HomeMy WebLinkAboutENCLAVE AT REDWOOD - FDP220014 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE RELATED DOCUMENTProject Name:
Review Start Date: 4/18/2023
Project Reviewer: Matt Simpson
Item Yes/ No/ N.A.
Plans
Coversheet
- Project name, date, vicinity map, scale, north arrow, general
notes, section YES
- Vertical control benchmarks YES
- Ditch company, other utility signature blocks YES
- Check standard notes YES
Plat
- All existing easements & ROWs with size & type Yes
- All proposed easements & ROWs with size & type Yes
- Property boundaries with accurate bearings & distances Yes
- Streets shown with names & ROW dimensions Yes
- Cross lot drainage easements (check grading & drainage plans) N.A.
- Floodplain & floodway boundaries shown N.A.
Utility Plan
- Alignment, size, & type of all existing drainage facilities Yes
- Alignment, size, & type of all proposed drainage facilities Yes
- 10’ horizontal separation from other utilities at all points Yes
- Any existing utilities being removed/abandoned called out Yes
*Please note that these items could be shown on the grading and/or drainage
plans
Grading Plan
- Existing contours not more that 2’ intervals, grading shown 50’
off property boundary on all sides, grading of entire area that flows onto
site (offsite area can also be shown in report) Yes
- Proposed contours (max 2’, 1’ preferred) Yes
- Detailed grading showing flow around buildings (side'-lot
swales, high points, etc…) Yes
- Building footprints with F.F. or lowest opening elevation Yes
- Corner lot elevations for all lots N.A.
- Tie'-ins with existing contour lines Yes
- Flowline, high points, & other spot elevations to define flow
patterns Yes
Enclave at Redwood
***If new submittal, pull Conceptual Review comments. If resubmittal, pull old set of comments to see if there was
any correspondence since the last submittal***
Instructions: mark YES if all components are present; mark NO and mark or note all components not present
CITY OF FORT COLLINS
Drainage Plans Checklist
- *Swale X'-sections (side slopes, WSEL, longitudinal slope) Yes
- *All swales should have slope called out, 2% slope or pan?
- *Floodplain & floodway boundaries N.A.
- Sidewalk location (check for conflicts with swales, check for
culverts) Yes
- Spillway & berm spot elevations denoted (1 foot of freeboard) Yes
- Check maximum 4:1 slopes (3:1 with variance) & slopes labeled
for ponds, channels, etc… Yes
- Spill locations for sump inlets Yes
- LID techniques shown & labeled Yes
Drainage Plan
- Basins coincide with grading plan Yes
- Off'-site areas draining to site delineated Yes
- Basin labels (preferably with runoff coefficient & area) Yes
- Concentration points Yes
- *Flow arrows to show direction of flow Yes
- Basin summary table (basin, area, C, Q2, Q100) Yes
- Detention pond summary (WSEL100, release rates, volume) Yes
- Alignment, size, & type of all existing & proposed drainage
facilities Yes
- *Floodplain & floodway boundaries N.A.
- Water quality (is it provided?) Yes
- No back lot swales Yes
- LID techniques shown and labeled Yes
- Maximum of 3 lots draining onto a swale in the back of another
lot N.A.
- Drainage easements for lots that require an easement N.A.
- Buried riprap placement where required (called out with
reference to detail) Yes
- *Delineation of wetland areas N.A.
- *Spillway location(s) shown with cross'-section provided Yes
- *Detention pond depth markers (if deeper than 4 feet) Yes
Street Plan
- Utility alignments including storm sewer & inlet locations Yes
- Intersection details with spot elevations, crosspans, & inlets
(Be sure to spot elevations indicate flows will go where drainage
plan intends) Yes
- FL'-Fl width of each street Yes
- Proposed & existing contours Yes
Street Profiles
- Left & right flowline profiles with slope at inlet locations Yes
- Alignment, size, & depth of storm sewers & inlets Yes
- Inlet locations Yes
Storm Sewer Plan
- Alignment, size, type (if RCP, state class), length, slope Yes
- 10’ horizontal separation from other utilities at all points Yes
- Note stating that all sewer lines will be inspected by City Yes
- Proposed & existing storm sewers Yes
Storm Sewer Profiles
- Alignment, size, type (if RCP, state class), length, slope, of all
pipes, manhole, Inlets, & culverts Yes
- Inverts & rim or profile elevations for all storm sewer structures Yes
- Existing & proposed ground elevations Yes
- Concrete encased water main crossings Yes
- Buried riprap at outfalls with dimensions called out Yes
- WSEL at pond or channel outfall locations Yes
- 100 yr HGL Yes
- Call out cover for all lines & vertical separation between other
utilities Yes
- Are FES or other outlet configurations provided Yes
- Minimum cover of 1'-foot Yes
- Can the pond backflow through proposed or existing storm
sewers Yes
- Designate public or private storm sewers Yes
Details
- Manholes, inlets, cross pans, riprap design, detention pond
outlets Yes
- Storm sewer & riprap bedding Yes
- Water quality structure Yes
- Detention pond depth marker
- All LID construction details included Yes
- Buried riprap detail with temporary erosion control included Yes
- Verify all current details applicable to the specific site are
included Yes
Low Impact Development (LID)
- Verify LID table is on the drainage plan Yes
- Verify all applicable LID construction details are on Utility Plans Yes
- Verify all applicable LID specifications are on Utility Plans Yes
Phasing Plan
- Phasing delineations with each phase labeled N.A.
- Utility alignments shown N.A.
- All detention ponds shown – Make sure all ponds that will be
needed in the initial phases will be built in those phases N.A.
N.A.
- All flows going off the end of unfinished roads have erosion
protection N.A.
Offsite Road Improvements
- Street X'-sections need to show new culverts if old ones are filled
in when roads are widened/altered '- Make sure flows have conveyance. N.A.
N.A.
- CMP’s replaced N.A.
- Side slopes of roads 4:1 or at least matching existing N.A.
Miscellaneous
- Gas spill containment N.A.
- Concrete sidewalk culverts in street (instead of curb cuts) N.A.
- Check to make sure that the site plan and landscape plan match N.A.
Notes:
On overall coversheet
Ditch company
Storm notes
ave at Redwood
Drainage easements shown, but no "cross-lot drainage easements"
(other than in areas as previously discussed/determined)
ld set of comments to see if there was
or note all components not present
LID Map
See Design Points
See Water Quality Map
One swale on west PL
See LID Map
TRM in some cases
Easements for storm and drainage infrastructure provided, but not for "single-family lots"
Existing non-JD wetlands labeled in Redwood pond
Note added to plans to include
Shown on Street Plans & Detailed Grading Plans
Forebays in some cases
Existing ground is shown
Details are included
See spillway details
Pipes outlet lower than 100-yr, major events will back into proposed sewers
Notes are made on storm sewer P&P Sheets
Structures detiailed, WQ orifice plate details wil be included after FDP R2
Stormtech and rain garden details are included in the plan
Included details are current
Separate LID plan with Table
Stormtech and rain garden details are included in the plan
Stormtech and rain garden construction specifications