Loading...
HomeMy WebLinkAboutUNION PARK - PDP230005 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT PRELIMINARY DRAINAGE REPORT FOR Union Park Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: Landmark Real Estate Holdings, LLC 6341 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 February 22, 2023 Job Number 21-1044-00 6355 FAIRGROUNDS AVE, SUITE 100, WINDSOR, COLORADO 80550 | PHONE 970.674.7550 February 22, 2023 Mr. Wes Lamarque Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Preliminary Drainage Report – Union Park (Previously Ziegler-Corbett) Dear Wes, We are pleased to submit, for your review, the Preliminary Drainage Report for the Union Park (Ziegler – Corbett) Preliminary Development Plan. This report describes the general drainage design intent to be implemented with future development and in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Highland Development Services Paul Schwindler, CFM Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................. i Engineer’s Certification Block ..........................................................................................................ii General Description and Location .................................................................................................. 1 Site Description and Location ...................................................................................................... 1 Site Soils ....................................................................................................................................... 1 Storm Drainage Criteria .................................................................................................................. 3 Existing Conditions ...................................................................................................................... 3 Hydrologic Criteria ....................................................................................................................... 4 Hydraulic Criteria ......................................................................................................................... 4 Drainage Basins ............................................................................................................................... 6 Drainage Facility Design .................................................................................................................. 7 Drainage Conveyance Design ...................................................................................................... 7 Detention/Water Quality Pond Design ....................................................................................... 7 Detention/Water Quality Pond Variance Request ...................................................................... 8 Low Impact Development ............................................................................................................... 9 Stormwater Pollution Prevention ................................................................................................. 11 Conclusions ................................................................................................................................... 12 References .................................................................................................................................... 13 Appendix ....................................................................................................................................... 14 Appendix A – Site Vicinity Map & References ............................................................................. A Appendix B – Rational Calculations ............................................................................................. B Appendix C – Detention Pond Calculations ................................................................................. C Appendix D – Street Capacity Calculations ................................................................................. D Appendix E – Low Impact Development Calculations ................................................................. E Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Preliminary Drainage Report for Union Park was prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION The Union Park property is located in the Southeast Quarter of Section32, Township 7 North, Range 68 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. More specifically, the Union Park property is located north of the Front Range Village commercial area, east of the Affinity residences, south of the English Ranch residential subdivision, and west of Ziegler Road. The project site is approximately 32.78 acres currently and is undeveloped agricultural and rural residential land, with one residence and multiple outbuildings. The site appears to be mostly vegetated with grass harvested for livestock feed. The site generally slopes from the west to the east at about 0.7% slope. The intent of the Preliminary Development Plan (PDP) is to update the ODP with the anticipated uses No improvements are being constructed with the PDP, but rather establishing future expectations for development. The property is anticipated to be a high-density multi-use development, mainly multi-family residential, with retail space and supporting amenities. The Union Park property is located within the City’s Fox Meadows Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in both the “Front Range Village Final Drainage and Erosion Control Study,” prepared by Stantec Consulting Inc., dated February 2007, and the “Final Drainage Report for Affinity Fort Collins,” prepared by JR Engineering, LLC, dated March 2, 2016. No City or FEMA floodplains/floodways are located within the Union Park property. SITE SOILS The Union Park project site consists primarily of Nunn clay loam (0 to 1 percent slopes) that is classified as Type-C hydrologic group. According to USDA/Natural Resource Conservation “Group, Type C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.” Page 2 Per the “Preliminary Geotechnical Subsurface Exploration Report, Proposed Ziegler-Corbett Mixed-Use Development”, prepared by Soilogic, Inc., dated April 4, 2022: “approximately 4 to 6 inches of vegetation and topsoil was encountered at the surface at the boring locations, underlain by brown/beige/rust lean clay with varying amounts of sand which varied to clayey sand in places. The apparently-natural lean clay/clayey sand varied from soft to hard in terms of consistency or from very loose to medium dense in terms of relative density, typically exhibited no to low swell potential at in-situ moisture and density conditions (however one sample of sandy lean clay obtained from boring B-2 at a depth of about 9 feet below ground surface exhibited moderate swell potential) and extended to the bottom of each of the borings at a depth of approximately 15feet below present site grades.” “Groundwater was observed during the subsurface soil exploration: “Groundwater was not encountered in borings B-1, B-2, B-3 or B-5 to the depths explored (about 15 feet below ground surface), but was measured at a depth of about 15 feet below ground surface in boring B-4 when checked immediately after completion of drilling. When checked about five (5) days after drilling, borings