HomeMy WebLinkAboutIMPALA REDEVELOPMENT - FDP230001 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORT
CTL|Thompson, Inc.
Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County –
Colorado
Cheyenne, Wyoming and Bozeman, Montana
306 and 400 IMPALA CIRCLE
Fort Collins, Colorado
Prepared for:
HOUSING CATALYST
1715 West Mountain Avenue
Fort Collins, Colorado 80521
Attention:
Nichole Rex
Senior Project Manager
Project No. FC10389-115
June 3, 2022
PRELIMINARY GEOTECHNICAL INVESTIGATION
Table of Contents
i
Scope .................................................................................................................................. 1
Summary Of Conclusions ................................................................................................... 1
Site Description and Proposed Development .................................................................... 2
Site Geology........................................................................................................................ 2
Geologic Hazards ............................................................................................................... 2
Existing Fill ...................................................................................................................... 3
Expansive Soils and Bedrock ......................................................................................... 3
Flooding ........................................................................................................................... 4
Seismicity ........................................................................................................................ 4
Radioactivity .................................................................................................................... 4
Field And Laboratory Investigations ................................................................................... 5
Subsurface Conditions ........................................................................................................ 5
Existing Fill ...................................................................................................................... 6
Development Recommendations ....................................................................................... 6
Site Grading .................................................................................................................... 6
Permanent Cut and Fill Slopes ....................................................................................... 7
Utility Construction .......................................................................................................... 7
Preliminary Pavement Recommendations ......................................................................... 9
Subgrade Preparation ..................................................................................................... 9
Preliminary Pavement Thickness Design ....................................................................... 9
Preliminary Recommendations for Structures .................................................................... 9
Foundations ................................................................................................................... 10
Slabs-on-Grade and Basement Floor Construction ..................................................... 10
Below-Grade Construction ............................................................................................ 10
Surface Drainage .......................................................................................................... 11
General Design Considerations .................................................................................... 11
Water Soluble Sulfates ..................................................................................................... 12
Recommended Future Investigations ............................................................................... 12
Limitations ......................................................................................................................... 13
FIGURE 1 – LOCATIONS OF EXPLORATORY BORINGS
FIGURE 2 – SUMMARY LOGS OF EXPLORATORY BORINGS
APPENDIX A – LABORATORY TEST RESULTS
APPENDIX B – GUIDELINE SITE GRADING SPECIFICATIONS
HOUSING CATALYST 1
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Scope
This report presents the results of our Preliminary Geotechnical Investigation. The purpose
of our investigation was to identify geologic hazards that may exist at the site and to evaluate the
subsurface conditions to assist in planning and budgeting for the proposed development. The
report includes descriptions of site geology, our analysis of the impact of geologic conditions on site
development, a description of subsoil, bedrock and groundwater conditions found in our exploratory
borings, and discussions of site development as influenced by geotechnical considerations. The
scope was described in our Service Agreement (CTL |T Proposal No. FC-22-0062) dated March 29,
2022.
This report was prepared based upon our understanding of the develop ment plans. The
recommendations are considered preliminary and can be used as guidelines for further planning of
development and design of grading. We should review final development and grading plans to
determine if additional investigation is merited, or if we need to revise our recommendations.
Additional investigations will be required to design building foundations and pavements. A
summary of our findings and recommendations is presented below. More detailed discussions of
the data, analysis, and recommendations are presented in the report.
Summary Of Conclusions
1. The site contains geologic hazards that should be mitigated during planning and
development. Existing fill, expansive soils and bedrock and regional issues of
seismicity, radioactivity are the primary geologic concerns pertaining to the
development of the site . No geologic or geotechnical conditions were identified
which would preclude development of th is site.
2. In general, the soils and bedrock encountered in our borings consisted of sandy clay
or clayey sand overlying weathered to competent claystone bedrock to the depths
explored of 25 feet. The upper approximately 5 feet of borings TH-2 through TH-4
was comprised of man-placed fill. Groundwater was encountered at depths of 18 to
23 feet below the existing ground surface. Groundwater levels will not likely affect
planned development at this site.
3. Swell consolidation testing of multiple samples from our borings indicated non-
swelling to low swelling soils and bedrock. We anticipate footing or pad-type
foundations be appropriate for most structures. Slab-on-grade basement floors are
likely acceptable.
HOUSING CATALYST 2
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Site Description and Proposed Development
The site is located north of West Mulberry Street and east of South Impala Drive in Fort
Collins, Colorado. There are occupied homes currently on the site that will be demolished for the
future construction. Poudre High School is to the north and residential areas are to the east, west
and south. The southwest portion of the site is in a floodplain.
The proposed development includes the new construction of ten townhomes, several multi-
family apartment buildings, and a community center. The buildings are expected to be two to three-
story structures with and without basements, with attached and detached garages.
Site Geology
The geology of the site was investigated through review of mapping by Roger B. Colton
(Geologic Map of the Boulder-Fort Collins-Greeley Area, 1979). Geology was further evaluated
through review of conditions found in exploratory borings, and our experience in the area. According
to the referenced mapping, th e site is located over alluvium or river deposited soils generally
consisting of well graded gravel and cobble overlain by sands and clays. The materials encountered
in our borings were in general agreeance with the re ferenced mapping.
