HomeMy WebLinkAboutARAPAHOE FARM TOWNHOMES PUD - FINAL - 55-87K - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST + • •
[31� -a o e
urban design, inc.
3555 stanford road, suite 105
TRANSMITTAL LETTER fort collins,colorado 80525
(303)226-4074
FAX (303)226-4196
TO: Ted Shepard
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, CO 80522
DATE: February 7, 1994
PROJECT: Arapahoe Farms
PROJECT NO: 3820
We are transmitting the following:
1 each Submittal Package for Final PUD Plans per attached Checklist from the City of
Fort Collins Development Manual.
BY MESSENGER
Sincerely, Received by:
./ •
i
Cityscape Urban Design, Inc.
Checksheet Arapahoe Farm Townhomes PUD
The following check sheet is to be used in the preparation of a complete submittal of a Final PUD
Plan:
X 1. Application form (1 copy).
X 2. Filing fee ($110.00) plus $10.00 per page of the subdivision plat.
plus $58 . 50 ( 50¢ per name on the APO List — 117 names )
X 3. Site plan (25 folded copies).
X 4. Landscape plan (16 folded copies).
X 5. Final subdivision plat (21 folded copies).
X 6. Final utility plans (10 unfolded copies).
X 7. Final drainage report and plans and grading plans (4 copies).
X 8. Other documentation as determined by special circumstances.
Land Use Breakdown
Legal Description
Point Charts
4.16