HomeMy WebLinkAboutBLOOM FILING FOUR - PDP230003 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT
4025 Automation Way, Ste B2 | Fort Collins, CO 80525 | 970-698-6046 | www.civilworxeng.com
Preliminary Drainage and Erosion Control
Report
Bloom Multi Family
Fort Collins, CO
Prepared for:
Hartford Acquisitions, LLC
4801 Goodman Road
Timnath, CO 80547
January 24th, 2022
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
i C22026 - Bloom Multi Family Drainage Report
January 24th, 2023
Mr. Wes Lamarque
City of Fort Collins Engineer
4750 Signal Tree Drive
Timnath, CO 80547
RE: Bloom Multi Family Preliminary Design and Erosion Control Report
Project Number: C22026
Dear Wes,
CivilWorx, LLC. is pleased to submit this Preliminary Design and Erosion Control Report for the Bloom Multi
Family Development in Fort Collins, Colorado. This report serves to document the preliminary design plans
for the Bloom Development.
We understand that review by the City of Fort Collins is to assure general compliance with standardized
criteria contained in City of Fort Collins Storm Drainage Design Criteria and Construction Standards. This
report was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood
Control District (UDFCD) Urban Storm Drainage Criteria Manual and the City of Fort Collins Storm Drainage
Design Criteria.
If you should have any questions or comments as you review this report, please feel free to contact me at
your convenience.
Respectfully,
Shane Boyle, PE Brian O’Donnell
Senior Project Manager Project Engineer
CivilWorx, LLC Civilworx, LLC
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
ii C22026 - Bloom Multi Family Drainage Report
TABLE OF CONTENTS
PAGE
I. General Location and Description .................................................................................................................. 1
A. Location ................................................................................................................................................ 1
B. Description of Property ......................................................................................................................... 2
II. Drainage Basins and Sub-Basins ..................................................................................................................... 2
A. Major Basin Description ........................................................................................................................ 2
B. Pre-Project Drainage Patterns ............................................................................................................... 3
III. Drainage Design Criteria................................................................................................................................. 3
A. Regulations ........................................................................................................................................... 3
B. Development Criteria Reference and Constraints ................................................................................... 3
C. Hydrological Criteria .............................................................................................................................. 4
D. Hydraulic Criteria and Governing Standards ........................................................................................... 4
IV. Drainage Facility Design ................................................................................................................................. 4
A. General Developed Project Overview .................................................................................................... 4
V. Sediment/Erosion Control .............................................................................................................................. 9
A. Proposed Construction Activities and Phasing ........................................................................................ 9
B. Important Site Areas and Volumes ...................................................................................................... 10
C. Potential Pollutant Sources.................................................................................................................. 10
D. Water Quality Treatment and LID Practices ......................................................................................... 12
E. Erosion and Sediment Controls ............................................................................................................ 13
F. Erosion Control Sequencing ................................................................................................................. 15
G. Materials Handling and Spill Prevention............................................................................................... 18
H. Other Controls .................................................................................................................................... 19
I. Final Stabilization and Long-term Stormwater Quality.......................................................................... 19
J. Inspection and Maintenance Procedures ............................................................................................. 19
VI. Conclusions ................................................................................................................................................. 20
A. Compliance with Standards ................................................................................................................. 20
B. Drainage Plan ...................................................................................................................................... 20
VII. References............................................................................................................................................... 21
VIII. Certification ............................................................................................................................................. 21
Figure 1. Vicinity and Phase Map ............................................................................................................................ 1
Figure 2. Major Drainage Plan – Town of Timnath ................................................................................................... 3
APPENDICES
APPENDIX A - Drainage Plan
APPENDIX B - Water Quality Calculations
- 100-Year SWMM Model Report
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
1
I. General Location and Description
A. Location
The Bloom Development (referred herein as “the site”) is located north of State Highway 14 (Mulberry
Street) and just west of Interstate 25. The site is located within the southwest half of Section 9, Township
7 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins, County of Larimer, State of
Colorado. The site is located on the parcel of land # 8709300004 with coordinates of 40.587086, -
105.016334. A vicinity map is shown with Figure 1.
Figure 1. Vicinity and Phase Map
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
2
B. Description of Property
Currently, the property is undeveloped. There are no structures or significant infrastructure located on
the site. The current use of the property is agriculture and farming and thus the existing land can be
characterized as a tilled field. Below is a detailed summary of the existing conditions:
Ground Cover - The site is currently being used as crop land and therefore ground conditions can
be characterized as tillage/field with varying seasonal crops.
Grades – In general, the entire site drains to the south. These grades are generally less than 1%,
with a few localized areas that slope at approximately 2%.
Soil Type - According to the Natural Resources Conservation (NRCS) web soil survey and report, the
site consists of Garret loam and Ascalon sandy loam soils of hydrologic soils groups Type B and C.
Utilities – The site does not have an existing utilities on it its property. Domestic water, sanitary
sewer, and storm water utilities have been designed and are planned to be built under roads that
will abut the property. Natural gas, telephone, fiber, and electric are planned to be installed in
and around the site at a future time.
Storm Drainage / Irrigation Facilities – The site does not contain any storm drainage infrastructure
except for surface drainage. No irrigation facilities are present on the site.
II. Drainage Basins and Sub-Basins
A. Major Basin Description
This site is located within the Cooper Slough drainage basin as most recently described in the Mulberry
Master Drainage Plan (MDP) by Galloway Engineering Firm and dated April 6th, 2021, with the last revision
of the report being dated as October 13th, 2021.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
3
Figure 2. Lower Cooper Slough Drainage Basin – As Shown on the City of Fort Collins Website
B. Pre-Project Drainage Patterns
The project site is located within the Cooper Slough Drainage Basin as shown Figure 2 above. The
proposed site area consists of approximately 15.8 acres. 4 proposed roads that will be constructed as
part of the Bloom 1st Filing Project and shown in the construction plans by Galloway engineering
surround the rectangular property - Aria way on the west, Greenfields Drive on the east, International
Boulevard to the north, and Donella Drive to the south. The entire site drains to the south but the site
is generally flat. The site has localized areas that have grades of approximately 2%, but most grades are
less than 1%. The nearest receiving waters to the site are the Cooper slough drainage and wetlands
(approximately 1,200 feet from the site) that flow into the Boxelder Creek, which further transports
water to the Poudre River. Below is summary of the existing runoff generated by the site as it exists
pre-development.
Existing Site Area (ac.) %
Imperv.
Q2
cfs
Q100
cfs
Bloom Property 15.83 2 0.91 9.30
III. Drainage Design Criteria
A. Regulations
The design criteria for this development are the City of Fort Collins Stormwater Drainage Criteria Manual
and the Mile High Flood District Criteria Manuals Volumes 2, and 3 (referred to herein as MHFDCM).
B. Development Criteria Reference and Constraints
The criteria used as the basis to analyze and design stormwater features of this project were done so
according to the references cited in this report.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
4
C. Hydrological Criteria
In accordance with the City of Fort Collins policy, a minor and major storm are identified as the 2-year and
100-year storms, respectively. These storms have been used as a basis for planning and design. The
proposed developed drainage networks, including the stormwater detention system, are designed using
SWMM software.
Post development runoff for the site will be in accordance with the Mulberry and Greenfields Master
Drainage Plan developed by Galloway Engineering.
D. Hydraulic Criteria and Governing Standards
The developed site will convey runoff to a proposed detention pond on the southeast corner of the site
via a combination of channelized flow, sheet flow, and storm sewer, then release to the downstream
system per the approved Mulberry and Greenfields Master Drainage Report by Galloway Engineering.
EPA-SWMM modeling was used to determine the required detention pond volume for the Bloom site.
Hydraulic calculations for all pipes and swales were also completed using EPA-SWMM and are included in
this report.
IV. Drainage Facility Design
A. General Developed Project Overview
The developed Bloom project site area includes the construction of multi-family homes, parking areas,
landscaped areas and access roads. The Bloom multi-family subdivision project is part of the Cooper
Slough basin whose ultimate outfall is the Boxelder Creek, located south of Colorado Highway 14
(Mulberry Street). Runoff from the Bloom-multifamily site will be captured using a combination of curb &
gutter and storm sewer pipe and conveyed to a proposed onsite detention facility. The proposed
detention pond will also include flows from adjacent property to the east, west and north as shown on
the Mulberry and Greenfields Master Drainage Plan by Galloway Engineering. Information on the
proposed Bloom site detention pond outlet structure and storm pipe will be provided by Galloway
engineering at a later date after their analysis incorporates the drainage modeling provided in this report.
Overall Drainage Plan
The overall drainage plan is to convey runoff to the detention facility on the southeast corner of the site
prior to discharging via a proposed outlet structure and storm pipe. Following is an analysis of the site
drainage concepts and routing as well as a summary of all of the proposed on site drainage basins. All flow
summaries at design points, including conveyance facilities, have been designed in detail as part of the
EPA SWMM model.
Basin 01:
The 01 basin has an area of 2.59 acres and generally flows to the southeast. Runoff is conveyed via street
flow and channelized curb/gutter/pan flow to a Type C inlet located at the southeastern corner of the
basin. From here it is carried through Storm Lines C, B, A-1 and A respectively, after which it drains into
the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all
completed using EPA-SWMM.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
5
Basin 02:
The 02 basin has an area of 1.05 acres and generally flows to the southeast. Runoff is conveyed via street
flow and channelized curb/gutter/pan flow to a Type C inlet located at the southern side of the basin.
From here it is carried through Storm Lines C, B, A-1 and A respectively, after which it drains into the
proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all
completed using EPA-SWMM.
Basin 03:
The 03 basin has an area of 0.89 acres, is located at the northeastern portion of the site and generally
flows to the southwest. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a
Type C inlet located at the southern portion of the basin. From here it is carried through Storm Lines C-1,
C, B, A-1 and A respectively, after which it drains into the proposed-on site detention pond. Street
capacities, inlet sizing, and storm sewer sizing were all completed using EPA -SWMM.
Basin 04:
The 04 basin has an area of 1.28 acres, is located at the northern portion of the site and generally flows
to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type R inlet
located at the south side of the basin. From here it is carried through Storm Lines A-1, and A respectively,
after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm
sewer sizing were all completed using EPA-SWMM.
Basin 05:
The 05 basin has an area of 1.67 acres, is in the central portion of the site and generally flows to the south.
Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type R inlet located at the
southern portion of the basin. From here it is carried through Storm Lines B, A-1, and A respectively, after
which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer
sizing were all completed using EPA-SWMM.
Basin 06:
The 06 basin has an area of 0.35 acres, is in the central portion of the site and generally flows to the south.
Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a sidewalk chase/curb cut
where water then travels further south via a grass swale and into the proposed-on site detention pond.
Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA -SWMM.
Basin 07:
The 07 basin has an area of 1.90 acres, is located at the southwestern portion of the site and flows to the
center of itself where a proposed low point and Type R inlet is located. Runoff is conveyed via street flow
and channelized curb/gutter/pan flow to the Type R inlet. From here it is carried north and east through
Storm Lines A-2, A-1 and A respectively, after which it drains into the proposed-on site detention pond.
Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA -SWMM.
Basin 08:
The 08 basin has an area of 2.59 acres and is located at the southwestern portion of the site. This basin
is where the proposed detention pond for the site lies, and water eventually leaves the detention pond
via an outlet control structure located at the southwest corner of the basin . Overall pond volume
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
6
requirements were calculated with EPA-SWMM in conjunction with the Mile High Flood District Drainage
Criteria.
OS Basins
OS 1: Basin OS-1 is 0.82 acres, located at the Northwestern portion of the site and drains offsite to the
west via sheet flow and curb and gutter flow. All of the OS-1 flows will be captured in the proposed Bloom
Filing 1 storm sewer infrastructure and directed via storm pipe and inlets back to the proposed-on site
detention pond.
OS 2: Basin OS-2 is 0.24 acres, located at the Northwestern portion of the site and drains offsite to the
west via sheet flow and curb and gutter flow. All of the OS-2 flows will be captured in the proposed Bloom
Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the existing-off site detention
pond located on the north side of International Boulevard.
OS 3: Basin OS-3 is 1.05 acres, located at the Northern portion of the site and drains offsite to the north
and east via sheet flow and curb and gutter flow. All of the OS-2 flows will be captured in the proposed
Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets back to the proposed-on
site detention pond.
OS 4: Basin OS-4 is 0.73 acres, located at the western portion of the site and drains offsite to the west via
sheet flow and curb and gutter flow. OS-4 flows will be captured in the proposed Bloom Filing 1 storm
sewer infrastructure and directed via storm pipe and inlets to the proposed-on site detention pond.
OS 5: Basin OS-5 is 0.79 acres, located at the southwestern portion of the site and drains to the west via
sheet flow and curb and gutter flow. OS-5 flows will be captured in the proposed Bloom Filing 1 storm
sewer infrastructure and directed via storm pipe and inlets to the proposed-on site detention pond.
OS 6: Basin OS-6 is 3.01 acres. It is made up of areas that will be flowing to the proposed detention pond
that are not on the Bloom-multifamily property and is included in the pond WQ calculations provided in
appendix B. Basin OS-6 is the area that surrounds the site located within City of Fort Collins Right-of-Way
and includes mostly asphalt and concrete surfaces. This area includes right-of-way to the West, South,
and East sides of the property and extends from the site property line to the centerline of each
surrounding road.
Drainage Basin Summaries
The following is a basin summary table:
Table 2. Developed Conditions Runoff Summary
Basin Area
(ac.)
%
Imperv.