Geologic Hazards
Our investigation identified several geologic hazards that must be considered during the
planning and development phases of this project. None of the geologic hazards identified will
preclude development of the property. Development plans are preliminary.
Planning should consider the ge ologic hazards discussed below. The hazards require
mitigation which could include avoidance, non-conflicting use or engineered design and
construction during site development. Geologic hazards at the site that need to be addressed
include existing fill, expansive soils and bedrock and regional issues of seismicity and radioactivity.
The following sections discuss each of these geologic hazards and associated development
concerns. Mitigation concepts are discussed below and in the DEVELOPMENT
RECOMMENDATIONS section of the report.
HOUSING CATALYST 3
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Existing Fill
Three of the borings were overlain by up to 5 feet of, what we determined to be, man-placed
fill. The fill was comprised of sandy clay and clayey sand. The fill could exist to greater depths and
extents than encountered in our borings. The existing fill is of unknown ag e and origin, and
presents risk of heave or settlement. We typically recommend the complete removal of
undocumented fill below improvements.
Expansive Soils and Bedrock
Colorado is a challenging location to practice geotechnical engineering. The climate is
relatively dry, and the near-surface soils are typically dry and relatively stiff. These soils and related
sedimentary bedrock formations tend to react to changes in moisture conditions. Some of the soils
and bedrock swell as they increase in moisture and are called expansive soils. Other soils can
settle significantly upon w etting and are referred to as collapsing soils. Most of the land available for
development east of the Front Range is underlain by expansive clay or claystone bedrock near the
surface. The soils that exhibit collapse are more likely west of the continental divide; however, both
types of soils occur all over the state.
Covering the ground with houses, streets, driveways, patios, etc., coupled with lawn
irrigation and changing drainage patterns, leads to an increase in subsurface moisture conditions.
As a result of this moisture fluctuation, some soil movement due to heave or settlement is
inevitable. There is risk that improvements will experience damage. It is critical that precautions are
taken to increase the chances that the foundations and slabs-on-grade will perform satisfactorily.
Engineered planning, design and construction of grading, pavements, foundations, slabs-on-grade,
and drainage can mitigate, but not eliminate the effects of expansive and compressible soils.
The soils and bedrock at this site include sandy clay and weathered to competent claystone
bedrock. Samples tested exhibited predominantly non-swelling to low swelling behavior. We
believe the risk of differential movement due to swelling soil to be low for this site.
HOUSING CATALYST 4
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Flooding
The southeast portion of this site lies within a floodplain fringe zone. Geologic hazards maps
indicate the site area may be prone to sheet flow flooding. The civil engineer should address
surficial drainage for the site.
Seismicity
This area, like most of central Colorado, is subject to a low degree of seismic risk. No
indications of recent movements of any of the faults in the Larimer County area have been reported
in the available geologic literature. As in most areas of recognized low seismicity, the record o f the
past earthquake activity in Colorado is somewhat incomplete. Based on the subsurface conditions
encountered in our borings and ou r understanding of the geology , the site classifies as a Seismic
Site Class D (2018 International Building Code). Only minor damage to relatively new, properly
designed and built buildings would be expected. Wind loads, not seismic considerations, typica lly
govern dynamic structural design in this area. If it is determined that seismic site class is critical to
the design, CTL|Thompson can provide a proposal for services to determine the site class based on
a geophysical study.
Radioactivity
It is normal in the Front Range of Colorado and nearby eastern plains to measure radon gas
in poorly ventilated spaces in contact with soil or bedrock. Radon 222 gas is considered a health
hazard and is one of several radioactive products in the chain of the natura l decay of uranium into
stable lead. Radioactive nuclides are common in the soils and sedimentary rocks underlying the
subject site. Because the se sources exist on most sites, there is potential for radon gas
accumulation in poorly ventilated spaces. Th e amount of soil gas that can accumulate is a function
of many factors, including the radio -nuclide activity of the soil and bedrock, construction methods
and materials, pathways for soil gas and existence of poorly -ventilated accumulation areas. It is
difficult to predict the concentration of radon gas in finished construction.
We recommend testing to evaluate radon lev els after construction is completed. If required,
typical mitigation methods for residential construction may consist of sealing soil gas entry areas
HOUSING CATALYST 5
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
and periodic ventilation of below-grade spaces and perimeter drain systems. It is relatively
economical to provide for ventilation of perimeter drain systems or underslab gravel layers at the
time of construction, compared to retrofitting a structure after construction. Rad on rarely
accumulates to significant levels in above-grade, heated and ventilated spaces.
Field And Laboratory Investigations
Subsurface conditions were further investigated by drilling four exploratory borings and a
temporary piezometer at the approximate locations shown on Figure 1. The borings were drilled
using a truck-mounted drill rig with 4-inch diameter, continuous-flight auger. Our field
representative observed drilling, logged the soils found in the borings, and obtained samples.
Summary logs of the soils found in the borings and field penetration resistance values are
presented on Figure 2.
Samples of soil and bedrock were obtained during drilling by driving a modified California-
type sampler (2.5-inch O.D.) into the subsoils and bedrock using a 140-pound hammer falling 30
inches. Samples recovered from the test holes we re returned to our laboratory and visually
classified by the geotechnical engineer. Laboratory testing included determination of moisture
content and dry density, swell-consolidation characteristics, particle-size analysis and water soluble
sulfate content. Laboratory test results are presented in Appendix A.
