Loading...
HomeMy WebLinkAboutNEWTON SUBDIVISION - PDP - PDP170019 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW Cit of a- 6- Fort Collins .� _ , ; ... 3 s fr Community Development and Neighborhood Services �� 281 North College Avenue ?0 > L r- ,jfn.L .T ` / PO Box 580 ff�� Fort Collins,CO 80522 970.221.6750 970.224.6134-fax fcgov.com October 22, 2016 Mr. James Newton C 7' M) 737 S Lemay Ave B-4 #182 Lytury NEw ro,J Fort Collins, CO 80524 I vl,-7 I I 4 NEWT Sly g Cencfrr. iv err Re: 1516 W Vine Dr. -Annexation and Replat Description of project: This is a request to replat, annex, and build a home on the property at 1516 W Vine Dr. (parcel #9703400010). The existing parcel will be subdivided to create a two acre lot for the development of a new single-family home. The rest of the property would remain as-is. The site will be zoned Urban Estate (UE) upon annexation into the City of Fort Collins. This proposal will be subject to Annexation and Initial Zoning followed by Administrative (Type I) review for the plat and single-family home. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Zoning Contact: Ryan Boehle, 970-416-2401, rboehle@fcgov.com 1. This annexation would be zoned UE (Urban Estate), which is intended to set a prominence of low- density and large-lot housing. 2. Lot sizes shall bet acre or larger for dwellings that are not considered clustered. 3. Setbacks for a single family dwelling in the UE shall be at a minimum 30'for the front, 25' for the rear, and 20' for the side. 4. Maximum building height in the UE is designated as 3 stories. S 1 Rt Department: Water-Waster Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com 1. There are existing water mains in the vicinity of this property. There are large water transmission mains along the northerly property line, and there is a 16-inch water main along Vine Drive. The existing water service to this lot comes from the main in Vine Drive and it is a 3/4-inch size service. 2. There is a 24-inch sewer main in Vine Drive that is situated on the southerly side of the roadway. 3. A new water and sewer service will be required to be installed for the new residence at this property. 4. The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards 5. Development fees and water rights will be due at building permit. Department: Traffic Operations Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com 1. The anticipated change in traffic volume is not expected to rise to the threshold of needing a TIS. Based on section 4.2.3.D of LCUASS, the Traffic Impact Study requirement can be waived. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com 1. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. 2. This property is outside of the City limits. When submitting an Annexation Plat, please note that addresses are not acceptable in the Plat title/name. 3. This property is not platted. If submitting a Subdivision Plat for this property/project, addresses are not acceptable in the Plat title/name. Department: Stormwater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com 1. The design of this site must conform to the drainage basin design of the West Vine Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual 2. If there is an increase in imperviousness greater than 1,000 square feet a drainage report, erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in the State of Colorado. The drainage report must address the four-step process for selecting structural BMPs. If the increase in impervious area is greater than 350 square feet and less than 1,000 square feet, a drainage letter along with a grading and erosion control plan should be sufficient to document the existing and proposed drainage patterns. A grading plan is required if the increase in imperviousness is less than 350 square feet. 2 L_ 3. It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. 4. The 2016 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious area over 350 sq.-ft., and there is a$1,045.00/acre review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo pment-fees or contact Jean Pakech at 221-6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. 5. A portion of this property is located in the City regulatory West Vine 100-year Floodplain and Floodway. Any improvements planned for within the floodplain and floodway boundaries must comply with Chapter 10 of City Code. A Flood Risk Map is attached. 6. The materials submitted for conceptual review show a residential lot and site improvements to be located in the floodplain and/or floodway. Please add the floodplain and floodway boundaries to all applicable drawings so that it is clear what flood zone the improvements will be impacting. 7. Per Section 10-102 of the City Municipal Code, new residential structures are prohibited in the floodway. Per Section 10-108, residential construction is allowed within the floodplain, provided that the lowest floor of all structures (along with all duct work, heating, ventilation and air-conditioning systems, hot water heaters, boilers, electrical, etc.) are elevated a minimum of 18-inches above the Base Flood Elevation (BFE). This elevation is known as the Regulatory Flood Protection Elevation (RFPE). New basements are not allowed below the RFPE in any residential structure located in the floodplain. 8. Nonstructural development (fill, utilities, driveways, sidewalks, vegetation, etc.) can be completed within the floodway as long it can be proven that the work will not cause a change in the Base Flood Elevation (BFE) or a change to the boundaries of the floodway or floodplain through a No-Rise Certification with supporting documentation and applicable floodplain modeling prepared by a licensed engineer registered in the State of Colorado. 9. Nonstructural development (fill, utilities, driveways, sidewalks, vegetation, etc.) is allowed in the floodplain with an approved Floodplain Use Permit. 10. Any and all construction activities in the floodplain/floodway must be preceded by an approved Floodplain Use Permit, the appropriate permit application fees, and approved plans. An approved FEMA Elevation Certificate is required prior to issuance of the Certificate of Occupancy for any structures built in the 100-year floodplain. 