HomeMy WebLinkAboutTHE OVERLOOK CONVENIENCE CENTER AT ARAPAHOE FARM PUD - PRELIMINARY - 55-87N - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW Commuer Planning and Environmental ices
Current Planning
_...sit._ipt.
Cit of Fort Collins
January 23, 1996
Mr. David Pietenpol, Wheeler Realty ' - A L A L E K.A N 0 E 2
C/O Mr. Eldon Ward
Cityscape Urban Design
3555 Stanford Road, Suite 105
Fort Collins, CO 80525
Dear Eldon:
For your information, attached is a copy of the Staffs comments concerning Convenience
Center at Arapahoe Farm O.D.P. presented before the Conceptual Review Team on January
16, 1996.
The comments are offered informally by Staff to assist you in preparing the detailed components
of the project application. Modifications and additions to these comments may be made at the
time of-formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6750.
Sincellrel�y�
........... ,?Ai
Ted Shepard
Senior Planner
TS/clm
Attachtnents
cc: Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970)221-6378 • TDD (970) 224-6002
CONCEPTUAL REVIEW STAFF COMMENTS
Ci of Fort Collins
MEETING DATE: January 22, 1996
ITEM: Convenience Center at Arapahoe Farm O.D.P.
APPLICANT: Mr. David Pietenpol, Wheeler Realty do Mr. Eldon
Ward, Cityscape Urban Design, 3555 Stanford
Road, Suite 105, Fort Collins, CO. 80525.
LAND USE DATA: Request for a Neighborhood Convenience
Shopping Center on 3.5 acres located at the
northwest corner of Old Harmony Road and
Seneca Street. Potential uses include a 2,500
square foot convenience store, with gas pumps
and canopy and with one-bay automatic carwash.
Other potential uses include retail, office, daycare,
restaurant, and residential.
COMMENTS:
1. The site will be served by the City of Fort Collins Light and Power
Department. Electrical facilities are in the New Harmony Road
right-of-way and can be extended to serve the site. The
transformer must be located so that it is not visible from a public
street and be within ten feet of hard surface for emergency change
out. Screening may be by landscape materials or by a solid
enclosure meeting the clearance specifications of Light and Power.
For further information, please contact Bruce Vogel, 221-6700.
2. There is a 16 inch diameter water line and an eight inch diameter
sanitary sewer main in New Harmony Road. The carwash will need
a sand and oil interceptor. Landscaping and irrigation must comply
with the water conservation standards. For further information,
please contact Jeff Hill, 221-6681.
COMMUNITY PLANNING&
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS,COLORADO 80522-0580(303)221-6750
PLANNING DEPARTMENT
3. The site is located in the residential neighborhood sign district
which has stricter signage allowances than what the Sign Code
would allow along South College Avenue. For further information,
please contact Gary Lopez, 221-6760.
4. For the proposed restaurant, and If there is to be food service in
the convenience store, the commercial kitchen(s) will be reviewed
by the Larimer County Health Department for compliance with
public health codes. Please be aware that rooftop exhaust and
ventilation equipment must be totally screened from public view or
view from any adjacent residential lot.
5. For the residential portion, if there is more than seven dwelling
units, then one of the units must be handicap accessible. For
further information regarding compliance with handicap access
codes, please contact Sharon Getz, 221-6760.
6. For the residential units, the Parkland Development Fee will $813
per unit payable at the time of building permit issuance. This fee is
subject'to an annual increase based on the Denver-Boulder
consumer price index.
7. A new fire hydrant will be required along New Harmony Road. The
installation of the underground gas tanks is subject to a separate
permitting process and inspection by the Poudre Fire Authority. A
Hazardous Material Impact Analysis will also be required. As
presently shown, the two western buildings are not totally within
150 feet of a fire access lane. For further information regarding
compliance with the Poudre Fire Authority, please contact Roger
Frasco, 221-6570.
8. The interior parking areas must have no less than 6% of the area in
the form of landscape islands.
9. The site is located in the McClelland/Mail Creek Drainage Basin.
The storm drainage fee in this basin is $3,717 per acre. Onsite
detention will be required. A storm sewer will be required along the
New Harmony Road frontage. The release rate will be restricted to
the two-year historic unless otherwise noted in the previously
approved drainage studies for the area.
10. Please be aware that there may be rear lot drainage from the
adjacent residential lots along Overlook Drive and Vista Court that
impacts your property. This drainage must be accounted for.
11. A Drainage Report, Drainage and Grading Plan, and Erosion
Control Plan must be submitted at the time of Preliminary P.U.D.
For further information, please contact Glen Schlueter, stormwater
engineer, 221-6589.
12. The street oversizing fee for retail/commercial is $14,005 per acre.
For office, the fee is $10,504 per acre. For residential, the fee is
$584 per dwelling unit. All fees are due at the time of building
permit issuance. Fees are prorated over the applicable land area
per use.
13. A traffic impact analysis will be required.
14. The City acknowledges that a decision must be made on the fate of
Old Harmony Road. This decision will determine the site layout
and circulation system for this site as well as for the Harmony
Ridge P.U.D., the adjacent property to the south.
15. The developer is responsible for the local street portion of the
public street frontage along New Harmony Road and Seneca if it is
extended south.
16. Utility plans are required. A Development Agreement must be
executed between the City and the developer prior to allowing work
to begin on the site. For further information, please contact Sheri
Wamhoff, development engineer, 221-6750.
17. The western boundary directly abuts existing residential. This area
will need a substantial buffer zone to mitigate light, noise, and other
activities associated with commercial development.
18. The site will have to be developed in a sensitive manner due to the
proximity of existing residential. Buildings should feature a
residential style with pitched roofs and heavy dimensional asphalt
shingles. Siding should be high quality materials.
19. A neighborhood information meeting will be required.
u
. -4— Tank Test -
_Spill Device j
I
Vapor—� L��
Monitor0
Q ,
Interstitial Monitoring
Monitor —is Well "4'
®—InTank
Monitor
6
j- Barrier w/
' Monitor
Water•Tattle : .
w•
Vent Pipes
e
Tank Truck .
t
a •
• Fill Pipe Iti ,
yam' 4 i2a
Delivery Hose _ l., .,
' h. ...
•
�~ � Line leak
De'.:ctors
•
, 1 , .._, .. .,.., , , , . ,
.. . , ... _ . . . . , ,.,.„ ,. .,„...
:, r :, _ .
_ .. . , • .
. . _
: , „.. ..
„ . . .
. _
, . . ._
_ _ _
.. .. „. , . All- _ .., .. . .
. . . _ . . Product Delivery Lane
Product Dispensers ,
A Typi•cal Tank Facility
c
''1 rf+' Ji: } ;t'i il r r } r a r ;` �dY .
r n..v
•
�.
W 1