January 13, 2023
Patrick Mcmeekin
Hartford Homes
4801 Goodman road
Timnath, CO 80547
RE: Bloom Offsite Water, BDR220004, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Bloom Offsite Water. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970‑416‑2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744,
bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
11/22/2022: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
11/22/2022: SUBMITTAL:
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color.
When replying to the comment letter please be detailed in your responses, as
all comments should be thoroughly addressed. Comments requiring action
should NOT have a response such as noted or acknowledged. You will need to
provide references to specific project plans, pages, reports, or explanations of
why comments have not been addressed [when applicable].
Comment Number: 3
11/22/2022: SUBMITTAL:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information, and round number.
Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
Reach out to me if you would like a list of suggested names.
*Please disregard any references to paper copies, flash drives, or CDs.
Comment Number: 4
11/22/2022: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing‑text‑appears‑as‑Comments‑in‑a‑PDF‑created‑by‑Aut
oCAD.html
Comment Number: 5
11/22/2022: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut‑off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced notice as possible.
Comment Number: 6
11/22/2022: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
Comment Number: 7
11/22/2022: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an
additional fee of $3,000.00.
Comment Number: 8
11/22/2022: FOR FINAL APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures
(Section 2.2.8).
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners and shall also be posted on the City's website at www.fcgov.com.
Comment Number: 9
11/22/2022: FOR FINAL APPROVAL:
If the project is approved by the Director, there is a two‑week appeal period
from the date of the decision. The project is not able to be recorded until it is
confirmed there are no appeals.
Comment Number: 10
11/22/2022: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we
are closer to this step.
Department: Planning Services
Contact: Kai Kleer, 970‑416‑4284, kkleer@fcgov.com
Topic: General
Comment Number: 1
11/27/2022 INFORMATION:
No comments at this time. Please continue to work with environmental planning
staff regarding landscaping and any disruption to the Cooper Slough.
RESPONSE: NOTED, NO COMMENTS
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: General
Comment Number: 2
01/06/2023: FOR FINAL APPROVAL‑UPDATED:
Closure reports were not submitted. These are required for Easements that are
submitted. Please provide reports for the Easements in review, so we can
complete our review & ultimately approve them for recording.
RESPONSE: PER DISCUSSION WITH CITY STAFF: EASEMENTS ARE PRIVATE AND THEREFORE CLOSURE REPORTS ARE NOT REQUIRED.
11/29/2022: FOR FINAL APPROVAL:
Closure reports are now required for all Easements submitted for review.
Department: Engineering Development Review
Contact: John Gerwel, , jgerwel@fcgov.com
Topic: General
Comment Number: 1
01/05/2023: FOR FINAL APPROVAL ‑ UPDATE:
My apologies. I erroneously thought this project was going to hearing. LOIs are
not required since there is no hearing.
RESPONSE: NOTED, LOI’S NOT REQUIRED
11/15/2022: FOR FINAL APPROVAL:
Is there a letter of intent from the owner of this land? I would like to see some
sort of written documentation that the owner of this land approves of this.
Comment Number: 4
12/28/2022: FOR FINAL APPROVAL ‑ UNRESOLVED
Missing general notes #47, 48 (the list can just be "N/A" since there are no
variances yet). Missing Street Improvements Notes, Traffic Signing and
Pavement Marking Construction Notes, Storm Drainage Notes, and the
Waterline Note. See Appendix E.
RESPONSE: NOTES CORRECTED
11/15/2022: FOR FINAL APPROVAL:
The general notes do not appear to be current. Please use the most recent
general/construction notes from LCUASS Appendix E.
Comment Number: 7
01/06/2023: FOR FINAL APPROVAL ‑ UPDATE:
The LOI is not necessary with no hearing. But the signature block for the ditch
company is needed and it will need to be signed by the ditch owner before recording.
RESPONSE: COOP SIGNATURE BLOCK ADDED TO COVER SHEET
11/15/2022: FOR FINAL APPROVAL:
Is there a signed letter‑of‑intent from this ditch owner already? There needs to
be a signature block from the ditch company on the cover sheet.