Subsurface Conditions
In general, the soils and bedrock encountered in our borings consisted of 14 to 25 feet
sandy clay or clayey sand. The upper approximately 5 feet of borings TH-2 through TH-4 was
comprised of man-placed fill that generally consisted of sandy clay and clayey sand . The fines
content (percent passing the No. 200 sieve) of three samples of the overburden ranged from 17 to
37 percent. Weathered to competent claystone bedrock was below the overburden in two of the
borings from 14 to 22 feet to the depths explored. Swell-consolidation testing indicated nil to 1
percent swell potential in the overburden soils and 0.8 to 1 percent swell potential in the bedrock.
One sample of the bedrock at 25 feet exhibited unconfined compressive strength of 20,900 pounds
per square foot.
HOUSING CATALYST 6
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Groundwater was encountered at depths of 18 to 23 feet below the existing ground surface.
Groundwater levels are not expected to affect planned development at this site. Groundwater levels
fluctuate seasonally. A more detailed description of the subsurface conditions is presented in our
boring logs and laboratory testing.
Existing Fill
Existing fill was encountered in three borings to depths of up to 5 feet. Deeper fill areas may
be encountered during site development. The fill i s of unknown origin and age. The fill presents a
risk of settlement or heave to improvements supported by the fill. We recommend the fil l be
removed and recompacted in planned buildi ng areas.
The existing fill can also affect pavements and exterior fl atwork. The lowest risk alternative
for exterior pavement and flatwork would also be complete removal and recompaction. The cost
could be significant. If some movement and distress in these areas is acceptable, then partial depth
removal is an alternative. We suggest removal of the existing fill to a depth of 1 to 2 feet below
existing grade, proof rolling the exposed subgrade, and addit ional removal or stabilization of areas
where soft, yielding, or organic soils or debris is encountered. After this, f ill placement can proceed
to construction grades.
Development Recommendations
Site Grading
At the time of this investigation, site grading plans were not available for review in
conjunction with this subsurface exploration program. Based on the existing topography, we
anticipate minor additional cuts and fill may be needed. We believe grading can be accomplished
using conventional construction techniques and heavy -duty equipment.
It is important that deep fills (if planned) be constructed as far in a dvance of surface
construction as possible. It is our experience that fill compacted in accorda nce with the compaction
recommendations in this report may settle about 1 percent of its height under its own weight. Most
of this settlement usually occurs duri ng and soon after construction. Some additional settlement is
HOUSING CATALYST 7
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
possible after development and la ndscape irrigation increases soil moisture. We recommend
delaying the construction of buildings underlain by deep fills as long as possible to allow for this
settlement to occur. Delaying construction of structures up to one year where located on deep fill s is
recommended.
The existing on-site soils are suitable for re-use as fill material provided debris or deleterious
organic materials are removed. Claystone bedrock should be avoided as fill material as it is
typically difficult to breakdown sufficiently . Prior to fill placement, all trash and debris shoul d be
removed from fill areas and properly disposed. Import fill should generally have similar or better
engineering properties as the onsite materials and should be approved by CTL|T. The ground
surface in areas to be filled should be stripped of vegetation, topsoil, and other deleterious
materials, scarified to a depth of at least 8 inches, moisture conditioned and compa cted as
recommended below. The depth of any topsoil is not anticipated to be more than 6 inches in most
areas.
Site grading fill should be placed in thin, loose lifts, moisture conditioned and compacted. In
areas of deep fill, we recommend higher compaction criteria to help reduce settlement of the fill.
The placement and compaction of fill should be observed, and density tested during construction.
Guideline site grading specifications including compaction recommendations are presented in
Appendix B.
Permanent Cut and Fill Slopes
We recommend permanent cut and fill slopes be designed with a maximum inclination of 3:1
(horizontal to vertical). Where fills will be placed on slopes exceeding 20 percent (5:1) the slope
should be benched. Structures should be setback from the top or bottom of cut and fill slopes. If
site constraints (property boundaries and streets) do not permit construction with recommended
slopes, we should be contacted to evaluate the subsurface soils and steep er slopes.
Utility Construction
We believe excavations for utility installation in the overb urden soils can be performed with
conventional heavy-duty trenchers or large bac khoes. Groundwater is not anticipated in
HOUSING CATALYST 8
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
excavations unless they exceed approximately 16 feet. If groundwater is encountered during
construction, dewatering may be accomplished by sloping excavations to occasional sumps where
water can be removed by pumping.
Utility trenches should be sloped or shored to meet local, State , and federal safety
regulations. Based on our investigation, we believe the sandy clay with interlayers of clayey sand
classifies as Type C soil and the bedrock classifies as Type A soil based on OSHA standards.
Excavation slopes specified by OSHA are dependent upon soil types and groundwater conditions
encountered. Seepage and ground water conditions in trenches may downgrade the soil type.
Contractors should identify the soils encountered in the excav ation and refer to OSHA standards to
determine appropriate slopes. Excavations deeper t han 20 feet should be designed by a
professional engineer.
The width of the top of an excavation may be limited in some areas. Bracing or “trench box”
construction may be necessary. Bracing systems include sheet piling, braced sheeting, and others.
