Loading...
HomeMy WebLinkAboutSUN COMMUNITIES - THE FOOTHILLS - FDP220005 - SUBMITTAL DOCUMENTS - ROUND 4 - SUPPORTING DOCUMENTATION (3)400A MCB KWH METER #3/0 GEC (REFER TO GROUNDING & BONDING DETAIL) UTILITY 'XFMR' 120/240V. 1Ø. 3W. LOCAL ENERGY CTC RP-"A" (2) SETS OF 4"C. EA. W/ 3-350KCM POWER ONE-LINE DIAGRAM N.T.S. 400A MCB RP-"B" (2) 2-1/2"C. 3 #3/0 #1/0 SEG#1/0 SEG 1"C. 3 #6, #8G. TO PANEL "MB" IN MAIL BUILDING 3"C. 3 #3/0, #4G. TO PANEL "PE" IN POOL BUILDING 400A MAIN DISCONNECT400A MAIN DISCONNECT (2) 2-1/2"C. 3 #3/0 1"C. NOTES: 1.REFER TO SHEET E.001 FOR ELECTRICAL SYMBOL LIST, ABBREVIATIONS, AND PROJECT NOTES. 2.ALL WIRING SHALL BE COPPER UNLESS OTHERWISE NOTED. 3.ALL WORK SHALL BE COORDINATED WITH THE LOCAL ELECTRIC UTILITY COMPANY REPRESENTATIVE AND PROVIDED IN ACCORDANCE WITH THEIR REQUIREMENTS. 4.PROVIDE ENGRAVED NAMEPLATES FOR ALL ELECTRICAL EQUIPMENT (SWITCHBOARDS, TRANSFORMERS, PANEL-BOARDS, SAFETY SWITCHES, MOTOR STARTERS, ETC.) INDICATING THE IDENTITY OF THE EQUIPMENT AND THE POWER SOURCE FOR EACH. 5.ELECTRICAL SYSTEM SHALL BE LABELED WITH THE INSTALLING CONTRACTOR'S COMPANY NAME AND CONTACT INFORMATION. 6.PROVIDE TYPE-WRITTEN DIRECTORY FOR ALL PANEL BOARDS. SERVICE LOAD CALCULATION PANEL "RP-A"64.9 KVA PANEL "RP-B"68.7 KVA PANEL "MB"0.64 KVA SUB-TOTAL 134.24 KVA SPARE 12.0 KVA GRAND TOTAL 146.2 KVA = 609 AMPS @ 240V. 1Ø. Fort Collins - Clubhouse One-line Diagram 21-0030 Joe Leahu Jordan Koenig SKE-16/13/22