Loading...
HomeMy WebLinkAbout1ST BANK AT HARMONY MARKET PUD, 4TH FILING - PRELIMINARY & FINAL - 54-87F - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETING 411 NEIGHBORHOOD MEETING MINUTES PROJECT: First Bank at Pad Six Harmony Market P.U.D. DATE: August 26, 1992 APPLICANT: Bill Shoemaker Bill Iwata REPRESENTATIVE: Eldon Ward, Cityscape Urban Design PLANNER: Ted Shepard QUESTIONS, CONCERNS, COMMENTS 1. Will First Bank own or lease the property? RESPONSE: We will own the property. 2 . Is there a limit on height? Will this be a "bank/office" or a "bank tower"? RESPONSE: Both the modular and permanent building will be one story structures. Also, by deed restriction, there is a 24 foot height limit on all the pad sites at Harmony Market for visibility to the . anchor tenants. 3 . What is the height limit for the "in-line" retail for Harmony Market? RESPONSE: The City's overall height limit is 40 feet, with a variance procedure under the jurisdiction of the Planning and Zoning Board. Pace Warehouse is 32 feet in height. It is unlikely that future "in-line" retail will need a taller structure than Pace Warehouse. 4. How many employees are expected? RESPONSE: Approximately seven to eight employees are expected. 5. Will the existing trees be preserved? RESPONSE: Yes, the existing trees have been inspected by the City Forester and will be allowed to be pruned. The one story building should fit underneath the existing trees. 6. How big a structure for the modular and the permanent building? 4 RESPONSE: The modular is expected to be around 3, 000 square feet and the permanent building around 6,000 to 7,000 square feet. 7. Will there be any additional signage along Harmony Road or Lemay Avenue? RESPONSE: The existing monument sign for Steele's has three panels. One of the remaining two panels will be for First Bank. Other signage will be restricted to wall mounted letters. 8. How long do you expect to be in the modular building? RESPONSE: It depends on how well we do at this location. We are requesting permission to be in the modular from three to five years. 9. Will the modular building be landscaped and have paved parking? RESPONSE: Yes, our modular is quite attractive and will be landscaped with paved parking. 10. Will the permanent building be constructed while the modular is occupied? RESPONSE: Yes. The site plan is set up so that construction of the permanent building will not impair the operation of the modular. After the permanent building receives a Certificate of Occupancy, the modular structure will be removed from the site. 11. Will there be any brick? RESPONSE: Although the permanent building has not been designed yet, it is likely that there will be some exterior brick. PROJECT: Pfra C liknoNY f,¢,e.t-T` 1ST OM< TYPE OF MEETING: I11 E/GH 4M Nfaov- ,X„/ P01 /"7H_n IA)_ DATE: fUGUST �� Mica. DID You AftElY6 WRITTEN • NOTIFICATION oe ARC Ydv RN you NAME ADDRESS YES/NO ? OWNER RENT T � ,sviep4A.0 CITY PL9arornrG DEPT. •79 ' //�� pia vIs pfi w#P eies Pc ARCIPT rgla Y (,�Rawnielt /77 S_5,Vi4tJ M S v,71E 3/aa DE11!/Etz 8020 3 NA- Al 1-1 LJ 2-y G D o s.,ec„ -s .$ i' Ge ,. ,1/4 10 v€.7 j/q90z ti /14(__.31h11/4 � -L /LL iA..ht 7�a Fr J t/J.�-.,�c, I n/e. n/ir- n/ Afr_ R>et•D y FIR ST E N k - -- -- .�44- N 44- 11/14 -5•vitf SILO R /I41- Ml Ny1 /J.v rc/A- , Gj T�v�o,�PG /�G. 4, >>