Lateral loads on bracing depend on the depth of ex cavation, slope of excavation above the bracing,
surface loads, hydrostatic pressures, and al lowable movement. For trench boxes and bracing
allowed to move enough to mobilize the strength of the soils, with associated cracking of the ground
surface, the “active” earth pressure conditions are appropriate for design. If movement is not
tolerable, the “at rest” earth pressures are appropriate. We suggest an equivalent fluid density of 30
pcf for the “active” earth pressure condition and 45 pcf for the “at r est” earth pressure condition,
assuming level backfill. These pressures do not include allow ances for surcharge loading or for
hydrostatic conditions. We are available to assist further with bracing design if desired.
Water and sewer lines are usually c onstructed beneath paved roads. Compaction of trench
backfill can have significant effect on the life and serviceability of pavements. We believe trench
backfill should be placed in thin, loose lifts, and m oisture conditioned to between optimum and 3
percent above optimum content for clay soils and within 2 percent of optimum moisture content fo r
sand. Trench backfill sho uld be compacted to at least 95 percent of maximum dry density (ASTM D
698). The placement and compaction of fill and backfill should be observed and tested by our firm
during construction. If deep excavations are necessary fo r planned utilities, the compaction
requirements provided in Appendix C should be considered.
HOUSING CATALYST 9
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Preliminary Pavement Recommendations
Subgrade Preparation
Based on the borings, the near surface soils on this site will consist of sandy clay or clayey
sand. Some of the soils could be existing fill. These soils will range from low to moderately plastic
and will provide relatively poor to fair subgrade support below the pavements. Mitigation for
swelling soils is not expected to be necessary.
Preliminary Pavement Thickness Design
Preliminary guidelines for pavement systems on this site are provided. Final pavement
sections should be determined based a design level geotechnical investigation and anticipated
frequency of load applications on the pavement during the desired design life. Flexible hot mix
asphalt (HMA) over aggregate base course (ABC) or rigid Portland cement concrete (PCC)
pavements can be used at this site for automobile and light truck traffic use. Rigid pavements are
recommended in any areas subject to heavy truck traffic. Based on 2021 Larimer County Urban
Street Standards for minimum pavement requirements we anticipate asphalt pavement sections for
local residential streets will be on the o rder of 4.5 to 5.5 inches thick. Collectors and other higher
volume pavement will likely require thicker pavement sections, estimated on the order 6 to 8 inches.
Portland cement concrete (PCC) pavement is recommended in areas subject to any heavy
truck traffic such as garbage pickup and/or dumpster trucks and any heavy delivery trucks. We
anticipate the use of 5 inches of PCC for general area pavements which are not subject to truck
traffic. A minimum 6-inch thick section is anticipated in main drives and any areas subject to some
moderately heavy truck traffic. Any areas subject to frequent heavy trucks should be designed
based on frequency and wheel loads. PCC pavements in this area are typically reinfo rced due to
the underlying active clays. Properly designed control joints and other joints systems are required
to control cracking and allow pavement movement.
Preliminary Recommendations for Structures
The property is currently planned for residential construction. Our field and laboratory data
indicate the soil and bedrock conditions vary somewhat across the site. The following discussions
HOUSING CATALYST 10
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
are preliminary and are not intended for design or construction. After grading is completed, a
detailed soils and foundation investigation should be performed.
Due to the preliminary nature of this project, subdivision organization or site grading plans
have not been prepared, and therefore not available for review in conju nction with this subsurface
exploration program. Therefore, recommendations provided here are gen eral and for planning
purposes only.
Foundations
Our geologic and preliminary geotechnical investigation for this site indicates structures may
be founded on shallow foundations. A design level geotechnical investigation may identify potential
hazards for specified areas not indica ted by our borings which may suggest the need for a deeper
foundation system. Deep foundations may be required in areas of shallow bedrock, cuts that
extend into bedrock, and for structures with heavy column loads .
Slabs-on-Grade and Basement Floor Construction
The use of slab-on-grade floors for unfinished basements should be limited to areas wher e
soils within the depth likely to influence floor performance are consolidating to low swelling granular
soils or clay. We believe most of this site will be rated with low risk of poor slab performance.
Structurally supported floor systems should be planned in all non-basement finished living areas
and in basements where slab risk is judged high or very high. Our firm also generally recommends
structurally supported basement floors for mode rate (2 percent to less than 4 percent), high (4
percent to less than 6 percent) and very high (greater than 6 percent) risk sites where walkout and
garden level basements are planned. Slab performance risk should be more t horoughly defined
during the design level soils and foundation investigation.
Below-Grade Construction
Groundwater was encountered at 18 to 23 feet during this investigation. With long-term
development and associated landscaping, a “perched” water table may develop on the bedrock
surface or on relatively impermeable soils and bedrock layers. To reduce the risk of hydrostatic
pressure developing on found ation walls, foundation drains will be necessary around all below -
HOUSING CATALYST 11
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
grade areas. We suggest foundation drains be tied to the sewer underdrain system if planned.
They may also discharge to sumps where water can be removed by pumping. In our opinion,
underdrain systems offer more comprehensive control of groundwater and will better mitigate
impacts of groundwater and swelling soils on foundations, slabs, and pavements. Foundation walls
and grade beams should be designed to withstand lateral earth pressures. The design pressure
should be established during design-level soils investigations.
