HomeMy WebLinkAboutTHE GATES AT WOODRIDGE PUD, 3RD FILING - FINAL - 55-87H - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT ! ® •
I
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR THE
THE GATES AT WOODRIDGE
THIRD FILING
FORT COLLINS, COLORADO
I
October 26, 1992
I
1 Prepared for:
Woodcraft Homes
111 1501 N. Cleveland Avenue
Loveland, Colorado 80538
Prepared by:
RBD, Inc. Engineering Consultants
2900 South College Avenue
1 • Fort Collins, Colorado 80525
(303) 226-4955
1 RBD Job No. 434-008
I
1 ® •
930NC.
' Engineering Consultants •
2900 South College Avenue
Fort Collins,Colorado 80525
' 303/226-4955
FAX:303/226-4971
October 26, 1992
Ms. Kathy Malers
City of Fort Collins
Utility Services Stormwater
235 Mathews Street
Fort Collins, Colorado 80522
RE: Final Drainage and Erosion Control Study
The Gates at Woodridge Third Filing
Dear Kathy:
We arepleased to submit to you, foryour review and approval, this Final Drainage and
PP � g
Erosion Control Study for the Gates at Woodridge Third Filing. All computations within
this report have been completed in compliance with the City of Fort Collins Storm
Drainage Design Criteria
' We appreciate your time and consideration in reviewing this submittal. Please call if you
have any questions.
Respectfully,
RBD Inc. Engineering Consultants
(742r.a.)e
Roger Curtiss, P.E.
Project Engineer
1
cc: Mr. Gary Berger
Mr. John Hutchinson
1
Other offices:Denver 303/458-5526•Vail 303/476-6.340•Longmont 303/678-9584
I
ITABLE OF CONTENTS
IDESCRIPTION PAGE
I. GENERAL LOCATION AND DESCRIPTION 1
I A. LOCATION 1
B. DESCRIPTION OF PROPERTY 1
I II. DRAINAGE BASINS 1
A. MAJOR BASIN DESCRIPTION 1
I
III. DRAINAGE DESIGN CRITERIA 2
A. REGULATIONS 2
B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 2
IC. HYDROLOGICAL CRITERIA 2
D. HYDRAULIC CRITERIA 2
E. VARIANCES FROM CRITERIA 2
1 IV. DRAINAGE FACILITY DESIGN 3
A. GENERAL CONCEPT 3
IB. SPECIFIC DETAILS 3
V. EROSION CONTROL 4
IA. GENERAL CONCEPT 4
B. SPECIFIC DETAILS 4
IVI. CONCLUSIONS 5
A. COMPLIANCE WITH STANDARDS 5
B. DRAINAGE CONCEPT 5
I' C. EROSION CONTROL CONCEPT 5
1 REFERENCES 6
APPENDIX
IVICINITY MAP 2
DETENTION 3
I THIRD FILING HYDROLOGY 5
DESIGN OF CHANNELS, SWALES 8
EROSION CONTROL 10
ICHARTS, FIGURES AND TABLES 14
I
I
I
1
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR THE GATES AT WOODRIDGE
THIRD FILING
FORT COLLINS, COLORADO
1 I. GENERAL LOCATION AND DESCRIPTION
A. Location
The Gates at Woodridge P.U.D. is bounded by Future Harmony Road on
the west, open space (future filings) and Imperial Estates on the north,
Webber Junior High School and Regency Park PUD to the east and by the
Gates Second Filing and existing Harmony Road on the south.
The site location can also be described as situate in the Southwest 1/4 of
Section 34, Township 7 North, Range 69 West of the 6th P.M., City of Fort
1 Collins, Larimer County, Colorado. The site location can be seen on Exhibit
1 in the appendix.
B. Description of Property
The Third Filing of the Gates at Woodridge contains approximately 5.0
acres, more or less. Presently, the property is undeveloped. The property
is being proposed for planned unit development within the City of Fort
Collins Zoning District PUD, and will be developed consistent with the Gates
First and Second Filing at Woodridge. Native grasses presently cover the
property. The topography of the site generally slopes from west to east at
approximately 1.5 percent.
1
II. DRAINAGE BASINS
1 A. Major Basin Description
The proposed development lies within Basin 80 of the McClellands and Mail
Creek Major Drainageway Plan prepared by Cornell Consulting Company.
A natural drainageway runs from west to east along the northern edge of
the project boundary within Basin 80. Runoff from Basin 80 is routed by
open channels and culverts along the northern boundary of the First and
Second Filings of The Gates, along the north side of Seneca Street past
Webber Junior High School and then along the east side of Regency Drive
to the existing Regional Detention Pond.
1
1 1
1
11110
III. DRAINAGE DESIGN CRITERIA
A. Regulations
The City of Fort Collins Storm Drainage Design Criteria is being used for the
subject site.
B. Development Criteria Reference and Constraints
From the Preliminary Drainage Report for the 1990 Junior High School, the
channel and culvert system along the north side of Seneca Street and the
1 east side of Regency Drive was sized for undetained off-site 100 year
developed runoff from Basins 79, 80, and 85. A current SWMM model
analysis for Basins 79 and 80, obtained by the City of Fort Collins, has
determined that the existing channel, culverts and Seneca Street
(downstream of the subject site) will receive greater 100 year developed
runoff than was originally anticipated. The City of Fort Collins is currently
reviewing this matter and has indicated that the downstream existing
improvements may not be adequate to transport the entire 100 year
developed runoff (318 cfs) that could be produced from the Woodridge
property at Seneca Street and the East property line. The City is considering
acquiring a portion of the Woodridge property for use as an additional
regional detention pond.
C. Hydrological Criteria
The Rational Method for determining surface runoff was used for the project
site. The 2 year and 100 year storm event criteria, obtained by the City of
Fort Collins, was used in calculating runoff values. These calculations and
criteria are included in the Appendix of this report.
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in
accordance with the City of Fort Collins Drainage Criteria and are also
included in the Appendix.
E. Variances from Criteria
No variances are being sought for the proposed project site.
i
I
1 2
I
1
IV. DRAINAGE FACILITY DESIGN
A. General Concept
All on-site runoff produced by the proposed development of the Gates at
Woodridge Third Filing will flow easterly to the existing drainageway along
the east side of Seneca Street and eventually arrive at the Regional
Detention Pond. Included in the back pocket of this report are the proposed
drainage and grading plans.
B. Specific Details
The Gates at Woodridge Third Filing has been broken down into three
subbasins; 18A, 18B, and 19. These subbasin designations correspond to
the basin designations of the Preliminary/Master Drainage Study for the
Woodridge development.
Runoff from basins 18A and 18B will be directed to Silvergate Road and will
travel easterly to curb inlets placed on either side of street at the intersection
of Overlook Drive and Silvergate Road in the Gates Second Filing. Flows
from these curb inlets is piped to the north to the Regional Channel and on
to the existing drainageway at Seneca Street. The curb inlets were sized in
the Second Filing Drainage Study to accommodate all of basin 18 as
described in the Preliminary/Master Report for Woodridge, and also have
been sized to accommodate 100 year flows (37.5 cfs) with an emergency
overflow path north through an opening between lots 2 and 3.