C2 Q2
cfs
C100 Q100
cfs
01 2.59 76 0.68 4.13 0.82 19.95
02 1.05 80 0.72 2.14 0.86 9.40
03 0.89 94 0.84 2.35 0.94 8.84
04 1.28 83 0.74 2.73 0.87 11.44
05 1.67 77 0.69 3.20 0.84 14.36
06 0.35 36 0.32 0.36 0.59 2.48
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
7
Table 2. Developed Conditions Runoff Summary
Basin Area
(ac.)
%
Imperv.
C2 Q2
cfs
C100 Q100
cfs
07 1.90 90 0.807 3.90 0.92 17.32
08 2.59 16 0.14 1.18 0.41 7.84
OS-1 0.82 40 0.36 0.91 0.60 4.82
OS-2 0.24 10 0.09 0.07 0.44 1.79
OS-3 1.05 40 0.33 1.09 0.59 7.36
OS-4 0.73 42 0.38 0.87 0.62 4.88
OS-5 0.79 36 0.35 0.86 0.66 6.34
OS-6 3.01 66 0.95 7.42 1.00 22.42
Storm Sewers
The proposed drainage system for the Bloom Multifamily development was modeled in EPA-SWMM to
determine pipe sizing and flow routing. The SWMM models for the 100-year and 2-year storms are
included in Appendix B for reference.
• Storm Line A – This system drains most of the site to the proposed detention pond. It is
the largest storm line and is responsible for carrying the convergence of all flows collected
from all other proposed storm lines on the site (Storm lines C, C-1, B, A-1, and A-2).
• Storm Line A-1 - This system drains portions of the central site via a type R inlet. Water
is conveyed into storm Line A and then deposits into the proposed-on site detention
pond.
• Storm Line A-2 - This system drains the southern portion of the site via a type R inlet.
Water is then conveyed to Storm Line A where it travels to the proposed-on site detention
pond.
• Storm Line B – This system collects drainage from the central and southern portions of
the site via a type R inlet and receives flows from Storm Lines C, and C-1. Water is then
conveyed to Storm line A-1 followed by storm line A where it is deposited into the
proposed-on site detention pond.
• Storm Line C – This system collects drainage from the central and northern portions of
the site using 2 Type C inlets and conveys it south before the runoff continues through
Storm Lines B, A-1, and A respectively and into the proposed detention pond.
• Storm Line C-1 – This system collects drainage from the north and central portion of the
site and conveys it to storm line C where it is further conveyed to storm lines B, A -1, and
A respectively into the proposed detention pond.
The table below summarizes the pipe flows for the major storm sewer systems for the project:
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
8
Table 3. Storm Sewer System Summary
Link Element Q2
cfs
Q100
cfs
Pipe Size Description
STM_C2 1.24 3.70 18” Storm Line C
STM_C1 4.42 12.42 24” Storm Line C
STM_C-1 1.40 3.72 18” Storm Line C-1
STM_B1 9.33 23.06 24” Storm Line B
STM_A-1-1 11.25 28.88 30” Storm Line A-1
STM_A-1-2 2.26 8.49 18” Storm Line A-1
STM_A-2-1 3.87 17.32 18” Storm Line A-2
STM_A-2-2 3.90 17.32 18” Storm Line A-2
STM_A1 14.64 44.97 36” Storm Line A
STM_A2 14.70 44.97 36” Storm Line A
Inlets
The proposed drainage system was modeled in EPA-SWMM. Inlet sizing and intercepted flows were
modeled using the SWMM analysis, with corresponding flowline depths in the street also modeled in
SWMM.
The table below summarizes intercepted flow and flow depths in the curb & gutter at the proposed inlets
for the minor and major storms:
Table 4. Inlet Summary
Inlet Name Link Element Q2
cfs
Flowline Depth2
feet
Q100
cfs
Flowline Depth100
feet
INLET-C2 ORIFICE-C2 1.26 0.19 3.70 0.39
INLET-C1 ORIFICE-C1 1.97 0.26 5.01 0.56
INLET-C-1-1 ORIFICE-C-1-1 1.40 0.21 3.72 0.40
INLET-B1 ORIFICE-B1 5.10 0.19 15.57 0.75
INLET-A-1-1 ORIFICE-A-1-1 2.43 0.11 9.39 0.28
INLET-A-2-1 ORIFICE-A-2-1 3.90 0.16 17.32 0.51
Street Capacity
The proposed drainage system for the development was modeled in SWMM. Street flows and curb &
gutter flow depths were also modeled using the SWMM analysis.
Detention Pond Summary
Onsite detention was modeled using EPA-SWMM for pond volume and release rate calculations. Water
Quality volume was determined using Mile High Flood District methodologies. These calculations are
included in appendix B. The Bloom site detention pond also includes off-site flows and therefore, final
calculations will be provided at the Master level by Galloway engineering later. Required on site storage
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
9
for the Bloom site alone is 0.60 acre-feet for the 2-year storm and 2.87 acre-feet for the 100-year storm
respectively.
V. Sediment/Erosion Control
In addition to the information provided below, A separate Storm Water Management Plan (SWMP) will
be prepared for the site in accordance with the Stormwater Discharge Permit for Colorado Department
of Public Health and Environment. The SWMP will include more detailed information on the sediment and
erosion control items for this project. The construction plans for the Bloom multi-family development will
be updated to include the SWMP administrator and contact information before construction begins.
Construction phasing, sequencing and use as well as location of project control measures, can be found
in the erosion control plan sheets provided in Appendix A.
A. Proposed Construction Activities and Phasing
Construction of the proposed Bloom site will take place over 2 phases (see Erosion Control/Phasing Map
in Appendix A). For both phases, initial construction activities will begin with clearing and grubbing as
well as topsoil removal and stockpiling. After the site has been cleared of existing vegetation and
topsoil, grading of phase 1 will begin, which will include the installation of temporary erosion control
measures. Once phase 1 has been graded, proposed utilities will be installed. Proposed utilities will
include the installation of underground storm sewer systems (including pipe, manholes, inlets and water
quality control features and systems), sanitary sewer mains and services and water/fire line mains and
services. Following the completion of utility installation subgrade preparation will occur and installation
of hardscape areas will occur. Concrete curb and gutter as well as sidewalks will be installed followed by
paving of the parking areas and access roads. This process will take place in the same order for phase 2.
After infrastructure improvements are complete, all remaining disturbed areas of the site will be re-
seeded to minimize any erosion potential as well as to help eliminate the transport of sediment or
pollutants located on the property. Listed below, are the major aspects of construction in the
anticipated order for each phase of the project:
1.) Initial Erosion Control Measures Installed.
2.) Clearing and grubbing of the site.
3.) Topsoil removal and stockpile.
4.) Grading – includes grading of the proposed detention pond located on the southeast portion of
the site.
5.) Install additional erosion control measures for detention pond, maintenance of existing control
measures.
6.) Installation of utilities – open trenching and installation of proposed utility pipelines and
structures/junctions for storm sewer, sanitary sewer and water infrastructure located on the
site.
7.) Install additional erosion control measures for storm sewer facilities, maintenance of existing
control measures.
8.) Subgrade preparation / final grading of the site in preparation for building pads, and hard
surfaces.
9.) Installation of concrete curb and gutter, drainage pans, sidewalks, miscellaneous concrete pads
and walkways, asphalt paving, and building pads.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
10
10.) Install additional erosion control measures based on these hard surface improvements and
changes in drainage paths, maintenance of existing control measures.
11.) Installation of project lighting as well as required hard surface striping.
12.) Revegetation efforts and stabilization of remaining disturbed areas on the site begins. Work
will include seeding, mulching, installation of sod, and installation of other natural landscape
features provided in the landscaping plan.
13.) Permanent erosion control measures installed; temporary control measures removed.
14.) Final site cleanup and punch list items addressed.
B. Important Site Areas and Volumes
The total area of the project is 15.83 acres which will be divided into two construction phases. Notable
area for each phase and the project total can be seen in the table below.
Area Staging/Stockpiling
Area (Ac.)
Existing
Imperviousness
(%)
Topsoil
Volume
(CY)
Area of
Disturbance
(Ac.)
Net adjusted,
required import of
materials with 15%
compaction factor
(CY)
Phase
1
11.78 0.50 2 6,350 11.78 105,000
Phase
2
4.05 Will be provided at
final submittal
2 2,200 4.05 50,000
Total 15.83 Will be provided at
final submittal
2 7,550 15.83 155,000
C. Potential Pollutant Sources
Listed below are potential pollutant sources that are expected on the site as well as means and methods
to contain and eliminate chances of these sources to be transported off site and to downstream
receiving waters.
1.) Disturbed and Stockpiled Topsoil:
Stockpiled soils generated from grading and utility excavation as well as topsoil stockpiles
will be stored in designated areas for each phase of the project. These stockpile piles shall
not exceed 10 feet in height and shall be located at minimum 50’ away from any proposed
or existing storm inlets or from the proposed-on site detention pond. If these stockpiled soil
piles are anticipated to remain for greater than 30 days, they shall be temporarily seeded.
Silt fence or straw waddles shall be installed around the perimeter of the stockpiles in order
to prevent rainfall events from transporting sediment away from the stockpiles. Disturbed
areas of the site shall be surface roughened to prevent heavy erosion. Locations for
proposed staging / stockpiling areas can be found in Appendix C as part of the interim
erosion control plan.
2.) Vehicle tracking of sediments:
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
11
It is anticipated that the contractor will access the property from Lions Gate Drive. A Vehicle
tracking control pad will be required at this access location onsite during construction to
reduce tracking sediment onto the adjacent streets.
At the end of each workday, the Contractor shall sweep or scrape Lions Gate Drive of sediment
that may have accumulated during the workday.
3.) Management of contaminated soils:
There are not any known contaminated soils on the site. However, if the contractor encounters
contaminated soils during the construction process, they should stop construction immediately
and notify the appropriate government authorities in accordance with good construction safety
and practice.
4.) Loading and Unloading operations:
Loading and unloading will take place on the site. Truck access should be limited to the extent
possible to locations within the disturbed limits of the project. BMP’s such as silt fence in non-
paved areas and rock socks in paved areas should be placed to keep sediment from exiting the
disturbed area limits, primarily towards the East as this is the low side of the site.
5.) Outdoor storage activities (building materials, fertilizers, chemicals, etc.):
Storage of onsite materials including building materials, fertilizers, waterline, and sanitary sewer
will be covered and placed on pallets to prevent direct contact with the ground and potential
surface runoff.
6.) Vehicle and equipment maintenance:
Vehicle and equipment maintenance should be performed offsite or onsite within an area
surrounded by silt fence or straw wattles. Vehicle and equipment maintenance shall not happen
along the adjacent public streets. At a minimum, all vehicle and equipment maintenance shall be
performed on the hard surface or gravel areas at least 50’ from any stormwater feature (i.e. inlet,
storm sewer, concentrated runoff, swale, etc.)
7.) Significant dust or particulate generating processes:
The Contractor shall comply with applicable air pollution control requirements of the Town of
Winter Park. The Contractor shall take appropriate actions to minimize atmospheric pollution and
take reasonable precautions which shall include, but not be limited to:
1. The use of water for control of dusts for construction processes such as demolition,
grading, or the clearing of land.
2. Covering, always when in motion, open-bodied trucks transporting materials likely to
give rise to airborne dusts.
3. Require lower speeds for vehicles entering, exiting, and driving within the project limits
to minimize the amount of dust disturbed by moving vehicles.
8.) Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, etc.;
Chemicals, fuels, lubricants, and paints stored on-site will be in watertight containers and covered
as necessary and stored in a bermed area, a storage building, or within a vehicle to act as
secondary containment.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
12
9.) On-site waste management practices (waste piles, liquid wastes, dumpsters, etc.);
1. Waste piles should be covered or surrounded by silt fence or straw wattles. Liquid wastes
should be collected and stored in covered containers and disposed of properly.
2. Solid waste materials, including disposable materials incidental to the major construction
activities, will be collected in on site dumpsters. The containers will be emptied periodically
and trucked away from the site. Dumpsters should have covers.
10.) Concrete truck / equipment washing, including the concrete truck chute and associated fixtures and
equipment:
A dedicated concrete washout area is necessary for this project. The contractor shall clean out
equipment within the washout area so that runoff is not allowed to leave site and enter the public
streets or neighboring properties.
11.) Dedicated asphalt and concrete batch plants:
There will not be dedicated asphalt or concrete batch plants on this site.
12.) Non-industrial waste sources such as worker trash and portable toilets:
Worker’s trash shall be disposed of in an onsite dumpster. The site should be free of trash at
the end of each working day.
Portable toilets shall be utilized by construction personnel and serviced regularly by a
commercial operator. They shall be located a minimum of 5 feet from the curb or 50 feet from
inlets. If sanitary facilities are located on a paved surface, toilets shall be equipped with a
containment pan or a secondary containment BMP. Regardless of location all portable toilets
shall be anchored per manufacturer recommendations.
13.) Saw cutting and Grinding:
Cutting of pavement or concrete and milling of asphalt is expected to occur during the
project for tie in locations of proposed access roads and utilities. These are are not on the
project property and will be part of city ROW. Nevertheless, water suppression shall be
used to reduce transport of dust during operations. Loose material shall be removed and
disposed of off-site at a proper facility.
14.) Non-Storm Water Discharge:
Other non-storm water components of discharge include, but are not limited to, water line
flushing, irrigation to establish seeding. It is important for the contractor to manage the runoff
from these items utilizing the BMP’s mentioned in this report (i.e. silt fence, straw waddles,
concrete washout areas, surface roughening, etc.).
