5-39 0 . 270 25 . 3 D 21 ' 1 C TR 0 . 325 0 ' 270 18 ' 9 C �8 L 0 . 176 0 . 270 21 -3 C 19 . 4 C � TR 0 .355 0 . 270 19 ' 1 C INTERSECTION : Delay = 11 . 2 (sec/veh) V/C 0 . 407 LOS B