Runoff from Basin 19 will be directly overland to the Regional Channel.
A portion of the regional channel has been constructed with the First and
Second Filings of the Gates, up to a point just to the east of an existing Fort
Collins - Loveland Water District water line. This project will require the
lowering of that existing water main, and the completion of the interim fully
developed regional channel up to Future Harmony Road.
Storm water runoff collected in the regional channel will be directed easterly
to the existing 42 inch culverts immediately north of Seneca Street. There
flows travel via open channels and additional 42 inch culverts to the Regional
Detention Pond at Wake Robin Lane and Regency Drive. The City of Fort
Collins is currently studying the possibility of reconfiguring the two existing
42 inch culverts to provide a more efficient transmission of storm water to
the east.
3
I
I
The existing downstream culverts, open channels and streets have the
available capacity for the Gates at Woodridge Third Filing
V. EROSION CONTROL
A. General Concept
This development lies within the High Rainfall Erodibility Zone and the
Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. The
potential exists for moderate erosion problems after completion of the Third
Filing improvements, due to some existing and proposed site slopes of
greater than 2%. It is also anticipated that the project site improvements will
be subject to both wind and rainfall erosion before new vegetation can take
hold or before the new residential lots are developed.
The Erosion
os on Control Performance Standard (PS) for this project was
computed to be 80% per the criteria in the City of Fort Collins Erosion
Control Reference Manual for Construction sites. The Effectiveness (EEF)
of the proposed erosion control plan was calculated to be 81%. Therefore,
the erosion control plan below meets the City of Fort Collins' requirements.
A copy of the calculations has been included in the appendix.
111 B. Specific Details
After the overlot grading has been completed, all disturbed areas, not in a
roadway, should have temporary vegetation seed applied. After seeding, a
hay or straw mulch should be applied over the seed at a rate of 2 tons/acre
minimum, and the mulch should be adequately anchored, tacked, or
crimped into the soil. After the utilities have been installed, the roadway
surfaces should receive the pavement structure.
If the disturbed areas will not be built upon within one growing season, a
permanent seed should be applied. After seeding, a hay or straw mulch
should be applied over the seed at a rate of 2 tons/acre minimum, and the
mulch should be adequately anchored, tacked or crimped into the soil. In
the event a portion of the roadway pavement surface and utilities will not be
constructed for an extended period of time after overlot grading, a
temporary vegetation seed and mulch should also be applied to the roadway
areas as discussed above.
I
1 4
I
I
® VI. CONCLUSIONS
A. Compliance with Standards
All computations that have been completed within this report are in
compliance with the City of Fort Collins Erosion Control Reference Manual
for Construction Sites and the Storm Drainage Design Criteria Manual. In
addition, all computations are in compliance with the Preliminary/Master
Drainage Study for Woodridge prepared by RBD, Inc. in December 1991.
B. Drainage Concept
The proposed drainage concepts adequately provide for the transmission
of developed on-site runoff to the existing drainage devices at the eastern
property line of the subject site. The existing storm sewer system installed
in the Second Filing of the Gates will collect the 100 year developed flows
generated by basins 18A and 18B, and discharge into the proposed
regional channel. Basin 19 will discharge directly into the proposed regional
channel. The 100 year runoff generated by development of this site will be
carried to the existing off-site regional detention pond by a series of existing
culverts, open channels and streets per the Preliminary/Master Drainage
Study for Woodridge.
The City of Fort Collins is currently studying the possible reconfiguration of
the existing 42 inch culverts at Webber Junior High School adjacent to
Seneca Street. Depending on the outcome of this analysis, the existing
culverts may or may not be reconfigured for this development. In addition
to the 42 inch culvert study, the City of Fort Collins is also evaluating the
capacity of downstream improvements in regards to the new SWMM runoff
flows which exceed the previously used downstream criteria. For the Gates
Third Filing, adequate downstream capacity in the culverts, open channels,
and street systems exists to safely convey developed runoff to the Regional
Detention Pond east of Regency Drive.
At the time of construction, if for some unforeseen reason groundwater is
encountered during construction, a Colorado Department of Health
Construction Dewatering Permit would be required.
C. Erosion Control Concepts
The proposed erosion control concepts adequately provide for the control
of wind and rainfall erosion from the Gates Third Filing. Through the
construction of the proposed erosion control concepts, the City of Fort
Collins performance standards will be met. The proposed erosion control
111
5
1
1
concepts presented in this report and shown on the erosion control plan are
in compliance with the City of Fort Collins erosion control criteria.
REFERENCES
1. Storm Drainage Design Criteria and Construction Standards by the City of Fort
Collins, Colorado, May 1984.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991.
3. Preliminary/Master Drainage Study for Woodridge by RBD, Inc. Engineering
Consultants, December 27, 1991.
4. Final Drainage and Erosion Control Study for the Gates at Woodridge Second
Filing and the Overlook at Woodridge Second Filing, by RBD, Inc. Engineering
Consultants, March 3, 1992.
5. The McClellands and Mail Creek Major Drainageway Plan byCornell Consulting
9 Y
Company, December 1980.
6. The Final Drainage Report for Regency Park PUD byParsons and Associates
9 p g Y
Consulting Engineers, March 30, 1987.
7. Preliminary Drainage Report for the 1990 Junior High School by RBD, Inc.
Engineering Consultants, February 5, 1988.
8. Final Drainage Report for Poudre School District R-1 Elementary School by
Engineering Professionals, Inc. April 1987.
•
I
I
1
I
1 6
1
1
APPENDIX
1
1
1
1
1
1
1
1
1
i
1
1
1
/ • :* .1 , • 1 - :! : :1 '..: %) ed,
1 • ,; ;NI •,,,•
i il .'• /11:i .:‘'. ..ye!,1.1;:........,...:, ... • ,
II : ,7..,, ...,.:// 'N }..•,..\.„.:,. N 122-
111 .. ,. 1 •1 l
—/... f..
i";r2;:: " ,' . ., co ' Nii.., ..i • !
1 • f - -- '..:. ),, 1, i hm/rAcar .,‘ 1 I
I • \. 4
,..h.• t l',11,, . .
t ...,1( • .
.5)V ...V e .4> Q.) i
Q) I
ss• I l 7.• i',..11,21.3!„;,,c.\ :r....1;• ..„,... ,, ,..itve-•\,f,:13.;I:: I •
•••1 t
.3" k
I 1 ,.<I, 1
, .. . . ...„ _ __.. .., k f I t . • • j ...am' 1 li
; - -ID- •••• " . ".) 1:" ` ' t•'...z.*:.: 4* ...