3 • 11. This floodplain is currently being re-modeled with updated hydrology and topographic information. A copy of the preliminary map is attached. The mapping is likely to become regulatory in 2017. The timing of the project will determine which mapping will apply. This project would be required to meet the above regulations based on which floodplain and floodway boundary is in effect at the time of building permit. These mapping changes could affect final layout of the site. Please plan for this change so that the site will be compatible with the applicable floodplain regulations. 12. Development review checklists and application forms for floodplain requirements can be obtained at http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents. Please utilize these documents when preparing your plans for submittal. 13. The floodplain and floodway boundaries must be shown and called out on all plans so that it is clear whether improvements are within the boundaries. Please contact Sandra Bratlie of Stormwater Master Planning at sbratlie@fcgov.com for floodplain CAD line work as required per the floodplain development review checklist. 14. Please contact Heidi Hansen, 970-221-6854, hhansen@fcgov.com with questions concerning development in the floodplain. Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org 1. FIRE LANES Fire access is required to within 150' of all exterior portions of any building, or facility as measured by an approved route around the perimeter. For the purposes of this section, fire access cannot be measured from an arterial road. Any private alley, private road, or private drive serving as a fire lane shall be dedicated as an Emergency Access Easement (EAE) and be designed to standard fire lane specifications. Where a fire access cannot be provided,the condition may be offset by the installation of a residential sprinkler system. Code language and fire lane specifications provided below. > IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. When any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access, the fire code official is authorized to increase the dimension if the building is equipped throughout with an approved, automatic fire-sprinkler system. 2. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general commercial requirements (unless otherwise approved by the fire marshal): > Shall be designated on the plat as an Emergency Access Easement. 4 > Maintain the requirecefoot minimum unobstructed width & 14 fo•inimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. >The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by painting and/or signage, and maintained unobstructed at all times. Sign locations or red curbing should be labeled and detailed on final plans. International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. 3. WATER SUPPLY Hydrant spacing and flow must meet minimum requirements based on type of occupancy. A hydrant is required within 400' of any Residential Building as measured along an approved path of vehicle travel. Currently,the closest hydrant is approximately 1,130 feet to the east, which would typically trigger the need for another hydrant to be installed. Where a hydrant cannot be provided, the condition may be offset by the installation of a residential sprinkler system and adequate fire access, as per above. Code language provided below. > IFC 507.5 and PFA Policy: RESIDENTIAL REQUIREMENTS: Within the Urban Growth Area, hydrants to provide 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. 4. PREMISE IDENTIFICATION &WAYFINDING Addresses shall be posted on each structure and where otherwise needed to aid in wayfinding. Code language provided below. > IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible, visible from the street or road fronting the property, and posted with a minimum of six-inch numerals on a contrasting background. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com 1. An Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of known natural habitat (riparian and forested area; tree and shrub groves; grasses and forbs). These areas may provide cover and nutritional resources for local and migratory wildlife. Standard buffers for natural habitats and features are varied and outlined in Section 3.4.1(E) of the Land Use Code. Based on the site size and conditions for this proposed project area, an abbreviates and memo-based ECS (2-3 pg) can be submitted that addresses (a) general wildlife use of the site and broader area, (b) presence of stick nests including raptor nests. Once this information is received, staff can better evaluate whether the buffer zone standards and/or mitigation would be applied. 5 r i The Ecological Characterization Study is due a minimum of 10 days prior to the PDP submittal. A comprehensive list of local qualified ecological consultants can be provided upon request. 2. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and techniques. This includes use of low-water-use plants and grasses in landscaping or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. Please refer to the Fort Collins Native Plants document available online and published by the City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. 3. Note LUC Section 3.2.1(C) requiring developments to submit a landscape and tree protection plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat, and (5) enhances the pedestrian environment."A significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any of the trees within this site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (970-221-6361 or tuchanan@fcgov.com) to determine the status of the existing trees and any mitigation requirements that could result from the proposed development. 4. If tree mitigation is necessary, include the following note on the tree mitigation plan and/or landscape plan: "All tree removal shown shall be completed outside of the songbird nesting season (Feb 1 -July 31) or a survey will be conducted of the trees to be removed to ensure that no active nests are present." 5. Our city has an established identity as a forward-thinking community that cares about the high quality of life it offers its citizens now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit this project. 1) Green Building Program: fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 2) Solar Energy: www.fcgov.com/solar, contact Norm Weaver at 970-416-2312 or nweaver@fcgov.com 3) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gschroeder@fcgov.com 4) Nature in the City Strategic Plan: http://www.fcgov.com/natureinthecity/, contact Justin Scharton at 970-221-6213 or jscharton@fcgov.com Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. 