B-1, B-2 and B-5 remained dry to the approximate depth explored, while groundwater was measured at a depth of about 14 feet below ground surface at the locations of borings B-3 and B-4 at that time. Groundwater information is indicated in the upper right- hand corner of the attached boring logs.” “Groundwater levels will vary seasonally and over time based on weather conditions, site development, irrigation practices and other hydrologic conditions. Perched and/or trapped groundwater conditions may also be encountered at times throughout the year. Perched water is commonly encountered in soils overlying less permeable soil layers and/or bedrock. Trapped water is typically encountered within more permeable zones of layered soil and bedrock systems. The location and amount of perched/trapped water can also vary over time.” Page 3 STORM DRAINAGE CRITERIA This Preliminary Drainage Report was prepared to establish drainage basins, and required detention volumes, that meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. EXISTING CONDITIONS The Union Park Property is a portion of a drainage basin that is situated north of Harmony Road, and west of Ziegler Road, which runoff is conveyed east under Ziegler Road into the existing drainage channel on the HP Harmony Campus property. It has been determined in the Front Range Village Final Drainage Report that this area is allowed to contribute 76.7 cfs to the HP Campus drainage channel during 100-year event peak discharge. More specific to this site, 20.1 cfs release rate was allocated to the Union Park & the Affinity Fort Collins properties. Per The Final Drainage Report for Affinity Fort Collins, the Affinity site has a 100-yr peak release rate of 2.1 cfs, allowing a 100-yr peak discharge of 18.0 cfs from the Union Park property. The Harmony Village Manufactured Home Community does not provide adequate detention facilities. During a 100-yr storm event, a portion of the site flows to the east into both the Front Range Village development as well as the Affinity Fort Collins site. This runoff was evaluated in the Front Range Village Final Drainage Report and was determined to be 116 cfs peak runoff during the 100-yr event. This runoff will be collected in the Front Range Village Detention Pond D, intended to collect but not detain his flow. During the 100-year event, this peak flow of 116 cfs will flow over the weir on the north side of Detention Pond D. It is conveyed via the private drive aisles to a level spreading weir on the northeast side of the Affinity Fort Collins site, where it is discharged into the Union Park property. This flow is then assumed to sheet flow east to be inadvertently detained on the east side of the Union Park property along Ziegler Road. In reference to the Front Range Village Final Drainage Report, a detention pond is planned to be incorporated into the Union Park site, Detention Pond 298. The volume of Detention Pond 298 has been determined by detaining the 100-yr peak developed runoff to the 2-yr historic runoff rate, adding the existing inadvertent detention volume (detention volume is currently provided onsite due to existing constraints such as grade features and outlet restrictions). Based on the topographic survey of the existing conditions, the inadvertent detention volume is constrained for this site by the spill location along the north property line, at an approximate elevation of 4928.0 ft. The inadvertent detention volume is estimated to be 7.5± acre-ft. The Page 4 estimated volume did not account for the two existing culverts along the west side of Ziegler Road that currently provide ponding relief for the Ziegler-Corbet site. All supporting preliminary calculations are located in the Appendix. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Percent impervious were estimated based on land use, and the associated runoff coefficients were calculated. The time of concentration was calculated using the City of Fort Collins’s initial time of concentration, and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation 4-3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has a 2-yr 1-hr rainfall depth of 0.82 inches and a 100-yr 1-hr rainfall depth of 2.86 inches. These depths account for the 1999 adjusted rainfall depths. HYDRAULIC CRITERIA The hydraulic calculations provided in this report are limited to maximum street capacities based on the minimum street slopes (0.5%) for the most restrictive sections. The final Union Park storm drainage system will be designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and swales. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes will be designed such that, during the minor initial storm event, the 2-yr storm, the flows for the streets will not top the curb and may only rise to the street crown elevation, and for the entrance (with Median) will not top the curb and the flow spread will leave at least one 12 ft lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the streets will be held to a maximum depth of 6” at the street crown, 12” at the gutter flow line, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. Within the Final Drainage Report, peak basin runoff flows from the rational calculations will then be used to determine the street flows, and on-grade inlet locations. The on-grade and sump inlet capacities will be calculated using UDFCD’s spreadsheet UD-Inlet_v4.05.xlsm. The inlet capacities will be analyzed, and the necessary adjustments will be applied to the street runoff flows based on the amount of runoff collected by on-grade inlets. The sump inlets will be sized using the previously mentioned street capacity allowances, with overtopping if needed. Page 5 The captured flows will then be analyzed using EPA’s SWMM program to design pipe size and slopes. UD-Inlet applies a clogging factor while sizing the inlets, but while sizing the storm pipes, it is assumed that the inlets are free of clogging debris and capture the maximum amount of street runoff. Orifice rating curves will be utilized for the inlet capture capacities and route the captured runoff through the storm drain system. The program accounts for head losses within manholes and bends and head losses associated with pipe friction. Hydraflow will be used to compute the open channel hydraulics and check the capacities of the drainage swales throughout the site. Flow velocities within these swales will be reviewed and where flows are found to be supercritical, the swales will be protected with turf reinforcement mat. All swale and pipe outlets will be protected with riprap or suitable erosion protection methods. Storm sewer pipe outlets will be protected using the requirements set by the USDCM to protect downstream of culverts. All supporting calculations for street sections are located in the Appendix. Page 6 DRAINAGE BASINS The Union Park developed drainage basins are delineated by areas draining to major drainage elements. The Union Park property is divided into four developed drainage basins. The final drainage report will further detail the drainage basins. For the purpose of this Preliminary Drainage study impervious areas have been calculated and applied. Drainage Basin D1 consists entirely of pond 298A, having an area of 2.96 acres. This basin will convey flow to pond 298B