HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - SUBMITTAL DOCUMENTS - ROUND 1 - STREET RELATED DOCUMENTVine/Jerome Responsibilities
Construction Applicant City Notes
Public Trail/ Public Sidewalks X
Trail crosswalk at PH2 driveway on Jerome X
Driveway ramps (2) at PH2 driveway on Jerome X
Plaza at Corner X
North Ramp at Vine Crossing X
South Ramp at Vine Crossing X
Vine Cross-walk X
Vine Pedestrian Signal ? ?
Landscaping X
Irrigation X
Construction Cost Sharing Applicant City
Public Trail/Public Sidewalks X X
Trail crosswalk at PH2 driveway on Jerome X
Ramps at PH2 driveway on Jerome X X
Plaza at Corner X X
North Ramp at Vine Crossing X X
South Ramp at Vine Crossing X
Vine Cross-walk X X
Vine Pedestrian Signals X X
Landscaping X
Irrigation X
Maintenance Applicant City
Public Trail/sidewalks X
Trail crosswalk at PH2 driveway on Jerome X
Driveway ramps (2) at PH2 driveway on Jerome X
Plaza at Corner X
Ramps at Vine Crossing X
Vine Cross-walk X
Vine Pedestrian Signal X
Grass in Tree Lawns abutting PH2 property X
Street Trees abutting PH2 property X X
Landscaping on PH2 property X
Irrigation in PH2 property and abutting ROW X
Landscaping south of Vine X
Irrigation south of Vine X
updated Oct 4, 2022
City crews could do install cheaper
Applicant pays cost of standard sidewalks, City cov
City pays cost of cross-walk. City is requiring the cr
Applicant pays cost of standard ramp, City covers a
Applicant pays cost of standard walk, City covers a
Applicant pays cost of standard ramp, City covers a
City covers full cost of south ramp
Applicant pays 7-9% of cost, City pays balance
Applicant pays 7-9% of cost, City pays balance
City maintains and covers cost of electricity
Applicant maintains first 2 years, City maitains afte
nstall cheaper
of standard sidewalks, City covers cost of additional width, additional depth for truck rating, color pigment, etc.
ss-walk. City is requiring the cross-walk as part of the public trail system. Crosswalks aren't typically required for driveways.
of standard ramp, City covers additional cost
of standard walk, City covers additional cost
of standard ramp, City covers additional cost
of south ramp
of cost, City pays balance
of cost, City pays balance
overs cost of electricity
first 2 years, City maitains after 2 years
for driveways.