Surface Drainage
The performance of foundations will be influenced by surface drainage. The ground surface
around proposed residences sho uld be shaped to provide runoff of surface water away from the
structure and off of pavements. We generally recommend slopes of at least 12 inches in the first 10
feet where practical in the landscaping areas surrounding residences. There are practical
limitations on achieving these slopes. Irrigation should be minimized to control wetting. Roof
downspouts should discharge beyond the limits of backfill. Water should not be allowed to pond on
or adjacent to pavements. Proper control of surface runoff is also important to limit the erosion of
surface soils. Sheet flow should not be directed over unprotected slopes. Water should not be
allowed to pond at the crest of slopes. Permanent slopes should be re-vegetated to reduce erosion.
Water can follow poorly compacted fill behind curb and gutter and in utility trenches. This
water can soften fill and undermine the performance of the roadways, flatwork , and foundations.
We recommend compactive effort be used in placement of all fill.
General Design Considerations
Exterior sidewalks and pavements supported above the on-site clays are subject to post
construction movement. Flat grades should be avoided t o prevent possible ponding, particularly
next to the building due to soil movement. Positive grades away from the buildings should be used
for sidewalks and flatwork around the perimeter of the buildings to reduce the possibility of lifting of
this flatwork, resulting in ponding next to the structures. Where movement of the flatwork is
objectionable, procedures recommended for on-grade floor slabs should be considered.
Joints next to buildings should be thoroughly sealed to prevent the infiltrat ion of surface
water. Where concrete pavement is used, joints should also be sealed to reduce the infiltration of
HOUSING CATALYST 12
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
water. Since some post construction movement of pavement and flatwork may occur, joints around
the buildings should be periodically observed and resealed where necessary.
Roof drains should be discharged well away from the structures, preferably by closed pipe
systems. Where roof drains are allowed to discharge on concrete flatwork or pavement areas next
to the structures, care should be tak en to ensure the area is as water-tight as practical to eliminate
the infiltration of this water next to the buildings.
Water Soluble Sulfates
Concrete that comes into contact with soils can be subject to sulfate attack. We measured
water-soluble sulfate concentrations in one sample from this site. Concentration was measured to
be below measurable limits. Sulfate concentrations less than 0.1 percent indicate Class 0 exposure
to sulfate attack for concrete that comes into contact with the subsoils, according to the American
Concrete Institute (ACI). For this level of sulfate concentration, ACI indicates any type of cement
can be used for concrete that comes into contact with the subsoils. In our experienc e, superficial
damage may occur to the exposed surfaces of highly permeable concrete, even though sulfate
levels are relatively low. To control this risk and to resist freeze-thaw deterioration, the water-to-
cementitious material ratio should not exceed 0.50 for concrete in contact with soils that are likely to
stay moist due to surface drainage or high water tables. Concrete should be air entrained.
Recommended Future Investigations
Based on the results of this investigation and the proposed development, we recommend
the following investigations be performed:
1. Review of final site grading plans by our firm;
2. Construction testing and observation for site development;
3. Subgrade investigation and pa vement design after site grading is complete;
4. Design-level soils and foundation investigations after grading;
5. Construction testing and observation for residential building construction and paving.
HOUSING CATALYST 13
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Limitations
Our exploratory borings were located to obtain preliminary subsoil data indicative of
conditions on this site. Although our borings were spaced to obtain a reasonably accurate picture of
subsurface conditions, variations in the subsoils not indicated in our borings are always p ossible.
We believe this investigation was conducted in a manner consistent with that level of skill and care
ordinarily used by members of the profession currently practicing under similar conditio ns in the
locality of this project. No warranty, express or implied, is made.
This report was prepared from data developed during our field exploration, laboratory
testing, engineering analysis, and experience with similar conditions. The recommendations
contained in this report were based upon our understandi ng of the planned construction. If plans
change or differ from the assumptions presented herein, we should be contacted to review our
recommendations.
If we can be of further service in discussing the contents of this report or in the analysis of
the building and pavement from the geotechnical point of view, please call.
Very truly yours,
CTL|THOMPSON, INC.
Trace Krausse, EI R.B. "Chip" Leadbetter, III, P.E.
Geotechnical Project Engineer Senior Geotechnical Engineer
TH-1
TH-2
TH-3
TH-4
P-1
West Mulberry Street
Impala CircleSouth Impala DriveLAPORTE AVE.N. TAFT HILL RD.W. MULBERRY ST.
SITE
S. OVERLAND TRAILLEGEND:
INDICATES APPROXIMATE
LOCATION OF EXPLORATORY
BORING
TH-1
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL I T PROJECT NO. FC10389-115
FIGURE 1
Locations of
Exploratory Borings
VICINITY MAP
FORT COLLINS, COLORADO
NOT TO SCALE
200'100'
APPROXIMATE
SCALE: 1" = 200'
0'
P-1 INDICATES APPROXIMATE
LOCATION OF TEMPORARY
PIEZOMETER
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
12/12
16/12
13/12
13/12
21/12
WC=17.3DD=109SW=1.0
WC=12.5DD=123SW=0.3
TH-1
44/12
23/12
13/12
19/12
21/12
WC=12.0-200=37
WC=2.7-200=27
WC=5.4DD=128SW=0.2
WC=14.4DD=119SW=0.0
WC=21.7DD=108SW=1.0
TH-2
26/12
45/12
11/12
13/12
13/12
WC=18.7DD=105SW=0.9SS=<0.01
WC=19.0DD=108SW=0.0
TH-3
18/12
18/12
17/12
21/12
50/7
WC=4.8-200=17
WC=21.5DD=107SW=0.8
WC=15.9DD=116UC=20,900
TH-4
DEPTH - FEETDRIVE SAMPLE. THE SYMBOL 12/12 INDICATES 12 BLOWS OF A 140-POUND HAMMER FALLING
30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES.
