Loading...
HomeMy WebLinkAboutBLOOM OFFSITE WATER - BASIC DEVELOPMENT REVIEW - BDR220004 - SUBMITTAL DOCUMENTS - ROUND 3 - UTILITY PLANSHARTFORD HOMES BLOOM OFFSITE WATER DEVELOPMENT CONSTRUCTION PLANS JANUARY, 2023 A TRACT OF LAND LOCATED IN THE NORTHEAST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO. FORT COLLINS, CO Know what's before you dig. Planning. Architecture. Engineering. GAS Xcel Energy Stephanie Rich (970) 225-7828 ELECTRIC City of Fort Collins Light and Power Tyler Siegmund (970) 416-2772 CABLE Xfinity Don Kapperman (970) 484-7166 TELECOM. Centurylink William Johnson (970) 377-6401 WATER ELCO Mike Scheid (970) 493-2044 WASTEWATER Boxelder Sanitation District Karen Reynolds (970) 498-0604 STORMWATER City of Fort Collins Utilities Wes Lamarque (970) 416-2418 UTILITY COMPANY CONTACT PHONE NUMBER * ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. SITES. TIMBERLINE RD.E. VINE DRIVE INTERSTATE - 25DateCity Engineer, Date Date Date Date Stormwater Utility, Parks Planning and Development, Traffic Operations, Date APPROVED: APPROVED: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility, City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner, APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. GENERAL MANAGER REVIEWED BY: DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C0.0_Cover Sheet.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP COVER SHEET C0.0Date POUDRE VALLEY COOP A. GENERAL NOTES 1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5.All waterline construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7.The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10.The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18.The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19.All recommendations of the Erosion Control Report for Bloom Offsite Water dated 12.07.2022 by Galloway and Company, shall be followed and implemented. 20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27.Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34.There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. Please see the benchmark statement on cover sheet for benchmark information. THE BASIS OF ELEVATIONS FOR THIS SURVEY IS REFERENCED TO THE CITY OF FORT COLLINS VERTICAL BENCHMARK BM 1-98 HAVING A PUBLISHED ELEVATION OF 4928.70' - NAVD88. PROJECT DATUM: NAVD 88 BENCHMARK BM 1-98: ON THE SOUTHWEST CORNER OF A BRIDGE ABUTMENT WALL (BRIDGE NO. B-16-T) AT THE LAKE CANAL AND MULBERRY STREET, EAST OF 3201 EAST MULBERRY AT A DEAD END OF THE SOUTH FRONTAGE ROAD. ELEVATION = 4928.70' (NAVD 88) 41.All stationing is based on centerline of roadways unless otherwise noted. 42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45.Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46.After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47.The local entity shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N/A 48.Approved variances are listed as follows: N/A CONSTRUCTION NOTES A. GRADING AND EROSION CONTROL NOTES These notes are a summary for the legal requirements, that are set forth in the Fort Collins Stormwater Criteria Manual (FCSCM), and that any conflict is resolved by the more stringent requirement controlling. 1.The Property Owner, Owner's Representative, Developer, Design Engineer, General Contractor, Sub-contractors, or similar title for the developing entity (here after referred to as the Developer) has provided these Erosion Control Materials in accordance with Erosion Control Criteria set forth in the Manual as an attempt to identify erosion, sediment, and other potential pollutant sources associated with these Construction Activities and preventing those pollutants from leaving the project site as an illicit discharge. Full City requirements and are outlined and clarified in the Manual under Chapter 4: Construction Control Measures and should be used to identify and define what is needed on a project. 2.The Developer shall make themselves thoroughly familiar with the provisions and the content of the specifications laid out in the Manual, the Development Agreement, the Erosion Control Materials compiled for this project, and the following notes as all these materials are applicable to this project. 3.The Developer shall implement and maintain Control Measures for all potential pollutants from the start of land disturbing activities until final stabilization of the construction site. 4.The City Erosion Control Inspector shall be notified at least twenty-four (24) hours prior to the desired start of any construction activities on this site to allow adequate time for on-site confirmation (initial inspection which can take up to two business days after receiving the request) that the site is in fact protected from sediment and pollutants discharges off site. Please contact erosion@fcgov.com early to schedule those Initial Erosion Control Inspections well in advance so that demolition, clearing, grubbing, tree removal, and scraping may begin without delay. Failure to receive an on-site confirmation before construction activities commence is an automatic “Notice of Violation” and can result in further enforcement actions. 5.The Developer shall proactively provide all appropriate Control Measures to prevent damage to adjacent downstream and leeward properties. This includes but is not limited to: trees, shrubs, lawns, walks, pavements, roadways, structures, creeks, wetlands, streams, rivers, and utilities that are not designed for removal, relocation, or replacement in the course of construction. 