in a system of pipes, with overflow being routed through a swale and streets to pond 298B. No water quality will be provided for this basin. (0% impervious) Drainage Basin D2 consists of 9.42 acres of single-family attached and apartment residential lots, attached garages, streets, private drives, and the club house recreation area. Flows from this basin are mainly conveyed along roadways and will be collected by inlets and conveyed to detention Pond 298B. Low Impact Development (LID) will be used to address water quality in this basin through the application of ADS Stormtech MC-3500 Filtration Chambers. Drainage Basin D3 consists of 11.17 acres of attached single-family and apartment residential lots, attached garages, streets, and private drives. Flows from this basin are mainly conveyed along streets and will be collected by inlets and conveyed to detention Pond 298B. LID will be used to address water quality in this basin through the application of ADS Stormtech MC-3500 Filtration Chambers. Drainage Basin D4 consists of 8.32 acres of attached single-family and apartment residential lots, commercial and mixed-use lots, attached garages, streets, and private drives. Flows from this basin are mainly conveyed along streets and will be collected by inlets and conveyed to detention Pond 298B. Standard water quality will be used to address water quality in this basin with the inclusion of extended detention for the WQCV. Page 7 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include, concrete trickle pans, inlets, storm sewer and culverts. Stormwater detention and water quality enhancement will be achieved using extended detention and low impact development (LID). Storm inlets, storm sewers and the roadway culverts will be appropriately sized with the final drainage design. DETENTION/WATER QUALITY POND DESIGN The FAA Method was utilized to estimate the required detention to be 7.3± acre-ft for the developed conditions in accordance with the City of Fort Collins requirements (the 100-year developed peak runoff detained to the 2-year historical peak runoff). Combining the inadvertent detention (7.5 ac-ft), the 2-yr standard Storm Water Capture Volume (SWCV) for drainage basin D4 (0.185 ac-ft) and the detention volume (7.3 ac-ft), a total of 15.0± ac-ft is required to accommodate the developed site, as well as account for the displacement of the historical inadvertent detention. Due to the limited grades on the site, and the profusion of detention volume, multiple ponds are planned, with the main detention pond located in the northwest corner of the site (298A), and the minor detention pond (298B) located adjacent to the eastern property line. Pond 298A outlet connects to an underground storm drain leading to pond 298B. Overflow from pond 298A will flow via an internal swale and streets to pond 298B. The outlet for pond 298B will connect to an existing 30-inch storm drain that passes stormwater east under Ziegler Road. The ultimate outfall will be the existing HP Harmony Campus storm channel system, which ultimately flows into the Cache La Poudre River. EPA SWWM will be utilized for the final drainage design. As mentioned, the detention volume described above is designed to be provided in two on-site detention facilities: Pond 298A detention basin (DB) will be used as site detention and account for the displacement of the historical inadvertent detention. The DB will provide an estimated detention volume of 14.4 ac-ft, accounting for the historical inadvertent detention volume of 7.5 ac-ft, and along with pond 298B, the additional detention of 7.3 ac-ft required to accommodate the site in its developed condition. Pond 298B extended detention basin (EDB) with a dry bottom will be utilized as site detention and standard water quality (SWQ) facility for basin D4. The EDB will provide an estimated detention volume of 4.7± acre-ft, accounting for additional detention, in Page 8 addition to pond 298A, required to accommodate the site in its developed condition. UDFCD is referenced for the water quality capture volume (WQCV) of 0.185 ac-ft with a 40-hr drain time. Pond 298B will release to an existing 30” storm drain under Ziegler Road leading to the HP Harmony Campus storm channel. Pond 298A has a potential storage volume of 14.4± ac-ft, and pond 298B has 4.7± ac-ft of available storage. The combined available storage from ponds 298A & 298B is 19.1± ac-ft. Adjustments should be expected in future submittals as the design is settled. The final design will ensure the pond overflows, and outlet structures, are designed to release flows as outlined above in accordance with the City of Fort Collins requirements. Reference the appendix for estimated calculations and the drainage plan. DETENTION/WATER QUALITY POND VARIANCE REQUEST The Union Park site has several challenges that have limited the ability to meet the requirement in Chapter 8, Section 3.1 Geometry of Stormwater Detention Facilities for the site’s various detention ponds embankments and side slopes to “vary and undulate.” The site is flat with very limited geographical relief (0.7% avg slope). Additionally, the site must account for inadvertent detention that more than doubles the detention storage volume required. Accommodating for the flat site and the large volume of detention, the ponds had to be maximized for volume. In order to maximize the ponds for volume, pond side slopes are augmented with stepped landscape walls and 4:1 slopes. We request a variance to the requirement to “vary and undulate” the site’s detention ponds embankments and side slopes to maximize detention pond volumes. This variance will not be detrimental to public health, welfare, and safety, and will have no impact on the capital and maintenance costs of the City of Fort Collins. It is respectfully requested that this variance be granted. Page 9 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: · Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or · Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private drivable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID), the Union Park property will utilize below-grade filtration galleries (ADS StormTech chamber system model MC-3500). Other LID techniques were explored, but due to the limited grade available and the amount of detention volume required, shallow filtration galleries assisted in maintaining storm drain grades and detention volumes. Pavers within the private drives did not treat enough contributing areas to justify their use. Filtration galleries will promote filtration while capturing fine sediment that drains off the impervious areas. Isolator rows will be implemented at the headworks to the filtration galleries to allow larger sediment particles to settle before entering the gallery. The isolator rows will be accessible to remove sediments. A Standard Operations Procedure will be provided at the final design to ensure these BMPs adequately perform over time. For this preliminary design, the impervious area was calculated in each drainage basin. Basins D2 and D3, which will be treated using filtration chambers (LID), represent 35.5% and 39.6% of the impervious area, respectively, resulting in 75.1 % of the developed impervious area being treated using LID best practices. The remainder 24.9% of