Loading...
HomeMy WebLinkAbout1ST BANK AT HARMONY MARKET PUD, 4TH FILING - PRELIMINARY & FINAL - 54-87F - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS • 0 0 reQ o e urban design, inc. 3555 stanford road,suite 105 September 30, 1992 fort collins,colorado 80525 (303)226-4074 FAX(303)226-4196 Ted Shepard City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Ted; Attached are 5 sets of prints of the Preliminary and Final Site and Landscape Plans for 1 ST Bank at Harmony Market PUD, Fourth Filing, indicating revisions made in response to Staff Comments. Specific responses include: 1 . A note regarding the five year limit on the use of the modular building, consistent with provisions of the City Code, has been added to the site plan. Similar language is anticipated to be included in the Development Agreement. Please note that the draft language you provided has been revised to reflect the applicant's understanding, from our previous meeting, that: - The five year time limit referred to the maximum time period within which to apply for a building permit for the permanent bank building; and - Removal of the modular building would apply to the issuance of a C.O. for the permanent bank building. 2. As indicated on the cross section (Sheet 4 of 5), the modular building has been located where the slope of the existing landscaping north of the building will allow positive drainage away from the building without regrading. 3. Sidewalks have now been indicated consistently on the site, landscape, and engineering drawings. 4. The requested notes regarding protection of the existing trees during construction have been added to the landscape plans. 5. The requested information regarding finish materials has been added to Sheet 5 as requested. 7. Additional language has been added to the notes regarding signage, as requested. 8. A detail of the identity signage for "pad" users to be added to the existing monument sign has been included (Sheet 3 of 5). • it i ly2ssa urban design, inc. 9. The ground sign previously shown at the internal drive entry to the 1ST Bank site has been eliminated. 10. Slides and photographs for P&Z Board review will be provided as requested. 11 . Finish material of the trash enclosure (wood with construction phase 1; brick with construction of the permanent building) has been indicated on the site plans. 12. Tree locations have been adjusted as needed to provide clearance from utility lines. Ten sets of prints, a colored plan, and 8 1/2 X 11 reductions will be submitted by October 12, 1992, and Final Documents will be submitted by October 15, 1992, for the October 19, 1992, Planning and Zoning Board Meeting. Sincerely, AW/w-r 0 Eldon Ward, President Cityscape Urban Design, Inc. cc: Bill Iwata, 1st Bank Data Corporation Pat Brady, 1st Bank of Longmont Bill Shoemaker, 1st Bank of Longmont Kevin Scott, Davis Partnership Peter Kast, G.T. Land Colorado Inc. Stan Myers, RBD, Inc.