Loading...
HomeMy WebLinkAboutARAPAHOE FARM TOWNHOMES PUD - FINAL - 55-87K - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST + • • [31� -a o e urban design, inc. 3555 stanford road, suite 105 TRANSMITTAL LETTER fort collins,colorado 80525 (303)226-4074 FAX (303)226-4196 TO: Ted Shepard City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 DATE: February 7, 1994 PROJECT: Arapahoe Farms PROJECT NO: 3820 We are transmitting the following: 1 each Submittal Package for Final PUD Plans per attached Checklist from the City of Fort Collins Development Manual. BY MESSENGER Sincerely, Received by: ./ • i Cityscape Urban Design, Inc. Checksheet Arapahoe Farm Townhomes PUD The following check sheet is to be used in the preparation of a complete submittal of a Final PUD Plan: X 1. Application form (1 copy). X 2. Filing fee ($110.00) plus $10.00 per page of the subdivision plat. plus $58 . 50 ( 50¢ per name on the APO List — 117 names ) X 3. Site plan (25 folded copies). X 4. Landscape plan (16 folded copies). X 5. Final subdivision plat (21 folded copies). X 6. Final utility plans (10 unfolded copies). X 7. Final drainage report and plans and grading plans (4 copies). X 8. Other documentation as determined by special circumstances. Land Use Breakdown Legal Description Point Charts 4.16