D. Water Quality Treatment and LID Practices
The site will incorporate a water quality volume into the proposed detention pond for the settlement
and deposition of particles and contaminants. Sizing and calculations for this water quality volume and
outlet release structure can be found in Appendix B. For additional Low-Impact development water
quality control, an underground stormwater chamber system is proposed that will capture 80.1% of the
sites impervious area and allow the water to be filtered before it enters the proposed-on site detention
pond. Sizing and calculations for this water quality chamber system can also be found in Appendix B. It
should be noted that the water quality volume provided in the proposed detention pond is for areas
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
13
that are not captured first by the proposed-on site water quality chamber system. Basins that do not
drain to the water quality chamber system are the designated ‘OS’ basins as seen in the drainage map in
appendix A.
E. Erosion and Sediment Controls
Once construction activity begins, Best Management Practices (BMP’s) intended to contain sediment
onsite must be constructed, inspected, and repaired as necessary. Such controls must be functional
before upslope land disturbance takes place. The BMP’s will be installed as shown on the SWMP Map
shown in Appendix A. They must be supplemented as on-site experience proves necessary in order to
control sediment, pollutant discharge, and ensure public safety.
The following temporary and permanent BMP’s will be installed and maintained to control on-site
erosion and prevent sediment from traveling off-site during construction.
Temporary Control Measures (BMPs)
• Inlet Protection is a temporary BMP that helps prevent soil and debris from the site from
entering the storm drain inlets and usually consists of a sediment filter around or upstream of
the storm drain inlet. Inlet protection allows storm water to flow into the drain but only after
excess sediment has been filtered out. Inlet protection will be used on existing and proposed
storm inlets and will be installed at such time as construction of the storm sewer system occurs.
Inlet protection for this site will consist of:
• Regular Meetings are a temporary and non-structural BMP. Regular meetings with on-site
workers including builders, suppliers, landscape personnel, etc. should be conducted so that
they are kept up to date with site standard operating procedures.
• Silt Fence is a woven synthetic permeable fabric that filters runoff. Silt fence is a temporary
barrier that is installed prior to earthmoving activities and is placed downstream of areas where
runoff from construction activities is expected to occur, especially along the site perimeter to
allow sediment to settle from runoff before water leaves the construction site. Silt fences will
be installed per manufacturer’s recommendations. Silt fence encourages sheet flow and is not
intended to be used in areas of concentrated flow. If concentrated flow is encountered during
the placement of the fence, an alternative BMP shall be used and the SWMP should be updated
to reflect this change.
• Staging Areas will be provided during the construction process at least 100’ from any storm
water conveyance. Staging areas include locations for vehicle fueling, concrete truck washout,
material storage and transfer, equipment maintenance and cleaning, and other construction
activities. These areas will be maintained as isolated locations that allow for contaminants to be
concentrated and removed from the site as necessary. Concrete washout areas shall be
designed such that washout water cannot leave the location, nor shall storm water runoff wash
concrete from the locations.
• Straw Wattles are a temporary BMP that are used for a variety of purposes. They are used for
inlet protection, curbside check dams, swale protection, at the bottom of slopes, or the limits of
property boundaries. They are easy to install and are increasingly being used for Small Site
SWMP’s. The straw wattles, which are meshed netting “tubes,” filled with straw, excelsior, or
coconut fiber. Wattles for swale protection should be installed following rough grading of
channel areas. Wattles require proper installation and maintenance to ensure their
performance.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
14
• Rock Socks are a temporary BMP that are used for a variety of purposes. They are used for inlet
protection, curbside check dams, or at the limits of property boundaries. Rock socks are wire
meshed “tubes” filled with rocks. Rock Socks require proper installation and maintenance to
ensure their performance.
• Check Dams are a temporary BMP that are used as grade control structures in drainage channels
to limit the erosive nature of stormwater by reducing flow velocity. Check dams are typically
constructed from rock or gravel. Check dams require proper installation and maintenance to
ensure their performance.
• Street Sweeping and Vacuuming removes sediment that has been tracked onto roadways to
reduce sediment transport into storm drain systems or a surface waterway. This practice should
be used on the adjacent paved road to the construction site. Paved roads should be inspected
on a daily basis and more frequently as needed.
• Saw Cutting Pollution Prevention prevents dust and slurry from asphalt and concrete saw
cutting activities from migrating into the existing storm drain system. Sl urry and cuttings shall
be vacuumed during cutting and surface operations and shall not be allowed to remain on
pavement surface overnight. Collected slurry and cuttings shall be disposed of in a manner that
does not violate groundwater or surface water standards.
• Surface Roughening is provided following grading activities to slow the effects of wind erosion.
Roughening can be used as a temporary BMP and is a technique used for creating unevenness
on bare soil through the construction of furrows (groove cuts) running across a slope or by
utilization of construction equipment to track the soil surface. The primary function of surface
roughening is to reduce erosion potential by decreasing runoff velocities, reducing the length of
sheet flow trapping sediment, and increasing infiltration of water into the soil.
• Temporary Seeding is the establishment of a temporary vegetative cover on a graded area that
will be exposed for longer 30 days. Temporary seeding can be used on areas requiring
temporary protection that will eventually need permanent vegetation at the completion of the
construction or it can be used for areas that will be re-disturbed after a period of inactivity. The
seed mix 100% smooth brome at a minimum application rate of 30 pls/lbs/acre. Fertilizer and
Mulch shall be included as specified on the plans.
• Temporary Erosion Control Fabric is comprised of a temporary degradable erosion control
blanket designed to provide immediate erosion protection and vegetation establishment
assistance on moderate slopes and low to medium-flow channels where bare-ground seeding
and loose mulches often fail. Temporary erosion control blankets are being recommended
moderate slopes that do not require permanent turf reinforcement matting.
• Vehicle Tracking Control is a stabilized stone pad located at points of ingress and egress on a
construction site and acts as a temporary BMP. The stone pad is designed to reduce the amount
of mud transported onto public roads by construction traffic by removing mud and sediment
from the vehicle’s wheels when it drives over the gravel pad. These areas are limited to the
minimum number necessary to provide functional construction access and are installed prior to
grading activities. Whenever the construction entrance exists onto a public road, the road shall
be cleaned at the end of each day. Vehicle Tracking Control will also be used on this site at any
stockpile area exits.
• Wattle Sediment Protection is a temporary BMP that are typically used as check structures in
areas of concentrated water flow such as swales, grassed waterways, and down drains. They
can be installed in combination with any type of rolled erosion control blanket or channel liner
and function by slowing water velocity, settling out sediment, and preventing undermining of
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
15
the channel lining material. Wattles for swale protection should be installed following rough
grading of channel areas. Sizing and spacing shall be per manufacturer’s recommendation.
• Wind Borne Sediment and Dust Control measures will be provided during the construction
process to control wind borne sediment. During grading activities, water will be applied to the
disturbed soils for the purpose of maintaining cohesion with clay type soils and also to meet
moisture requirements for compaction of disturbed soils. Other measures of mitigation for
wind erosion may include the timely installation of seed and mulch following the establishment
of final grade, and the timely installation of pavement following completion of utility trenching
operations and curb construction. Open areas should be kept in a roughened condition (see
Surface Roughening above).
Permanent Control Measures (BMPs)
• Grass-Lined Swales (included as part of permanent seeding or other permanently stabilized
swales) are permanent landscaped channels constructed generally below grade to convey runoff
or channel water to a desired location. The grass-lined areas allow for infiltration to occur as
well as including a flow path across a vegetated surface slowing the conveyance rate of storm
water runoff.
• Permanent Seeding and Planting is the establishment of a permanent perennial vegetation such
as trees, shrubs, vines, grasses/sod, or legumes on exposed areas for final permanent
stabilization in order to provide stabilization of the soil by holding soil particles in place. The site
specific re-vegetative seed mix is listed in the table below. Sow seeds at 2-3 lbs, per 1,000
square feet. The application method is hand broadcast spreading and rake in mechanically or by
hand. Slopes over 3:1 should be hayed and tackified or netted with biodegrabale erosion
blankets. Soil Amendments shall be incorporated in all landscape areas to a depth of 6” at a rate
of 3 cubic yards per 1000 square feet of area unless 4” of loose topsoil have been imported onto
the site over 4” of loosened subgrade soils. Permanent Landscaping reduces storm water runoff
velocity, maintains sheet flow, protects the soil surface from erosion, promotes infiltration of
runoff, and improves wildlife habitat.
• Preservation of Existing Vegetation should occur where no construction activity is expected to
occur. Preservation of natural vegetation is generally a permanent BMP and is applicable to
construction sites with pre-existing vegetation. Only land needed for building activities and
vehicle traffic needs is to be cleared.
• Storm Sewer Outlet Protection devices are structurally lined aprons or other energy dissipating
devices placed at the outlets of pipes or paved channel sections. Outlet protection devices
prevent scour at storm water outlets and minimize the potential of downstream erosion by
reducing the velocity of storm water flows. Turf reinforcement matting will be used
downstream of storm sewer outfalls as pipe outlet protection. Outlet Protection is installed
with the storm sewer construction and serves as a permanent structural BMP.
F. Erosion Control Sequencing
This project will have three distinct erosion control phases. The initial phase will be installing
erosion control items prior to any construction on the site. After the initial erosion control items
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
16
have been installed, the next phase will consist of site demolition, grading activities and construction
of the infrastructure (utilities, storm sewer, and development of landscaped areas). The final stage
will include the construction of the site hard surfaces including roads, parking areas, curb and gutter,
concrete sidewalk and island areas and finally ending in stabilization of all remaining disturbed areas
of the site. Each of the phases is described below, including necessary erosion control items.
A SWMP drawing is located in the Appendix that includes the minimum required BMP’s found on
the Sediment and Erosion Control Plans. It should be filled in with the appropriate BMP’s as they
are constructed/placed within the project site.
Sequence 1 – Initial, Prior to Construction
• Silt Fence – Before construction commencement, silt fence will be placed
downstream of areas where runoff from construction activities is expected to occur.
• Staging Area – A concrete wash out area, fueling area, and other staging areas will
be provided during the construction process at least 100’ from any storm water
conveyance. A staging area is to be shown on the SWMP drawing when its location
is identified.
• Vehicle Tracking Control – Before commencement of construction, vehicle tracking
control shall be placed at the location shown west of Overland Trail along West
Elizabeth Street. Any other points of ingress and egress planned by the contractor
and approved by the owner shall also receive suitable vehicle tracking control
BMP's.
• Construction Fence – Before commencement of construction, construction fence
shall be placed at the contractor’s discretion (or as shown in the plans) to limit
access by construction equipment and personal vehicles to designated areas of
ingress and egress.
• Stage/stockpiles – Designate stockpile/staging location per erosion control initial
sequence map included in appendix A. Strip topsoil and store at this location and be
sure to surround the stockpile (s) with silt fence or straw wattles.
Sequence 2 – Site Demolition, Site Grading, and Infrastructure Construction
The items installed in sequence 1 shall be in place, functional, and maintained during
and following the site demolition and site grading operations. In addition to those
items, the following BMP’s shall be installed.
• Wind Borne Sediment and Dust Control – Wind borne sediment and dust control
measures should be implemented during grading activities. This will be particularly
important to consider prior to the establishment of seeding.
• Inlet Protection – Wattles will be placed at curb inlets and area inlets located
throughout the site immediately after the inlet is constructed / installed. Existing
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
17
inlets shall be protected prior to heavy equipment staging, demolition, or
commencement of construction activities.
• Swale Protection – Straw wattles and check dams will be placed within the swales
immediately following rough grading. Wattles and check dams shall be placed
across the swale for every 2’ of drop in swale elevation or every 300'.
• Slope Protection – Surface roughening and contour furrows shall occur after rough
grading.
• Temporary Seeding – The majority of the landscaped areas will be permanently
seeded or planted. However, if disturbed areas are left without permanent
stabilization 30 days after grading, temporary seeding will be required.
• Outlet Protection– Riprap and/or permanent turf reinforcement matting will be
placed immediately downstream of storm sewer outfalls.
• Concrete Washout Area – Concrete washout areas will be placed prior to, and
maintained during, the completion of concrete work.
• Inlet Protection – Wattles will be placed at curb inlets and area inlets located
throughout the site immediately after the inlet is constructed / installed. Existing
inlets shall be protected prior to heavy equipment staging, demolition, or
commencement of construction activities.
• Rock Socks – Rock socks will be placed to replace other inlet protection devices as
required after paving operations have been completed.
Sequence 3 - Building and roadway construction
This sequence will likely begin before the seeding has been established throughout the
site, so it is expected that majority of the BMP’s shown in Phase 1 and Phase 2 will be in
place at the beginning of this phase. As roads are paved and seeding is established
there will be previously placed BMP's such as vehicle tracking control devices and some
sections of silt fence that may be removed. There are other items such as inlet
protection, silt fence, and swale protection that may only be removed after all
construction is complete and upstream areas are established.
• Permanent Seeding – Permanent seeding or landscaping shall be placed
immediately in areas that are final graded and where little future disturbance is
expected.
• Rock Socks – Rock socks will be placed to replace other inlet protection devices as
required after paving operations have been completed.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
18
G. Materials Handling and Spill Prevention
The site development includes appropriate construction staging and stockpile areas
identified on the SWMP Plans shown in Appendix A. Stormwater runoff generated from
the staging areas will be routed to a temporary sedimentation area where runoff will be
contained and filtered before being discharged downstream. The staging/stockpile
area(s) may be moved to a location no closer than 100’ from a storm water conveyance.
Vehicle tracking control should be placed at the stockpile area entrance/exit and silt
fence should surround it. If relocated, the SWMP should be updated with the actual
location of the stockpile/staging area(s).