6.At all times the Developer shall be responsible to ensure adequate Control Measures are designed, selected, installed, maintain, repaired, replaced, and ultimately removed in order to prevent and control erosion suspension, sediment transportation, and pollutant discharge as a result of construction activities associated with this project. 7. All applicable Control Measures based upon the sequencing and/or phasing of the project shall be installed prior to those construction activities commencing. 8.As dynamic conditions (due to the nature, timing, sequence, and phasing of construction) in the field may warrant Control Measures in addition, or different, to what is shown on these plans, the Developer shall at all times be responsible to implement the Control Measures that are most effective with the current state and progress of construction. The Developer shall implement whatever measures are determined necessary, and/or as directed by the City Erosion Control Inspector. The Developer shall insure that all Erosion Control Plans (Maps) or SWMP documents are updated to reflect the current site conditions, with updates being initialed and dated. These site inspections and site condition updates shall be made available upon request by the City. 9. All listings, provisions, materials, procedures, activities, site work and the like articulated in this or other written site-specific documents (Including but not limited to the erosion control reports, development agreements, landscape, and drainage materials) shall meet or exceed the most restrictive language for City, County, State, and Federal regulations with regards to erosion, sediment, pollutant, and other pollution source Control Measures. The Developer shall be responsible to comply with all of these aforementioned laws and regulations. 10.The Developer shall ensure that all appropriate permits (CDPS General Permit Stormwater Discharges Associated with Construction Activity, Dewatering, Clean Water Act, Army Corps of Engineers' 404 Wetlands Mitigation Permit, etc.) have been attained prior to the relevant activity has begun. These permits or copies shall be made available upon request by the City. 11.The Developer shall furnish all conveniences and assistances to aid the Erosion Control Inspectors of materials, workmanship, records, and self-inspections, etc. of the Control Measures involved in the construction activities. 12.The Developer shall request clarification of all apparent site construction issues that may arise due to inconsistencies in construction plans for the site or site conditions around the selected Control Measures by contacting the Erosion Control Inspector. The Erosion Control Inspector will not be responsible for any explanations, interpretations, or supplementary data provided by others. 13.All Control Measures shall be installed in accordance with the Manual. 14.The City reserves the right to require additional Control Measures as site conditions warrant, to the extent authorized by relevant legal authority. 15.As with any construction standards, occasions may arise where the minimum erosion control standards are either inappropriate or cannot be justified. In these cases, a variance to these standards may be applied for pursuant to the terms, conditions, and procedures of the Manual. 16.Inspection. The contractor shall inspect site pollutant sources and implement Control Measures at a minimum of once every two weeks during construction and within 24 hours following a precipitation event. Documentation of each inspection shall be recorded and retained by the contractor. 17.All temporary Control Measures shall be cleaned, repaired, or reconstructed as necessary in order to assure continual performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any drainage way. 18.Any Control Measure may be substituted for another standard Control Measure so long as that Control Measure is equal to, or of greater protection than the original Control Measure that was to be used in that location. (ex. silt fence, for wattles, or for compact berms) Wattle alone on commercial construction sites have shown to be an ineffective substitute for silt fence or compact berms unless it is accompanied by a construction fence to prevent vehicle traffic. 19.Any implementation or replacement of existing Control Measures for a non-standard control, or alternative Control Measure, shall require the review and acceptance by the City erosion control staff before the measure will be allowed to be used on this project. These Control Measures' details shall be submitted, reviewed and accepted to be in accordance with the Erosion Control Criteria based upon the functionality and effectiveness in accordance with sound engineering and hydrological practices LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS 20.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. Off road staging areas or stockpiles must be preapproved by the City. Disturbances beyond these limits will be restored to original condition. 21.Pre-disturbance vegetation shall be identified, protected, and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical period of time. This should include sequencing and phasing construction activities in a way so that the soil is not exposed for long periods of time by schedule or limit grading to small areas. This should also include when practical advancing the schedule on stabilization activities such that landscaping takes place shortly if not immediately after grading has occurred. Vegetation efforts shall start as soon as possible to return the site to a stabilized condition. Sensitive areas should avoid clearing and grading activities as much possible. 