% . eti ....'"•\ ...' 1
II • 1 ..."....:•••• ...Z.?:
I i --
I 03
I 1 1 ,
i • ..r;;.,1 l• ....-! .i.tis.! •
..•-;f '4,604 11 1,1 : r•-s- •
r)S. - ; ii•••--
• •----- - -.---- •••.::::: • •
i . '\___ __,‘
0 1...,...-ri .0),•:
I i :
t .
0
,
it
V- • . (0
. i• i . .i
i :
..
•
CIS t. AA •••••. "••••..e•
. ••."ft .i r\
I
I '•
I •
.. • Ilir
: < iitt•.;:Skile.. . II ,I' •
I I
i • pi fil:.•:**A• • - :
.).••::::*; •; I t
81 •1:•::i.:•:.:... ...,•-,
1 .
1 . .
• %. ::
.i . l• I I
•• ' t I .v)
d: .0143 i S-:, 1
CQ
. . ; • i
.
..., •••
. , •
,
1- 7)...., •
I 1 :. • .
...
. 4> .%, ./••• .. 11,, :.'...: •1
1 ; ... ./. .: 1 i co e
. ./ ,... 4.i) .1:v.'s.. ,..,.,. 1 1
I .
i
I
i
•—. co)
•-, :•.,.. "•
ce%
•
‘ . .I.
- - •Q
• i'lt ( ,I
, 1
1 ! / ‘r
'7‘
N i
. . .
0 . 4>
i ; i • ',----•••• ' .
r
I . 1
. .
1 ........". I I ;L..1.1 WI:1‘"...... : . s I I d
)If •
— . it til Y1
)i
-II
;•1 I I... 0) /"Or NIIII
l'.:Z\N '.,. 4•01. l.
I
. .
-7-- .7:1!"":.
.• .*I
.
. • . •. •., i, • .
il
. ,
)
I t . .I/ 1'
. :. • • •• ••- ---••••--....„: ,..... 1---_...g:L.;:: .....
I - 1.1 CO II 00 , I
(. ( r . 0 tio. dokirofw,• . .4:(
0
I I \..,. ..,...i. ...:. .. .. ..1:7-L... .--
. . I • 1 . ri
i t • .!...a. 4
Z •
0 . i
I
\
; X
.,.JAL.:•_::-.= .--.:--, -_. .....:•
,
. et •
..
1 <
I I
i 1
VI
v••
t•
.- . •
P •
al .
- — - • --
I •
I _. i i
, .
I ---1 li-'0 ! 100.. TA) tILL ROAD
tD
.4 i 2
•••b
.•
• I • •
N 'Is•
.
1 1,!
I • 1 ;i r 4
c\J 1
. i.
, co ,
- -.. . 1
‘ki ..,. .. ,..z...
co . ''• .. Ili % • s'4<41 1/4: 1.3
•1,) \,A
\2 iZ`rji\tz3
I . . I 0; •
I :
. • I' 1 tA)L,
;I, •
; 1 0
• ; .---.17,. . •
'
•Lid A ...3 ...1
1 I ;(3,)\I • O'1: :2)
1 rl
; .
• .3..4 - ;6 .
I
,
1 . ..
I
, h ,
,,t 1
1 1 I 1 I 1 (4c
. 1 I •
4
I 1 i
1 ,
. .
: • ,
. • .%1
-.),
1 , .:: 1, . . ii.k5,1
„, •--., .
I . .. .--".
.. _, \•• EXIHIBir _I_
DETENTION
I 0 • 4/Zz
1 1 -.
CLIENT \ C7C7L7C F-�i-`T" -4-I4C�A11��. JOB NO. ' ,u;
I ,.', ..-.,..f.;J:.:',2'.':''''. INC PROJECT C SATES Sf GI T CALCULATIONS FOR ' ��= .tno�l
Engineering Consultants MADEBY DATE ID'I�92CHECKEDBY DATE SHEET_4._OF
(77)c1/4-/ ! - -Joc_oc= r-r -{-1c.)re) � It aPY-11.,r . 21�—G7uiE til-r
TO .D.aT-�i NJTom= 17 1+= =r? :1JG� 'zt=fUJ E< )•1. .7TGaZ-.1�
. -v c-C,Pi=n_ t._.c:: i..s..,/s
{ . 1 NJ ID.. . - LTGfJTt .KJ L1....)T1 c7r 1
owr,oN +_�. pal cn, 1 oizv. M dsrt. 2d.1>J:�'=.: srv. y�
3:3-60-- 1 z 7 I �� P , IOC..Z 9 E3 D
EvaL.c.P-L7 c J Ts 51 ZuT.Icr=F
I ,
CI:. -LC- 1--!RCS G .. c-E=z . __ 1 t._]1\1C_ -. . V.1\J ..' : L,w.1 -.,U Kl.D -.-T'.cu n.1 D
'.. -r� T-4--e_ c21 TA" Ot=- . .(-1'n. LL.4 NS r-{41.1.G.L 17 `- 1-n c .l
4
,
�f�rJ 6. 1.Tri-1 C:'= U._ n 7.-C)�1 l.). I_ .1`l- : 1--d r=.
UI
.
I i
I
i
!
1
I
• I
{
{
1
I
.
I
i • • s/Z
1
1
1
1
THIRD FILING HYDROLOGY
i
1
1
1
1
1
1
i
1
1
1
1
1
/.1
® /ZZ
- �
g x
4 0 cc
N 3 _ 2
It ;N., ' L a en d' t Q; — ► EE
W
1 z
all ,
` �' �rL'{i .� W
a
LJ }\,
� i � n� w •
Q . 0 .
. . J * . 2 Z
I_Il
0 7 N ¢ �-+
cn
-P - V. ? tI N
Z a
I
I N. t i
1 — w c ^p 0 0 d' t
I cc n c'
cc Z 0 a cQ dJ 0 0 10 NI
cc Z ` wa. m
0 W ,n �- `` `- N -= N N
Li. U 1,-, _. _ _
I
CC U 0 a c oo w \
U �, cJ ,- N O N N o Q
Z 0 �. 0 0 0 0 0 ° W
( z u. ti M — 01 F-
I tom- w } �� c°Ci
2 Z m
E' O 0 0 � J
m 0
Q 0 W^ W N e\ p\ X n\ U
-- cn a w N N t� Ni N Nz
Ux
m N - I—}-- IG -- 0 lU 0 0 1) 0 Z
N a
O.
- 3 t o 3 i s a
M
z t3 Q (� 0 0 p 0 ca
_n p Q
. . Q Q a M o aN c� o z
(/� mQ wQy 0 r o r o
mod 0 0 c� U O
0
I - 02 d
Iav-s 1-, 2 a'v-).-, \ .
•
•
•
•
•
•
• E o if)
i
N
N . t o=
tl` . 0 •
•
•0
1
•tl] • ,� Sd j. N
6-
0 1 X00010A N
r . Q.