Chemicals, fuels, lubricants, and paints stored on-site will be in water tight containers
and covered as necessary and stored in a bermed area, a storage building, or within a
vehicle to act as secondary containment. Storage of onsite materials including building
materials, fertilizers, waterline, sanitary sewer, and storm sewer will be covered and
placed on pallets to prevent direct contact with the ground and potential surface runoff.
Concrete and asphalt batch plants are not anticipated on this site and thus are not
included in this SWMP.
In the event of a spill or accident, it shall be contained and disposed of so that it will not
flow from the site or soak into the soil. Once construction is completed, concrete waste
and contaminated soil will be disposed of properly. The SWMP Administrator should be
notified of spills.
Reporting Spills: Any spill or discharge of any pollutant, including but not limited to oil,
paints, fuels, hazardous liquids, sediment, or super-chlorinated water that reaches
storm drains or enters “Waters of the State” must be reported to th e CDPHE
Emergency Spill Reporting line at 1-877-518-5608.
If a spill or leak is of a hazardous substance that exceeds 1 pint or is of an unknown
substance of any amount, call 911 and notify the Colorado Department Public Health
and Environment (CDPHE) 24-hour emergency spill notification hotline at 1- 877-518-
5608, immediately. If the spill is more than 25 gallons of a petroleum product from a
regulated storage tank or delivery truck or any amount that causes a sheen on nearby
surface water, it must be reported to the Division of Oil and Public Safety at the
Colorado Department of Labor and Employment within 24 hours at (303) 318-8547 or to
CDPHE Emergency Spill Reporting line at 1-877-518-5608 – if after normal business
hours. If cleanup cannot be accomplished within 24 hours, the Division of Oil and Public
Safety must be notified immediately. For non-emergency spills, call 970-674-2490. Spills
shall also be reported to the onsite supervisor.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
19
H. Other Controls
The following includes other measures to control pollutants:
• Solid waste materials, including disposable materials incidental to the major
construction activities, will be collected in containers. The containers will be
emptied periodically and trucked away from the site. Dumpsters shall have covers.
• Water used to establish and maintain grass, for dust control, and for other purposes
during the construction phase must originate from a public water supply or private
well approved by the Colorado Department of Public Health and Environment unless
otherwise approved.
• Sanitary facilities shall be provided at the site throughout construction activities.
They shall be utilized by construction personnel and serviced regularly by a
commercial operator. They shall be located a minimum of 5 feet from the curb or
50 feet from inlets and must be anchored. If sanitary facilities are located on a
paved surface, a secondary containment BMP will need to be constructed.
• Access off paved roads should be limited.
I. Final Stabilization and Long-term Stormwater Quality
Final stabilization is reached when all soil disturbing activities at the site have been completed
and vegetative cover has been established with a density of at least 70 percent of pre-
disturbance levels or when equivalent permanent erosion reduction methods have been
utilized. Upon final stabilization, temporary BMP’s may be removed, unless they are required to
remain in place for future phasing.
Water quality enhancements are provided in areas where grass-lined swales are provided for
storm water conveyance. The soft bottom/overbank areas allow for infiltration to occur as well
as including a flow path across a vegetated surface slowing the conveyance rate of storm water
runoff.
Temporary and Permanent seeding will be implemented on the site as well as other plantings
that will be implemented based off a landscape architectural plan as required by the local
jurisdiction where the site exists (Town of Winter Park).
J. Inspection and Maintenance Procedures
Upon completion of each phase of construction, appropriate measures shall be taken to inspect
and maintain existing erosion control features, as described herein or per manufacturers
specifications (whichever is more stringent) and install new erosion control elements associated
with each phase of construction.
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
20
The temporary BMP’s will be inspected and documented at a minimum of once every 14 days
and after each precipitation or snowmelt event. The SWMP will be kept up-to-date with
inspection records, maintenance procedures, and changes. Records should include complete
inspection reports for each inspection, maintenance, and/or repair. A record-keeping system is
recommended in managing inspection and maintenance reports and should include all
maintenance records, spill response, weather conditions, training, correspondence, etc. A blank
copy the CDOT Stormwater Field Inspection Report is provided in Appendix C.
Preventative maintenance also involves the regular inspection and testing of equipment, timely
maintenance of the equipment, and complete records of the maintenance and inspections of
the equipment. The maintenance and inspection records should be kept on site and made
available upon request.
Inspections must include the observation of the construction site perimeter, runoff discharge
points, disturbed areas, staging areas (including concrete washout areas and fueling areas),
erosion and sediment control measures identified in this SWMP, and any other structural BMP’s
that may require maintenance. The inspection must determine if there is evidence of or
potential for pollutants to enter the drainage system and if they should be modified, replaced,
or added to.
The following list includes some recommended maintenance procedures:
• Erosion and sediment control measures determined, upon inspection, to be in need of
repair shall be maintained before the next anticipated storm event or as necessary to
maintain continued effectiveness of erosion and sediment control measures. If it is
impractical to maintain erosion and sediment control measures before the next storm
event, maintenance should be accomplished as soon as practical.
• Locations where vehicles enter or exit the site shall be inspected for evidence of sediment
being tracked off-site by construction traffic. Such sediment shall be removed before it can
be conveyed to the receiving storm drains or creeks.
• Seeded areas will be checked to see that grass coverage is maintained. Areas will be
watered, fertilized, and reseeded as needed.
VI. Conclusions
A. Compliance with Standards
Storm drainage calculations have followed the guidelines provided by the City of Fort Collins Stormwater
Criteria manual and the Mile High Flood District Manuals Volumes 2, and 3.
B. Drainage Plan
The drainage system is not anticipated to have issues associated with conveyance, collection or detention
based on the work to date in the subdivision planning. No negative impacts are expected due to this
development as related to the existing downstream drainage networks or subdivisions. The preliminary
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
21
drainage plan for the Bloom multifamily development is submitted as being both viable and sound in
terms of drainage planning in both the short- and long-term for the City of Fort Collins.
VII. References
1. City of Fort Collins Stormwater Criteria Manual, As adopted by the City Council of the City of
Fort Collins, as referenced in Section 26-500 of the Code of the City of Fort Collins, Revised
December 2018.
2. Mile High Floor District Drainage Criteria Manuals 2 and 3, Urban Drainage and Flood Control
District, Denver, Colorado, November 2010 with some sections revised January 2021.
3. Storm Water Management Model, Reference Manual Volume I, Hydrology, U.S.
Environmental Protection Agency, January 2016.
4. Storm Water Management Model, Reference Manual Volume II, Hydraulics, U.S.
Environmental Protection Agency, May 2017.
5. Mulberry Master Drainage Report, City of Fort Collins – Galloway, revised October 13th, 2021.
VIII. Certification
"I hereby attest that this report for the preliminary drainage design of the Drehle subdivision was
prepared by me, or under my direct supervision, in general accordance with the provisions of the City of
Fort Collins Storm Drainage Design Criteria for the responsible parties thereof. I understand that the City
of Fort Collins does not and shall not assume liability for drainage facilities designed by others.”
<Review Draft until notice of approval>
_____________________________________
Shane Boyle
Registered Professional Engineer
State of Colorado No. 40185
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
1
APPENDIX A
DRAINAGE AND EROSION CONTROL PLAN MAPS
EROSION CONTROL ESCROW CALCULATIONS
13.5
'9'9'13.5'6'13.5'9'
R8'13.5'9'
01
2.59 76%
02
1.05 80%
03
0.89 94%
04
1.28 83%
05
1.67 77%
06
0.35 36%
07
1.90 90%
08
2.59 16%
OS-1
0.82 40%
OS-3
1.05 40%
OS-4
0.73 42%
OS-5
0.79 36%
OS-6
3.01 79%
OS-2
0.24 10%
CLUBHOUSE
A A A
B
BC
EE B B
DOUBLE TYPE R INLET
DOUBLE TYPE R INLET
DOUBLE TYPE R INLET
TYPE C INLET
TYPE C INLET
TYPE C INLET
STORM LINE A:
36" STORM SEWER
STORM LINE A:
36" STORM SEWER
STORM LINE A-1:
18" STORM SEWER
STORM LINE A-1:
30" STORM SEWER
STORM LINE A-2:
18" STORM SEWER
STORM LINE C:
18" STORM SEWERSTORM LINE C:
24" STORM SEWER
STORM LINE B:
24" STORM
SEWER
48" STORM SEWER MANHOLE (TYP.)
STORM LINE A:
36" STORM SEWER
STORM LINE C-1:
18" STORM SEWER
STORM LINE A-3:
18" STORM SEWER
DRAINAGE PLAN1" = 60'
1" = 60'
12
DN01 PREPARED FOR: JOB NUMBER
SHEET NUMBER
SHEETSOF DATE SUBMITTED:The engineer preparing these plans will not be responsiblefor, or liable for, unauthorized changes to or uses of theseplans. All changes to the plans must be in writing andmust be approved by the preparer of these plans.NO.BYDATECAUTIONREVISIONS:VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BLOOM MULTI-FAMILY DEVELOPMENTC22026 HARTFORD HOMES01/11/202333
PRELIMINARY
NOT FOR
CONSTRUCTION
13.5'
9'
13.5'
9'
13.5'
9'
9'13.5'
6'
13.5'
9'
R8'
13.5'
9'
16'
13.5'
00 60'120'
SCALE: 1" = 60'
30'PHASE 2KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PHASING LINE
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SEE GRADING SHEETS FOR ADDITIONAL
SPOT ELEVATIONS FOR THE PROJECT.
2.SEE EROSION CONTROL PLANS FOR
ADDITIONAL INFORMATION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
D-101
GRADING
BASIN BOUNDARY
DESIGN POINT
BASIN LABEL
BASIN IMPERVIOUSNESS
BASIN AREA
FLOW DIRECTIONPHASE 1
IP
SFSFSF
SF
SF
SF
SF
SFVTC
TRACT ALOT 2LOT 1TRACT BTRACT B TRACT B
SF
SF
VTC
PROJECT LIMITS OF DISTURBANCE
PHASE 1: 12.78 ACRES
PHASE 2: 3.72 ACRES
TOTAL: 16.50 ACRES
CWA
RS
EROSION CONTROL PLAN - INITIAL1" = 60'
1" = 60'
13
EC01 PREPARED FOR: JOB NUMBER
SHEET NUMBER
SHEETSOF DATE SUBMITTED:The engineer preparing these plans will not be responsiblefor, or liable for, unauthorized changes to or uses of theseplans. All changes to the plans must be in writing andmust be approved by the preparer of these plans.NO.BYDATECAUTIONREVISIONS:VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BLOOM MULTI-FAMILY DEVELOPMENTC22026 HARTFORD HOMES01/11/202333
PRELIMINARY
NOT FOR
CONSTRUCTION
00 60'120'
SCALE: 1" = 60'
30'
PHASE 2
TOTAL PROJECT
DISTURBED AREA 16.50 ACRES
TOTAL "ONSITE" AREA
OF DISTURBANCE 15.91 ACRES
TOTAL "OFFSITE" AREA
OF DISTURBANCE 0.59 ACRES
TOTAL
STORAGE/STAGING
AREA
0.5000 ACRES
TOTAL HAUL ROADS
AREA N/A
CONSTRUCTION
VEHICLE TRAFFIC AREA N/A
ESTIMATED PERCENT
OF PROJECT AREA
EXPOSED
100%
ESTIMATED PERCENT
VEGETATIVE COVER ~95%DENSITY
EXISTING SOIL TYPE TYPE B & C SANDY/LOAM
GROUNDWATER DEPTH FEET
NUMBER OF PHASES
W/PROJECT 2
TOTAL VOUME OF
IMPORTED (+) /
EXPORTED (-)
MATERIALS
(+) 155,000 CUBIC YARDS
TOTAL AREA OF
STOCKPILING OF FILL
OR BORROW AREAS OFF
SITE
SQUARE FEET
STEEPEST SLOPE 4 H:V
DISTANCE FROM A
RIPARIAN AREA OF
SENSITIVE AREA
1,200 FEET
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
CENTER LINE
CURB AND GUTTER
PHASING LINE
EROSION CONTROL
VEHICLE TRACKING
CONTROL PAD
WATTLE DIKE
ROCK SOCK
TEMPORARY SEDIMENT
INLET PROTECTION
TURF REINFORCEMENT MAT
SILT FENCE
STOCKPILE MANAGEMENT
SURFACE ROUGHENING
CONCRETE WASHOUT
STRUCTURE
PERMANENT SEEDING
NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
2.ALL DISTURBED AREAS SHALL BE
REVEGETATED.
3.EROSION CONTROL PRACTICES, SITE
PROTECTION, AND REVEGETATION
METHODS SHALL FOLLOW CITY
REGULATIONS.
4.IN ADDITION TO THE EROSION CONTROL
MEASURES SHOWN ON THIS DRAWING, THE
CONTRACTOR SHALL COMPLETE,
COORDINATE WITH, AND UPDATE AS
REQUIRED, THE STORMWATER POLLUTION
PREVENTION PLAN (SWPP) FOR THIS
PROJECT.
5.CONTRACTOR TO TERRACE SLOPES USING
A "TRACKED" VEHICLE, RUN
PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY
USE OTHER WINDROW-TYPE METHODS AS
APPROVED BY ENGINEER. TYPICAL ALL
SLOPES, REPEAT AS NECESSARY UNTIL
LANDSCAPING IS INSTALLED.
6.ANY AREAS USED FOR STOCKPILING
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS
SHOULD BE LOCATED AT LEAST 100' AWAY
FROM DRAINAGE WAYS. THE SWMP
SHOULD BE UPDATED TO SHOW THESE
AREAS AND SEDIMENT AND EROSION
CONTROL ITEMS. THE ITEMS MAY INCLUDE
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL, SILT FENCE,
CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
7.TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE
EVENT THAT A GRADED AREA IS EXPOSED
LONGER THAN 14 DAYS WITH NO
CONSTRUCTION ACTIVITY.
