HomeMy WebLinkAboutARAPAHOE FARM TOWNHOMES PUD - FINAL - 55-87K - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETING 411
•
THIRD NEIGHBORHOOD MEETING MINUTES
PROJECT: Arapahoe Farm Townhomes, Final P.U.D.
DATE: February 2 , 1994
DEVELOPER: Mr. Jim Postle, The James Company
CONSULTANT: Mr. Eldon Ward, Cityscape Urban Design
CITY PLANNER: Ted Shepard
The meeting began with a review of the agenda. Topics to be
covered include disposition of the Hilburn Drive dead-end,
landscaping, building materials, architectural elevations,
QUESTIONS, CONCERNS, COMMENTS
1. The two adjacent property owners are reluctant to accept
additional lot area from the vacated public right-of-way if it
remains as a public street. We are concerned about the change of
grade between the street level (low) and Arapahoe Townhomes (high) .
There must be some kind of permanent structure or retaining wall
that addresses this grade change. This wall should be brick. As
an example, there is an attractive retaining wall in Taft Canyon
that separates the lower area from the upper area.
2 . Further, foot traffic needs to be controlled so there is no
"cutting-through" our properties by kids going to the two schools.
This may require a gate or controlled access to a path that is
ramped. There is a concern that the ramp not be so steep as to
preclude use by the disabled.
3 . The level of the street needs to be brought up so the
additional lot area is usable.
4 . There is currently an erosion problem with the grade change at
the rear corner of the southerly lot. This will have to be
addressed.
5. Neither adjacent property owner desires a half-court
basketball facility that was suggested at earlier meetings.
RESPONSE: These are all good ideas. The developer is willing to
work with the two owners, and the City of Fort Collins to find the
best way to dispose of the right-of-way.
1
•
6. Are there utilities in the portion of Hilburn Drive that is
intended to be vacated?
RESPONSE: Yes, there are water and sewer lines and a fire hydrant.
7. The 54 feet of right-of-way is too narrow for another lot.
RESPONSE: Agreed. While there are plenty of examples of high
quality housing on 54 foot wide lots, clearly such a lot would be
out of character with the existing neighborhood.
8. We should meet out on the site to gain a better understanding
of the grade separation from west (proposed townhomes) to east
(existing houses) . Representatives from the City Engineering
Department should also attend since the City will play a key role
in the ultimate disposition of the right-of-way.
RESPONSE: Agreed. In fact, the vacation of the public right-of-way
must be approved by the City Council.
9. What about the berms shown along the east property line of the
project? Will these berms cause drainage problems on our
properties?
RESPONSE: No, there will be a swale between your properties and the
berms to capture the runoff and direct the flows into the two
detention ponds being planned on the site.
10. What is the height of berm?
RESPONSE: The berms will range in height from 3 to 4 1/2 feet.
11. Have the berms increased in length since the preliminary?
RESPONSE: Yes, the length has increased.
12 . What is the ultimate height of a Blue Spruce?
RESPONSE: Ultimate height would be about 100 feet.
13 . We are concerned about the views to the west.
RESPONSE: At earlier meetings, there was a concensus to place a
generous amount of landscaping along the east property line to
buffer the existing homes from the townhomes.
14 . What about solar acces for our lots? Won't all the
landscaping western sun in the afternoons?
P g w rn block our e t
RESPONSE: Please keep in mind that most of the benefit of solar
exposure is gained from a southern orientation, not western. There
2
•
should be no lack of sun to the rear yards during the growing
season.
15. We are concerned about the timing of the landscaping. The
area closest to our homes is in the final phase. Does this mean
that all the landscaping designed to buffer our homes will be
planted last with the final phase? This easterly landscaping
should be planted early on with the first phase in order to
establish maturity.
RESPONSE: This is a good comment. We will look at planting this
area with the first phase. We have to be careful with construction
activity and would hate to see trees destroyed by construction.
Also, the shaping of the berm has to occur before plant material
can be installed.
16. How long do you anticipate it will take to complete all three
phases and complete the project?
RESPONSE: Two years at the most, hopefully, 18 months.
17 . Building J is closest to our house. This building should be
shifted to the south which would pull it away from our lot. This
could be done by reducing the size of the next building to the
south, Building K, from a 5-plex to a 6-plex.
RESPONSE: Please keep in mind Building J is angled away so that
there is less impact on the adjacent lots. Also, this is the area
with the berms and most generous landscaping. Finally, it may be
difficult to shift further south due to the detention pond.
18. What are the setbacks on Buildings G and J from property line?
RESPONSE: Measuring from the building, not the garden wall, the
distance is 55 feet for both buildings.
19. It would be my preference that Buildings G and J be reduced
further to 3-plexes.
RESPONSE: This would be difficult for the developer to accept.
20. Is there a mix of deciduous and conifer trees?
RESPONSE: Yes.