6 • 2. The City's Transportation Development Review Fee (TDRF) is due afie time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. All public sidewalk, driveways and ramps existing or proposed adjacent or within the site need to meet ADA standards, if they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. The existing driveway will need to be evaluated to determine if the slopes and width will meet ADA requirements or if they need to be reconstructed so that they do. 5. 24-95 of the City Code obligates development to the local street portion of abutting right-of-way. The local street portion of improvements would then require the design and construction for the widening of Vine Drive,the addition of curb and gutter, and construction of sidewalk abutting the property. City Transportation staff has discussed this and is acceptable to an option where in-lieu of the design and construction,the local street portion is paid to the City prior to the first building permit. The payment option instead of construction would still also be acceptable if an additional unit (duplex) is proposed. 6. Street cuts to public streets for utility services would require an excavation permit as found here: http://www.fcgov.com/engineering/pdf/Excavation PermitDigital.pdf 7. Each lot should share a single driveway access point onto Vine Drive, as access spacing requirements onto Vine Drive would not allow to access points abutting the property. 8. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm 9. This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. Most easements to be dedicated need to be public easements dedicated to the City. This shall include half of the minor arterial street standard (42 feet half street right-of-way) and the standard 15 foot utility easement behind the right-of-way. Information on the dedication process can be found at: http://www.fcgov.com/engineering/devrev.php 10. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. 11. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. • 12. At the conceptual review meeting it was indicated that the underground of overhead utilities (or conduit installation in lieu of the undergrounding) is required under city code. In looking at the code provision, Land Use Code section 3.3.2(D)(7)(a), it would appear that an exception to this is allowed based on the overhead line being temporary in nature for the purpose of servicing "lands not developed to urban qualifications"and would not be required with the project. 13. A Development Construction Permit (DCP) or excavation permit will need to be obtained prior to starting any work on the site. 14. The annexation of the property itself would not require the comments contained in this section, except for the TDRF in comment#2, specific to the TDR fee for Annexations. 15. Existing fences within the public right-of-way would need to be relocated with the development. 16. The public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary Staging and/or parking needs associated with the completion of the Development. Information on the location(s) of these areas will be required to be provided to the City as a part of the Development Construction Permit application. Department: Electric Engineering Contact: Luke Unruh, 9704162724, Iunruh@fcgov.com 1. The closest place to tap into the electrical system is at Lancer Dr and Vine Dr. 2. Electric Capacity Fee, Building Site charges, and any necessary system modification charges will apply. Please see the Electric Estimating Calculator and Electric Construction Policies, Practices & Procedures at the following link: http://www.fcgov.com/utilities/business/builders-and-developers 3. You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. You may reference Light& Power's Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FI NA L_17June2016.pdf Planning Services Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com 1. Upon annexation, per the City's Structure Plan Map, the property will be placed into the U-E, Urban Estate zone district. 2. Annexation and zoning requires a recommendation by the Planning and Zoning Board and then two readings by City Council. This takes three to four months. 8 • 3. Part of the Annexation and Zoning process is that the City notifies afurrent utility providers to the site. Please prepare a list of the applicable utility providers for electricity (R.E.A. or Xcel), natural gas, water, sanitary sewer, telephone (land line only), cable television (land line only). 4. The proposed size of the lot, two acres, exceeds the minimum required lot size of the Urban Estate zone district of one-half acre. 5. The Subdivision Plat must be prepared by a State of Colorado registered land surveyor. The Plat may be submitted and considered somewhat concurrently to the annexation and zoning but consideration of the Plat cannot take place until after Second Reading by Council on the A &Z. 6. The Subdivision may be considered a Minor Subdivision since no more than one new net lot is being created. This will be processed in accordance with Section 2.18. Please note that notification is required to surrounding property owners within 800 feet, exclusive of public right-of-way and publicly owned open space. 7. For the Minor Subdivision, the Planning Director will be the decision maker. There will be no public hearing. Instead, after proper notification, there will be a two-week open comment period. Please note that the Planning Director's decision may be appealed to the Planning and Zoning Board, per Section 2.18. 8. Please note that the Annexation Petition must be certified by an attorney. 9. For your reference, in U-E zone, the minimum required lot width is 100 feet. This standard will be evaluated at the time the subdivision plat is being reviewed. 10. Also for your reference, the building minimum required setbacks in the U-E zone are 30 feet for the front yard setback, 25 feet for the rear yard, and 20 feet for the side yards. 11. A pre-submittal meeting is recommended for both the Annexation and Zoning and the Subdivision Plat so that the proper number of submittal documents are prepared and that submittal fees are reviewed. Also, the review schedules can be scoped so the applicants are aware of the two timelines. 9