CLAY, SANDY, WITH OCCASIONAL GRAVEL, SLIGHTLY MOIST TO MOIST, STIFF TO VERY STIFF,
LIGHT BROWN, BROWN, WHITE, RED-BROWN (CL)
1.
NOTES:
THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN THIS
REPORT.
WATER LEVEL MEASURED ON APRIL 26, 2022.
SAND, CLAYEY, MOIST, MEDIUM DENSE TO DENSE, BROWN (SC)
3.
LEGEND:
WEATHERED CLAYSTONE, FIRM TO MEDIUM HARD, MOIST TO VERY MOIST, BROWN, GRAY,
OLIVE
CLAYSTONE, HARD, SLIGHTLY MOIST, BROWN, GRAY
DEPTH - FEETWATER LEVEL MEASURED AT TIME OF DRILLING.
Summary Logs of
Exploratory Borings
THE BORINGS WERE DRILLED ON APRIL 22, 2022 USING 4-INCH DIAMETER
CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG.
FIGURE 2
WC
DD
SW
-200
UC
SS
-
-
-
-
-
-
INDICATES MOISTURE CONTENT (%).
INDICATES DRY DENSITY (PCF).
INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (%).
INDICATES PASSING NO. 200 SIEVE (%).
INDICATES UNCONFINED COMPRESSIVE STRENGTH (PSF).
INDICATES SOLUBLE SULFATE CONTENT (%).
2.
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL | T PROJECT NO. FC10389-115
FILL, CLAY SANDY AND/OR SAND, CLAYEY, SLIGHTLY MOIST
TO MOIST, VERY STIFF AND DENSE
APPENDIX A
LABORATORY TEST RESULTS
TABLE A-I: SUMMARY OF LABORATORY TEST RESULTS
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=109 PCF
From TH - 1 AT 4 FEET MOISTURE CONTENT=17.3 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=123 PCF
From TH - 1 AT 14 FEET MOISTURE CONTENT=12.5 %
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL | T PROJECT NO. FC10389-115
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-1COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
ONER C TSANSNTAION UNDPXE
ETTSSU GINTO WRE DUEERP
-4
-3
-2
-1
0
1
2
3
TAER C SANS TNONION UNDPXE
INGTSSUPETTO WRE DUEER
0.1 1.0 10 100
0.1 1.0 10 100
Sample of SAND, CLAYEY (SC) DRY UNIT WEIGHT=128 PCF
From TH - 2 AT 14 FEET MOISTURE CONTENT=5.4 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=119 PCF
From TH - 2 AT 19 FEET MOISTURE CONTENT=14.4 %
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL | T PROJECT NO. FC10389-115
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-2COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
ONER C TSANSNTAION UNDPXE
ETTSSU GINTO WRE DUEERP
-4
-3
-2
-1
0
1
2
3
GWETTDMOVNNTIEOUEEMENTO
0.1 1.0 10 100
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=108 PCF
From TH - 2 AT 24 FEET MOISTURE CONTENT=21.7 %
Sample of FILL, CLAY, SANDY OR SANDY, CLAYEY DRY UNIT WEIGHT=105 PCF
From TH - 3 AT 4 FEET MOISTURE CONTENT=18.7 %
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL | T PROJECT NO. FC10389-115
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-3COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
ONER C TSANSNTAION UNDPXE
ETTSSU GINTO WRE DUEERP
-4
-3
-2
-1
0
1
2
3
TAER C SANS TNONION UNDPXE
INGTSSUPETTO WRE DUEER
0.1 1.0 10 100
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=108 PCF
From TH - 3 AT 14 FEET MOISTURE CONTENT=19.0 %
Sample of CLAYSTONE, WEATHERED DRY UNIT WEIGHT=107 PCF
From TH - 4 AT 19 FEET MOISTURE CONTENT=21.5 %
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL | T PROJECT NO. FC10389-115
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-4COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
GWDMOVNTIETOUE TEMENTON
-4
-3
-2
-1
0
1
2
3
TAER C SANS TNONION UNDPXE
INGTSSUPETTO WRE DUEER
0.1 1.0 10 100
0.1 1.0 10 100
Sample of FILL, CLAY, SANDY OR SANDY, CLAYEY GRAVEL 13 %SAND 50 %
From TH - 2 AT 4 FEET SILT & CLAY 37 %LIQUID LIMIT %
PLASTICITY INDEX %
Sample of SAND, CLAYEY (SC)GRAVEL 10 %SAND 63 %
From TH - 2 AT 9 FEET SILT & CLAY 27 %LIQUID LIMIT %
PLASTICITY INDEX %
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL | T PROJECT NO. FC10389-115
