Loading...
HomeMy WebLinkAboutOAK/COTTONWOOD FARM AMENDED OVERALL DEVELOPMENT PLAN - 54-87F - CORRESPONDENCE - STAFF'S PROJECT COMMENTS CommComnuay Planning and Environmentakiervices {a ,r, Planning epartment xY 4 .. City of Fort Collins May 22, 1992 Mr. Eldon Ward Cityscape Urban Design 3030 South College Avenue, Suite #200 Fort Collins, CO. 80525 Dear Eldon: Staff has completed the interdepartmental review of Oak-Cottonwood Farm Amended Master Plan, and the Upper Meadow at Miramont Preliminary P.U.D. In addition, comments from outside utility providers are included. Oak-Cottonwood Farm Amended Master Plan: 1. The Fort Collins-Loveland Water District has an existing 14 inch diameter water line generally located along the south boundary of the property. The District will require adequate easement for access, maintenance, and operation of these existing facilities. 2. The Fort Collins-Loveland Water District, in cooperation with the city of Fort Collins, will require the minor extension of the 20 inch diameter water line in Lemay Avenue and installation of a meter vault to provide appropriate looping. 3 . The water and sanitary sewer service areas should be clearly identified between the City of Fort Collins and the Districts. 4. Electrical power is available along Lemay Avenue, Oakridge Drive, and Boardwalk from Harmony to Oakridge. As long as the construction phasing is sequential with these existing facilities, and standard utility easements are provided, then there should be no problems with the City of Fort Collins Light and Power Department. 5. Please be reminded that City Council approval is needed before any commitments are made on acquisition of a City Neighborhood Park on Parcel P. 6. As you are aware, there has been discussion regarding the extension of a collector street system to the south to connect to an extension of Fossil Creek Parkway. The exact location of this connection is undetermined at this time. Also, the need for a local street connection into Mail Creek Lane, south 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 a 411 of Werner School, is still under discussion. It is hoped that these issues will be resolved over the next few weeks as meetings will the affected parties will explore possible scenarios and solutions. Preliminary discussions have already been held with officials from Poudre R-1 School District and the Fossil Creek Meadows Homeowners Association. The Upper Meadow at Miramont: 7. U.S. West has responded with the following generic concerns: A. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. U.S. West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. B. Telephone facilities generally occupy rear lot utility easements, which must be located on terrain which permits trenching operations. If the developer prefers a front- lot telephone layout, then the front lot easement should be wide enough to accommodate all utilities to be located there. C. The developer is responsible for provision of all trenching for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. D. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 8. Comments based on the Preliminary Utility Plan will be provided under separate cover. A soils report must accompany pavement design. 9. Public Service Company requests that street trees be kept a minimum of four feet of horizontal separation from underground natural gas facilities. 10. Columbine Cablevision requests that drainage areas be designated as "Utility and Drainage Easement". 11. A variance request must be submitted to the Engineering Department to allow the 28 foot wide cul-de-sac streets. Please refer to Section 1.02.10 (page 17) of the Design Criteria and Standards for Streets for appropriate evaluation criteria for 28 foot wide streets. Initial reaction is that Sawgrass and Bulrush Courts seem rather long to qualify for a 28 foot wide street. a 110 12. The Poudre Fire Authority evaluates 28 foot streets based on the ability to preserve unobstructed access within the roadway. This can be accomplished by providing the ability to use offstreet parking. Wide lots, extra large driveways, three-car garages, staggered drive-ways or parking in the cul- de-sac are methods that can be used to minimize obstructions in the roadway. 13 . Please verify that the sight distance is adequate at Bluestem and Sandreed. If not, then a sight distance easement may have to be dedicated. 14. Please use a longer radius on Meadow Run and Sawgrass instead of angle points. 15. The location of a proposed detention pond in the future park area was not included in discussions with the Parks and Recreation Department. Detention areas within neighborhood parks are incompatible and the proposed pond should be relocated. 16. Water lines must provide a minimum of 1, 000 gallons per minute of fire flow at 20 psi residual pressure. 17. Fire hydrants must be provided within 400 feet of all lots. 18. If discussions regarding the southern collector system result in a collector stub over to Fossil Creek Parkway (extended) , then the width of Highcastle Drive could be reduced to a local street standard. 19. Staff is very concerned about the proposed 10 foot minimum rear setback. This appears to be unrealistic. Are building envelopes anticipated to cover so much lot that only 10 feet will be left over for rear yard? This may be acceptable if the rear yard is adjacent to a greenbelt or open space area, but certainly would be intrusive where two lots are back to back. How is a 10 foot rear yard area sufficient for homes that are allowed to be 36 feet in height? What is the impact on shadows, solar gain, and privacy? Please give some serious thought to lot coverage and lot size. There should be some logical balance between the size of the house and the size of the lot. Do these lots need to be larger than shown? 20. The Solar Orientation Ordinance allows for variances but also asks the developer explore options that would achieve the intent, if not the letter, of the Ordinance. Examples include maximizing south facing windows, solar hot water heaters, providing guaranteed solar access to the south, and other individual site and building considerations. Please submit a variance request (letter) and address the variance criteria offered in the Ordinance. s O 21. Similarly, a variance request (letter) from the requirement that the gross density be a minimum of three dwelling units per acre should also be submitted. Please indicate the justification and design considerations for the proposed 2.83 dwelling units per acre. 22. Will rear yard and side yard fencing along Boardwalk be uniform or left up to the individual homeowner? Will the fencing guidelines along the open space apply along Boardwalk? 23. Is a pedestrian trial planned to parallel Mail Creek Ditch? What would this tie into in Fairway Estates? This concludes Staff comments at this time. In order to stay on schedule for the June 22, 1992 Planning and Zoning Board meeting, please note the following deadlines: Plan revisions are due June 3, 1992. P.M.T. 's, 10 prints, renderings are due June 15, 1992. As always, if there are any questions or concerns, or if you would like to set meeting to discuss these comments, please feel free to call our office. Sincerely: 44k..1161e*A1(. Ted Shepard Senior Planner xc: Sherry Albertson-Clark, Chief Planner Kerrie Ashbeck, Civil Engineer