22.All exposed soils or disturbed areas are considered a potential pollutant and shall have Control Measures implemented on the site to prevent materials from leaving the site. 23.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition at all times by equipment tracking, scarifying or disking the surface on a contour with a 2 to 4 inch minimum variation in soil surface until mulch, vegetation, and/or other permanent erosion control is installed. 24.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport through the use of surface roughening, watering, and down gradient perimeter controls. All soil stockpiles shall be protected from sediment transport by wind in accordance with Municipal Code §12-150. All stockpiles shall be flattened to meet grade or removed from site as soon as practical, and no later than the completion of construction activities or abandonment of the project. All off-site stockpile storage locations in City limits shall have a stockpile permit from the City Engineering Department prior to using the area to store material. If frequent access from hardscape to the stockpile is needed a structural tracking Control Measure shall be implemented. 25.All required Control Measures shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of the required erosion Control Measures must be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 26.All inlets, curb-cuts, culverts, and other storm sewer infrastructure which could be potentially impacted by construction activities shall be protected with Control Measures. Material accumulated from this Control Measure shall be promptly removed and in cases where the protection has failed, the pipes shall be thoroughly cleaned out. 27.All streams, stream corridors, buffers, woodlands, wetlands, or other sensitive areas shall be protected from impact by any construction activity through the use of Control Measures. 28.All exposed dirt shall have perimeter control. Any perimeter controls that drain off or has the ability to be tracked onto the nearby hardscape shall have some form of effective sediment control as the, or as part of the, perimeter control. 29.All exposed slopes should be protected. All exposed steep slopes (Steeper than 3:1 H:V) shall be protected from erosion and sediment transport through use of Control Measures. 30.No soils shall remain exposed by land disturbing activity for more than thirty (30) days after activity has ceased before required temporary seeding or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. This is not just limited to projects that are abandoned; this includes any project that is temporarily halted and no immediate activity is to resume within the next thirty (30) days, unless otherwise approved by the City Erosion Control Inspector. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented with or until temporary seeding or permanent erosion control can be performed. 31.All individual lots shall have effective sediment controls located on the street side and any down gradient side. Typically most lots drain to the front yet on those cases where houses are along a pond or drainage swale have the lot drain in a different direction than the street, those individual lots will need protection on that down gradient side to prevent sediment from leaving the lot. See the Individual Lot Details for further clarification. VEHICLE TRACKING 32.At all points where vehicles exit or leave the exposed dirt area on to a hardscape or semi hardscape (concrete, asphalt, road base, etc.) shall have installed at least one structural tracking Control Measure to prevent vehicle tracking. All areas not protected by an adequate perimeter control shall be considered a point where vehicles exit the site. Access points should be limited to as few entrances as possible (All perimeter areas shall be protected from tracking activities). 33.In all areas that the structural tracking Control Measures fail to prevent vehicle tracking, collection and proper disposal of that material is required. All inlets located near access points and affected by tracking activities shall be prevented from the introduction of sediment into the drainage system. 34.City Municipal Code §20-62, among other things, prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any source. City Municipal Code, §26-498, among other things, prohibits the discharge of pollutants on public or private property if there is a significant potential for migration of such pollutant. Therefore, all tracked or deposited materials (intentional or inadvertent) are not permitted to remain on the street or gutter and shall be removed and legally disposed of by the Developer in a timely and immediate manner. Dirt ramps installed in the curb-lines are not exempt to these sections of code and shall not be permitted in the street right of way (public or private). 