Comment Number: 8
12/28/2022: FOR FINAL APPROVAL ‑ UPDATE:
Please show the proposed easement in its entirety on the northern side. See redlines.
RESPONSE: LINEWORK UPDATED
11/15/2022: FOR FINAL APPROVAL:
The waterline easement to the north doesn't fully cover the proposed waterline.
Is there an existing easement that is making up the distance? It needs to be
shown with a reception number of this is the case. Otherwise, the proposed
easement must be extended.
Comment Number: 11
12/30/2022: FOR FINAL APPROVAL:
All existing easements need to be shown in the utility plans with corresponding
reception numbers or book/page numbers.
RESPONSE: REC NO. ADDED FOR THE REDMAN SUBDIVISION TO ACCOUNT FOR THE 80’ PRIVATE ACCESS AND THE 10’ UTILITY EASEMENT
Comment Number: 12
01/05/2023: FOR FINAL APPROVAL:
I'm seeing that Redman is private street owned by the parcel to the south, not
ROW. Do you have information that says otherwise? It may be more
appropriate to call the "ROW" a private access easement. If communication has
not been initiated with these property owners, it would be good to get that going.
RESPONSE: ROW CHANGED TO PRIVATE ACCESS
Comment Number: 13
01/10/2023: FOR RECORDING:
This project cannot be recorded until these easements are conveyed by the property owners.
RESPONSE: NOTED
Department: Stormwater Engineering
Contact: Andrew Crecca, , acrecca@fcgov.com
Topic: Erosion Control
Comment Number: 7
01/03/2023: For Final Acceptance:
Thank you for addressing all comments from round 1. We look forward to
seeing these changes upon final plans and report submittal. Please refer to
ESC Redlines in round 2. All comments have been addressed except the
"Chart of Calculations" required per FCSCM Chapter 2 Section 6.1.3.1 (Please
see attached example from appendix D in returned ESC Redlines Round 2)
RESPONSE: CHART OF CALCULATIONS HAS BEEN ADDED PER THE EXAMPLES PROVIDED.
Department: Environmental Planning
Contact: Scott Benton, (970)416‑4290, sbenton@fcgov.com
Topic: General
Comment Number: 3
01/09/2023: FOR APPROVAL ‑ UNRESOLVED:
Regarding reclamation:
‑If any non‑agricultural area is disturbed for construction, an acceptable seed
mix needs to be detailed for revegetation of those area.
‑The landowner needs to sign off on the reclamation methods of the agricultural
area (soil handling, amendments, weed management, etc.) and signage
location to ensure that it is to their satisfaction.
RESPONSE: THE LAND OWNER HAS PROVIDED THE SEEDING MIX (DETAILED IN THE SWMP REPORT SEED CHART) THAT THEY WANT FOR RECALMATION AND WILL SIGN THE CD’S TO INDICATE APPROVAL OF RECALMATION
METHODS.
Comment Number: 5
01/09/2023: FOR APPROVAL:
A table regarding seeding timelines was included but the seed mixes to be
used in both the agricultural and non‑agricultural areas was not included. Please
include the seed mixes, including common and scientific of species,
proportions, rates.
RESPONSE: SIX MIX HAS BEEN SPECIFIED BY THE COOP AND THE SEED MIX TABLE IN THE SWMP NOW REFLECTS THAT SEEDING
Comment Number: 6
01/09/2023: FOR APPROVAL:
On the reclamation, the green hatching labelled ‘Re‑seed and Remediate
Trench’ in the legend (pages C3.0 and C3.1) needs to read/indicate that all
disturbed areas need to be remediated and revegetated. That includes the
construction easement, stockpile areas, etc. Decompaction is included in the
remediation/reclamation.
RESPONSE: LEGEND EDITED TO CALL OUT THE REMEDIATION OF ALL DISTURBED AREAS AS WELL AS RE-SEEDING AND RE-VEGATATING THOSE AREAS AND DECOMPACTION HAS ALSO BEEN CALLED OUT
Comment Number: 7
01/09/2023: FOR APPROVAL:
Please a cutoff wall detail within the Development Construction Plans.
RESPONSE: DETIAL ADDED