Subject: Groundwater Measurement
Powerhouse 2
Fort Collins, Colorado
CTL|T Project Number: FC10223-112
CTL|Thompson, Inc. previously provided a Geotechnical Investigation for the proposed
Powerhouse 2 at the northeast corner of East Vine Drive and College Avenue in Fort Collins,
Colorado under CTL|T project No. FC10223-125, report dated March 14, 2022. We were
requested to install a temporary groundwater monitoring piezometer at the site and to take
groundwater measurements from July 2022 to October 2022. The location of the temporary
piezometer is presented in Figure 1. The groundwater measurements are provided in the table
below.
Date Groundwater Depth (Feet)
July 29, 2022 5.0
August 16, 2022 5.5
September 16, 2022 6.5
October 19, 2022 7.0
We appreciate the opportunity to work with you on this project. Please do not hesitate to
contact us with any other questions or concerns.
Sincerely,
CTL|THOMPSON, INC.
Trace Krausse, EI
Geotechnical Project Engineer
Temporary Piezometer Location
Figure 1