the impervious area within basin D4 will be treated using an extended dry detention pond (pond 298B) with a 40-hour drain time of the WQCV. Below is a description of the 4-step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainage ways, and implementing long-term source controls. The Four Step Process applies to manage more minor, frequently occurring events. Step 1: Employ Runoff Reduction Practices Page 10 To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Captured runoff from strategic areas are routed through below grade filtration galleries, bioretention pond/rain gardens, and/or permeable pavers. Filtration galleries, rain gardens, and permeable pavers will slow runoff, promote filtration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The infiltration galleries, rain gardens, and permeable pavers are designed to provide water quality capture volume per Urban Drainage’s recommendations and calculations. The captured runoff is design for a 12-hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate, and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site- specific needs such as construction site runoff control, post-construction runoff control, and pollution prevention / good housekeeping. It will be the contractor’s responsibility to develop a procedural best management practice for the site. Page 11 STORMWATER POLLUTION PREVENTION Erosion and sedimentation can be controlled on-site by use of sediment control logs, inlet protection, a gravel construction entrance, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall conduct proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings or causing a nuisance to persons. The Contractor will be held liable for any damage from dust originating from his operations under these specifications on a right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of- way. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize sediment transport by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets daily. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to ensure the continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of the project’s start. Vegetation shall not be considered established until a ground cover is achieved, which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather conditions. Page 12 CONCLUSIONS This Preliminary Drainage Report for the Union Park property has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed development’s drainage system will be designed to convey the developed peak storm water runoff through the site to the existing storm drain system and to the development’s detention, water quality, and LID facilities. Storm drains will be sized to provide the required roadway relief in both the 2-yr and 100-yr storm events, and to adequately convey the released runoff from the detention ponds disbursed throughout the site. Overland relief will be provided at all sump locations. The calculated 100-yr peak flows released from the Union Park property will adhere to the allowed rates as established in the Front Range Village & Affinity Fort Collins drainage studies. This Preliminary drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities that will be further designed and detailed in future Preliminary and Final Drainage Reports. It can therefore be concluded that the development of the Union Park property will comply with the stormwater jurisdictional criteria and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Controlling the developed runoff from these improvements will improve the current situation currently existing on the site. Therefore, this preliminary report satisfies the burden of proof needed to proceed to the Final Drainage Report. Page 13 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, Revised August 2018. 2. Fort Collins Stormwater Criteria Manual, Fort Collins Utilities, City of Fort Collins, Colorado, Dated November 2018 3. “Final Drainage Report for Affinity Fort Collins,” prepared by JR Engineering, LLC, Dated March 2, 2016. 4. “Final Drainage and Erosion Control Study for Front Range Village, Fort Collins, Colorado,” Prepared by Stantec Consulting, Inc., dated February 2007. 5. “Preliminary Geotechnical Subsurface Exploration Report Proposed Ziegler-Corbett Mixed-Use Development” Prepared by Soilogic, Inc., dated April 4, 2022. Page 14 APPENDIX Appendix A – Site Vicinity Map & References Appendix B – Rational Calculations Appendix C – Detention Pond Calculations Appendix D – Street Capacity Calculations Appendix E – Low Impact Development Calculations Appendix A APPENDIX A – SITE VICINITY MAP & REFERENCES ZIEGLER RDE. HARMONY RD PADDINGTON RD CORBETT DRKINGSLEY DRSITE Vicinity Map Scale: 1" = 1000' PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #14-94 NORTHWEST CORNER OF HEWLETT PACKARD PROPERTY ON EAST SIDE ZIEGLER RD., ON THE NORTHWEST CORNER OF THE CONCRETE BASE OF A NATURAL GAS UNIT HOUSING. ELEV= 4927.83 CITY OF FORT COLLINS BENCHMARK #6-07 SOUTHEAST CORNER OF HARMONY RD. AND ZIEGLER RD. 50 FEET +/- SOUTH OF THE EDGE OF ASPHALT ON THE WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. ELEV= 4931.08 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4927.83 (NAVD88 DATUM) - 3.19' NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4931.08 (NAVD88 DATUM) - 3.19' PRELIMINARY GEOTECHNICAL SUBSURFACE EXPLORATION REPORT PROPOSED ZIEGLER-CORBETT MIXED-USE DEVELOPMENT 4105 ZIEGLER ROAD, FORT COLLINS, COLORADO SOILOGIC # 22-1062 April 4, 2022 Soilogic, Inc. 3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144 April 4, 2022 Landmark Homes 6341 Fairgrounds Avenue, Suite 100 Windsor, Colorado 80550 Attn: Mr. Andrew Quest Re: Preliminary Geotechnical Subsurface Exploration Report Proposed Ziegler-Corbett Mixed-Use Development Larimer County Parcel #’s 8732400010, 8732400009 and 8732000002 4105 Ziegler Road, Fort Collins, Colorado Soilogic Project # 22-1062 Mr. Quest: Soilogic, Inc. (Soilogic) personnel have completed the preliminary geotechnical subsurface exploration you requested for the proposed mixed-use development to be constructed on a combined property consisting of Larimer County Parcel Numbers 8732400010, 8732400009 and 8732000002, located at 4105 Ziegler Road in Fort Collins, Colorado. The results of our subsurface exploration and pertinent geotechnical engineering recommendations are included with this report. In summary, approximately 4 to 6 inches of vegetation and topsoil was encountered at the surface at the boring locations, underlain by brown/beige/rust lean clay with varying amounts of sand which varied to clayey sand in places. The apparently-natural lean clay/ clayey sand varied from soft to hard in terms of consistency or from very loose to medium dense in terms of relative density, typically exhibited no to low swell potential at in-situ moisture and density conditions (however one sample of sandy lean clay obtained from boring B-2 at a depth of about 9 feet below ground surface exhibited moderate swell potential) and extended to the bottom of each of the borings at a depth of approximately 15 feet below present site grades. Groundwater was not encountered in borings B-1, B-2, B-3 or B-5 to the depths explored (about 15 feet below ground surface), but was measured at a depth of about 15 feet below ground surface in boring