35.If repeated deposit of material occurs on a site, additional structural tracking controls may be required of the Developer by the City Erosion Control Inspector. LOADING AND UNLOADING OPERATIONS 36.The Developer shall apply Control Measure to limit traffic (site worker or public) impacts and proactively locate material delivered to the site in close proximity to the work area or immediately incorporated in the construction to limit operational impacts to disturbed areas, vehicle tracking, and sediment deposition that could impact water quality. OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS 37.Any materials of a non-polluting nature (steel, rock, brick, lumber, etc.) shall be inspected for any residue coming off the material during routine inspection and will generally be located where practical at least fifty (50) feet from any permanent or interim drainage ways. 38.Any high environmental impact pollutant materials that have a high likelihood to result in discharge when in contact with stormwater (lubricants, fuels, paints, solvents, detergents, fertilizers, chemical sprays, bags of cement mix, etc.) should not be kept on site where practical. When not practical, they should be stored inside (vehicle, trailer, connex, building, etc.) and out of contact with stormwater or stormwater runoff. Where not available, they shall be stored outside in a raised (high spots or on pallets), covered (plastic or tarped), and sealed (leak proof container) in secondary containment location. The secondary containment or other Control Measure shall be adequately sized, located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING 39.Parking, refueling, and maintenance of vehicles and equipment should be limited in one area of the site to minimize possible spills and fuel storage areas. This area shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. All areas shall keep spill kits and supplies close. SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS 40.The property must be actively preventing the emission of fugitive dust at all times during construction and vegetation activities. All land disturbing activities that result in fugitive dust shall be in accordance with Municipal Code §12-150 to reduce the impacts to adjacent properties and community health. All required practices shall be implemented and additional ones shall be followed. These practices include watering the sites and discontinuing construction activities until the wind subsides as determined by any City Inspectors. CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT 41.All concrete and equipment washing shall use structural Control Measures appropriate to the volume of wash and frequency of use. These Control Measures shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. These areas shall be clearly identified and protected from any wash from leaving the Control Measure. If frequent access from hardscape to the Control Measure is to occur, a structural tracking Control Measure shall be implemented. These Control Measures shall be frequently cleaned out. 42.The Developer is responsible for ensuring washing activity is taking place at the appropriate Control Measure and site workers are not washing or dumping wash water on to the dirt or other uncontrolled locations. DEDICATED ASPHALT AND CONCRETE BATCH PLANTS 43.Dedicated asphalt and concrete batch plants are not acceptable on construction sites within the City of Fort Collins without an expressed written request and plan to reduce pollutants associated with that type of activity and approval by the City of Fort Collins specifically the Erosion Control Inspector. The Developer shall inform the erosion control inspection staff of any dedicated asphalt, or concrete batch plants that is to be used on site. CONCRETE SAW CUTTING MATERIALS 44.Saw cutting material shall be in accordance with Municipal Code §12-150 for air emissions and all water applications to the saw cutting shall prevent material from leaving the immediate site and collected. These cutting locations, once dried, shall be swept and scraped of all material and shall have proper and legal disposal. WASTE MATERIALS STORAGE AND SANITARY FACILITIES 45.Trash, debris, material salvage, and/or recycling areas shall be, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. These facilities should be located out of the wind and covered as able. Where not able to cover, locating said areas on the side of other structures to reduce exposure to winds, and follow maximum loading guidelines as marked on the container. The Developer is required to practice good housekeeping to keep the construction site free of litter, construction debris, and leaking containers. 46.Sanitary facilities shall be prevented from tipping through the use of anchoring to the ground or lashing to a stabilized structure. These facilities shall also be located as far as practical from an inlet, curb cut, drainage swale or other drainage conveyances to prevent material transport from leaving the local area. This consists of the facility being located, where practical, at least fifty (50) feet from any permanent or interim drainage ways. OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS 47.Spills: For those minor spills that; are less than the State's reportable quantity for spills, stay within the permitted area, and in no way threaten any stormwater conveyance, notify the City of Fort Collins Utilities by email at erosion@fcgov.com or phone (970) 817-4770. For any significant, major, or hazardous spills, notify the City of Fort Collins Utilities by phone only after Emergency Response (911) has been notified and is on route, County Health Department (LCDHE) has been notified through Larimer County Sheriff Dispatch (970) 416-1985, and the State Spill Hotline Incident Reporting have been contacted 1-877-518-5608. Written documentation shall be provided to the City within 5 days of the event. All spills shall be cleaned up immediately. 