21. What earthwork will be done with the first phase?
RESPONSE: Development of the first phase will require the entire
site to be overlot graded, with proper excavation for the drainage
swales and detention ponds. Berms will also be sculpted. (Please
keep in mind that berms, by themselves, do not direct drainage.
3
• •
This is done by the swales. )
22 . Will the problem with standing water in the southeast corner
be resolved with the first phase?
RESPONSE: Yes.
23 . We have had a real problem with construction debris blowing in
from the Woodridge project. So far, the developer of Woodridge has
been uncooperative in keeping his construction site clean. Debris
piles up in our yards and along our fences. Since we will be
downwind of Arapahoe Farm Townhomes, we are concerned about blowing
trash and debris. Is the developer willing to construct a
temporary fence to capture the blowing trash and debris?
RESPONSE: Yes, we are willing to look at doing this.
24 . What about the fence along Harmony? Will it look like the
fence in Regency?
RESPONSE: No, it will be brick but it will have more openings and
be lower. There will also be some berms along Harmony unlike in
Regency.
25. Could you again describe the size of the units and the
potential asking price?
RESPONSE: The interior units will range in size from 1, 140 to 1, 200
square feet and in price from $95, 000 to $100, 000. The end units
will be about 1, 340 square feet and price will range from $110, 000
to $120, 000.
26. Will the developer consider fencing in addition to landscaping
and berming?
RESPONSE: We would rather put our money into landscaping and
berming than fencing. We would not want to do both. Again, the
concensus at earlier meetings was that landscaping was preferable
to fencing to maintain an open character.
27. Since my lot is the most affected by Building J, I would
prefer the developer provide a fence in addition to the landscaping
and berming as proposed.
RESPONSE: Building J is angled toward your lot. The setback will
range from 55 to 80 feet. The developer would rather not do
fencing in addition to the landscaping.
28. What about the building materials? Has the developer
considered a "permatek" roof? This roof is a cedar shake look
alike that would blend in with Regency Park. (Permatek roof is a
4
i •
composite roof consisting of Portland cement and wood fiber. )
Also, east of Harmony, in the Gates at Woodridge, there is mostly
cedar shake. Miramont and Adriel Hills uses Permatek roof. We are
concerned about compatibility.
RESPONSE: We are proposing a 300 lbs. composition shingle roof.
This a high quality roof that lasts 25 to 30 years. This type of
shingle has a high definition which gives it a shadowline. The
shingles in the Overlook at Woodridge are a 240 lbs. roof so our
roof will be superior to that.
29. It seems we have an issue here with the roof. We believe the
roofing material is critical in determining compatibility.
30. How much brick will be on the buildings?
RESPONSE: The lower level of the fronts of the building will
feature brick. We are still adjusting the exact amount of brick on
the buildings at this time.
31. Will the chimneys be brick?
RESPONSE: No, the chimneys will be enclosed with 8 inch lap siding.
32. Will there be trash dumpsters and noisy trash service?
RESPONSE: No, there will be no dumpsters. Individual units will
have separate household-sized containers that will be put out on
trash collection day. The association will likely select one
hauler.
33 . Have you drafted your covenants yet? When do you turn over
control to the homeowner's association?
RESPONSE: No, not yet. The developer will control the association
until 75% of the units have been sold. Control will then be turned
over.
34 . As mentioned at previous meetings, we are concerned about
lighting. What are your lighting plans?
RESPONSE: Harmony and Seneca are public streets and will feature
standard lighting as per the City of Fort Collins. Within our
project, we hope to have security lighting that is necessary but
not excessive. There will security lighting on the buildings, on
poles, and in areas to illuminate pedestrian walkways.
35. Will the buildings have to be raised to provide proper grade
for sewer purposes?
RESPONSE: No.
5
A g n P R HO E P'Af M 76 nl 1 Aft e-4
NEIGHBORHOOD IIADORMATION NIEETIrS DId You
ecei ve ion?.ddr Correct
Q/27 ' 41 3.c Novi • 7 • of this meeting?
Name Address ZiP Yes No Yes No
•
7 i SHP19,c,0 G ® r'r PL 6 ,6) 7-,
6 c M!k- .AlS-c -i. 4 -1( 1-1- IL&At2rJ 0`'"',� ,,' 4077,yt Q,C
0-) - 41-leeletIe xlV:24 at,z2/01,) /
_741AJA) - 4) i t___AEL7--0„) 4-4,' ( 9 #/t&i.,; ) ._
STe ./E. fe.‹./F s 4 uo E GSA IG' ,.,e. gyros- t, , ' ' k.,'
'1-lavt- (. (aosscn LiCZ9 I414iiiil. G. (9 �,,
.(et)C" Ott tbV zt4( 4 l'i ;Grhj e4 .3dSz1
,/kyle 4'. ti pis, 7 kl: / :: ,, cf gacZ‘ ✓ :,--
-��-� ,,,- 5-0 5-- f// ,, cc/a, c ee, e/