RE: Arapahoe Farm Townhomes P.U.D. - Meeting of August 11, 1994
The attached is a summary of what I understand was agreed to by the
parties at the meeting of August 11, 1994,. regarding how the
reconstruction of vacated Hilburn Drive would be completed by the
developer. Please review the text and return your comments to me
as soon as possible. If there are disagreements with my
interpretation we may have to discuss these items further.
In a conversation I had with Tom Wilberton last Friday, he asked
for a change in how the new fence is constructed on the north side
of the new walk. He would like to have the new fence constructed
along the east property line of the development from the west end
of the new fence north to the existing timber retaining wall (about
16 feet) . In exchange he would agree to reduce the. length of new
fence paralleling the new walk at the east end by the same length.
This would keep the agreed upon length of new fence to be
constructed by the developer the same.
If you have any questions please call me at 221-6750.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605
410
ARAPAHOE FARM TOWNHOMES P.U.D.
Vacation of Hilburn Drive
8/29/94
The following is a summary of the agreements between the developer
and the adjoining property owners that were made during the meeting
held Thursday, August 11, 1994.
1. The fencing in the Hilburn Drive vacated area shall be
installed 4 feet from each side of the new 5 foot wide
walk.
2. The developer agrees to remove the existing fence on the
Gottschalk property paralleling Hilburn Drive; reinstall
the fence 4 feet south of the new walk and construct new
fence needed to make the fence whole. The new portion of
fence shall be the same as the existing fence. The fence
construction will be done by a reputable fence company in
Fort Collins.
3. The developer agrees to construct a new fence paralleling
the new walk in vacated Hilburn Drive 4 feet north of the
walk, from the front of the Wilberton property, in. line
with the front of the house, to the rear property line
bordering the east property line of the development. The
fence will match the fence constructed for the Gottschalk
and, also, be constructed by a reputable fence company in
Fort Collins.
4. The developer agrees to grade the vacated street area to
match the landscaped areas of the Wilberton and
Gottschalk properties. In addition the developer shall
grade onto the. Gottschalk property to tie into the
predominantly existing grade of the Gottschalk backyard
and maintain grading out to the new fence to be
"ergonomically acceptable" for usability of the backyard
(but not necessarily flat) . Then the grade shall be
sloped to the new walk at no more than a 4: 1 slope (the
maximum allowed slope for City standards) . Grading on
the north side of the new walk shall be done so that no
ponding will be created on the existing landscaped area
of the Wilberton property nor on the newly graded area,
and, in addition, grading to add elevation to meet the
grade of the developer's property shall begin, heading
west, at the timber planter/retaining wall and shall not
in any location top the the wall.
5. The developer agrees to install new sprinkler system in
the vacated street area. The new system will tie into
the Gottschalk's and Wilberton's existing Systems with
the new walk being the dividing line between the two
systems. The tie ins shall be done professionally in a
workperson like manner.
411
6. The developer agrees to sod all graded areas to match the.
existing grass areas on the Gottschalks and Wilbertons
properties.
7. The developer agrees to restore any existing landscaping
disturbed by the construction operation.
8. The Gottschalks and the Wilbertons will allow the
developer onto their property to perform all of the above
described work.
Requirements of the developer by the City mentioned in the meeting
were as follows:
1. The developer shall install the berm and the swales along
the east property line of the development with the first
phase of three phases in the development.
2. A swale must be formed off of the new walk in the vacated
street area to direct storm runoff through a sidewal
chase under the new sidewalk of Hilburn Court.