—u6!sop N - —
• Q 1- sd, of
1 < 4- xn30ID/� N
1 o
el r S;D O,
Q N u613DQ —
+
• �`�l 0 S;D oD
j I W XI,I3DdDO —
1 0 0 • 11
Q • N
aZiS
tfi o 0.0 •
\. t .. al
wi CC
.0 < •
co
DdoIS —
Z s1.2
tit 2 clDDdoo to
- olgoMolidF _ _
J
W "' cr.
0 CCado�S "i '
C..+ of p q
`- v s3o 3}ouna 4. N
M 0;.
NuoilDwwns m 0 Ni di
}-- j.louna N� .. a
logio
s;D i N i d N
noun a =I M 0 o N
loD�1p
co ti-j
W DODO ndr, 0 2; I p 1� .
3 1
0 DDJ d r'd a a m o
Xosuzluj N N N j O .
II ict
�'• �. no..
d 0
1 1ualo!UUDo3 d 0 6 A o
4 •uiw ._. r _a, _ r
uo!1D.11uOouo3 r- m r
X 10 Oulu a0 _ r
�, •uiw
Q� � Ddid
I r •u1w
gIODJs w)�
uiw •
owl.L 131u1
y16ua-
1. d
d d d m
Su1SDg N ' -A 03 Q\ d) 0 O
I
c
1O d_
o g •
• J N
i 0
1
I
1
r
DESIGN OF CHANNELS, SWALES
1
I
1'
I
■
I
1
1
1
I
1
1
■
I ® • '42.
I
II RBD INC. ENGINEERING CONSULTANTS
CHANNEL RATING INFORMATION
INTERIM REGIONAL CHANNEL FULLY DEVELOPED CONDITION EAST OF HARMONY ROAD
11 STA ELEV
Q Z.-=...._5 ..9---C 5..... .. .
1 0.00 20.00 -
20.00 15.00 (i oc . = 0.14-.l0 c.+-S
26.00 15.00
46.00 20.00
'N' VALUE SLOPE (ft/ft)
I
0.035 0.0060
ELEVATION AREA VELOCITY DISCHARGE FROUDE
(feet) (sq ft) (fps) (cfs,) NO.
I
15.50 4.0 1.8 7.11 0.50
II 16.00 10.0 2.6 26.05 0.54 z= S-T.9 La ci = t, . S I
16.50 18.0 3.3 58.56 0.57
17.00 28.0 3.8 106.83 0.60.
17.50 40.0 4.3 173.02 0.61 Qloo = 2:-.I4.(o 42. G = Z.7'
II
18.00 54.0 4.8 259.16 0.63
18.50 70.0 5.2 367.22 0.64
19.00 88.0 5.7 499.07 0.66
19.50 108.0 6.1 656.54 0.67
I 20.00 130.0 6.5 841.37 0.68
I
I •
I 7V'
m cZ - 1 • 5'
Via'
e
� EROSION CONTROL
I ® ® It zz
IRAINFALL PERFORMANCE STANDARD EVALUATION
PROJECT:
- STANDARD FORM A
1 COMPLETED BY: a-C e ss (IZ at7, - DATE: a3 9a
DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS
ISUBBAMIN ZONE (ac) (ft) (%) (feet) (%) (%)
Ilrc>14_Qn,kiFa.
I --_-.. ),L3_A__._..._.. MO.D.E2ATE lU.i L10 _._.3.03._ . _-_(zz,-7 c..) _ _.__.Z._/
LZ._. _.._ ----c,,-2___ 1 Q:S _��
. l .
I �b. - SuKA (.__LS[ .. ,kSb)-,/ U_M- _..L.Sb_.
_ ED ' L.)N.A ( `..,S1_. 4i.e- A-S6) 7SL)%n 11-si:, _ _
I . _. L1„ _= C3.t> 0:::7-7 ( ,-7t] 4 5> r (0<4?�3 { tv )
I
S6 _ (a_._(:)_3")(-7_"/� -r (Di.-7s Zf) -3-(e_9eXo-8)__-
1 4.
fib_..__ .__ 1o.-7s%_ _
I12_o_nrl - ns__.- 8U o
I
I
I
MARCH 1991 8-14 DESIGN CRITERIA
II zAz
IEFFECTIVENESS CALCULATIONS
PROJECT: oT� e- W Gc pJ>Y ..rc� �t�IN� STANDARD FORM. B
ICOMPLETED BY: .S. G_U1;TIss 'ado, I *,c... DATE: LCS• z39Z
Erosion Control C-Factor P-Factor
Method Value Value Comment
.
I .Ro A --P0v e.D _If.,.GO_N._STY-L3CT_ED_
.?...,,2A.1,/St_.--1=t t_T- _2S.- 1 , coo . C) ,.80 _._I_t.I.LET_S
I •• •,...r eAN.1...t—e-_,A.1._ff...s
__ -14y__._Qe._STPuv iMULL+t
----------- - - --
I W/.1-EMP.__.5.=SD C]_..00., I,,,.O.- .. ....Li_ P.cn=-._..T..10T hd..-I - I
..
- — - ------ -- z oo �+./oy.
-
MAJOR PS SUB AREA
BASIN (%) 'BASIN (Ac) CALCULATIONS
I r' o
/- -- .- I t-1 .1.1 u-r._ICI T->_.__ PwK.1 _tS .TC, USE
__::t._ r-n:P_,_S.EE-.._.-'�4--.n'tLx.CH ._. Al- DISTu.Q-ESED._.. .
1 .ArQ EoS N OT I tJ A-• P f>..n�'- ' 4 us
ST2... y..i e7.1c..La.S.
I767-pc_ 1STUP ; .O LDS - 4.-72_ .oc,_
I
vMJ= 24DnS NOT !-C)$..IS �., Ll-/I:-n4-1L
fo_ .V./1=E lLS - ---
-
I • __. . - (I - C 41 in)( I c.o.')
__ _ 1_ (Os_ )o.ap31ha.___ - ..
- _-C__ - 19Z X c -J - - 3.1 D:�
I
1
IMARCH 1991 8-15 DESIGN CRITERIA •
13/
i IIIzz
' 1 CONSTRUCTION SEQUENCE
1 PROJECT: (/' b1 r1=S ,1/oop2_1 11:>C, rd '-t u sLC_ STANDARD FORM C
I SEQUENCE FOR 19 93 ONLY COMPLETED BY: 3. ( i )�ns5 DATE: C.cr. Z3 , 19,Z
L3 eD, hue_
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
11
1993
YEAR 1`
MONTH I I I J IF I >uI 111.E I J I I I
OVERLOT GRADING 1
l
WIND EROSION CONTROL
Soil Roughening
Perimeter Barrier
1 Additional Barriers •
Vegetative Methods
Soil Sealant •
II Other
EROSION CONTROL
IRAINL STRUCTURAL: _
Sediment Trap/Basin
Inlet Filters
II Straw Barriers
Silt Fence Barriers
Sand Bags
II Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
I/ Other
II VEGETATIVE: j
Permanent Seed Planting
Mulching/Sealant
II
Temporary Seed Planting !