8.TURF REINFORCEMENT MAT SHALL BE
PYRAMAT OR APPROVED EQUAL.
9.CONTRACTOR SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS,
OR OTHER POTENTIAL POLLUTANTS THAT
MAY HAVE BEEN DISCHARGED TO OR,
ACCUMULATE IN, THE FLOW LINES AND
PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A
RESULT OF CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT. SAID REMOVAL
SHALL BE CONDUCTED DAILY, AS MAY BE
REQUIRED. SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM
SEWER.
10.THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
REGARDING REQUIRED SEED TYPES/MIXES.
11.SEE THE GENERAL NOTES SHEETS FOR ALL
OF THE CITY OF FORT COLLINS EROSION
CONTROL NOTES.
VTC
WD
RS
TS
IP
TRM
SF
LIMITS OF DISTURBANCE
RIP RAP
FLOW DIRECTION
SF
SRSR
CWA
PSPS
PHASE 1
PHASE 1 STOCKPILE
IPIP
IP
IP
IP
IP
SFSFSF
SF
SF
SF
SF
SFVTC
TS TRACT ALOT 2LOT 1TRACT BTRACT B TRACT B
4.9:1
4.1:1
3.8:14.1:18.0:14.9:15.1:14.2:14.1:14.0:1SF
SF
VTC
SR
SR
SR
SR
SR
SR
PROJECT LIMITS OF DISTURBANCE
PHASE 1: 12.78 ACRES
PHASE 2: 3.72 ACRES
TOTAL: 16.50 ACRES
CWA
WD
WDWDWD
WD
WD
WD
WD
WD
WD
WD
WDWD
WD
WD
WD WD
WD WD
WD WD
WD
WD
WD
WD
WD
WD WD
WD WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WDWD
SR SR
SR SR
SRSRSR SR
SR
RS
IP
EROSION CONTROL PLAN - INTERIM1" = 60'
1" = 60'
14
EC02 PREPARED FOR: JOB NUMBER
SHEET NUMBER
SHEETSOF DATE SUBMITTED:The engineer preparing these plans will not be responsiblefor, or liable for, unauthorized changes to or uses of theseplans. All changes to the plans must be in writing andmust be approved by the preparer of these plans.NO.BYDATECAUTIONREVISIONS:VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BLOOM MULTI-FAMILY DEVELOPMENTC22026 HARTFORD HOMES01/11/202333
PRELIMINARY
NOT FOR
CONSTRUCTION
00 60'120'
SCALE: 1" = 60'
30'
PHASE 2
TOTAL PROJECT
DISTURBED AREA 16.50 ACRES
TOTAL "ONSITE" AREA
OF DISTURBANCE 15.91 ACRES
TOTAL "OFFSITE" AREA
OF DISTURBANCE 0.59 ACRES
TOTAL
STORAGE/STAGING
AREA
0.5000 ACRES
TOTAL HAUL ROADS
AREA N/A
CONSTRUCTION
VEHICLE TRAFFIC AREA N/A
ESTIMATED PERCENT
OF PROJECT AREA
EXPOSED
100%
ESTIMATED PERCENT
VEGETATIVE COVER ~95%DENSITY
EXISTING SOIL TYPE TYPE B & C SANDY/LOAM
GROUNDWATER DEPTH FEET
NUMBER OF PHASES
W/PROJECT 2
TOTAL VOUME OF
IMPORTED (+) /
EXPORTED (-)
MATERIALS
(+) 155,000 CUBIC YARDS
TOTAL AREA OF
STOCKPILING OF FILL
OR BORROW AREAS OFF
SITE
SQUARE FEET
STEEPEST SLOPE 4 H:V
DISTANCE FROM A
RIPARIAN AREA OF
SENSITIVE AREA
1,200 FEET
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
CENTER LINE
CURB AND GUTTER
PHASING LINE
EROSION CONTROL
VEHICLE TRACKING
CONTROL PAD
WATTLE DIKE
ROCK SOCK
TEMPORARY SEDIMENT
INLET PROTECTION
TURF REINFORCEMENT MAT
SILT FENCE
STOCKPILE MANAGEMENT
SURFACE ROUGHENING
CONCRETE WASHOUT
STRUCTURE
PERMANENT SEEDING
NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
2.ALL DISTURBED AREAS SHALL BE
REVEGETATED.
3.EROSION CONTROL PRACTICES, SITE
PROTECTION, AND REVEGETATION
METHODS SHALL FOLLOW CITY
REGULATIONS.
4.IN ADDITION TO THE EROSION CONTROL
MEASURES SHOWN ON THIS DRAWING, THE
CONTRACTOR SHALL COMPLETE,
COORDINATE WITH, AND UPDATE AS
REQUIRED, THE STORMWATER POLLUTION
PREVENTION PLAN (SWPP) FOR THIS
PROJECT.
5.CONTRACTOR TO TERRACE SLOPES USING
A "TRACKED" VEHICLE, RUN
PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY
USE OTHER WINDROW-TYPE METHODS AS
APPROVED BY ENGINEER. TYPICAL ALL
SLOPES, REPEAT AS NECESSARY UNTIL
LANDSCAPING IS INSTALLED.
6.ANY AREAS USED FOR STOCKPILING
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS
SHOULD BE LOCATED AT LEAST 100' AWAY
FROM DRAINAGE WAYS. THE SWMP
SHOULD BE UPDATED TO SHOW THESE
AREAS AND SEDIMENT AND EROSION
CONTROL ITEMS. THE ITEMS MAY INCLUDE
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL, SILT FENCE,
CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
7.TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE
EVENT THAT A GRADED AREA IS EXPOSED
LONGER THAN 14 DAYS WITH NO
CONSTRUCTION ACTIVITY.
8.TURF REINFORCEMENT MAT SHALL BE
PYRAMAT OR APPROVED EQUAL.
9.CONTRACTOR SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS,
OR OTHER POTENTIAL POLLUTANTS THAT
MAY HAVE BEEN DISCHARGED TO OR,
ACCUMULATE IN, THE FLOW LINES AND
PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A
RESULT OF CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT. SAID REMOVAL
SHALL BE CONDUCTED DAILY, AS MAY BE
REQUIRED. SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM
SEWER.
10.THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
REGARDING REQUIRED SEED TYPES/MIXES.
11.SEE THE GENERAL NOTES SHEETS FOR ALL
OF THE CITY OF FORT COLLINS EROSION
CONTROL NOTES.
VTC
WD
RS
TS
IP
TRM
SF
LIMITS OF DISTURBANCE
RIP RAP
FLOW DIRECTION
SF
SRSR
CWA
PSPS
PHASE 1
PHASE 1 STOCKPILE
IP
TRACT ALOT 2LOT 1TRACT BTRACT B TRACT B
4.9:1
4.1:1
3.8:14.1:18.0:14.9:15.1:14.2:14.1:14.0:1PROJECT LIMITS OF DISTURBANCE
PHASE 1: 12.78 ACRES
PHASE 2: 3.72 ACRES
TOTAL: 16.50 ACRES
PS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PSPSPS
PS
PS
PS
PS
PSPS
PS
PS
PS
RS
RS
RS
RSRS
RS RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RSRS
RSRS
RS
RS
RS
RS
RS RS
RS RS
RS
RSRS
RS
RSRS
RS
RS
RS
RS
RS
RS
IPIP
IP
IP
IP
IP
RS
RS
RS
EROSION CONTROL PLAN - FINAL1" = 60'
1" = 60'
15
EC03 PREPARED FOR: JOB NUMBER
SHEET NUMBER
SHEETSOF DATE SUBMITTED:The engineer preparing these plans will not be responsiblefor, or liable for, unauthorized changes to or uses of theseplans. All changes to the plans must be in writing andmust be approved by the preparer of these plans.NO.BYDATECAUTIONREVISIONS:VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BLOOM MULTI-FAMILY DEVELOPMENTC22026 HARTFORD HOMES01/11/202333
PRELIMINARY
NOT FOR
CONSTRUCTION
00 60'120'
SCALE: 1" = 60'
30'
PHASE 2
TOTAL PROJECT
DISTURBED AREA 16.50 ACRES
TOTAL "ONSITE" AREA
OF DISTURBANCE 15.91 ACRES
TOTAL "OFFSITE" AREA
OF DISTURBANCE 0.59 ACRES
TOTAL
STORAGE/STAGING
AREA
0.5000 ACRES
TOTAL HAUL ROADS
AREA N/A
CONSTRUCTION
VEHICLE TRAFFIC AREA N/A
ESTIMATED PERCENT
OF PROJECT AREA
EXPOSED
100%
ESTIMATED PERCENT
VEGETATIVE COVER ~95%DENSITY
EXISTING SOIL TYPE TYPE B & C SANDY/LOAM
GROUNDWATER DEPTH FEET
NUMBER OF PHASES
W/PROJECT 2
TOTAL VOUME OF
IMPORTED (+) /
EXPORTED (-)
MATERIALS
(+) 155,000 CUBIC YARDS
TOTAL AREA OF
STOCKPILING OF FILL
OR BORROW AREAS OFF
SITE
SQUARE FEET
STEEPEST SLOPE 4 H:V
DISTANCE FROM A
RIPARIAN AREA OF
SENSITIVE AREA
1,200 FEET
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
CENTER LINE
CURB AND GUTTER
PHASING LINE
EROSION CONTROL
VEHICLE TRACKING
CONTROL PAD
WATTLE DIKE
ROCK SOCK
TEMPORARY SEDIMENT
INLET PROTECTION
TURF REINFORCEMENT MAT
SILT FENCE
STOCKPILE MANAGEMENT
SURFACE ROUGHENING
CONCRETE WASHOUT
STRUCTURE
PERMANENT SEEDING
NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
2.ALL DISTURBED AREAS SHALL BE
REVEGETATED.
3.EROSION CONTROL PRACTICES, SITE
PROTECTION, AND REVEGETATION
METHODS SHALL FOLLOW CITY
REGULATIONS.
4.IN ADDITION TO THE EROSION CONTROL
MEASURES SHOWN ON THIS DRAWING, THE
CONTRACTOR SHALL COMPLETE,
COORDINATE WITH, AND UPDATE AS
REQUIRED, THE STORMWATER POLLUTION
PREVENTION PLAN (SWPP) FOR THIS
PROJECT.
5.CONTRACTOR TO TERRACE SLOPES USING
A "TRACKED" VEHICLE, RUN
PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY
USE OTHER WINDROW-TYPE METHODS AS
APPROVED BY ENGINEER. TYPICAL ALL
SLOPES, REPEAT AS NECESSARY UNTIL
LANDSCAPING IS INSTALLED.
6.ANY AREAS USED FOR STOCKPILING
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS
SHOULD BE LOCATED AT LEAST 100' AWAY
FROM DRAINAGE WAYS. THE SWMP
SHOULD BE UPDATED TO SHOW THESE
AREAS AND SEDIMENT AND EROSION
CONTROL ITEMS. THE ITEMS MAY INCLUDE
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL, SILT FENCE,
CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
7.TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE
EVENT THAT A GRADED AREA IS EXPOSED
LONGER THAN 14 DAYS WITH NO
CONSTRUCTION ACTIVITY.
8.TURF REINFORCEMENT MAT SHALL BE
PYRAMAT OR APPROVED EQUAL.
9.CONTRACTOR SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS,
OR OTHER POTENTIAL POLLUTANTS THAT
MAY HAVE BEEN DISCHARGED TO OR,
ACCUMULATE IN, THE FLOW LINES AND
PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A
RESULT OF CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT. SAID REMOVAL
SHALL BE CONDUCTED DAILY, AS MAY BE
REQUIRED. SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM
SEWER.
10.THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
REGARDING REQUIRED SEED TYPES/MIXES.
11.SEE THE GENERAL NOTES SHEETS FOR ALL
OF THE CITY OF FORT COLLINS EROSION
CONTROL NOTES.
