HomeMy WebLinkAboutJEROME STREET STATION - FDP230006 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject:Disturbed Acres:6.46
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
each 7 $250.00 $1,750.00
L.F. 2,704 $1.10 $2,974.40
each 15 $90.00 $1,350.00
each 13 $125.00 $1,625.00
each 2 $1,700.00 $3,400.00
Outlet Protection each 2 $900.00 $1,800.00
Scourstop Pads each 4 $1,000.00 $4,000.00
Bioretention/Level Spreaders each 3 $315.00 $945.00
Extended Detention Basins each 2 $250.00 $500.00
each 1 $1,250.00 $1,250.00
Stabilized Staging Area S.Y. 4,000 $4.75 $19,000.00
acre 2.70 $1,000.00 $2,700.00
Sub-Total: $41,294.40
1.5 x Sub-Total: $61,941.60
Amount of security: $61,941.60
Total Acres x Price/acre: $5,168.00
$800.00 Sub-Total: $5,168.00
1.5 x Sub-Total: $7,752.00
Amount to Re-seed: $7,752.00
Minimum escrow amount: $3,000.00
Erosion Control Escrow:$61,941.60
Fields in yellow should be amended for this project.
Reseeding Amount
Miniumum Escrow Amount
Jerome Street Station
Unit Price of Seeding per acre:
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost
to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is
greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars
($3,000) for commercial development”
Silt Fence
Straw Wattles
Final Escrow Amount
Vegetate Landscaped Areas
Vehicle Tracking Control Pads
Concrete Washout Area
Erosion and Sediment Control Escrow/Security Calculation for
the City of Fort Collins
BMP Amount
Inlet Protection
Rock Socks
2/7/2023 7:53 PM P:\1124-005\Drainage\Erosion\1124-005_Jerome Street-EC_Escrow