Sod Installation
•
Nettings/Mats/Blankets
Other I• l
"STRUCTURES: INSTALLED BY MAINTAINED BY
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON
I
11 MARCH 1991 8-16 DESIGN CRITERIA
I 4�Zz
1 • •
1
1
1
1
CHARTS, TABLES AND FIGURES
1
1
I
I
I
1
I
p
I
I
I
® ® ZZ
DRAINAGE CRITERIA MANUAL RUNOFF
1 •
1
1 50
30 IIIII lirII .
•
I t . 20 0
2 0 *
W �e o. • r
�ry
4 h. * ti .
CC J
LU y .ate 0Air V.
4 .
o. 10• . �4, UJv o �i
Lau"
rw 41 �v /°e a �32. � ys' ice■
I
II I HI
' 24 i
yvt4°1 cc �~3 / 4?/ 111111
. / 4 A1®11
1 v. AIMIMMIMMII
w �y
Q iZr
i '
I .1 .2 .3 ,5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
•
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR ,
IUSE WITH THE RATIONAL FORMULA. '
I * MOST FREQUENTLY OCCURRING "UNDEVELOPED'•'
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
•
5-1-84 •
IURBAN DRAINAGE & FLOOD CONTROL DISTRICT '
® 16/
I ® zz .
•
I
0
as 0 0
�w �0 ° 1- . 1! • _ _..J
-
U •F-- IL cc _-- _ _ _ ■ - _. : _
N
.v , -_—__ - r p _ _�
`n WZoo _ _ ■ --
PI-- 2
cr o J - --____ _-- - ae _ a
i a�i O W a2.6 U - _ ____ _
2 0 W 1 �- --- ---
m oo.� , — N
V► El
- --- ■
�- cr z W QI 3 __ ___ C1
Q N -- -- -.
0 Ili > wx -- _ ■
�. f J W
oQo ' _ 1 /
a MI CO
Y
-- Film 0
cr 1
0z _ -- _ - : ill Z
_ - __-- ; - 17 ■- -...< 4:t. fli Lill _-
i .
h_1
Iiiii f 1...._
GP
___ ____ ___111_•• 411. ° JO I
i ,
_____L_ pd il •
gi ? il
i . -_--
•
—1 ... 0 ----- --
- --- -----N -- -
ti (D
in 0
IJ1iOH 133d S3HONI —NOLLVIld103»d
•
IMAY 1904 3-2 DESIGN CRITERIA
17/
I ill ® zZ
Calculations for Curb Capacities and Velocities
III
Major and Minor Storms
il per City of Fort Collins Storm Drainage Design Criteria
ll RESIDENTIAL with drive over curb and gutter Prepared by: RBD, Inc.
a is for one side of the road only February 28, 1992
V is based on theoretical capacities
11
Area = 2.63 sq.ft. Area = 20.11 sq.ft.
: : : Minor Storm : : Major Storm
Slope : Red. Minor Q V Major Q V
(X) :Factor : X : (cfs) : (fps) : X : (cfs) : (fps) .
1 0.40 : 0.50 : 86.71 : 2.74 : 2.09 : 696.73 : 22.03 : 2.19 :
0.50 0.65 86.71 : 3.99 2.33 696.73 32.02 2.45
0.60 : 0.80 : 86.71 : 5.37 : 2.55 : 696.73 43.17 : 2.68 :
I0.70 0.80 : 86.71 : 5.80 2.76 a 696.73 : 46.63 2.90 :
0.80 : 0.80 : 86.71 : 6.20 : 2.95 : 696.73 : 49.85 : 3.10 :
0.90 : 0.80 : 86.71 : ' 6.58 : 3.13 : 696.73 52.88 : 3.29 :
1.00 : 0.80 : 86.71 : 6.94 : 3.30 : 696.73 : 55.74 : 3.46 :
I1.25 0.80 : 86.71 : 7.76 : 3.69 : 696.73 62.32 3.87 :
1.50 : 0.80 : 86.71 : 8.50 : 4.04 : 696.73 : 68.27 : 4.24
1.75 : 0.80 86.71 : 9.18 : 4.36 : 696.73 : 73.73 : 4.58 :
I2.00 : 0.80 : 86.71 : 9.81 : 4.66 : 696.73 : 78.83 : 4.90 :
2.2S : 0.78 : 86.71 : 10.15 : 4.95 : 696.73 : 81.52 5.20 :
2.50 0.76 : 86.71 : 10.42 : 5.21 : 696.73 : 83.72 : 5.48
I 2.75 : 0.74 : 86.71 : 10.64 : 5.47 : 696.73 : 85.50 : 5.75 :
3.00 : 0.72 : 86.71 : 10.81 : 5.71 : 696.73 : 86.89 : 6.00 :
3.25 : 0.69 : 86.71 10.79 : 5.94 : 696.73 : 86.67 : 6.25 :
3.50 : 0.66 : 86.71 : 10.71 : 6.17 a 696.73 : 86.03 : 6.48 :
I3.75 : 0.63 : 86.71 : 10.58 : 6.38 : 696.73 : 85.00 : 6.71 :
4.00 0.60 : 86.71 : 10.41 : 6.59 : 696.73 83.61 : 6.93 :
4.25 : 0.58 : 86.71 10.37 : 6.80 : 696.73 : 83.31 : 7.14 :
I4.50 0.54 : 86.71 : 9.93 : 6.99 : 696.73 79.81 : 7.35
4.75 : 0.52 : 86.71 : 9.83 : 7.19 : 696.73 78.96 : 7.55 :
5.00 : 0.49 : 86.71 : 9.50 : 7.37 : 696.73 : 76.34 7.75 :
5.25 0.46 : 86.71 : 9.14 7.55 : 696.73 : 73.43 7.94 :
I5.50 0.44 86.71 8.95 : 7.73 : 696.73 : 71.89 8.13
5.75 0.42 : 86.71 : 8.73 : 7.91 : 696.73 : 70.17 : 8.31 :
6.00 : 0.40 : 86.71 : 8.50 : 8.08 : 696.73 : 68.27 : 8.49 :
1
I
I
I
I
1 e,/
I0 0 i al
z'
CLIENT ci,-.1 c:::, . ...„,,47.7,--ci-A,_,Qs. JOB NO.
-,•:A7).:'..]:',
I PROJECT CALCULATIONS FOR
Engineering Consultants
MADE BY ' ... DATE P•GYZ CHECKED BY O UTTSE. FR-CM../
DATE SHEET_I OF _Z-____
I D ),-1-1 I.6-1.-.: ' ' L1.11 - 2-1k./ -E"- C:)Lre..k..: d4L.)E.15,et.L31-1-E...e.: -Jr S I
III . , . ; . - •
. A ,
1-1..tpu-bn-E.L.E.. j -'S-1-2-ee:1-- .....n..,E'z."-•c_-1-1.71=..--.:1 , . ! . i : : , . ! • : ; :
!.. _.,4:1_. •aot.QH...:................: aG: .........5--= 1-.0.1.; .. _Ti:?_.!..... . ; : ; ' : : •
I
. . „ . . ;_„. .. . • .
