HomeMy WebLinkAboutENCLAVE AT REDWOOD - FDP220014 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE RELATED DOCUMENT (2)Project Name:
Review Start Date: 2/20/2021
Project Reviewer: Matt Simpson
Item Yes/ No/ N.A.
Introduction:
- Signed and stamped by a PE (at final compliance) N.A.
- Description of historic & developed conditions Yes
- Discussion & mitigation of impacts on wetlands, receiving waters,
etc. Yes
- Ditch company/neighboring development approval (if applicable) No
- Floodplain description N.A.
- Sub-basin descriptions Yes
- Quantity detention w/ design parameters Yes
- Check target release (historic or master planned rate) Yes
- Water quality discussion with design parameters Yes
- LID discussion with design table Yes
- Variance requests listed (if applicable) N.A.
- Check the text is all inclusive and per the outline Yes
- Check all descriptions for inconsistencies, errors, & mistakes Yes
Hydrologic Calculations:
- All basin areas are consistent with drainage sheet in plans Yes
- Check all composite C values with developed conditions Yes
- Check the overland flow & gutter flow lengths Yes
- Verify the intensity and discharge Yes
- Verify the inclusion of offsite flows Yes
- Verify all drainage calcs consistent w/ drainage plan Yes
Hydraulic Calculations:
- Check the street flows against allowable capacities Yes
King Soopers FDP
***If new submittal, pull Conceptual Review comments. If resubmittal, pull old set of comments to see if there was an
correspondence since the last submittal***
Instructions: mark YES if all components are present; mark NO and mark or note all components not present
CITY OF FORT COLLINS
Drainage REPORT Checklist
- Verify inlet sizing and configuration Yes
- Check diagram of each storm sewer line and verify design with
plans Yes
- In UDSewer verify: slope, upstream & downstream inverts, sewer
length, pipe diameter Yes
- Verify the capacity of all swales and channels (1.33Q100 Yes
- Verify the grading of all swales and channels (longitudinal & side
slopes, cross-section provided) Yes
- Verify outlet erosion protection calculations, check dimensions w/
plans Yes
Detention Basins:
- Check pond sizing (FAA or SWMM) Yes
- Check contour-area table - verify storage capacity Yes
- Check 2'-yr orifice calculations No
- Check water quality capture volume calculations/elevations Yes
- Check the water quality orifice plate calculations No
- Check emergency spillway calculations (1’ freeboard, clogged
outlet) Yes
- Verify stage/storage table is included & elevations match pond
grading Yes
Low Impact Development (LID):
- Check 75% of site’s imperv. area is draining through a LID
technique Yes
- Check 25% porous pavement requirement is met N.A.
- Verify 3 to 1 maximum run'-on area for pavers (if used) N.A.
- Verify LID techniques are designed per standards Yes
State Wide Compliance:
- Check 5'-year storm drain time meets 97% in 72 hours Yes
- Check 100'-year storm drain time meets 99% in 100 hours Yes
- Verify surface area information is listed Yes
Notes:
Will be stamped at Final Compliance
In FDR
Wetlands discussed with Redwood
pond, Receiving Waters are the NECCO
line
The project has a concurrent ditch
company approval process, and the
ditch company appvoal blocks are
included on the plans
100 yr 0.2 cfs/acre
See specific details section of FDR
See specific details section of FDR
Most Tc's are minimum
OS Basins to West, into Redwood Pond
Inlet Calcs
Soopers FDP
comments to see if there was any
all components not present
Calculation completed with StormCAD
Swale at western PL
SWMM
Per coord with the city WQ orifice
calculations will be included after the
2nd FDP submittal
Tables are included on pond plans
See LID Exhibit and Tables
See LID above
See LID Above
See LID Exhibit and Tables
Structures detailed, WQ orifice plate details wil be included after FDP R2 after further coordination with the City
SDI Compliance worksheets are inclide for each pond
SDI Compliance worksheets are inclide for each pond
SDI Compliance worksheets are inclide for each pond
n with the City