B-4 when checked immediately after completion of drilling. When checked about five (5) days after drilling, borings B-1, B-2 and B-5 remained dry to the approximate depth explored, while groundwater was measured at a depth of about 14 Preliminary Geotechnical Subsurface Exploration Report Proposed Ziegler-Corbett Mixed-Use Development 4105 Ziegler Road, Fort Collins, Colorado Soilogic # 22-1062 4 from boring B-2 at a depth of about 9 feet below ground surface exhibited moderate swell potential) and extended to the bottom of each of the borings at a depth of approximately 15 feet below present site grades. The stratigraphy indicated on the included boring logs represents the approximate location of changes in soil types. Actual changes may be more gradual than those indicated. Groundwater was not encountered in borings B-1, B-2, B-3 or B-5 to the depths explored (about 15 feet below ground surface), but was measured at a depth of about 15 feet below ground surface in boring B-4 when checked immediately after completion of drilling. When checked about five (5) days after drilling, borings B-1, B-2 and B-5 remained dry to the approximate depth explored, while groundwater was measured at a depth of about 14 feet below ground surface at the locations of borings B-3 and B-4 at that time. Groundwater information is indicated in the upper right-hand corner of the attached boring logs. Groundwater levels will vary seasonally and over time based on weather conditions, site development, irrigation practices and other hydrologic conditions. Perched and/or trapped groundwater conditions may also be encountered at times throughout the year. Perched water is commonly encountered in soils overlying less permeable soil layers and/or bedrock. Trapped water is typically encountered within more permeable zones of layered soil and bedrock systems. The location and amount of perched/trapped water can also vary over time. ANALYSIS AND RECOMMENDATIONS General Based on the subsurface conditions encountered in the completed site borings, results of field and laboratory testing and type of construction anticipated, we expect relatively lightly-loaded commercial/retail and residential structures could be constructed with conventional footing foundations and floor slabs bearing on natural site lean clay/clayey sand with no to low swell potential or a suitable zone of properly moisture conditioned Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 1 of 444863604486420448648044865404486600448666044867204486360448642044864804486540448660044866604486720497700497760497820497880497940498000498060498120498180498240498300 497700 497760 497820 497880 497940 498000 498060 498120 498180 498240 498300 40° 31' 53'' N 105° 1' 38'' W40° 31' 53'' N105° 1' 11'' W40° 31' 39'' N 105° 1' 38'' W40° 31' 39'' N 105° 1' 11'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 16, Sep 2, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 26.6 91.7% 74 Nunn clay loam, 1 to 3 percent slopes C 2.4 8.3% Totals for Area of Interest 29.0 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 4 of 4 Union Park Site Flow Rate to Union Park site from Affinity=116.0 cfs Union Park SiteAffinity Pond D 100-yrOverflow = 116.0 cfs TRACT H FRONT RANGE VILLAGE LOT 11 FRONT RANGE VILLAGE LOT 16 FRONT RANGE VILLAGE LOT 12 FRONT RANGE VILLAGE TRACT B ENGLISH RANCH SOUTH P.U.D. ENGLISH RANCH SOUTH HOA PARCEL #8732100001 BARTRAN FAMILY LLC. TRACT A ENGLISH RANCH SOUTH P.U.D. ENGLISH RANCH SOUTH HOAENGLISH RANCH SOUTH P.U.D. THIRD FILING LOT 1 AFFINITY SUBDIVISION LOT 15 FRONT RANGE VILLAGE ENGLISH RANCH SOUTH P.U.D.CORBETT DRIVEPAD D I N G T O N R O A D CARRICK ROADEDMONDSROADZIEGLER ROAD(ROW VARIES)KINGSLEY COURT NEWBURY COURT HARRINGTON COURT PARCEL 2 3.879± acres PARCEL 1 27.430± acres PROPOSED DETENTION POND 1 VOLUME PROVIDED=10.7± ACRE-FT 2.4± SURFACE ACRES AVAILABLE WATER CONNECTION AVAILABLE WATER CONNECTION AVAILABLE WATER CONNECTION AVAILABLE SANITARY OUTFALL AVAILABLE SANITARY OUTFALL AREA OF INADVERTENT DETENTION 7.5± ACRE-FT LOT 10 FRONT RANGE VILLAGE INADVERTENT DETENTION SPILL LOCATION OFFSITE AFFINITY SPILL LOCATION FULL MOVEMENT ACCESS (SIGNALIZED) BIKE & PEDESTRIAN ACCESS ONLY PARCEL 3 1.466± acres STORM DRAIN OUTFALL (CONNECT TO EX) PROPOSED DETENTION POND 2 VOLUME PROVIDED=5.6± ACRE-FT 1.4 ± SURFACE ACRES HIDDEN POND DRIVE REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V)ZIEGLER-CORBETTAMENDED OVERALL DEVELOPMENT PLANMASTER UTILITY & OVERALL DRAINAGE PLAN11/11/22 1" = 80' N/A JTC JTC 21-1044-00 ODP 1 1 N W E S 0 SCALE: 1" = 80' 160804080 NOTES 1.TOTAL SITE AREA IS 32.78± ACRES. 2.BOUNDARY, UTILITY AND TOPOGRAPHICAL INFORMATION PROVIDED BY ALTA LAND TITLE SURVEY PREPARED BY MAJESTIC SURVEYING, DATED 9-24-21. 3.PROJECT VERTICAL DATUM IS ON NAVD88. 4.WATER SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS UTILIZING MAIN WITHIN CORBETT DRIVE AND ZIEGLER ROAD. 5.SEWER SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS UTILIZING 30" MAIN ALONG THE WEST SIDE OF ZIEGLER ROAD AND/OR THE 8" MAIN ALONG EAST SIDE OF CORBETT DRIVE. 6.STORMWATER OUTFALL PROVIDED BY THE EXISTING 24" STORM DRAIN STUB, IN COMBINATION WITH ADEQUATELY SIZED SPILLWAYS. 7.ALL POINTS OF ACCESS, POINTS OF UTILITY CONNECTIONS, AND STORMWATER DETENTION LOCATIONS ARE CONCEPTUAL AND ARE SUBJECT TO CHANGE WITH SUBSEQUENT PROJECT DEVELOPMENT APPLICATIONS. Ziegler-Corbett Inadvertent Detention Volume Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Stage Storage Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4925.00 0 0.00 0.00 0.00 0.00 4926.00 3144 0.07 0.02 1.00 0.02 4927.00 164156 3.77 1.45 2.00 1.48 4928.00 377427 8.66 6.05 3.00 7.53 J.Claeys Highland Development 21-1044-00 November 9, 2022 *Inadvertant spill elevation = 4928.00 ft Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, Revised August 2018 () 3 2121 DepthAAAAV++= 21-1044-00 Inadvertant Detention.xls Page 1 of 1 Highland Development Services Appendix B APPENDIX B – RATIONAL CALCULATIONS MECH MECHMECHOFFSITE AFFINITY SPILL LOCATION POND 298A KINGSLEY COURT NEWBURY COURT HARRINGTON COURT CORBETT DRIVESTREET-04LOT 1AFFINITY SUBDIVISIONLID D2 STORMTECH MC-3500 (48 CHAMBERS) POND 298A AREA=2.81 AC VOLUME=14.4 AC-FT SPILLWAY ELEV=4935.25 STREET-05STREET-03 STREET-02 STREET-01 MATCHLINESEE SHEET 7TRACT A PRIVATE ACCESS &UTILITY EASEMENT AFFINITY OUTFALL ROUTED THROUGH POND & SITE BLOCK 1BLOCK 9 LOT 1 1BLDG ENVELOPE A2 LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 2LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 3LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 4LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 5LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 7LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 8LOT 1 LOT 2 LOT 3 LOT 4BLOCK 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 2 LOT 3 LOT 4 LOT 5 BLOCK 10 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 BLOCK 11 BLOCK 12 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 BLDG ENVELOPE A7 BLDG ENVELOPE A8 BLDG ENVELOPE A1 BLDG ENVELOPE A3 BLDG ENVELOPE A4 BLDG ENVELOPE R1 BLDG ENVELOPE F1 BE G5 BE G9 BE G10BE AG1 BE AG2 BE AG3 BLDG ENVELOPE F5 REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V)UNION PARKGRADING & DRAINAGE PLAN02/22/23 1" = 40' N/A PHS JTC 21-1044-00 C2.00 6 9 BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR N W E S 0 SCALE: 1" = 40' 80402040 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.CallKnow what's below. R MECHMECHMECH MECHMECHMECHMECHMECHMECHMECH MECH TRAFFIC SIGNAL TRAFFIC SIGNALTRAFFIC SIGNALTRAFFIC SIGNALINADVERTENT DETENTION SPILL LOCATION LID D3 STORMTECH MC-3500 (50 CHAMBERS)STREET-06STREET-01 STREET-02 STREET-06STREET-03 ZIEGLER ROAD(ROW VARIES)MATCHLINESEE SHEET 6POND 298B AREA=1.22 AC VOLUME=4.7 AC-FT SPILLWAY ELEV=4929.0 POND 298B AREA=1.22 AC VOLUME=4.7 AC-FT SPILLWAY ELEV=4929.0 TRACT A PRIVATE ACCESS &UTILITY EASEMENT STORM OUTFALL 20.1 CFS LIMITED BE G6 BLDG ENVELOPE A9 BLDG ENVELOPE A10 BLDG ENVELOPE A11 BLDG ENVELOPE A4 BLDG ENVELOPE A5 BLDG ENVELOPE A6 BLDG ENVELOPE R2 BLDG ENVELOPE F1 BLDG ENVELOPE F2 BLDG ENVELOPE F3 BLDG ENVELOPE F4 BLDG ENVELOPE F5 BLDG ENVELOPE F6 BLDG ENVELOPE C3 BLDG ENVELOPE C1 BLDG ENVELOPE C2 BLOCK 13LOT 2 LOT 3 LOT 1 BLOCK 14LOT 2 LOT 3 LOT 1 BE G7BE G5 BE G8 BE G1 BE G3 BE G2 BE G4 BE AG3 BE G11 BE AG4 BE G12 BE AG5 BE G13 BE MU1 BE MU2 BLDG ENVELOPE F5 REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V)UNION PARKGRADING & DRAINAGE PLAN02/22/23 1" = 40' N/A PHS JTC 21-1044-00 C2.01 7 9 BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR N W E S 0 SCALE: 1" = 40' 80402040 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.CallKnow what's below. R Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 2% 0.20 C2 to C10 C100 H1 1,427,720 32.78 3,427 9,737 6,176 39,454 1,368,926 4.3% 0.22 0.27 Agravel/pavers (sq feet) Alawn (sq feet) Weighted % Impervious COMPOSITE Union Park EXISTING IMPERVIOUS AREA CALCULATION Fort Collins Stormwater Criteria Manual, December 2018 DESIGN CRITERIA: BASINS: % Impervious values from Table RO-11 in the Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Sub-basin Designation Atotal (sq feet) Atotal (acres) Apaved (sq feet) Aroof (sq feet) Awalk/RAP (sq feet) Lawns (Clayey Soil) J.Claeys Highland Development Services 21-1044-00 February 15, 2023 Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Land Use Paved Roof Walks/RAP Gravel/Pavers 21-1044-00 Rational Calcs.xlsx Page 1 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (2-yr to 10-yr) Type of Travel Surface Cv H1 H1 4.3% 0.22 32.78 500 0.0074 40.75 1453 0.0074 Tilage/Field 5 0.43 56.30 97.06 0.0074 46.41 46.41 February 15, 2023 Union Park HISTORIC TIME OF CONCENTRATION J. Clayes Highland Development 21-1044-00 DESIGN CRITERIA: SUB-BASIN DATA INITIAL/OVERLAND TIME (ti)TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min)DESIGN POINT Sub-basin % Impervious C2-10 AREA (acres) Fort Collins Stormwater Criteria Manual, December 2018 tt (min) OVERALL SLOPE (ft/ft) LENGTH (ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) ticttt+=5.0 wvSCV= V Ltt60 = =18 − 15 + 60 24 +12 = 1.87(1.1 − ) 21-1044-00 Rational Calcs.xlsx Page 2 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 6-2 -Equation 6-4 -Urbanized Check Equation 6-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) Type of Travel Surface Cv H1 H1 4.3% 0.27 32.776 500 0.0074 38.23 1453 0.0074 Tilage/Field 5 0.43 56.30 94.53 0.0074 46.41 46.41 February 15, 2023 Union Park HISTORIC TIME OF CONCENTRATION J.Claeys Highland Development 21-1044-00 DESIGN CRITERIA: SUB-BASIN DATA INITIAL/OVERLAND TIME (ti)TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min)DESIGN POINT Sub-basin % Impervious C100 AREA (acres) Fort Collins Stormwater Criteria Manual, December 2018 tt (min) OVERALL SLOPE (ft/ft) LENGTH (ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) Table RO-2 VELOCITY (ft/s) ticttt+=5.0 wvSCV= V Ltt60 = =18 − 15 + 60 24 +12 = 1.87(1.1 − ) 21-1044-00 Rational Calcs.xlsx Page 3 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS:I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs)P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr =0.82 in A n = Basin drainage area (ac)P 1-100yr =2.86 in BASIN SUMMARY: tc (min)Runoff Coeff (C5)C(A) (acres)Intensity (in/hr)Q (ft3/s)tc (min)Runoff Coeff. (C100)C(A) (acres)Intensity (in/hr)Q (ft3/s) H1 H1 32.78 46.41 0.22 7.16 0.98 7.01 46.41 0.27 8.95 3.42 30.57 February 15, 2023 Union Park HISTORIC PEAK RUNOFF J.Claeys Highland Development Services 21-1044-00 DESIGN CRITERIA: Design Point Sub-basin Area (acres) 2-yr Peak Runoff 100-yr Peak Runoff Fort Collins Stormwater Criteria Manual, December 2018 nnnnAICQ= (0.786651) 1 )10( 5.28 ct PI + = 21-1044-00 Rational Calcs.xlsx Page 4 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 D1 128,895 2.959 0 0 0 0 128,895 0.0% 0.25 0.31 D2 410,142 9.416 112,697 137,182 55,397 0 104,866 69.7% 0.77 0.96 D3 486,716 11.173 120,220 163,837 56,166 0 146,494 65.4% 0.74 0.92 D4 362,282 8.317 89,395 91,541 33,617 0 147,729 55.8% 0.66 0.83 D total 1,388,035 31.865 322,311 392,560 145,179 0 527,984 58.1% 0.68 0.85 Union Park DEVELOPED IMPERVIOUS AREA CALCULATION DESIGN CRITERIA: Fort Collins Stormwater Criteria Manual BASINS: Highland Development Services % Impervious values from Table 3.2.2 in the Fort Collins Stormwater Criteria Manual J.Claeys 21-1044-00 February 15, 2023 Land Use Paved Roof Walks Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual Gravel/Pavers Lawns (Heavy, 2-7% Slope) Sub-basin Designation Atotal (sq feet) Atotal (acres) Weighted % Impervious COMPOSITEApaved (sq feet) Aroof (sq feet) Awalk (sq feet) Agravel/pavers (sq feet) Alawn (sq feet) 21-1044-00 Rational Calcs.xlsx Page 5 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (2-yr to 10-yr) D1 D1 0.0% 0.25 2.959 35 4.0000 1.28 136 0.0200 0.14 0.024 2.37 0.96 5.00 171 10.95 5.00 D2 D2 69.7% 0.77 9.416 52 0.0200 3.53 633 0.0050 0.10 0.016 1.42 7.44 10.98 686 13.81 10.98 D3 D3 65.4% 0.74 11.173 100 0.0200 5.35 647 0.0050 0.10 0.016 1.42 7.61 12.96 747 14.15 12.96 D4 D4 55.8% 0.66 8.317 35 0.0200 3.85 1107 0.0100 0.10 0.016 2.01 9.20 13.04 1142 16.35 13.04 February 15, 2023 Union Park DEVELOPED TIME OF CONCENTRATION J.Claeys 21-1044-00 Highland Development Services LENGTH (ft) DESIGN CRITERIA: City of Fort Collins Stormwater Criteria Manual Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti)TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min)DESIGN POINT Sub-basin % Impervious C2-10 AREA (acres) tt (min) OVERALL LENGTH (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) VELOCITY (ft/s) ROUGHNESS COEFFICIENT HYDRAULIC RADIUS (ft) ticttt+= V Ltt60 == 1.87(1.1 − ) 10 180 +=LtcV=.R2/3 S 1/2 21-1044-00 Rational Calcs.xlsx Page 6 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) D1 D1 0.0% 0.31 2.959 35 4.0000 1.18 136 0.0200 0.14 0.024 2.37 0.96 5.00 171 10.95 5.00 D2 D2 69.7% 0.96 9.416 52 0.0200 1.46 633 0.0050 0.10 0.016 1.42 7.44 8.91 686 13.81 8.91 D3 D3 65.4% 0.92 11.173 100 0.0200 2.61 647 0.0050 0.10 0.016 1.42 7.61 10.22 747 14.15 10.22 D4 D4 55.8% 0.83 8.317 35 0.0200 2.38 1107 0.0100 0.10 0.016 2.01 9.20 11.58 1142 16.35 11.58 February 15, 2023 Union Park DEVELOPED TIME OF CONCENTRATION J.Claeys 21-1044-00 Highland Development Services LENGTH (ft) DESIGN CRITERIA: City of Fort Collins Stormwater Criteria Manual Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti)TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min)DESIGN POINT Sub-basin % Impervious C100 AREA (acres) tt (min) OVERALL LENGTH (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) VELOCITY (ft/s) HYDRAULIC RADIUS (ft) ROUGHNESS COEFFICIENT ticttt+= V Ltt60 = = 1.87(1.1 − ) 10 180 +=LtcV=.R2/3 S 1/2 21-1044-00 Rational Calcs.xlsx Page 7 of 8 Highland Development Services Design Engineer: Design Firm: Project Number: Date:February 15, 2023 EQUATIONS:I = rainfall intensity (in/hr) Q n = n -yr peak discharge (cfs)P 1 = one-hour point rainfall depth (in) C n = n -yr runoff coefficient t c = time of concentration (min) I n = n -yr rainfall intensity (in/hr) P 1-2yr =0.82 in A n = Basin drainage area (ac)P 1-10yr =1.40 in P 1-100yr =2.86 in BASIN SUMMARY: tc (min)Runoff Coeff (C2-10)C(A) (acres)Intensity (in/hr)Q (ft3/s)tc (min)Runoff Coeff (C2-10)C(A) (acres)Intensity (in/hr)Q (ft3/s)tc (min)Runoff Coeff. (C100)C(A) (acres)Intensity (in/hr)Q (ft3/s) D1 D1 2.959 0.0% 5.00 0.25 0.74 2.85 2.11 5.00 0.25 0.74 4.87 3.60 5.00 0.31 0.92 9.95 9.20 D2 D2 9.416 69.7% 10.98 0.77 7.26 2.13 15.48 10.98 0.77 7.26 3.64 26.43 8.91 0.96 9.07 8.07 73.25 D3 D3 11.173 65.4% 12.96 0.74 8.26 1.99 16.41 12.96 0.74 8.26 3.39 28.01 10.22 0.92 10.33 7.66 79.07 D4 D4 8.317 55.8% 13.04 0.66 5.53 1.98 10.95 13.04 0.66 5.53 3.38 18.69 11.58 0.83 6.91 7.28 50.26 10-yr Peak Runoff 100-yr Peak Runoff Union Park DEVELOPED PEAK RUNOFF DESIGN CRITERIA: Design Point Sub-basin Area (acres) J.Claeys Highland Development Services 21-1044-00 2-yr Peak Runoff City of Fort Collins Stormwater Criteria Manual % Impervious nnnnAICQ=(0.786651) 1 )10( 5.28 ct PI + = 21-1044-00 Rational Calcs.xlsx Page 8 of 8 Highland Development Services Appendix C APPENDIX C – DETENTION POND CALCULATIONS Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.68 1.25 0.85 ft3 acre-ft 32.78 acres 318,601 7.31 7.01 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0 0 0 0.00 5 9.95 277.19 83,158 2,103 81,055 1.86 10 7.72 215.07 129,042 4,206 124,836 2.87 15 6.52 181.64 163,475 6,309 157,166 3.61 20 5.60 156.01 187,211 8,412 178,799 4.10 25 4.98 138.74 208,105 10,515 197,590 4.54 30 4.52 125.92 226,659 12,618 214,041 4.91 35 4.08 113.66 238,694 14,721 223,973 5.14 40 3.74 104.19 250,060 16,824 233,236 5.35 45 3.46 96.39 260,256 18,927 241,329 5.54 50 3.23 89.98 269,951 21,030 248,921 5.71 55 3.03 84.41 278,560 23,133 255,427 5.86 60 2.86 79.68 286,834 25,236 261,598 6.01 65 2.72 75.78 295,526 27,339 268,187 6.16 70 2.59 72.15 303,047 29,442 273,605 6.28 75 2.48 69.09 310,904 31,545 279,359 6.41 80 2.38 66.30 318,258 33,648 284,610 6.53 85 2.29 63.80 325,362 35,751 289,611 6.65 90 2.21 61.57 332,466 37,854 294,612 6.76 95 2.13 59.34 338,233 39,957 298,276 6.85 100 2.06 57.39 344,334 42,060 302,274 6.94 105 2.00 55.72 351,020 44,163 306,857 7.04 110 1.94 54.05 356,703 46,266 310,437 7.13 115 1.89 52.65 363,306 48,369 314,937 7.23 120 1.84 51.26 369,073 50,472 318,601 7.31 Ziegler-Corbett 100-yr Detention Volume - FAA Method Highland Development Services February 22, 2023 21-1044-00 J.Claeys Area (A ) Allowed Release Rate Fort Collins Stormwater Criteria Manual, December 2018 Runoff Coefficient (C ) Frequency Factor (C f )Required Detention Adjusted Runoff Coefficient (CC f ) Developed Detention Volume Calculation Union Park Critical Pond Elevations Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Stage Storage - Pond 298a Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE- FT) 4926.25 0.000 0.000 0.00 0.000 4927.0 5,858 0.134 0.034 0.75 0.034 4928.0 24,925 0.572 0.328 1.75 0.362 4929.0 45,998 1.056 0.802 2.75 1.163 4930.0 70,642 1.622 1.329 3.75 2.492 4931.0 93,965 2.157 1.883 4.75 4.375 4932.0 97,929 2.248 2.202 5.75 6.578 4933.0 100,509 2.307 2.278 6.75 8.855 4934.0 107,819 2.475 2.391 7.75 11.246 4935.0 110,390 2.534 2.505 8.75 13.751 4935.25 9.00 14.392 Spillway 4936.0 112,971 2.593 2.564 9.75 16.315 4937.0 122,267 2.807 2.699 10.75 19.014 Northwest POND J. Clayes Highland Development 21-1044-00 February 22, 2023 () 3 2121 DepthAAAA V ++= 21-1044-00 PondCalcs - NW Pond Stage Storage Page 1 of 1 Interwest Consulting Group DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Water Quality Capture Volume (WQCV): Tributary Area, A 8.317 acres Basin D4 (not treated by LID) Composite. Imperviousness, I 55.8% WQCV (watershed inches)0.223 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.185 acre-feet Including 20% for Sedimentation Stage Storage - Pond 298b Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE- FT) 4922.30 0.000 0.000 0.00 0.000 4923.0 4,852 0.111 0.026 0.70 0.026 4924.0 22,431 0.515 0.289 1.70 0.315 4925.0 33,771 0.775 0.641 2.70 0.955 4926.0 36,420 0.836 0.805 3.70 1.761 4927.0 41,824 0.960 0.897 4.70 2.658 4928.0 45,101 1.035 0.998 5.70 3.656 4929.0 49,692 1.141 1.088 6.70 4.743 Spillway 4930.0 53,287 1.223 1.182 7.70 5.925 Southeast POND () 3 2121 DepthAAAAV++= 21-1044-00 PondCalcs - SE Pond Stage Storage Page 1 of 2 Highland Development Services Appendix D APPENDIX D – STREET CAPACITY CALCULATIONS Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Feb 22 2023 26' Inverted Street User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = Composite Calculations Compute by: Q vs Depth No. Increments = 20 (Sta, El, n)-(Sta, El, n)... ( -15.67, 100.76)-(2.00, 100.17, 0.013)-(15.00, 100.43, 0.013)-(15.67, 100.76, 0.013) Highlighted Depth (ft) = 0.76 Q (cfs) = 73.08 Area (sqft) = 14.88 Velocity (ft/s) = 4.91 Wetted Perim (ft) = 31.51 Crit Depth, Yc (ft) = 0.76 Top Width (ft) = 31.34 EGL (ft) = 1.13 -5 0 5 10 15 20 25 Elev (ft)Depth (ft)Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Feb 22 2023 36' Crowned Street User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = Composite Calculations Compute by: Q vs Depth No. Increments = 20 (Sta, El, n)-(Sta, El, n)... ( 0.00, 100.50)-(2.00, 100.17, 0.013)-(18.00, 100.49, 0.013)-(34.00, 100.17, 0.013)-(36.00, 100.00, 0.013)-(36.00, 100.50, 0.013) Highlighted Depth (ft) = 0.50 Q (cfs) = 19.12 Area (sqft) = 7.10 Velocity (ft/s) = 2.69 Wetted Perim (ft) = 37.02 Crit Depth, Yc (ft) = 0.50 Top Width (ft) = 36.00 EGL (ft) = 0.61 -5 0 5 10 15 20 25 30 35 40 45 Elev (ft)Depth (ft)Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) Appendix E APPENDIX E – LOW IMPACT DEVELOPMENT CALCULATIONS Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Low Impact Development Summary Sq-Ft Acres Impervious Area (sq-ft) % of Impervious Area Requiring Treatment Impervious Area Requiring Treatment 1,427,723 32.78 860,051 75% 645,038 LID Facility Contributing Basins Area Drainage to LID (sq-ft) % Impervious Impervious Area Treated (sq-ft) WQCV12-hr (watershed inches) WQCV12-hr (cu-ft) Treatment Method D2 D2 410,142 69.7% 305,275 0.22 7,488 Filtration Gallery D3 D3 486,716 65.4% 340,222 0.20 8,294 Filtration Gallery EDB Pond Contributing Basins Drainage Area (sq-ft) Drainage Area (sq-ft)% Impervious WQCV40-hr (watershed inches) WQCV40-hr (ac-ft) Pond 298B D4 362,282 8.317 55.8% 0.22 0.185 645,038 645,497 100.1% Area (sq-ft) Area (acres) Treatment Ratio 896,858 20.59 62.8% 362,282 8.32 25.4% 1,259,140 28.91 88.2% 168,583 3.87 11.8% 1,427,723 32.78Total Improvement Area Water Quality Area Treatment Summary Description Total Area Treated by LID Total Area Treated by EDB Description Development Area Total Untreated Area (includes Pond 298A) Total Treated Area Union Park Low Impact Development Total % of Required Treatment Development Area Breakdown City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. Total