FIGURE A-5
Gradation
Test Results
0.002
15 MIN.
.005
60 MIN.
.009
19 MIN.
.019
4 MIN.
.037
1 MIN.
.074
*200
.149
*100
.297
*50
0.42
*40
.590
*30
1.19
*16
2.0
*10
2.38
*8
4.76
*4
9.52
3/8"
19.1
3/4"
36.1
1½"
76.2
3"
127
5"
152
6"
200
8"
.001
45 MIN.
0
10
20
30
40
50
60
70
80
90
100
CLAY (PLASTIC) TO SILT (NON-PLASTIC)SANDS
FINE MEDIUM COARSE
GRAVEL
FINE COARSE COBBLES
DIAMETER OF PARTICLE IN MILLIMETERS
25 HR.7 HR.
HYDROMETER ANALYSIS SIEVE ANALYSIS
TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS
PERCENT PASSING0
10
20
30
50
60
70
80
90
100 PERCENT RETAINED40
0.002
15 MIN.
.005
60 MIN.
.009
19 MIN.
.019
4 MIN.
.037
1 MIN.
.074
*200
.149
*100
.297
*50
0.42
*40
.590
*30
1.19
*16
2.0
*10
2.38
*8
4.76
*4
9.52
3/8"
19.1
3/4"
36.1
1½"
76.2
3"
127
5"
152
6"
200
8"
.001
45 MIN.
0
10
20
30
40
50
60
70
80
90
100
CLAY (PLASTIC) TO SILT (NON-PLASTIC)SANDS
FINE MEDIUM COARSE
GRAVEL
FINE COARSE COBBLES
DIAMETER OF PARTICLE IN MILLIMETERS
25 HR.7 HR.
HYDROMETER ANALYSIS SIEVE ANALYSIS
TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS
PERCENT PASSINGPERCENT RETAINED0
10
20
30
40
50
60
70
80
90
100
UNCONFINED PASSING WATER-
MOISTURE DRY APPLIED COMPRESSIVE NO. 200 SOLUBLE
DEPTH CONTENT DENSITY SWELL*PRESSURE STRENGTH SIEVE SULFATES
BORING (FEET)(%)(PCF)(%)(PSF)(PSF)(%)(%)DESCRIPTION
TH-1 4 17.3 109 1.0 500 CLAY, SANDY (CL)
TH-1 14 12.5 123 0.3 1,800 CLAY, SANDY (CL)
TH-2 4 12.0 37 FILL, CLAY, SANDY OR SANDY, CLAYEY
TH-2 9 2.7 27 SAND, CLAYEY (SC)
TH-2 14 5.4 128 0.2 1,800 SAND, CLAYEY (SC)
TH-2 19 14.4 119 0.0 2,400 CLAY, SANDY (CL)
TH-2 24 21.7 108 1.0 3,000 CLAY, SANDY (CL)
TH-3 4 18.7 105 0.9 500 <0.01 FILL, CLAY, SANDY OR SANDY, CLAYEY
TH-3 14 19.0 108 0.0 1,800 CLAY, SANDY (CL)
TH-4 9 4.8 17 SAND, CLAYEY (SC)
TH-4 19 21.5 107 0.8 2,400 CLAYSTONE, WEATHERED
TH-4 24 15.9 116 20,900 CLAYSTONE, SANDY
SWELL TEST RESULTS*
TABLE A-I
SUMMARY OF LABORATORY TESTING
Page 1 of 1
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
APPENDIX B
GUIDELINE SITE GRADING SPECIFICATIONS
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Appendix B-1
GUIDELINE SITE GRADING SPECIFICATIONS
1. DESCRIPTION
This item shall consist of the excavation, transportation, placement and
compaction of materials from locations indicated on the plans, or staked by the
Engineer, as necessary to achieve preliminary street and overlot elevations.
These specifications shall also apply to compaction of excess cut materials
that may be placed outside of the development boundaries.
2. GENERAL
The Soils Engineer shall be the Owner's representative. The Soils Engineer
shall approve fill materials, method of placement, moisture contents and
percent compaction, and shall give written approval of the completed fill.
3. CLEARING JOB SITE
The Contractor shall remove all vegetation and debris before excavation or fill
placement is begun. The Contractor shall dispose of the cleared material to
provide the Owner with a clean, neat appearing job site. Cleared material
shall not be placed in areas to receive fill or where the material will support
structures of any kind.
4. SCARIFYING AREA TO BE FILLED
All topsoil and vegetable matter shall be removed from t he ground surface
upon which fill is to be placed. The surface shall then be plowed or scarified
until the surface is free from ruts, hummocks or other uneven features, which
would prevent uniform compaction.
5. COMPACTING AREA TO BE FILLED
After the foundation for the fill has been cleared and scarified, it shall be
disked or bladed until it is free from large clods, brought to the proper moisture
content (0 to 3 percent above optimum moisture content for clays and within 2
percent of optimum moisture content for sands) and compacted to not less
than 95 percent of maximum dry density as determined in accordance with
ASTM D698.
6. FILL MATERIALS
Fill soils shall be free from organics, debris, or other deleterious substances,
and shall not contain rocks or lumps having a diameter greater than six (6)
inches. Fill materials shall be obtained from cut areas shown on the plans or
staked in the field by the Engineer.
