Loading...
HomeMy WebLinkAboutSTANFORD SENIOR LIVING - FDP210017 - SUBMITTAL DOCUMENTS - ROUND 5 - STAFF'S PROJECT COMMENTSCommunity Development and Neighborhood Services 281 North College AvenuePO Box 580Fort Collins, CO 80522970.221.6689970.224.6134 faxfcgov.com/developmentreviewJanuary 18, 2023Klara Rossouw Ripley Design, Inc419 Canyon Ave, Suite 200Fort Collins, CO 80521RE:Stanford Senior Living, FDP210017, Round Number 5Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Stanford Senior Living. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Tenae Beane via phone at 9702246119 or via email at tbeane@fcgov.com. Comment Summary:Department: Development Review CoordinatorContact: Tenae Beane, 9702246119, tbeane@fcgov.comTopic: GeneralComment Number: 8 All "For Final Approval / For Approval" comments need to be addressed and resolved prior to moving forward with the final documents and recording of this project. I will provide a recording checklist and process information when we are closer to this step.Comment Number: 9 01/05/2023: FOR RECORDING: Please be sure that the planning set includes the elevation sheets and photometric plan as part of the cover page sheet index and submit as one combined set.Department: Engineering Development ReviewContact: Marc Virata, 9702216567, mvirata@fcgov.comTopic: GeneralComment Number: 3 01/03/2023: for approval:The submitted drawings with the submittal (elevations, fire access, photometric, and site & landscape) don't necessarily have concerns, but the entire entitlement set should be resubmitted (plat, civils, etc.) to verify everything's been coordinated with the changes.Comment Number: 4 01/03/2023: for approval:Please provide information on any change on intention behind who is the owner/developer at time of recording of the plans for verification that the manner the plat, site, and D.A. ownership/developer signatures are still correct.Department: Stormwater EngineeringContact: Dan Mogen, 9703055989, dmogen@fcgov.comTopic: GeneralComment Number: 6 01/13/2023: FOR RECORDING:Please provide stamped, signed, and dated drainage report.Department: WaterWastewater EngineeringContact: Dan Mogen, 9703055989, dmogen@fcgov.comTopic: GeneralComment Number: 7 10/22/2021: INFORMATION:Starting January 1, 2022 all nonresidential and multifamily developments will be required to have a separate irrigation tap, provide a preliminary irrigation plan at FDP, and meet updated water supply requirements. In general, developments that use less water will pay less (e.g., offices or retail spaces), while developments that use more water will pay more (e.g., restaurants or hotels). Staff encourages developments to take these upcoming requirements into consideration now. Specific information can be found at fcgov.com/wsrupdate.Department: Light And PowerContact: Austin Kreager, 9702246152, akreager@fcgov.comTopic: GeneralComment Number: 1 08/16/2021: INFORMATION:Thank you for supplying a proposed C1 form. I see no issue with what was proposed, and I look forward to seeing a finalized C1 form along with a oneline diagram prior to DCP.Comment Number: 3 08/16/2021: INFORMATION:Electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this development.Comment Number: 4 08/16/2021: INFORMATION:You may contact Austin Kreager, project engineering if you have questions.(970) 2246152. You may reference Light & Power’s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18November2016_Amendment.pdfYou may reference our policies, development charge processes, and use ourfee estimator at http://www.fcgov.com/utilities/business/buildersanddevelopers.Department: GISContact: Lauren Wade, 9703025962, lwade@fcgov.comTopic: GeneralComment Number: 1 09/10/2021: GIS Reviewed. No changes required.Department: Technical ServicesContact: Jeff County, 9702216588, jcounty@fcgov.comTopic: PlatComment Number: 1 01/17/2023: FOR FINAL APPROVALUPDATED:The previous redlines were not addressed. Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. If you have any specific questions about the redlines, please contact John Von Nieda at 9702216565 or jvonnieda@fcgov.comDepartment: Outside AgenciesContact: Don Kapperman, Comcast, don_kapperman@comcast.com, Topic: GeneralComment Number: 1 09/14/2021: Comcast does not have any issues at this time. Thank you