48.Selection of “plastic welded” erosion control blankets shall not be used in areas that wildlife, such as snakes, are likely to be located as these have proven to cause entrapment issues. FINAL STABILIZATION AND PROJECT COMPLETION 49.Any stormwater facilities used as a temporary Control Measure will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the Owner, Homeowners Association (HOA), or other party responsible for long term maintenance of those facility. 50.All final stabilization specifications shall be done in accordance with the Manual, Chapter 4: Construction Control Measures. 51.All disturbed areas designed to be vegetated shall be amended, seeded & mulched, or landscaped as specified in the landscape plans within 14 working days of final grading. 52.Soil in all vegetated (landscaped or seeded) areas, including parkways and medians shall comply with all requirements set forth in Sections 12-130 through 12-132 of the City Municipal Code, as well as Section 3.8.21 for the City Land Use Code. 53.All seeding shall refer to landscaping plans for species mixture and application rates and depths requirements. 54.All seed shall be drilled where practical to a depth based upon the seed type. Broadcast seeding shall be applied at double the rate as prescribed for drill seeding and shall be lightly hand raked after application. Hydroseeding may be substituted for drill seeding on slopes steeper than 3(H):1(V) or on other areas not practical to drill seed and crimp and mulch. All hydroseeding must be conducted as two separate processes of seeding and tackification. 55.All seeded areas must be mulched within twenty-four (24) after planting. All mulch shall be mechanically crimped and or adequately applied tackifier. The use of crimped mulch or tackifier may require multiple re-applications if not properly installed or have weathered or degraded before vegetation has been established. Areas of embankments having slopes greater than or equal to 3H:1V shall be stabilized with an erosion mat or approved equal to ensure seed will be able to germinate on the steep slopes. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented along with, or until, temporary seeding or permanent erosion control can be performed. 56.The Developer shall warranty and maintain all vegetative measures for two growing seasons after installation or until seventy percent (70%) vegetative cover has been established, whichever is longer and meets all the Criteria outlined in the Fort Collins Stormwater Criteria Manual Chapter 4: Construction Control Measures. 57.The Developer shall maintain, monitor, repair, and replace any and all applicable Control Measures until final stabilization has been obtained. All Control Measures must remain until such time as all upstream contributing pollutant sources have been vegetated or removed from the site. When any Control Measure is removed, the Developer shall be responsible for the cleanup and removal of all sediment and debris from that Control Measure. At the point at which the site has been deemed stabilized and verified by City Erosion Control Inspector, all temporary Control Measures can then be fully removed. All measures shall be removed within 30 days after final stabilization is achieved. 58.The responsible party shall maintain and keep current all payments or related forms of security for the Erosion Control Escrow until 1) stabilization has been reached and 2) all Control Measures and/or BMPs have sediment materials collected and the Control Measure removed from the site. At that time the site will be considered completed and any remaining Erosion Control Escrow shall be returned to the appropriate parties. B.STREET IMPROVEMENT NOTES 1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5.Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8.The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C.TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES 1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3.All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5.All lane lines shall be latex paint. 6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8.Latex paint applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10.All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11.A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12.The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13.Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. 16.Contractor is responsible for removing all anchors, posts, signs and/or delineators in Construction area. Contractor may keep the signs, or call the City Traffic Division to have them removed. 17.No "Reset" anchors, posts, signs, and/or delineators will be accepted. 18.All anchors, posts, signs, and/or delineators shall be new and be consistent with the LCUASS criteria. - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C0.0_Cover Sheet.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP GENERAL AND CONSTRUCTION NOTES C0.1 D.STORM DRAINAGE NOTE 1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2.All recommendations of the final Erosion Control Reports for Mulberry dated 01.16.2023 by Galloway and Company, shall be followed and implemented. 3.