VTC
WD
RS
TS
IP
TRM
SF
LIMITS OF DISTURBANCE
RIP RAP
FLOW DIRECTION
SF
SRSR
CWA
PSPS
PHASE 1
Project: Disturbed Acres:12.78
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
L.F.3450 $2.50 $8,625.00
EA 5 $750.00 $3,750.00
EA 1 $1,500.00 $1,500.00
EA 1 $5,000.00 $5,000.00
L.F.350 $10.00 $3,500.00
E.A 35 $200.00 $7,000.00
A.C 2 $6,000.00 $12,000.00
Sub-Total:$41,375.00
1.5 x Sub-Total:$62,062.50
Amount of security:$62,062.50
Total Acres x Price/acre:$115,020.00
$9,000.00 Sub-Total: $115,020.00
1.5 x Sub-Total:$172,530.00
Amount to Re-seed:$172,530.00
Minimum escrow amount:$3,000.00
Erosion Control Escrow:$172,530.00
Erosion and Sediment Control Escrow/Security Calculation
for The City of Fort Collins
BMP Amount
Silt Fence (SF)
Vehicle Tracking Control (VTC)
Straw Wattle (WD)
Reseeding Amount
Rock Sock (rs)
Miniumum Escrow Amount
Bloom Multi-Family Development - Phase 1
Unit Price of Seeding per acre:
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three
thousand dollars ($3,000) for commercial development”
Inlet Protection (IP)
Concrete Washout (CW)
Surface Roughening (SR)
Final Escrow Amount
1/9/2023 12:06 PMD:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\Appendices\APPENDIX B - BLOOM EROSION CONTROL ESCROW.pdf
Project: Disturbed Acres:3.72
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
L.F.850 $2.50 $2,125.00
EA 2 $750.00 $1,500.00
EA 1 $1,500.00 $1,500.00
EA 1 $5,000.00 $5,000.00
L.F.70 $10.00 $700.00
E.A 7 $200.00 $1,400.00
A.C 0.5 $6,000.00 $3,000.00
Sub-Total:$15,225.00
1.5 x Sub-Total:$22,837.50
Amount of security:$22,837.50
Total Acres x Price/acre: $33,480.00
$9,000.00 Sub-Total:$33,480.00
1.5 x Sub-Total:$50,220.00
Amount to Re-seed:$50,220.00
Minimum escrow amount:$3,000.00
Erosion Control Escrow:$50,220.00
Unit Price of Seeding per acre:
Miniumum Escrow Amount
Final Escrow Amount
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three
thousand dollars ($3,000) for commercial development”
Rock Sock (rs)
Vehicle Tracking Control (VTC)
Straw WattLe (WD)
Surface Roughening (SR)
Reseeding Amount
Erosion and Sediment Control Escrow/Security Calculation
for The City of Fort Collins
Bloom Multi-Family Development - Phase 2
BMP Amount
Silt Fence (SF)
Inlet Protection (IP)
Concrete Washout (CW)
1/9/2023 12:06 PMD:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\Appendices\APPENDIX B - BLOOM EROSION CONTROL ESCROW.pdf
Preliminary Drainage and Erosion Control Report
Bloom Multi Family Development
Fort Collins, CO
2
APPENDIX B
WATER QUALITY AND LID CALCULATIONS
100-YEAR SWMM MODEL REPORT
Runoff Coefficients and % Impervious for Chamber System
Roof (1)Asphalt Walks(1)Gravel(1)Lawns(1)
%I = 90% %I = 100% %I = 90% %I =40% %I=2%
acres sf sf sf sf sf sf
C2 C5 C10 C25 C50 C100
0.0 0 - - - - - - -
0.0 0 0 0 0 0 0 -- - - - - -
Proposed Site to Chambers WQ Chambers 12.3 535853 98543 191576 63387 0 182347 63.6% C/D 0.712 0.712 0.712 0.890 0.890 0.890
0 - - - - - - -
Onsite Total 12.3 535853 98543 191576 63387 0 182347 64%0.712 0.712 0.712 0.890 0.890 0.890
Notes:
(1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.
(2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4.
(3) Impervious area assumed to be 2500 s.f. of roof and 500 s.f. of driveway per single family and twin home lot.
Proposed Basins
Existing Basins
Onsite Total
Basin
Areas
Composite
Imperviousness
(%I)
Total TotalDesign Pt.Composite Runoff Coefficients (2)NRCS Soil
Type
Calculations by: bao
Date: 1/6/2023 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing
TIME OF CONCENTRATION FOR CHAMBER SYSTEM FLOWS
Area Length Slope ti
(2)Length Slope Velocity (3)tt
(4)Check tc?Total
Length tc
(5)
acres ft % min ft % fps min min Urban? ft min min
Existing Basins 0.00 0.0 - - - - - - - -
0.0 - - - - - - - -
Proposed Site to Chambers WQ Chambers 12.3 Paved 0.90 115 2 3.1 1126 0.85 20 1.8 10.2 13.2 Yes 1241 17 13
Notes:
(1) C5 based initial ground type and Table RO-5 (4)tt=L/(V*60 sec/min)
(2)ti = [1.8(1.1-C5)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max)(5)tc check (for urban or developed areas only) = total length/180 + 10
(3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (6)min tc = 5 min
Proposed Basins
Basin Design Pt.
Initial Overland Flow Time (ti)Travel/Channelized Time of Flow (tt)
ti+tt
tc Check for Urbanized Basins
Final tc
(6)Initial
Ground
Type
C5
(1)Cv
0
1/2 OF THE 2-YEAR STORM TO CHAMBER SYSTEM
Final Runoff Coefficients Rainfall Intensity Peak Discharge
tc
(6)I Q
acre min in/hr cfs
Proposed Site to
Chambers WQ Chambers 12.3 13 0.712 1.04 9.12
9.12Totals
Proposed Basins
Design Pt.AreaBasin
C
Calculations by: BAO
Date: 1/6/2023 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing
Water Quality Required for Chamber System
Area (acres)(acres)Watershed WQCV* (cf)
(sf) (acres) (inches) (Extended Detention)
Proposed
Site 535,853 12.301 64%0.25 13,340
---
13,340Total
* based on 40 hr storage and additional 20% for extended detention
Basin %I
Required Onsite Water Quality Capture Volume
Calculations by: bao
Date: 1/6/2023 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing
VAULT ID
TOTAL
REQUIRED WQ
VOLUME (CF)
WQ
FLOW
(CFS)
CHAMBER TYPE
CHAMBER
RELEASE RATE
(CFS)
CHAMBER
VOLUME (CF)
INSTALLED CHAMBER
W/AGGREGATE (CF)
MIN. # OF
CHAMBERS
TOTAL
RELEASE
RATE (CFS)
REQUIRED
STORAGE
VOLUME BY FAA
METHOD (CF)
MIN # OF
CHAMBERS
STORAGE
PROVIDED
WITHIN THE
CHAMBERS (CF)
TOTAL
INSTALLED
SYSTEM
VOLUME (CF)
S1 13,340 9.12 SC-160 0.011 6.85 15 890 9.79 2,963 433 6096.5 13350
S2 13,340 9.12 SC-740 0.024 45.9 74.9 179 4.296 6,430 141 8216.1 13407.1
0
0
S5 13,340 9.12 SC-310 0.016 14.7 29.3 456 7.296 4,085 278 6703.2 13360.8
SC-160 0.011 6.85 15 0 0 0 0 0
CHAMBER DIMENSIONS SC-160 SC-310 SC-740
WIDTH [IN]25 34 51
LENGTH [IN]84.4 85.4 85.4
HEIGHT [IN]12 16 30
FLOOR AREA [SF]14.7 20.2 30.2
CHAMBER VOLUME [CF]6.9 14.7 45.9
CHAMBER/AGGREGATE VOLUME [CF]15 29.3 74.9
Chamber Configuration Summary
STORM TECH CHAMBER DATA
Volume to Chambers
(FAA Method)
100 year storm into detention facility
Area (sf) Area (acres)C2
535853 12.301 0.71
Release rate out of chamber system
Qout (cfs)cfs/acre Tc (min)
9.790
Rainfall
Intensity
Inflow
Volume
Adjustment
Factor
Average Outflow
Rate Outflow Volume Required
Storage Volume
I Vi=(Qin*T*60)m= 0.5(1 +
Tc/T)Qav = m*Qout Vo=Qav*T *60 Vs=Vi-Vo
min in/hr cfs
ft 3 cfs ft 3 ft 3
5 1.43 12.5 3,743 0.50 4.90 1,469 2,275
10 1.11 9.7 5,805 0.50 4.90 2,937 2,868
15 0.94 8.2 7,368 0.50 4.90 4,406 2,963
20 0.81 7.0 8,458 0.50 4.90 5,874 2,584
25 0.72 6.3 9,391 0.50 4.90 7,343 2,048
30 0.65 5.7 10,245 0.50 4.90 8,811 1,434
35 0.60 5.2 10,941 0.50 4.90 10,280 661
40 0.54 4.7 11,243 0.50 4.90 11,748 -505
45 0.50 4.3 11,703 0.50 4.90 13,217 -1,514
50 0.46 4.0 12,083 0.50 4.90 14,685 -2,602
55 0.44 3.8 12,569 0.50 4.90 16,154 -3,584
60 0.41 3.6 12,924 0.50 4.90 17,622 -4,698
70 0.37 3.2 13,423 0.50 4.90 20,559 -7,136
80 0.33 2.9 13,870 0.50 4.90 23,496 -9,626
90 0.31 2.7 14,421 0.50 4.90 26,433 -12,012
100 0.28 2.5 14,710 0.50 4.90 29,370 -14,660
110 0.26 2.3 15,026 0.50 4.90 32,307 -17,281
120 0.25 2.1 15,446 0.50 4.90 35,244 -19,798
Max Volume, ft 3 =2,963
= 0.068
acre-ft
Comments
Required Detention Volume
Rainfall
Duration (T)
Qin=
∑C100*Area*I
Comments
RELEASE RATE OUT OF CHAMBER
Calculations by: ARS
Date: 10/3/2019
D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber
Sizing
Runoff Coefficients and % Impervious - NON CHAMBER SYSTEM FLOWS
Roof (1)Asphalt Walks(1)Gravel(1)Lawns(1)
%I = 90% %I = 100% %I = 90% %I =40% %I=2%
acres sf sf sf sf sf sf
C2 C10 C100
0.0 0 - - - -
0.0 0 0 0 0 0 0 -- - -
OS-1 OS-1 0.82 35567 8022 4250 2450 0 20845 39.6% C/D 0.540 0.540 0.675
OS-2 OS-2 0.24 10528 0 600 250 0 9678 9.7% C/D 0.307 0.307 0.383
OS-3 OS-3 1.05 45738 17850 0 2000 0 25888 40.2% C/D 0.554 0.554 0.692
OS-4 OS-4 0.73 31668 8022 4400 1550 0 17696 42.2% C/D 0.559 0.559 0.699
OS-5 OS-5 0.79 34412 11580 150 1700 0 20982 36.4% C/D 0.523 0.523 0.654
OS-6 (OFFSITE ROADS) OS-6 (OFFSITE ROADS)3.01 131030 0 79622 25808 0 25600 78.9% C/D 0.813 0.813 1.000
OFFSITE BASINS TO PROPOSED
POND TOTAL 6.63 288943 45474 89022 33758 0 303036 58%C/D 0.815 0.815 0.890
Notes:
(1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.
(2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4.
(3) Impervious area assumed to be 2500 s.f. of roof and 500 s.f. of driveway per single family and twin home lot.
Proposed Basins
Existing Basins
Onsite Total
Basin
Areas
Composite
Imperviousness
(%I)
Total TotalDesign Pt.Composite Runoff Coefficients (2)NRCS Soil
Type
D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom Hydrology
Calculations by:
Date: 10/3/2019
Water Quality - Areas that drain to the proposed on site detention pond that are not treated by the proposed chamber system
Area Area Watershed WQCV* (cf)
(sf) (acres) (inches) (Extended Detention)
ALL POND WQ
BASINS 278,415 6.392 58%0.23 6,357
6,357
WQCV
Provided
(cf)
WQCV
Depth (ft)
Area Required per
WQ Plate Row (in2)
Diamter of WQ
Hole (in)No. of Columns
Space
between
rows (in.)
