Loading...
HomeMy WebLinkAboutJEROME STREET STATION - FDP230006 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject:Disturbed Acres:6.46 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price each 7 $250.00 $1,750.00 L.F. 2,704 $1.10 $2,974.40 each 15 $90.00 $1,350.00 each 13 $125.00 $1,625.00 each 2 $1,700.00 $3,400.00 Outlet Protection each 2 $900.00 $1,800.00 Scourstop Pads each 4 $1,000.00 $4,000.00 Bioretention/Level Spreaders each 3 $315.00 $945.00 Extended Detention Basins each 2 $250.00 $500.00 each 1 $1,250.00 $1,250.00 Stabilized Staging Area S.Y. 4,000 $4.75 $19,000.00 acre 2.70 $1,000.00 $2,700.00 Sub-Total: $41,294.40 1.5 x Sub-Total: $61,941.60 Amount of security: $61,941.60 Total Acres x Price/acre: $5,168.00 $800.00 Sub-Total: $5,168.00 1.5 x Sub-Total: $7,752.00 Amount to Re-seed: $7,752.00 Minimum escrow amount: $3,000.00 Erosion Control Escrow:$61,941.60 Fields in yellow should be amended for this project. Reseeding Amount Miniumum Escrow Amount Jerome Street Station Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Silt Fence Straw Wattles Final Escrow Amount Vegetate Landscaped Areas Vehicle Tracking Control Pads Concrete Washout Area Erosion and Sediment Control Escrow/Security Calculation for the City of Fort Collins BMP Amount Inlet Protection Rock Socks 2/7/2023 7:53 PM P:\1124-005\Drainage\Erosion\1124-005_Jerome Street-EC_Escrow