Loading...
HomeMy WebLinkAboutTHE OVERLOOK CONVENIENCE CENTER AT ARAPAHOE FARM PUD - PRELIMINARY - 55-87N - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST ©WC® oe urban design, inc. 3555 stanford road,suite 105 fort Collins,(o70)22 TRANSMITTAL LETTER 9 6-4074 FAX (970)226-4196 TO: Ted Shepard City of Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 DATE: November 25, 1996 PROJECT: The Overlook at Arapahoe Farm PROJECT NO: 0360 We are transmitting the following: 1 each Submittal per the attached Preliminary PUD Checksheet BY MESSENGER Sincerely, Received by: yscap rn Design, Inc. ' • Checksheet The Overlook at Arapahoe Farm Preliminary PUD The following check sheet is to be used in the preparation of a complete submittal of a Preliminary PUD Plan: X Application (1 copy). X . Filing fee ($1,472.00 + $656.00 (plat) = $2,128.00/ X / Legal description of property (2 copies on 8' " X 11" sheet)! X / A current list of names and addresses of all owners of record of real property within the boundaries as defined by the City of Fort Collins. The APO list and labels were submitted on October 1, 1996. APO filing fees of$150 (317 names X 50C) are included with the filing fees. X ' Planning objectives (25 copies). X Completed point charts (3 copies). NA 7. Energy conservation worksheet (3 copies).-- X y Architectural elevations (5 folded copies). X 9/ Site plan (25 folded copies). X 1,0'. Landscape plan (16 folded copies). X 1- Utility plans (10 unfolded copies). NA 12. Street cross sections (5 unfolded copies).046 X .1.3( Physiographic data (2 copies). X 14. Preliminary drainage report and plans and grading plans (4 unfolded copies). X )fS Preliminary subdivision plat (21 folded copies). X .1XTraffic impact analysis (4 copies). NA 1.7! Hazardous materials impact analysis (4 copies). X 18. Other documentation as determined by special circumstance. ,Land use breakdown (2 copies). ,Context diagram (5 folded copies). 4.12