1 , , , • , ' • ' . • . ' , .
„ -rz .z.-T,A , , • , • : • : , • .
. .
' • .:. ,
I , . . ,
- : P ..',4••- S -1::==n<=?Ii.. :4- 2...,.2.."4 . C...17,..Y'.'.C:) ....;.... !-E:Dr......r..!C..i.. l..1,1.1.4S...
• -i i
r • '
. ;
I • /-
.. sZ..1._./4.-1- a. ,,. . C? L---Hi 74-4-.. .._c2.Z.... .77C_..tt-L..., Ct_.)--.1-.1 c•-a• -4C-rT.Y. . L
. . . Li.---7,.,, z)--.-PTH. 0 r-7-7 . ,L.i /„: .-;-. ./\-e. TT--_.Z..
•
I .
. .
--' .14...n..),Jr..32E:..-L. '51-c:)?- -_. .. ."7"-/F7r ,
' . -.. .. 2_---c...,p.z....r. -- i I . •
1
-T-J TOr C3 C-L.)Z-13 .
I
c2.
IA 1 A ..1.........„.........-----7
0.54
A e.. A -
.1" 1
• 2."'4
- •
I C_1/2..)(•:54)) I.4:2-)4- (1/2)(.1 I di) , 3,/
4- (Yz.')(2..e)) 14) 4-(I.17X.2.,_g) , / 1.1-7 • = "3-41- ',.... •
2.7. •..3 45/. :
I , =-- a.E, • ••r z:
•
. . . ,
. . . •
1
. .
t..1. 1_.=.--r. • m i c.-:)e. ‘4 ---- . c›.. c. -a ii.-1:.5/3) : . : : Q---- . s ,.1 7-!>< - • •
. , • ! ,
. . ,
,:-.-7: a#)-r.a.L....:- z 7..) -,..-( ' -,. c.:h; i .•
I . .
- • ' : : ' . ' ' . . : : . . . • : ! : ' : : : - : i : : : . ! . : :
" - : i • ' ' ' ' ' . ' ' abl. .'._E I ' ' • ' . , . ' . . • • '
1 ao-1 T07.6.i_ - 0 S E. ' i,r:: Gc> • 39 3) - -, . ac) t z.: ; . . • . . . ' .
(
. , • •- , " • """". , . : : ; , I , : .. • C.•. -0 V.=. . .: j : ': ' • 11 1 ; : :, : : i : ! '. i ; : *::' .• ', 'H';
111 ,• : ; ,' , ' ; (.: •_ _I 6, ..• ..3 ,i : i
.
,....
' .i7--: = ' 0 C :( le= •4:::,c% c..2.5. • A - ; • ; !a.4- . . : : : : • - . ; ., ., _.:...•.._ :
. 1 0-;“;=)1 , , : : : : : , i ; ; : : , : , ; , I- : : ; : II:; : ; ; : 1 , : , , • I • : • : : : , :
:„..1 • ; ; : ; : 1 , . 1. : • , , ; ; • ; • i ' ,. • ;,. • ' ; , 1•-1-4 : I • ' ; : ; :..; • i : -; .-t--i- ----•-,-- -
I ..L A)___::=L._ cr--51-.... 6: O:-1 ' (ct,-;;;.z.,5_,_:cf(..$) i ; 74t-. ; .. - _lat..7_-,Z.., t : : ; : j_Li._.1__L--_;
-i . •i ' ' 1 1 ' ' ,.,: r...,:,i_. . ' i ' ! : ' 1.,-1 ! ! 1 : ' ! • 1 ' i : : 1, , :. I.4.4.i...1._..._ ...,...i.... ..._.;,......H__4.....t....i...::....
! ; ! * ; . ' .,-,7,--••‘-•;-' ; : ; ; , 1 , ' ' ; : HL ; . ; ' ..i.,' I ._ ' , . , 4 .i.........:........4_. ....: .:.
I -....... ; I ; 1 i ; .: ; .i...'... ; ;..... ;.
'(.._C:H; i;01 -2H j ; ;
,, ; ir• 7..1 :: . 1"1 :. 1 • ,C).(2=;1(= : - ' ' ' LI i ' ' ' ' : ' ' 1 ' , , - • ' . ' . . , . ,..-......_.....i...i.._-.........,___!...:...,........
: 1 , : . : : ! : : Ir--: ' ; : :, , ' i, .1... .', .i...•:--t.---:7 -.t:1--t- 1-H--;,--:':-i--'---.r-•
-7 ' . .',.. . . ....KA 7(74-1c5t.-7--Wil:777.1 (.B.:6;ft:.7.-.112.--A-- --i4 . El.:7.2.4- 10:3 2. : '77- ac.,;.7-7 I....4.1 :,L..# .,....:......i .:......I
Li_, ___: ; ,.. : • i • ; • ; • ; : . I : • : . • : .: :.1 ; ; ; • • : .i....;._ : ; ; L_1__,.......- • L__:...--:-.1
I
.
19/
III 110 __,110 az.
,„„,. CLIENT(1-1 `4 C) -7::1-e..:r C._i_r-sc..Li1/4i5, JOB NO.
;.,.-......::::..
I :,' ',:'::.:::''..,.'...,..:.:.": INC
Engineering Consultants PROJECT CALCULATIONS FORC- .TI-T—=_2... -t.._/__Tht.1.1
MADE BY, "C DATE a•C)Z. CHECKED BT - - DATE - - - -SHEET Z OF a.
I . ' .
1-; - 1,j: -r/. ..L.,H • • ..k../. / e.i 1..J a; C:>\,)..- . C-1-t)a- C.L.717te-r :----. ' ''-‘'"/r\k-k-.- . 1
I
I 1. .
. .
--L...L.6 cs-/A --1.-- , --r-ze-t7-- C.6.:1".-.c.c_i-r-1
.. 47.1... .eI C4-,r- -...."(=,I; ; . ll-c::•LI./LJ)....re' TE=', FA.A......ULII.J"=-- . : • :
I . .
,
• ; Is-A_ c:,e. 57-C1Z-M: ; . . • ,
. . ;
I ' _i
t- 0 .
: ' - 0 • : : • I : •
, , . 4 • Cil ' ' !
N : LA .03 J : : .
' • " 'd -.4 iv . 0 . ! : ! 0:8 .1 .
: :
• • N - 4 4 4- '
I
. .
, ; 0 _ 0 cr! 0 0 • . 2 • ,
•• • •, .
. : • . , . ........,,, --....., :
. ,
I . . .
• . .
TTTTE
, .
\LA AJC:)E- 7.Tst...--T•A - 'D . -l- LV.a.rat. C= .J a
I el 1P-f-,u_in_t " i-4.W_..L_ )....101- e..v c-.E..c.._ "
. . . . ..P. (..? % •._ 1-k-i c.--4-4- (.1_46.7r-.-.Z.: L.0,1 '.,- 1 cc:1. it2)
„.. , ..... . . ......