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 4.See City of Fort Collins Stormwater Criteria Manual – Appendix F Construction Control Measures Standard Notes and Standard Erosion Control Notes. 5.18" minimum vertical separation from other utilities is required including storm pipes and irrigation mains. Less than 18" will require a steel or concrete encasement of the lower sewer or water. WATERLINE NOTE: 1.The minimum cover over water lines shall be 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. TREE PROTECTION NOTES: Tree Protection Specifications. The following tree protection specifications shall be followed to the maximum extent feasible for all projects with protected existing trees. Tree protection methods shall be delineated on the demolition plans and development plans. 1.Within the drip line of any protected existing tree, there shall be no cut or fill over a four-inch depth unless a qualified arborist or forester has evaluated and approved the disturbance. 2.All protected existing trees shall be pruned to the City of Fort Collins Forestry Division standards. 3.Prior to and during construction, barriers shall be erected around all protected existing trees with such barriers to be of orange construction or chain link fencing a minimum of four (4) feet in height, secured with metal T-posts, no closer than six (6) feet from the trunk or one-half (½) of the drip line, whichever is greater. Concrete blankets, or equivalent padding material, wrapped around the tree trunk(s) is recommended and adequate for added protection during construction. There shall be no storage or movement of equipment, material, debris or fill within the fenced tree protection zone. A tree protection plan must be submitted to and approved by the City Forester prior to any development occurring on the development site. 4.During the construction stage of development, the applicant shall prevent the cleaning of equipment or material or the storage and disposal of waste material such as paints, oils, solvents, asphalt, concrete, motor oil or any other material harmful to the life of a tree within the drip line of any protected tree or group of trees. 5.No damaging attachment, wires, signs or permits may be fastened to any protected tree. 6.Large property areas containing protected trees and separated from construction or land clearing areas, road rights-of-way and utility easements may be "ribboned off," rather than erecting protective fencing around each tree as required in subsection (G)(3) above. This may be accomplished by placing metal t-post stakes a maximum of fifty (50) feet apart and tying ribbon or rope from stake-to-stake along the outside perimeters of such areas being cleared. 7.The installation of utilities, irrigation lines or any underground fixture requiring excavation deeper than six (6) inches shall be accomplished by boring under the root system of protected existing trees at a minimum depth of twenty-four (24) inches. The auger distance is established from the face of the tree (outer bark) and is scaled from tree diameter at breast height as described in the chart below. Low pressure hydro excavation, air spading or hand digging are additional tools/practices that will help reduce impact to the tree(s) root system when excavating at depths of twenty-four (24) inches or less. Refer to the Critical Root Zone (CRZ) diagram, Figure 2, for root protection guidelines. The CRZ shall be incorporated into and shown on development plans for all existing trees to be preserved. EAST LARIMER COUNTY WATER DISTRICT GENERAL NOTES FOR CONSTRUCTION Version: 12/2/2021 The following information is condensed from the current "Standard Construction Specifications for Water Mains" (Specification) as adopted by the East Larimer County Water District (‘ELCO’ or ‘District’) and is to be considered as such. In the event of any conflict the full District Specification document shall take precedence over these general notes. 1.Standards and Specifications: Construction shall be per the District Specifications in effect at the start of construction. Material or equipment shall be manufactured per the most recent version of applicable industry standards. 2.Locates: Contractor shall coordinate field locates of all existing utilities prior to commencement of any construction and as required notify all affected utility companies prior to commencing construction. Cost of repairs to any utility damaged during District waterline installation shall be the responsibility of the Contractor. 3.Damage to Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done and shall be fully responsible for all costs associated with damage to any and all public and private property. 4.Safety: Contractor shall comply with any and all requirements and regulations as set forth by any local, City, County, State or Federal agency having applicable authority. 5.Landscaping Adjacent to District Waterlines: No landscaping (bushes, shrubs, trees or other plantings) that has a mature height of over 3 feet (3-ft) shall be placed within ten feet (10-ft) of any District waterline or appurtenance (distribution main, service line, fire hydrant, meter, etc.). Bushes or shrubs with a mature height of less than 3-ft shall be placed a minimum 5-ft from any District water line, service line or appurtenance. The District shall have the right to remove any landscaping that violates this standard, at any time such landscaping is discovered, and shall not be required to replace the removed landscaping. 