No. of Rows
6,357 1.03 1.039 1 1/16 1 4 4
Basin %I
Required Onsite Water Quality Capture Volume
Designed Water Quality Plate Parameters
Basin
Bloom Multi-Family Site
Total
* based on 40 hr storage and additional 20% for extended detention
Calculations by: bao
Date: 1/6/2023 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom Hydrology
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.0)
------------------------------------------------------------
BLOOM MULTI-FAMILY DEVELOPMENT
1/11/2023
*************
Element Count
*************
Number of rain gages ...... 1
Number of subcatchments ... 14
Number of nodes ........... 30
Number of links ........... 30
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data Recording
Name Data Source Type Interval
------------------------------------------------------------------------
Gauge1 100year INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage Outlet
-----------------------------------------------------------------------------------------------------------
01 2.59 170.00 76.00 2.0000 Gauge1 6
02 1.05 150.00 80.00 2.0000 Gauge1 49
03 0.89 270.00 94.00 4.0000 Gauge1 50
05 1.67 205.00 77.00 2.0000 Gauge1 20
04 1.28 200.00 83.00 2.0000 Gauge1 51
07 1.90 190.00 90.00 2.0000 Gauge1 21
08 2.59 170.00 16.00 5.0000 Gauge1 BLOOM_POND
06 0.35 100.00 36.00 4.0000 Gauge1 17
OS-1 0.82 75.00 40.00 6.0000 Gauge1 4
OS-3 1.05 170.00 36.30 11.0000 Gauge1 5
OS-4 0.73 100.00 42.20 6.0000 Gauge1 8
OS-5 0.79 100.00 36.40 6.0000 Gauge1 9
EX_SITE 15.83 550.00 2.00 1.0000 Gauge1 10
OS-2 0.24 170.00 10.00 5.0000 Gauge1 5
************
Node Summary
************
Invert Max. Ponded External
Name Type Elev. Depth Area Inflow
-------------------------------------------------------------------------------
6 JUNCTION 4942.09 5.00 0.0
7 JUNCTION 4938.53 10.00 0.0
13 JUNCTION 4940.50 5.00 0.0
17 JUNCTION 4937.71 0.17 0.0
20 JUNCTION 4937.81 10.00 0.0
21 JUNCTION 4937.33 10.00 0.0
24 JUNCTION 4933.71 10.00 0.0
Page 1
25 JUNCTION 4932.79 10.00 0.0
26 JUNCTION 4932.65 10.00 0.0
27 JUNCTION 4933.50 10.00 0.0
28 JUNCTION 4931.51 10.00 0.0
35 JUNCTION 4940.68 5.00 0.0
36 JUNCTION 4941.00 10.00 0.0
39 JUNCTION 4939.50 10.00 0.0
43 JUNCTION 4935.00 10.00 0.0
44 JUNCTION 4935.50 10.00 0.0
45 JUNCTION 4941.54 5.00 0.0
46 JUNCTION 4933.59 10.00 0.0
47 JUNCTION 4942.72 5.00 0.0
48 JUNCTION 4936.25 10.00 0.0
49 JUNCTION 4942.92 0.76 0.0
50 JUNCTION 4941.20 0.76 0.0
51 JUNCTION 4941.75 0.76 0.0
1 OUTFALL 4927.00 1.50 0.0
4 OUTFALL 4940.00 0.00 0.0
5 OUTFALL 4939.00 0.00 0.0
8 OUTFALL 4938.00 0.00 0.0
9 OUTFALL 4937.50 0.00 0.0
10 OUTFALL 0.00 0.00 0.0
BLOOM_POND STORAGE 4928.40 10.00 0.0
************
Link Summary
************
Name From Node To Node Type Length %Slope Roughness
---------------------------------------------------------------------------------------------
GT-3 6 35 CONDUIT 250.0 0.5620 0.0160
GT-11 7 20 CONDUIT 120.0 0.5958 0.0160
STM_B1 24 25 CONDUIT 185.0 0.4973 0.0120
STM_A-1-1 25 26 CONDUIT 10.0 1.4001 0.0120
STM_A-2-1 27 26 CONDUIT 120.0 0.7084 0.0120
STM_A2 26 28 CONDUIT 185.0 0.6157 0.0120
STM_A1 28 BLOOM_POND CONDUIT 65.0 0.6323 0.0120
GT-7 13 7 CONDUIT 185.0 1.0660 0.0160
GT-4 35 7 CONDUIT 150.0 1.4355 0.0160
GT-9 36 39 CONDUIT 150.0 1.0001 0.0160
GT-10 39 7 CONDUIT 125.0 0.7768 0.0160
STM_C-1 44 43 CONDUIT 40.0 1.2501 0.0120
STM_C1 43 24 CONDUIT 260.0 0.4962 0.0120
STM_A-1-2 46 25 CONDUIT 160.0 0.5000 0.0120
GT-6 45 13 CONDUIT 54.0 1.9281 0.0160
34 17 BLOOM_POND CONDUIT 50.0 18.9599 0.0120
GT-2 47 6 CONDUIT 50.0 1.2601 0.0160
STM_C2 48 43 CONDUIT 260.0 0.4808 0.0120
GT-1 49 47 CONDUIT 20.0 1.0151 0.0160
38 BLOOM_POND 1 CONDUIT 40.0 13.6247 0.0120
GT-8 50 36 CONDUIT 20.0 1.0001 0.0160
GT-5 51 45 CONDUIT 20.0 1.0401 0.0160
INLET_B1 20 24 ORIFICE
INLET_A-2-1 21 27 ORIFICE
INLET_C1 35 43 ORIFICE
INLET_C-1-1 36 44 ORIFICE
INLET_A-1-1 45 46 ORIFICE
INLET_C2 47 48 ORIFICE
1 20 BLOOM_POND WEIR
3 21 20 WEIR
Page 2
*********************
Cross Section Summary
*********************
Full Full Hyd. Max. No. of Full
Conduit Shape Depth Area Rad. Width Barrels Flow
---------------------------------------------------------------------------------------
GT-3 street_1 0.76 9.61 0.40 27.00 1 36.35
GT-11 street_1 0.76 9.61 0.40 27.00 1 37.43
STM_B1 CIRCULAR 2.00 3.14 0.50 2.00 1 17.28
STM_A-1-1 CIRCULAR 2.50 4.91 0.62 2.50 1 52.58
STM_A-2-1 CIRCULAR 2.00 3.14 0.50 2.00 1 20.63
STM_A2 CIRCULAR 3.00 7.07 0.75 3.00 1 56.70
STM_A1 CIRCULAR 3.00 7.07 0.75 3.00 1 57.46
GT-7 street_1 0.76 9.61 0.40 27.00 1 50.06
GT-4 street_1 0.76 9.61 0.40 27.00 1 58.10
GT-9 street_1 0.76 9.61 0.40 27.00 1 48.49
GT-10 street_1 0.76 9.61 0.40 27.00 1 42.74
STM_C-1 CIRCULAR 1.50 1.77 0.38 1.50 1 12.72
STM_C1 CIRCULAR 2.00 3.14 0.50 2.00 1 17.26
STM_A-1-2 CIRCULAR 1.50 1.77 0.38 1.50 1 8.05
GT-6 street_1 0.76 9.61 0.40 27.00 1 67.33
34 TRIANGULAR 0.17 0.33 0.08 4.00 1 3.43
GT-2 street_1 0.76 9.61 0.40 27.00 1 54.43
STM_C2 CIRCULAR 1.50 1.77 0.38 1.50 1 7.89
GT-1 street_1 0.76 9.61 0.40 27.00 1 48.85
38 CIRCULAR 1.50 1.77 0.38 1.50 1 42.00
GT-8 street_1 0.76 9.61 0.40 27.00 1 48.49
GT-5 street_1 0.76 9.61 0.40 27.00 1 49.45
**************
Street Summary
**************
Street street_1
Area:
0.0002 0.0006 0.0014 0.0024 0.0038
0.0054 0.0074 0.0096 0.0122 0.0150
0.0183 0.0226 0.0282 0.0349 0.0428
0.0520 0.0623 0.0739 0.0866 0.1006
0.1157 0.1321 0.1496 0.1684 0.1883
0.2095 0.2319 0.2554 0.2802 0.3062
0.3334 0.3617 0.3913 0.4221 0.4541
0.4873 0.5216 0.5564 0.5912 0.6260
0.6608 0.6956 0.7304 0.7654 0.8015
0.8388 0.8773 0.9170 0.9579 1.0000
Hrad:
0.0175 0.0349 0.0524 0.0698 0.0873
0.1047 0.1222 0.1396 0.1571 0.1745
0.1725 0.1634 0.1647 0.1716 0.1817
0.1938 0.2073 0.2218 0.2370 0.2527
0.2689 0.2853 0.3021 0.3191 0.3362
0.3535 0.3710 0.3885 0.4062 0.4239
0.4416 0.4595 0.4774 0.4953 0.5133
0.5314 0.5523 0.5888 0.6252 0.6615
0.6978 0.7341 0.7703 0.8065 0.8414
0.8751 0.9076 0.9392 0.9699 1.0000
Width:
0.0070 0.0141 0.0211 0.0281 0.0352
0.0422 0.0493 0.0563 0.0633 0.0704
Page 3
0.0874 0.1156 0.1437 0.1719 0.2000
0.2281 0.2563 0.2844 0.3126 0.3407
0.3689 0.3970 0.4252 0.4533 0.4815
0.5096 0.5378 0.5659 0.5941 0.6222
0.6504 0.6785 0.7067 0.7348 0.7630
0.7911 0.8148 0.8148 0.8148 0.8148
0.8148 0.8148 0.8148 0.8311 0.8593
0.8874 0.9156 0.9437 0.9719 1.0000
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... GREEN_AMPT
Flow Routing Method ...... DYNWAVE
Surcharge Method ......... EXTRAN
Starting Date ............ 12/16/2022 00:00:00
Ending Date .............. 12/16/2022 23:59:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:01:00
Dry Time Step ............ 00:05:00
Routing Time Step ........ 1.00 sec
Variable Time Step ....... YES
Maximum Trials ........... 20
Number of Threads ........ 1
Head Tolerance ........... 0.005000 ft
*********************
Control Actions Taken
*********************
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 10.401 3.927
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 5.607 2.117
Surface Runoff ........... 4.717 1.781
Final Storage ............ 0.081 0.031
Continuity Error (%) ..... -0.030
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 4.717 1.537
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
Page 4
External Inflow .......... 0.000 0.000
External Outflow ......... 3.083 1.005
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 1.627 0.530
Continuity Error (%) ..... 0.139
*************************
Highest Continuity Errors
*************************
Node 13 (-1.82%)
***************************
Time-Step Critical Elements
***************************
None
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*********************************
Most Frequent Nonconverging Nodes
*********************************
Node 1 (0.14%)
Node 4 (0.14%)
Node 5 (0.14%)
Node 8 (0.14%)
Node 9 (0.14%)
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 0.19 sec
Average Time Step : 1.00 sec
Maximum Time Step : 1.00 sec
% of Time in Steady State : 0.00
Average Iterations per Step : 2.03
% of Steps Not Converging : 0.14
Time Step Frequencies :
1.000 - 0.871 sec : 99.92 %
0.871 - 0.758 sec : 0.02 %
0.758 - 0.660 sec : 0.01 %
0.660 - 0.574 sec : 0.01 %
0.574 - 0.500 sec : 0.03 %
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------------
Total Total Total Total Imperv Perv Total Total Peak Runoff
Page 5
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in in in 10^6 gal CFS
------------------------------------------------------------------------------------------------------------------------------
01 3.93 0.00 0.00 0.61 2.91 0.33 3.24 0.23 19.95 0.824
02 3.93 0.00 0.00 0.49 3.06 0.29 3.36 0.10 9.40 0.855
03 3.93 0.00 0.00 0.14 3.60 0.09 3.69 0.09 8.84 0.941
05 3.93 0.00 0.00 0.57 2.95 0.33 3.28 0.15 14.36 0.836
04 3.93 0.00 0.00 0.41 3.43 0.25 3.43 0.12 11.44 0.874
07 3.93 0.00 0.00 0.24 3.45 0.15 3.60 0.19 17.32 0.916
08 3.93 0.00 0.00 2.30 0.61 1.00 1.61 0.11 7.84 0.411
06 3.93 0.00 0.00 1.58 1.38 0.94 2.32 0.02 2.48 0.590
OS-1 3.93 0.00 0.00 1.54 1.53 0.82 2.35 0.05 4.82 0.598
OS-3 3.93 0.00 0.00 1.57 1.39 0.93 2.32 0.07 7.36 0.591
OS-4 3.93 0.00 0.00 1.45 1.62 0.82 2.44 0.05 4.88 0.621
OS-5 3.93 0.00 0.00 1.32 1.42 1.18 2.60 0.06 6.34 0.661
EX_SITE 3.93 0.00 0.00 3.23 0.08 0.62 0.70 0.30 9.30 0.178
OS-2 3.93 0.00 0.00 2.18 0.38 1.36 1.74 0.01 1.79 0.443
******************
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
6 JUNCTION 0.06 0.69 4942.78 0 00:40 0.69
7 JUNCTION 0.04 0.67 4939.20 0 00:41 0.67
13 JUNCTION 0.01 0.30 4940.80 0 00:40 0.29
17 JUNCTION 0.01 0.16 4937.87 0 00:40 0.16
20 JUNCTION 0.02 0.75 4938.56 0 00:40 0.75
21 JUNCTION 0.01 0.51 4937.84 0 00:40 0.51
24 JUNCTION 0.14 4.60 4938.31 0 00:40 4.60
25 JUNCTION 0.42 3.98 4936.77 0 00:40 3.96
26 JUNCTION 0.48 3.58 4936.23 0 00:40 3.57
27 JUNCTION 0.10 3.81 4937.31 0 00:40 3.81
28 JUNCTION 1.52 3.37 4934.88 0 00:40 3.36
35 JUNCTION 0.03 0.56 4941.24 0 00:40 0.55
36 JUNCTION 0.01 0.40 4941.40 0 00:40 0.40
39 JUNCTION 0.02 0.41 4939.91 0 00:40 0.41
43 JUNCTION 0.10 5.69 4940.69 0 00:35 4.22
44 JUNCTION 0.06 5.44 4940.94 0 00:35 3.83
45 JUNCTION 0.01 0.28 4941.82 0 00:40 0.28
46 JUNCTION 0.10 4.71 4938.30 0 00:40 4.68
47 JUNCTION 0.01 0.39 4943.11 0 00:40 0.39
48 JUNCTION 0.06 6.58 4942.83 0 00:35 3.35
49 JUNCTION 0.04 0.47 4943.39 0 00:40 0.47
50 JUNCTION 0.03 0.46 4941.66 0 00:40 0.46
51 JUNCTION 0.04 0.50 4942.25 0 00:40 0.50
1 OUTFALL 0.13 0.16 4927.16 0 00:49 0.16
4 OUTFALL 0.00 0.00 4940.00 0 00:00 0.00
5 OUTFALL 0.00 0.00 4939.00 0 00:00 0.00
8 OUTFALL 0.00 0.00 4938.00 0 00:00 0.00
9 OUTFALL 0.00 0.00 4937.50 0 00:00 0.00
10 OUTFALL 0.00 0.00 0.00 0 00:00 0.00
BLOOM_POND STORAGE 4.52 5.46 4933.86 0 02:21 5.46
*******************
Page 6
Node Inflow Summary
*******************
-------------------------------------------------------------------------------------------------
Maximum Maximum Lateral Total Flow
Lateral Total Time of Max Inflow Inflow Balance
Inflow Inflow Occurrence Volume Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent
-------------------------------------------------------------------------------------------------
6 JUNCTION 19.95 25.58 0 00:40 0.228 0.263 -0.063
7 JUNCTION 0.00 26.38 0 00:40 0 0.186 0.504
13 JUNCTION 0.00 2.01 0 00:40 0 0.00942 -1.792
17 JUNCTION 2.48 2.48 0 00:40 0.022 0.022 -0.032
20 JUNCTION 14.36 37.34 0 00:40 0.149 0.334 -0.058
21 JUNCTION 17.32 17.32 0 00:40 0.186 0.186 -0.000
24 JUNCTION 0.00 23.25 0 00:46 0 0.481 -0.089
25 JUNCTION 0.00 28.92 0 00:36 0 0.592 0.024
26 JUNCTION 0.00 44.95 0 00:40 0 0.777 -0.031
27 JUNCTION 0.00 17.32 0 00:40 0 0.186 -0.081
28 JUNCTION 0.00 44.94 0 00:40 0 0.777 0.413
35 JUNCTION 0.00 25.22 0 00:40 0 0.263 0.010
36 JUNCTION 0.00 8.84 0 00:40 0 0.0893 -0.140
39 JUNCTION 0.00 5.10 0 00:40 0 0.0308 -0.773
43 JUNCTION 0.00 12.42 0 00:40 0 0.237 -0.042
44 JUNCTION 0.00 3.72 0 00:40 0 0.0586 -0.097
45 JUNCTION 0.00 11.43 0 00:40 0 0.119 -0.016
46 JUNCTION 0.00 9.39 0 00:40 0 0.11 -0.189
47 JUNCTION 0.00 9.39 0 00:40 0 0.0958 -0.059
48 JUNCTION 0.00 3.70 0 00:40 0 0.0606 -0.128
49 JUNCTION 9.40 9.40 0 00:40 0.0958 0.0958 -0.000
50 JUNCTION 8.84 8.84 0 00:40 0.0893 0.0893 -0.001
51 JUNCTION 11.44 11.44 0 00:40 0.119 0.119 0.001
1 OUTFALL 0.00 1.00 0 00:49 0 0.47 0.000
4 OUTFALL 4.82 4.82 0 00:40 0.0523 0.0523 0.000
5 OUTFALL 9.14 9.14 0 00:40 0.0775 0.0775 0.000
8 OUTFALL 4.88 4.88 0 00:40 0.0484 0.0484 0.000
9 OUTFALL 6.34 6.34 0 00:40 0.0557 0.0557 0.000
10 OUTFALL 9.30 9.30 0 00:50 0.301 0.301 0.000
BLOOM_POND STORAGE 7.84 86.27 0 00:40 0.114 1 0.262
**********************
Node Surcharge Summary
**********************
Surcharging occurs when water rises above the top of the highest conduit.