Ae... c. 6)1Q 5)4::5 c::. • ST? :-E.-r- Cl....1L...'7,--) = Cl/z.) .1 z---,t,, sc)- I pc:).c)c,')(4S.17-'2..3.17)
I +- (Yz. 0;I 2:Y_3,.7 + ( 5:7S)(1 cDo, ... -I C>t).C.6) +. (vz.y. "69 X 1.4-2)
-F- (Vai. 1 I)(1, 17) -I-Ct. 1-7 (.1D:).SD-99.( (=.) -t- (/2.11 cX::, '-- 83) 4- C i 6.S'31:)."--- )
I . ' . = 26. It --r Z .
. .. .
•
•
. :I I i I I
U.A.n..11Q iKIC,S r)
. N/ N
(_2.. , ),(c:,.6 i 6) + ( .11),,0= 17
, .
. .
I ,
' ..-'rr" .: P 2 I kA Ter___2.. : -. 71-i-V.6.Z4.. UllrAd-. a'. ._ il_P ; = ::: ; : ' /4+..G. 1'7, • i = . ' .I4A-5 . E E • , ' • ' , , : ,
I .
' , : ' , : : • '. : • ' . , : • . ; : . ; . ' , : I ! . : • ' ; ' .1 : . : ; : ; , ! , ' : ! ; i
.::1 1Q -..-1-... ...::',. .-----c4;_Ii:-&.+16----C:-i---. ,--+ET H--'.-7....„7--7"---t--.+.--1-,...;7 .-l-ITTh• • tifl__tVZ-T--T-T •--'"----:-
1...-... ..i. :. ; • ...i. .i.... : • ; ; : ; : C__Q' -= : --' .:. .. C...: ; _.. i :, ; ; ::.; . -.. i L : .: : ...._..i.. , ! 1
C
I • ; ' ! : , : ; : : ; ' ; ; : ; ; ; : ' : n E ,. . , . ' : • , ' , ; ' : : E : , : , , • : • : , ; , , , :
; . . . , . . , . . • . • , : . : ; , , . E 1 ' : , : • • f ..j. ' : ; ' , : ; t ..:.....: ' ; • ' ! ! :
, ! ; • . t t ' f tt . : 1 , ' . ; ' 1 : : : , . . . , ; , . : ; : : r . 7 . ; : : •:: , , , , , : , ,
1 : i , )....L , • , , • : A . 0 ! ! : ' ._E.• ! :._ A.._,' .._.... Z,/,t]. t !
' ; •.- ---r NAtijoe.; '.. .i •.!: ! 0,..; .41; • . : . : , I : : ; :'1;::':I= :- ..,(•,_-_--.-.:! i L:::•,. : ; i , ! ; i
L
I .: _ _± ...._i_•,. i : 1 . .. _., ,-f.7 1 ! , • , ; . ! , • 1 'E ; ! ; _, ..... 1 • : .. ! _i; i ; _.L. .._. ___L4.4.__i._
!-TT".777.--7-7.7.7 -7.--;-• !-•-;- ' • E ' I ! 7 ! • ; I ; ' ' _...; ---... .... ....._ ...._ ..... ...... ........ .. .,-..........
f ' ; 7 ' ! t .: i l. .; 7 E , , E--r, , E , : , -, , : 1 , E 7-c. .. ,. 1.-E,e;,iiE:ie-:;.--7--'77;-- -1 , , , , , i ' : E
pit: '.. L ,..4._,....,...,.....1. ...:,...E ' ! '.,....4 ',--E .I E E ' 1 : i E E i E ' ' E E E i-j--• 1---! !- ' ' ..-E-L-E,E-••:,---E-.--', -E,...--i-Ei-1-EE,-, E-4-E-:',-4---------i-:!---- --';-;
it ! ''. 1 4 ' 4-.4 ! ! ! 4!. ! :, i--1 .+.4,-4—'44--!.- --,:- .--jr-4--.Hi-4:- :::: -ti
i. :_il .11-i-:--..-Tiit-1Q-.4.4.-4-6z.--±: ...;;,-;c:- 4,, .''...;( ,,F34',..--ITi S; i-•T -1 : i _..., !! !.....L! _,, ; 'i . --L-,:. , I
1._..LLH...! , i..., i.._.L.......1...L ; ' ; ' , , ; ! ' , ,. i ; HL. i 1..4 , , , .: ! : ' , ; ' i . : !.. ':. ] ! 1 , 4 ...`;••••_ ••••.-•.• -!.;•--L-i.-I
' ' 1 ' E 4 • ' ' ; ; i ! ,• : • • - • •••1•-•i•-•-L-j•-•L.4-•!-•••;••1 1,
i .4....! „ ; ; ie___LJ ; -; H ! H ! i ! ! ; ; ; , 1, ! : , • : I : i ! ! , i _L,,.. ___L_14___i_.!,,__,,,:_l_i__,4_4__•,..4.i._.:..
1-4-27-! ;: :L. :: -j,-----.'.,•-•-•!;--- 4 ; ! ; ! i-H, ! , , ! ' ' ' ' 4-4 :: !-- J--'4----::!':--1---4 ----H.-4--;-.4-- ---+-i
I 1---#, ..--i7t t-7-7t . 7 : -1-7 •-: i 1 : • ' :
. _ . _ . . :
1 0 01• 01• 0 • II Zv ZZ
o d• d' LIut
0 WWWWco .
0 o101001000000
. . . . . •
o d' d'. d' d' ul00vltntn
.r co co co co co co co co co co .
1
0 W 0101Q1. 01Q10101010 mm000
. . . . . . . . . . .
0 d' �44 .4 d' d t .:r0U1u1
M W W W W W W W W W W W W W W W
O W W 01 01 to 01 Q1 cy)m O1
. . . . . . . . . . . . . .
N W W W WWWW W W W W W W W W W W W W W
0 OMd' O1D1D101DNnbNNNNNNNNN W W 00 W W W
. . . . . . . . . . . . . . . . . .. . . . . . . . . .
O 0 nrcr11"0v1 � �r �rd �rv� V .1"r �r �r �r 4"4".
A ri W W W W W W W W W W W W W W W W W W W W W W W W W W
g0 W NMd' u1U1t11UDWOOWWDNNNNNbNNNN00t W
O . . . . . . . . . . . . . . . . . . . . • . . . .
a M M d' d' d' d' d' d' ' d' d' d'd •T d' d' d' d' d' d' d"
UCbtO W W W W W W W WW WW W W W W W W W W W W W W W
O W O N M d' d" In u1 u1 u1 1D 1D 1D 10 1D 1D 10 1D 10 1D n N N N N N
U1 W M d' d' d' . d' d d' d' d' d" d' d' d' .1 d'
Z WWW00WWWWWWWo0WtoWotWWcoWWWcoW
H
a 0 d'.01 .-iNMMd' d' d' d' InMu1 W u1u1u1u1U'11D10101D1O1DN
0 •r MMd' d' d' d• � ddd� mrdrdrd0d" 0nrd: d� 0d• d�
00
0 Wc000t0000 a0c0coc000tocoW W Oa co W W co co co CO
E-I 0 O w W O H H N N M M M M dV' d' d' d' d"d' d' lfl lfl UI M W 'O
0 W 1`"1 M M -d' d ' d d' d' d' d'
W c0 W c0 W W W W W W W W WWWW W W W W W W W W W W W
4 E4 ,o 0 N O S M 01 O 0 r r4 H N N N N N M M M M O IT KIM
10 4° . .