6.Design Approval and Construction Start: No construction shall begin without prior design acceptance from ELCO. District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. 7.Permits: Contractor is responsible for obtaining all permits which may be required. For any permitting where the District must apply for a permit the Contractor shall coordinate, cover the cost and schedule the permit acquisition with the District. 8.Changes During Construction: No verbal authorization for field revision shall be given. All requests for such field revision shall be made in writing with the proposed change indicated on a copy of the signed design drawings. Any field revision approved and installed shall also be accurately documented on the As-Built Drawings. 9.Materials of Construction: A.Pipe: All water line piping shall be Polyvinyl Chloride (PVC), DR 18 (pressure class 235 psi) and manufactured in accordance with AWWA Standard C900-16, "Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fitting, 4-inch through 60-inch, ", or most recent version. B.Tracer Wire: All water piping shall be installed with a twelve (12) gauge solid copper wire, plastic coated, six hundred (600) volts, taped to top of pipe and surfaced at each hydrant into a tracer wire box. C.Pipe Joints: Pipe joints shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber ring gaskets and machined pipe ends to form a push-on type joint. D.Materials and Installation: All materials installed shall be new and free of manufacturer defects or damage. E.Pipe Fittings: All fittings shall be ductile iron mechanical joint and manufactured in accordance with AWWA Standard C153, 250 psi rating. Fittings shall be furnished with fusion bonded epoxy exterior coating and interior lining. All fitting connections to valves, fire hydrants or other MJ type connections shall use foster adaptor type connectors. F.Gate Valves: Gate valves shall conform to AWWA Standard C509 with mechanical joint, 2" open left operating nut and resilient seat. G.Butterfly Valves: Butterfly valves shall be used for all valves 12-inches and larger and conform to AWWA Standard C504 with mechanical joint, 2" open left operating nut with resilient seat. H.Fire Hydrants: Hydrants shall conform to AWWA Standard C502, 1" square open-right operating nut with epoxy coated shoe. I.Pipe, Valve and Fitting Wrap: All ductile iron fittings, valves, fire hydrant shoes and plugs shall be poly-wrapped with 8-mil thick polyethylene plastic wrap, double layered, and ends securely taped prior to backfill. All fitting bolts shall be fluoropolymer coated (‘blue bolt’ type) with zinc caps installed. 10.Bedding: All pipe shall be bedded in 3/4" washed rock uniformly graded and compacted. Trench shall be excavated to a depth below established grade equal to 1 4 of pipe diameter (min. 4"). 1-1/2" uniformly graded washed rock shall be used for stabilization where needed. Bedding material shall be placed and compacted under and around sides of the pipe per the pipe manufacturer’s installation recommendations. 11.Backfill: Backfill of acceptable material shall be placed in ‘lifts’ of uniform horizontal layers not to exceed 6-inches of compacted depth per lift. Minimum 18" of compacted backfill above pipe must be in place before rolling mechanical equipment type compaction is to be used. Backfill shall be compacted to 95% of optimum density in roadway areas or per road authority’s requirements, and 90% in fields or non-road locations. Backfill compaction testing frequency shall be at least one test per 100-lineal feet of pipeline length and at varying depths and locations in accordance with the requirements of the applicable road authority or beginning 1.5-feet above top of pipe and at 1-foot increments to grade. 12.Joint Restraint: All fittings, tees, plugs and fire hydrants shall be provided with foster adaptor type and/or other mechanical joint restraint in accordance with District Specifications or as required per engineer’s design. Thrust blocks shall be used only as required per field conditions and as approved or directed by the District field inspector. 13.Concrete: All concrete construction, including thrust blocks, shall be completed utilizing Type 5 or equal cement only. 14.Asphalt Replacement: For asphalt pavement that is cut and has been in place less than two years (according to City or County Engineer's record), the cut shall be a minimum of 20 feet in width and will be replaced to the specified depth by a paving machine. 15.Pipe Cover: Pipe cover of 4-1/2 to 5-1/2 feet over top of pipe shall be maintained throughout the waterline and service line installation, particularly in areas of new grading and drainage swales. Maximum allowable cover shall be 6 feet, unless specifically approved by the District. 16.Connection to Existing System: All connections to existing waterlines shall be completed at the developer's expense. 17.Inspection: The District shall have the authority to assign an inspector who shall inspect, check and verify that any and all work, including all materials to be incorporated in the work, excavation, bedding, backfill, testing and all construction methods and practices of the installed facilities is equal to or better than minimum construction requirements as set forth in the District’s Specifications. 