---------------------------------------------------------------------
Max. Height Min. Depth
Hours Above Crown Below Rim
Node Type Surcharged Feet Feet
---------------------------------------------------------------------
24 JUNCTION 0.39 2.605 5.395
25 JUNCTION 0.26 1.476 6.024
26 JUNCTION 0.08 0.579 6.421
27 JUNCTION 0.16 1.809 6.191
28 JUNCTION 0.10 0.371 6.629
43 JUNCTION 0.29 3.694 4.306
44 JUNCTION 0.29 3.937 4.563
46 JUNCTION 0.34 3.214 5.286
48 JUNCTION 0.25 5.076 3.424
Page 7
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
--------------------------------------------------------------------------------------------------
Average Avg Evap Exfil Maximum Max Time of Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS
--------------------------------------------------------------------------------------------------
BLOOM_POND 89.943 24 0 0 125.091 34 0 02:21 1.00
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
1 96.68 0.75 1.00 0.470
4 11.95 0.68 4.82 0.052
5 10.40 1.17 9.14 0.078
8 11.12 0.68 4.88 0.048
9 10.57 0.82 6.34 0.056
10 11.79 3.97 9.30 0.301
-----------------------------------------------------------
System 25.42 8.08 34.30 1.005
*******************
Street Flow Summary
*******************
----------------------------------------------------------------------------------------------------------------------
Peak Maximum Maximum Peak Flow Average Bypass BackFlow
Flow Spread Depth Inlet Inlet Capture Capture Frequency Frequency
Street Conduit CFS ft ft Design Location % % % %
----------------------------------------------------------------------------------------------------------------------
GT-3 25.223 22.000 0.622
GT-11 25.212 22.000 0.707
GT-7 1.817 18.063 0.481
GT-4 19.666 22.000 0.613
GT-9 5.102 14.084 0.402
GT-10 5.012 20.820 0.536
GT-6 2.014 8.375 0.288
GT-2 5.651 21.141 0.543
GT-1 9.390 15.611 0.432
GT-8 8.839 15.469 0.429
GT-5 11.427 13.433 0.389
Page 8
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
GT-3 CONDUIT 25.22 0 00:40 3.98 0.69 0.82
GT-11 CONDUIT 25.21 0 00:41 3.43 0.67 0.93
STM_B1 CONDUIT 23.06 0 00:48 7.34 1.33 1.00
STM_A-1-1 CONDUIT 28.88 0 00:36 5.88 0.55 1.00
STM_A-2-1 CONDUIT 17.31 0 00:40 5.51 0.84 1.00
STM_A2 CONDUIT 44.94 0 00:40 6.36 0.79 1.00
STM_A1 CONDUIT 44.97 0 00:40 7.15 0.78 0.85
GT-7 CONDUIT 1.82 0 00:40 0.78 0.04 0.63
GT-4 CONDUIT 19.67 0 00:40 3.23 0.34 0.81
GT-9 CONDUIT 5.10 0 00:40 2.52 0.11 0.53
GT-10 CONDUIT 5.01 0 00:40 1.98 0.12 0.71
STM_C-1 CONDUIT 3.72 0 00:40 3.76 0.29 1.00
STM_C1 CONDUIT 12.42 0 00:40 3.95 0.72 1.00
STM_A-1-2 CONDUIT 9.46 0 00:40 5.35 1.18 1.00
GT-6 CONDUIT 2.01 0 00:40 2.54 0.03 0.38
34 CONDUIT 2.48 0 00:40 7.85 0.72 0.97
GT-2 CONDUIT 5.65 0 00:40 1.23 0.10 0.71
STM_C2 CONDUIT 3.70 0 00:40 2.49 0.47 1.00
GT-1 CONDUIT 9.39 0 00:40 3.67 0.19 0.57
38 CONDUIT 1.00 0 00:49 9.90 0.02 0.54
GT-8 CONDUIT 8.84 0 00:40 3.64 0.18 0.56
GT-5 CONDUIT 11.43 0 00:40 6.10 0.23 0.51
INLET_B1 ORIFICE 15.57 0 00:49
INLET_A-2-1 ORIFICE 17.32 0 00:40
INLET_C1 ORIFICE 5.01 0 00:40
INLET_C-1-1 ORIFICE 3.72 0 00:40
INLET_A-1-1 ORIFICE 9.39 0 00:40
INLET_C2 ORIFICE 3.70 0 00:40
1 WEIR 31.30 0 00:40 0.13
3 WEIR 0.00 0 00:00 0.00
***************************
Flow Classification Summary
***************************
-------------------------------------------------------------------------------------
Adjusted ---------- Fraction of Time in Flow Class ----------
/Actual Up Down Sub Sup Up Down Norm Inlet
Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl
-------------------------------------------------------------------------------------
GT-3 1.00 0.01 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.00
GT-11 1.00 0.01 0.00 0.00 0.74 0.26 0.00 0.00 0.01 0.00
STM_B1 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.50 0.00
STM_A-1-1 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.39 0.00
STM_A-2-1 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.76 0.00
STM_A2 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.34 0.00
STM_A1 1.00 0.01 0.00 0.00 0.96 0.00 0.00 0.03 0.00 0.00
GT-7 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.99 0.00
GT-4 1.00 0.01 0.00 0.00 0.98 0.01 0.00 0.00 0.99 0.00
GT-9 1.00 0.01 0.42 0.00 0.56 0.01 0.00 0.00 0.98 0.00
GT-10 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.99 0.00
Page 9
STM_C-1 1.00 0.01 0.10 0.00 0.89 0.00 0.00 0.00 0.96 0.00
STM_C1 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.97 0.00
STM_A-1-2 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.62 0.00
GT-6 1.00 0.01 0.39 0.00 0.56 0.04 0.00 0.00 0.98 0.00
34 1.00 0.01 0.00 0.00 0.95 0.04 0.00 0.00 0.98 0.00
GT-2 1.00 0.01 0.18 0.00 0.82 0.00 0.00 0.00 0.99 0.00
STM_C2 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.97 0.00
GT-1 1.00 0.01 0.00 0.00 0.40 0.59 0.00 0.00 0.01 0.00
38 1.00 0.03 0.00 0.00 0.48 0.48 0.00 0.00 0.00 0.00
GT-8 1.00 0.01 0.00 0.00 0.65 0.35 0.00 0.00 0.01 0.00
GT-5 1.00 0.01 0.00 0.00 0.43 0.56 0.00 0.00 0.00 0.00
*************************
Conduit Surcharge Summary
*************************
----------------------------------------------------------------------------
Hours Hours
--------- Hours Full -------- Above Full Capacity
Conduit Both Ends Upstream Dnstream Normal Flow Limited
----------------------------------------------------------------------------
STM_B1 0.37 0.39 0.37 0.33 0.37
STM_A-1-1 0.16 0.26 0.16 0.01 0.16
STM_A-2-1 0.16 0.16 0.28 0.01 0.05
STM_A2 0.08 0.08 0.10 0.01 0.07
STM_A1 0.01 0.10 0.01 0.01 0.01
STM_C-1 0.29 0.29 0.34 0.01 0.01
STM_C1 0.29 0.29 0.39 0.01 0.01
STM_A-1-2 0.34 0.34 0.65 0.07 0.10
34 0.01 0.01 23.72 0.01 0.01
STM_C2 0.25 0.25 0.34 0.01 0.01
Analysis begun on: Tue Jan 17 11:37:05 2023
Analysis ended on: Tue Jan 17 11:37:06 2023
Total elapsed time: 00:00:01
Page 10
Subcatchment Runoff Summary
Total Total Total Total Imperv Perv Total Total Peak
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Runoff
Subcatchment in in in in in in in 10^6 gal CFS Coeff
01 3.93 0.00 0.00 0.61 2.91 0.33 3.24 0.23 19.95 0.824
02 3.93 0.00 0.00 0.49 3.06 0.29 3.36 0.10 9.40 0.855
03 3.93 0.00 0.00 0.14 3.60 0.09 3.69 0.09 8.84 0.941
05 3.93 0.00 0.00 0.57 2.95 0.33 3.28 0.15 14.36 0.836
04 3.93 0.00 0.00 0.41 3.43 0.25 3.43 0.12 11.44 0.874
07 3.93 0.00 0.00 0.24 3.45 0.15 3.60 0.19 17.32 0.916
08 3.93 0.00 0.00 2.30 0.61 1.00 1.61 0.11 7.84 0.411
06 3.93 0.00 0.00 1.58 1.38 0.94 2.32 0.02 2.48 0.590
OS-1 3.93 0.00 0.00 1.54 1.53 0.82 2.35 0.05 4.82 0.598
OS-3 3.93 0.00 0.00 1.57 1.39 0.93 2.32 0.07 7.36 0.591
OS-4 3.93 0.00 0.00 1.45 1.62 0.82 2.44 0.05 4.88 0.621
OS-5 3.93 0.00 0.00 1.32 1.42 1.18 2.60 0.06 6.34 0.661
EX_SITE 3.93 0.00 0.00 3.23 0.08 0.62 0.70 0.30 9.30 0.178
OS-2 3.93 0.00 0.00 2.18 0.38 1.36 1.74 0.01 1.79 0.443
Page 1
Link Flow Summary
Maximum Day of Hour of Maximum Max / Max /
|Flow| Maximum Maximum |Velocity| Full Full
Link Type CFS Flow Flow ft/sec Flow Depth
GT-3 CONDUIT 25.22 0 00:40 3.98 0.69 0.82
GT-11 CONDUIT 25.21 0 00:41 3.43 0.67 0.93
STM_B1 CONDUIT 23.06 0 00:48 7.34 1.33 1.00
STM_A-1-1 CONDUIT 28.88 0 00:36 5.88 0.55 1.00
STM_A-2-1 CONDUIT 17.31 0 00:40 5.51 0.84 1.00
STM_A2 CONDUIT 44.94 0 00:40 6.36 0.79 1.00
STM_A1 CONDUIT 44.97 0 00:40 7.15 0.78 0.85
GT-7 CONDUIT 1.82 0 00:40 0.78 0.04 0.63
GT-4 CONDUIT 19.67 0 00:40 3.23 0.34 0.81
GT-9 CONDUIT 5.10 0 00:40 2.52 0.11 0.53
GT-10 CONDUIT 5.01 0 00:40 1.98 0.12 0.71
STM_C-1 CONDUIT 3.72 0 00:40 3.76 0.29 1.00
STM_C1 CONDUIT 12.42 0 00:40 3.95 0.72 1.00
STM_A-1-2 CONDUIT 9.46 0 00:40 5.35 1.18 1.00
GT-6 CONDUIT 2.01 0 00:40 2.54 0.03 0.38
34 CONDUIT 2.48 0 00:40 7.85 0.72 0.97
GT-2 CONDUIT 5.65 0 00:40 1.23 0.10 0.71
Page 1
Maximum Day of Hour of Maximum Max / Max /
|Flow| Maximum Maximum |Velocity| Full Full
Link Type CFS Flow Flow ft/sec Flow Depth
STM_C2 CONDUIT 3.70 0 00:40 2.49 0.47 1.00
GT-1 CONDUIT 9.39 0 00:40 3.67 0.19 0.57
38 CONDUIT 1.00 0 00:49 9.90 0.02 0.54
GT-8 CONDUIT 8.84 0 00:40 3.64 0.18 0.56
GT-5 CONDUIT 11.43 0 00:40 6.10 0.23 0.51
INLET_B1 ORIFICE 15.57 0 00:49
INLET_A-2-1 ORIFICE 17.32 0 00:40
INLET_C1 ORIFICE 5.01 0 00:40
INLET_C-1-1 ORIFICE 3.72 0 00:40
INLET_A-1-1 ORIFICE 9.39 0 00:40
INLET_C2 ORIFICE 3.70 0 00:40
1 WEIR 31.30 0 00:40 0.13
3 WEIR 0.00 0 00:00 0.00
Page 2