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Appendix B-2
On-site materials classifying as CL, CH, SC, SM, SW, SP, GP, GC, and GM
are acceptable. Concrete, asphalt, organic matter and other deleterious
materials or debris shall not be used as fill.
7. MOISTURE CONTENT AND DENSITY
Fill material shall be moisture conditioned and compacted to the criteria in the
table, below. Maximum density and optimum moisture content shall be
determined from the appropriate Proctor compaction tests. Sufficient
laboratory compaction tests shall be made to determine the optimum moisture
content for the various soils encountered in borrow areas.
FILL COMPACTION AND MOISTURE REQUIREMENTS
Soil
Type
Depth from
Overlot Grade
(feet)
Moisture Requirement
(% from optimum) Density Requirement
Clay 0 to 20 feet +1 to +4 95% of ASTM D 698
Sand -2 to +2 95% of ASTM D 698
Clay Greater than 20
feet
-2 to +1 98% of ASTM D 698
Sand -2 to +1 95% of ASTM D 1557
The Contractor may be required to add moisture to the excavation materials in
the borrow area if, in the opinion of the Soils Engineer, it is not possible to
obtain uniform moisture content by adding water on the fill surface. The
Contractor may be required to rake or disc the fill soils to provide uniform
moisture content through the soils.
The application of water to embankment materials shall be made with any type
of watering equipment approved by the Soils Engineer, which will give the
desired results. Water jets from the spreader shall not be directed at the
embankment with such force that fill materials are washed out.
Should too much water be added to any part of the fill, such that the material is
too wet to permit the desired compaction from being obtained, rolling and all
work on that section of the fill shall be delayed until the material has been
allowed to dry to the required moisture content. The Contractor will be
permitted to rework wet material in an approved manner to hasten its drying.
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Appendix B-3
8. COMPACTION OF FILL AREAS
Selected fill material shall be placed and mixed in evenly spread layers. After
each fill layer has been placed, it shall be uniformly compacted to not less than
the specified percentage of maximum density. Fill shall be compacted to the
criteria above. At the option of the Soils Engineer, soils classifying as SW,
GP, GC, or GM may be compacted to 95 percent of maximum density as
determined in accordance with ASTM D 1557 or 70 percent relative density for
cohesionless sand soils. Fill materials shall be placed such that the thickness
of loose materials does not exceed 12 inches and the compacted lift thickness
does not exceed 6 inches.
Compaction as specified above, shall be obtained by the use of sheepsfoot
rollers, multiple-wheel pneumatic-tired rollers, or other equipment approved by
the Engineer for soils classifying as CL, CH, or SC. Granular fill shal l be
compacted using vibratory equipment or other equipment approved by the
Soils Engineer. Compaction shall be accomplished while the fill material is at
the specified moisture content. Compaction of each layer shall be continuous
over the entire area. Compaction equipment shall make sufficient trips to
ensure that the required density is obtained.
9. COMPACTION OF SLOPES
Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable
equipment. Compaction operations shall be continued until slopes are stable,
but not too dense for planting, and there is not appreciable amount of loose
soils on the slopes. Compaction of slopes may be done progressively in
increments of three to five feet (3' to 5') in height or after the fill is brought to its
total height. Permanent fill slopes shall not exceed 3:1 (horizontal to vertical).
10. PLACEMENT OF FILL ON NATURAL SLOPES
Where natural slopes are steeper than 20 percent in grade and the placement
of fill is required, benches shall be cut at the rate of one bench for each 5 feet
in height (minimum of two benches). Be nches shall be at least 10 feet in
width. Larger bench widths may be required by the Engineer. Fill shall be
placed on completed benches as outlined within this specification.
11. DENSITY TESTS
Field density tests shall be made by the Soils Engineer at locations and depths
of his choosing. Where sheepsfoot rollers are used, the soil may be disturbed
to a depth of several inches. Density tests shall be taken in compacted
material below the disturbed surface. When density tests indicate that the
density or moisture content of any layer of fill or portion thereof is not within
specification, the particular layer or portion shall be reworked until the required
density or moisture content has been achieved.
HOUSING CATALYST
306 AND 400 IMPALA CIRCLE
CTL|T PROJECT NO. FC10389-115
Appendix B-4
12. SEASONAL LIMITS
No fill material shall be placed, spread or rolled while it is frozen, thawing, or
during unfavorable weather conditions. When work is interrupted by heavy
precipitation, fill operations shall not be resumed until the Soils Engineer
indicates that the moisture content and density of previously placed materials
are as specified.
13. NOTICE REGARDING START OF GRADING
The Contractor shall submit notification to the Soils Engineer and Owner
advising them of the start of grading operations at least three (3) days in
advance of the starting date. Notification shall also be submitted at least 3
days in advance of any resumption dates when grading operations have been
stopped for any reason other than adverse weather conditions.
14. REPORTING OF FIELD DENSITY TESTS
Density tests made by the Soils Engineer, as specified under "Density Tests"
above, shall be submitted progressively to the Owner. Dry density, moisture
content, and percentage compaction shall be reported for each test taken.
15. DECLARATION REGARDING COMPLETED FILL
The Soils Engineer shall provide a written declaration stating that the site was
filled with acceptable materials, and was placed in general accordance with
the specifications.