W G4 '-'0, N M M M M M vP%r d' d' d' d' d' d' c1"ct d' d'
1 COWWWWWWWWWWWWWWWWWWWWWWWtW
W v) W
00 out IW � Mv' �nu1W1ONNNWWWWWWrnC CI00000
ad' NNM MMMMMMMMMMMMMMMMMMd' d' d' d' d'
E+ W co0Wc000Coo0Wc000COWWCoWCOWWWWWWWWW
0 10 In W o r1 N M d' d' In u1 0 0 10 1D 10 10 N N N N W W CO 01 01
[-i . . .
U) d' r=1NNMMMMMMMMMMMMMMMMMMMMMMM
W W W W W W W W W W W tO t0 W W t0 W W W W W W W W W W
/ W
U to rlrlulnW OOe-{ NNMMMd' d' d' d' d' I!) llllfl \O1DWNN
M rl N N N N M M M M M M M M M M M M M M M M M M M M M
to c0 W W W W W cO W W W WWWW W W W W W W W W W W W
r0 0 1`1N10 W 010rINNMMMdLllU� lnlfl �O �D �0 �0
. . . . . . . . . . . . . . . . . . . . . . . .
PG M OrlrlririNNNNNNNNNNNNNNNNNNNNN
W tCO W W W W WWW W W W W W W W W W W W W W W W W W
a
In MIn01NMd' u110NNn W W to01M01010101000000
,a
N 0100rirtr4rir4r1e-i .-irlrlr4rlrirlrir11-4NNNNNIV
s c0 c W W W W W W W W W W W W W W W W W W W W W W W
Z 0 d' InOMu110 W CC101000e-Irir-� r-INNNNMMMMMM
I g . . . . . . . . . . . . . . . . . . . . . . . . . .
N ' W010000000r1r1r1rir1r1r1rlr e-1 l "-11.1rir t'iHri
N N W W W W W W W W W W W W W W 00 W W W W W W 00 W W
In W N W rl d' In N n W d1 01 O O ri ri rl rl rl N N N M M M M M
rt 10 W W 0101010101010101000000000000000
bN N rr N N N NNN co co co W co co co W CO CO W W 00 00 co
0 Wrei0d' 1- 01OTAN11Md' d' (nmMul1010wW1-. NOWw
O . 00 . 00008 . 004 . 00M00000000
111 r-I d' 1D N N N N to W W W W CO CD W W W CO W W W W W W W W W
N N N N N N 1- N N r N N N l- n N N N N N N N N N N N
0 M O tr O S W W S N N W 1D 10 1n M M N N M W d' r4 01 W
/ .
O ONNNNNNNNNNNNNNNNNNNrlHHH00
NNNNNNNNNrnrNNNNNNNNNN NNNN
x
E4 — 00000000000000000000000000
O U' E4 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0 0 0 0
-14Z44 rINMsYI koN W 010r1NMd' u110nto010ln0I0i0
c 4 N s— ri ri ri ri rl ri t-1 ri r- rl N fV M M d' d' In
a
MARCH 1991 8-4 DESIGN CRITERIA
I 0 I Zy
zz
1 Table 8B C-Factors and P-Factors for Evaluating EFF Values.
Treatment C-Factor P-Factor
I BARE SOIL
Packed and smooth 1.00 1.00
Freshly disked 1.00 0.90
I Rough irregular surface 1.00 0.90
SEDIMENT BASIN/TRAP 1.00 0.50'"
II STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG 1.00 0.80
SILT FENCE BARRIER 1.00 0.50
IASPHALT/CONCRETE PAVEMENT 0.01 1.00
ESTABLISHED DRY LAND (NATIVE) GRASS See Fig. 8-A 1.00
1 SOD GRASS 0.01 1.00
TEMPORARY VEGETATION/COVER CROPS 0.45'2' 1.00
IHYDRAULIC MULCH @ 2 TONS/ACRE .............................. 0.10' ' 1.00
SOIL SEALANT 0.01-0.60'4j 1.00
1 EROSION CONTROL MATS/BLANKETS 0.10 1.00
GRAVEL MULCH
I Mulch shall consist of gravel having a diameter of approximately
1/4" to 1 1/2" and applied at a rate of at least 135 tons/acre. 0.05 1.00
HAY OR STRAW DRY MULCH
I After olantina arass seed, apply mulch at a rate of 2 tons/acre (minimum) and adequately anchor,
tack or crimp material into the soil.
Slope (%)
1 to 05 0.06 1.00
6 to 10 0.06 1.00
11 to 15 0.07 1.00
16 to 20 0.11 1.00
I 21 to 25 0.14 1.00
25 to 33 0.17 1.00
>33 0.20 1.00
1 NOTE: Use of other C-Factor or P-Factor values reported in this table must be substantiated by documentation.
(1) Must be constructed as the first step in overlot grading.
/ (2) Assumes planting by dates identified in Table 11-4,thus dry or hydraulic mulches are not required.
(3) Hydraulic mulches shall be used only between March 15 and May 15 unless irrigated.
(4) Value used must be substantiated by documentation.
1
I .
I
MARCH 1991 8.6 DESIGN CRITERIA
I 411 II -az/
za
ITable 8-B C=Factors and P-Factors for Evaluating EFF Values (continued from previous page).
Treatment C-Factor P-Factor
I CONTOUR FURROWED SURFACE
Must be maintained throughout the construction period, otherwise P-Factor = 1.00. Maximum
length refers to the down slope length.
I Basin Maximum
Slope Length
(%)_ (feet).
I 1 --to 2 400 1.00 0.60
3 to 5 300 1.00 0:50
6 to 8 200 1.00 0.50
9 to 12 120 1.00 0.60
I 13 to 16 80... 1.00 0.70
17 to 20 60 .: .. :: . :. .: :.. .........: 1.00 0.80
>20 50 1.00 0.90
I TERRACING
Must contain 10-year runoff volumes, without overflowing, as determined by applicable hydrologic
methods, otherwise P-Factor = 1.00.
I Basin
Slope (%)
1 to 2 1.00 0.12
I 3 to 8 1.00 0.10
9 to 12 1.00 0.12
13 to 16 1.00 0.14
17 to 20 1.00 0.16
I >20 1.00 0.18
NOTE: Use of other C-Factor or P-Factor values reported in this table must be substantiated by documentation.
I
I
I
I
I
I
I .
MARCH 1991 8-7 DESIGN CRITERIA