Impervious Area Treated (sq-ft) Total Impervious Area Required for LID Treatment (sq-ft) LID Treatment Summary LID Treatment Areas J.Claeys Highland Development Services 21-1044-00 February 22, 2023 Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Standard Water Quality Areas Allowed FilterFabric Flow Ratea(cfs)0.35 gpm/sq-ftSC-106LP 14 10 6 6 85.4 25 12 14.8 0.012 6.9 15.0SC-310 18 8 6 6 85.4 34 16 20.2 0.016 14.7 31.0SC-740 18 8 6 6 85.4 51 30 30.2 0.024 45.9 74.9DC-780 18 12 6 9 85.4 51 30 30.2 0.024 46.2 78.4MC-3500 24 8 12 9 90 77 45 48.1 0.038 109.9 178.9 14.9 46MC-4500 24 7 12 9 52 100 60 36.1 0.028 106.5 162.6 35.7 108.7LIDFacilityChamberTypeTotalRelease Ratef(cfs) WQ Flowg(cfs)Req'd StorageVolumeh(cu-ft)Minimum No. of ChambersiChamberStoragej(cu-ft)No. ofEndcapskEndcapStoragel(cu-ft)Total ChamberVolumem(cu-ft)Total InstalledSystem Volumen(cu-ft)WQCV12-hr(cu-ft)D2 MC-3500 1.80 7.565,240 48 5,275 8 119 5,394 9,389 7,488D3 MC-3500 1.88 2.095,251 50 5,495 10 149 5,644 9,860 8,294Max Cover(ft)Min Cover(in)ChamberModelJ.ClaeysHighland Development Services21-1044-00February 22, 2023Min InstalledChamber/AggregateVolumec(cu-ft)Union ParkLow Impact DevelopmentStormTech Chamber Configuration SummaryStormTech Chamber DataDesign Engineer:Design Firm:Project Number:Date:Length(in)Width(in)Height(in)Floor Area(sq-ft)ChamberVolumeb(cu-ft)MinAggregate Base(in)Min Aggregate Cover(in)NegligibleEndcapVolumed(cu-ft)Min InstalledEndcap/AggregateVolumee(cu-ft)NegligibleNegligibleNegligibleNote:a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. City acceptable flow rates determined to be approximately 1/2 of the Nov-07 Qmaxfrom Figure 17 of the "Final Report on Field Verification Testing of the StormTech Isoloator Row Treatement Unit", prepard by the University of New Hamphire Stormwater Center, dated Setpember 2010.b. Volume within chamber only, not accounting for void spaces in surrounding aggregate.c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit.d. Volume within endcap only, not accounting for void spaces in surrounding aggregate.e. Volume includes endcap and void spaces (40%) in surrounding aggregate, per chamber unit.f. Release rate per chamber times number of chambers. This is used as the allowed release rate for the FAA calculations.g. WQ flow, equal to 1/2 of the 2-yr peak runoff rate, referenced to size flow control structure.h. Required detention volume determined using the FAA Method based on the acceptable release rate of sediment accumulated filter fabric of the chambers and the 1/2 of the 2yr in flow rate.i. Number of chambers required to provide required FAA storage volume stored within the chamber and endcaps only (no aggregate storage).j. Total volume provided in chambers only (no aggregate storage).k. Number of endcaps based on desired chamber layout.l. Total volume provided in endcaps only (no aggregate storage).m. Total chamber and endcap storage (not aggregate storage). This number must meet or exceed the required FAA storage volume.n. System volume includes total chambervolumeplus surrounding aggregate volume,assumes a 40% void ratio for aggregate storage.This totalis provided from ADS Design Tool. DESIGN CRITERIA 0.77 1.00 0.77 (ft3)acre-ft 9.42 acres 5,240 0.12 1.80 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 10.33 3,099 540 2,559 0.06 10 1.105 8.01 4,807 1,081 3,726 0.09 15 0.935 6.78 6,101 1,621 4,480 0.10 20 0.805 5.84 7,003 2,162 4,842 0.11 25 0.715 5.18 7,776 2,702 5,074 0.12 30 0.650 4.71 8,482 3,242 5,240 0.12 35 0.585 4.24 8,907 3,783 5,124 0.12 40 0.535 3.88 9,309 4,323 4,986 0.11 45 0.495 3.59 9,690 4,864 4,826 0.11 50 0.460 3.33 10,005 5,404 4,601 0.11 55 0.435 3.15 10,407 5,944 4,463 0.10 60 0.410 2.97 10,701 6,485 4,216 0.10 Union Park WQ Treatment Volume - FAA Method - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - D2 Filtration Gallery Runoff Coefficient (C ) J.Claeys Highland Development Services 21-1044-00 February 22, 2023 - City of Fort Collins - Storm Water Criteria Manual Design Engineer: Design Firm: Project Number: Date: - Drainage Basins A1 thru A12 Allowed Release Rate Frequency Factor (C f )Required Detention Adjusted Runoff Coefficient (CC f ) Area (A ) DESIGN CRITERIA 0.66 1.00 0.66 ft3 acre-ft 11.17 acres 5,251 0.12 1.88 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 10.51 3,153 563 2,590 0.06 10 1.105 8.15 4,889 1,126 3,763 0.09 15 0.935 6.90 6,206 1,689 4,517 0.10 20 0.805 5.94 7,124 2,252 4,872 0.11 25 0.715 5.27 7,909 2,815 5,095 0.12 30 0.650 4.79 8,628 3,378 5,251 0.12 35 0.585 4.31 9,060 3,940 5,119 0.12 40 0.535 3.95 9,469 4,503 4,965 0.11 45 0.495 3.65 9,856 5,066 4,790 0.11 50 0.460 3.39 10,177 5,629 4,548 0.10 55 0.435 3.21 10,586 6,192 4,394 0.10 60 0.410 3.02 10,885 6,755 4,130 0.09 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate - City of Fort Collins - Storm Water Criteria Manual - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - D3 Filtration Gallery Runoff Coefficient (C ) Frequency Factor (C f )Required Detention - Drainage Basins B10 thru B12 Union Park WQ Treatment Volume - FAA Method J.Claeys Highland Development Services 21-1044-00 February 22, 2023 Design Engineer: Design Firm: Project Number: Date: User Inputs Chamber Model: MC-3500 Outlet Control Structure: No Project Name: Union Park - LID D2 Engineer: Paul Schwindler Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 9000 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 9 in. Stone Above Chambers: 12 in. Average Cover Over Chambers: 18 in. Design Constraint Dimensions:(60 ft. x 110 ft.) Results System Volume and Bed Size Installed Storage Volume: 9389.10 cubic ft. Storage Volume Per Chamber: 109.90 cubic ft. Number Of Chambers Required: 48 Number Of End Caps Required: 8 Chamber Rows: 4 Maximum Length:95.88 ft. Maximum Width: 29.17 ft. Approx. Bed Size Required: 2796.57 square ft. System Components Amount Of Stone Required: 370 cubic yards Volume Of Excavation (Not Including Fill): 570 cubic yards Total Non-woven Geotextile Required:930 square yards Woven Geotextile Required (excluding Isolator Row): 168 square yards Woven Geotextile Required (Isolator Row): 419 square yards Total Woven Geotextile Required:587 square yards Impervious Liner Required:0 square yards User Inputs Chamber Model: MC-3500 Outlet Control Structure: No Project Name: Union Park - LID 3 (5 rows) Engineer: Paul Schwindler Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 9400 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 9 in. Stone Above Chambers: 12 in. Average Cover Over Chambers: 18 in. Design Constraint Dimensions:(50 ft. x 80 ft.) Results System Volume and Bed Size Installed Storage Volume: 9860.04 cubic ft. Storage Volume Per Chamber: 109.90 cubic ft. Number Of Chambers Required: 50 Number Of End Caps Required: 10 Chamber Rows: 5 Maximum Length:81.55 ft. Maximum Width: 36.08 ft. Approx. Bed Size Required: 2942.57 square ft. System Components Amount Of Stone Required: 391 cubic yards Volume Of Excavation (Not Including Fill): 600 cubic yards Total Non-woven Geotextile Required:958 square yards Woven Geotextile Required (excluding Isolator Row): 67 square yards Woven Geotextile Required (Isolator Row): 88 square yards Total Woven Geotextile Required:155 square yards Impervious Liner Required:0 square yards