18.Testing: All lines shall be pressure tested, chlorinated and flushed by the Contractor in accordance with District Specifications and under the District's supervision. Upon passing chlorination testing, bacteriological testing will be completed by a State certified water quality control laboratory. Copies of all passing test results, including soils compaction in the area of water main construction, shall be provided to the District. 19.Preliminary Acceptance: Preliminary Acceptance shall be issued to the Owner when all project work is complete, tested and operational such that the infrastructure is ready to be accepted by the District. Documentation required prior to issuance of Preliminary Acceptance includes but is not limited to bacteriological test report, flushing report, hydrotest report, compaction testing reports with map of test locations, statement of water line installation costs, As-built drawings and Record Drawings. Following receipt, review and acceptance by the District of these and other documents as may be required per project specifics, the District will issue Preliminary Acceptance. 20.Project As-Built and Record Drawing Requirements: A.As-Built Drawings are compiled and maintained during construction by the Contractor and identify, in red ink, on-site changes to the original design. As-Built Drawings shall be delivered to the District (electronically in PDF format or otherwise as requested by the District) for acceptance and to the project’s design engineer for creation of Record Drawings. B.Record Drawings are prepared by the project’s design engineer and shall accurately reflect any change made in the field which varies from the accepted construction plans, as noted in the As-Built Drawings, including at a minimum, field dimensions and elevations, horizontal and vertical locations of underground utilities and appurtenances. The Contractor’s surveyor shall survey in all fittings, valves, water service curb stops and other appurtenances so as to accurately document and create a final set of Record Drawings with water line, fitting and appurtenance locations that accurately represents the final, installed infrastructure. The Record Drawings shall be reviewed and accepted by the District prior to Preliminary Acceptance of the project. Record Drawings are to be delivered to the District in electronic format as Adobe (PDF), AutoCAD and ArcView shape files (release version to be confirmed with District at time of submittal). 21.Warranty: The Owner/Developer shall warrant all work associated with the waterline installation including, but not limited to the materials, installation workmanship and surface restoration for a period of two (2) years from date of Preliminary Acceptance. During this warranty period the Owner/Developer shall repair any defects in the work and maintain the work area. At the close of the two-year warranty period and upon satisfactory correction of any deficiencies noted, the District shall accept the constructed lines and appurtenances as the sole property and responsibility of the District. MCK JEP GENERAL AND CONSTRUCTION NOTES C0.2 - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C0.0_Cover Sheet.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C1.0_Existing Conditions.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP EXISTING CONDITIONS C1.0 KEYMAP Know what's before you dig. - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C1.0_Existing Conditions.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP EXISTING CONDITIONS C1.1 KEYMAP Know what's before you dig. KEYMAP - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C2.0_WATER.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 Know what's before you dig. MCK JEP WATERLINE 1 PLAN AND PROFILE C2.0 KEYMAP - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C2.0_WATER.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 Know what's before you dig. MCK JEP WATERLINE 1 PLAN AND PROFILE C2.1 WATER DETAILS C2.2CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R MCK JEP - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C2.2_Water_Details_F1.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 WATER DETAILS C2.3CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R MCK JEP - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C2.2_Water_Details_F1.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 WATER DETAILS C2.4CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R MCK JEP - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C2.2_Water_Details_F1.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C1.0_RESTORATION PLAN.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP RESTORATION PLAN C3.0 KEYMAP Know what's before you dig. - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C1.0_RESTORATION PLAN.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP RESTORATION PLAN C3.1 KEYMAP Know what's before you dig. - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C4.0_Erosion control.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP EROSION CONTROL PLAN C4.0 KEYMAP Know what's before you dig. - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C4.0_Erosion control.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022 MCK JEP EROSION CONTROL PLAN C4.1 KEYMAP Know what's before you dig. Know what's before you dig. MCK JEP EROSION CONTROL DETAILS C4.2 - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_4.2_EC_Details.dwg - Matthew Kasch - 1/16/2023Init.#Issue / DescriptionDateDEVELOPMENT CONSTRUCTION PLANSBLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 01.16.2023 HFH000022