Dear Frank:
Staff has reviewed the Harmony Market PUD, 2nd Filing and has the
following comments to make:
1. Utility plans' should conform to the approved Master Utility Plan for the
Harmony Market PUD.
2. All trees and fencing adjacent to the sidewalk along Oak Ridge Drive
should be installed outside of the 8' utility easement.
I 3. The lumber staging area and garden shop will require fire sprinkler
dit`
protection. The use of high rack or high pile storage will require special
consideration, such as fire sprinklers and smoke vents.
4. The Commission on Disability suggests that several more handicapped
„ cps parking stalls be added, since the current ratio is 4/444.
5. The site plan shows both typical and handicapped parking stall sizes as
"handicapped". Bike and motorcycle parking appear on the legend but are not
designated on the site plan.
6. Light poles and trash receptacle(s) show on the legend but do not appear
/A on the site plan. Information . should be provided on the usage, noise levels,
AIQ, °1 etc. of the trash compactor and on screening of both the compactor and any
wi ( P ' receptacles.
U� w 7. Staff would encourage the developer to use 15' high light poles in the
northern area of the site, since this is the highest portion of the site.
Information regarding parking lot and security lighting needs to be provided.
Included, should be placement, intensity of lighting, direction of lighting, hours
of lighting operation, pole height, etc.
8. The following drainage report/plan comments have been received:
- Re-analyze Pond D and the 18" culvert under Oak Ridge Drive. The current
design will allow releases from the site greater than allowed for any storm less
than the 100-year storm.
2s \. ll ` C A‘emits • I':O. Iior' • 'Fort (`o;!..1,. i'.) `,C:,,-(1-SSO • ( 01) 22l-o7)0
• I,
- Basins shown on the north 1/2 of Oak Ridge Drive are not consistent with
street profiles. If street flows are not being diverted to the ponds, this needs
to be re-analyzed, since this means over-detaining for street flows.
- How was the release rate of 3.03 cfs from Pond C determined?
The orifice in Pond D has been oversized and needs to be revised.
- Calculations for the culvert under the entrance at Harmony Road need to be
provided.
9. The following comments have been received on the utility plans from the
Stormwater Utility:
- The overall drainage plan needs design points, street basins modified, existing
pipe materials and sizes and elevations called out.
- The site grading plan needs to show basin delineations and design points,
drainage table added, cross section view of ditch along Harmony shown,
emergency overflow from the existing pond to the west indicated.
- Off-site easements for the portions of the pipes under Oak Ridge Drive and
the back driveway that extends outside the right-of-way need to be provided.
- Hydraulic gradeline needs to be shown on the storm sewer profile.
- Additional comments are on the plans or in the report.
30 10. The maximum building height shown on the site plan notes indicates 40',
while the height on the building footprint is 30'. Please clarify.
11. Staff will be meeting with the Colorado Department of Highways on
Monday, June 25 to discuss Harmony Road striping, signing and driveway
design, relative to this project. As a result of this meeting, additional
information will be supplied on these items.
12. Centerline stationing, signing, striping and design of Oak Ridge Drive and
the transition to Lemay needs to be provided. Additional Engineering
comments are shown on the red-lined utility plans.
13. Clarification is needed regarding how roof top mechanical equipment may
. ,{� be screened.
J�/� 14. As presently designed on the site plan, it appears the walkways from
Harmony Road south to the site are outside the platted lot. These walks must
either be in the platted lot or in public access easements. Without dimensions
on the site plan, it is not possible to determine if there are any other
discrepancies. If so, any other discrepancy needs to be resolved.
15. Plant materials in the detention pond may be dispersed throughout the
pond, rather than just concentrated along the banks of the pond. A xeriscape
turf mix (brome/fescue) should be used in the detention area, rather than
bluegrass.
16. Additional plant material is needed along all sides of the building. Of
particular concern, is the back of the building. Materials used along this area
should be coniferous, to screen the service area of the building, since this area
will be visible from Oak Ridge Drive.
17. The City Forester should be contacted regarding any pruning planned for
the existing trees along Harmony Road.
18. The "future parking" aisle should be constructed with this plan. This area
will likely be used for parking by customers, whether paved or not.
19. Pedestrian linkages with the adjacent sites are not addressed on the site
/ . ` plan, nor is there a connection from this site to Oak Ridge Drive. The
connection between Harmony Road and the Builder's Square building is weak.
20. The walk along Oak Ridge Drive will need to be in a public access
easement.
21. Clarification is needed regarding the amount of landscaping to be installed
J 1( with this project. It is staff's assumption that the materials shown along
/�I U 1 Harmony Road, as well as the Harmony entrance to the site will be included
ag2 with development of Builder's Square.
dS , 22. Parking lot aisles of more than 16 stalls in length should have additional
- / planting islands to break up the length of pavement.
IS
p 23. Details need to be provided on the site I.D. sign.
24. The signage proposed on the building (i.e.. "paint", "lumber") should be
deleted, as it detracts from the appearance of the building.
25. The proposed vinyl coated chain link fence is unacceptable. While staff
realizes the need for security in these areas, the garden shop and lumber
staging areas will be very visible from the public right-of-way. The proposed
fencing does not provide a visually desirable enclosure.
26. Building and roof material colors need to be specified on the elevations.
/� 27. The status of the construction of Oak Ridge Drive is not specified, nor is
this issue addressed in the traffic impact study: If Oak Ridge Drive is not
Gl.�9i1 constructed with development of this portion of the site, the rationale for not
constructing it at this time must be provided.
INUVV0
28. Oak Ridge Drive is a collector street. As designed, the access for this site
from Oak Ridge Drive appears to be primarily service access. Consideration
should be given to prioritizing this as an access point to the site.
j, ,,_,p 29. There have been several changes that affect access and circulation on the
site (i.e.. change in Harmony entrance through the parking area, placement of
Builder's Square structure, pedestrian linkages, etc.), yet there is no indication
of how these changes will affect the remainder of the site to be developed in
the future. A revised plan addressing this point needs to be provided for staff
review, to show how the remainder of the site is expected to develop, given
the changes now proposed for Builder's Square.
se S.
30. Staff has concerns regarding the bulk of the proposed building. As you
know, the previously approved preliminary plan for Harmony Market consisted
of smaller structures, with variations in the setbacks, entries, size and shape of
structures. The Builder's Square structure is very "bulky", with a straight,
box-like elevation. Efforts are needed to soften the abruptness of the
elevations, through the use of materials, architectural elements and variations
in the building footprint. Of particular concern, are the south and east
elevations.
31. Several items on the elevations should be carried throughout the building.
These are as follows:
continuation of brick wainscotting around the west elevation;
- continuation of tile accent panels along all elevations;
- creating interest by raising the pitch of canopies.
By Thursday, July 5, 1990 five (5) copies of the revised site plan, landscape
plan, building elevations and any other information needed to address these
comments must be submitted to the Development Review Center office. By
noon on Monday, July 16, 1990 ten (10) folded copies of the site plan,
landscape plan and building elevations, a colored rendering of the site plan
and 8-1/2" x 11" PMTs must be submitted. Please contact me, at your
convenience, to discuss these items.
Sincerely,
Sherry Albertson-Clark, AICP
Chief Planner
cc Mike Herzig
Jim Brannon, Neenan Company
Stan Meyers, RBD