Loading...
HomeMy WebLinkAboutSTANFORD SENIOR LIVING - FDP210017 - SUBMITTAL DOCUMENTS - ROUND 5 - ELEVATIONSSTUCCO 2 CEMENTITIOUS SIDING SPLIT FACE CMU STUCCO 1 GARAGE OPENING- METAL FRAME W/ MESH SCREENS ALUMINUM STOREFRONT VINYL WINDOW STUCCO 2 STUCCO 1STEEL RAILING CEMENTITIOUS SIDING PREFINISHED METAL WALL CAP STUCCO REVEAL SITE WALL AND FENCE BEYOND STUCCO BANDING PREFINISHED METAL FASCIA MONROE AVE. 147' - 8 1/2" 149' - 6" MECHANICAL SCREEN BEYOND -EMBOSSED METAL PANEL ROOF ACCESS STAIR TOWER STEEL SUNSHADE MECHANICAL LOUVER BASEMENT LEVEL 90' - 0" FIRST FLOOR LEVEL 111' - 11 1/2" SECOND FLOOR LEVEL THIRD FLOOR LEVEL 134' - 6 1/2" FOURTH FLOOR LEVEL LAMBSTONGUE65' - 6"STEEL BALCONY AND RAILING 123' - 3" 100' - 0" 1. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP EXTERIOR ELEVATION GENERAL NOTES EXTERIOR FINISH SCHEDULE STUCCO 1 COLOR LIGHT GREY STUCCO 2 COLOR DARK GREY STONE COLOR TAN CEMENTITIOUS SIDING DARK BROWN TRIM DARK GREY & LIGHT GREY SPLIT FACE CMU DARK GREY STEEL SUNSHADES DARK GREY STOREFRONT FRAME BLACK BALCONY RAILING BLACK GARAGE ENTRY GARAGE OPENING - METAL FRAME W/ MESH SCREENS, DARK GREY ALUMINUM STOREFRONT CEMENTITIOUS SIDING MANUFACTURED STONE VENEER STUCCO 2 STUCCO 1 WALL MOUNTED LIGHT FIXTURE SPLIT FACE CMU MECHANICAL LOUVER CEMENTITIOUS SIDING PREFINISHED METAL WALL CAP STEEL RAILING STEEL SUNSHADE STEEL SUNSHADE VINYL WINDOW MANUFACTURED STONE SILL MANUFACTURED STONE ACCENT TRIM, TYP SPLIT FACE CMU PORTE COCHERE STUCCO REVEAL MECHANICAL SCREEN - EMBOSSED METAL PANEL MECHANICAL SCREEN - EMBOSSED METAL PANEL ADDRESS NUMBERS 147' - 8 1/2" ROOF ACCESS STAIR TOWER MECHANICAL SCREEN BEYOND - EMBOSSED METAL PANEL STUCCO BANDINGMECHANICAL VENT VINYL WINDOW STUCCO 1 PREFINISHED METAL FASCIA PRECAST CONCRETE HEADER MANUFACTURED STONE ACCENT TRIM CEMENTITIOUS SIDING ALUMINUM STOREFRONT RECESSED SPLIT FACE CMU BANDINGRECESSED SPLIT FACE CMU BANDING 100' - 0" FIRST FLOOR LEVEL BRAKE METAL ACCENT PRECAST CONCRETE SILL FDC 10X2 STEEL TUBE, PAINTED LAMBSTONGUE 148' - 2" 149' - 6" 138' - 9 1/2" 149' - 6" STUCCO REVEAL PREFINISHED METAL WALL CAP STUCCO BANDING STEEL SUNSHADE CEMENTITIOUS SIDING STUCCO 1 STUCCO 2 149' - 6" LOW SITE WALL SITE FENCE STEEL RAILING 100' - 0" MECHANICAL SCREN BEYOND - EMBOSSED METAL PANEL MECHANICAL VENT 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE A R C H I T E C T U R E + I N T E R I O R S OWNER: UNITED PROPERTIES CONTRACTOR: BRINKMAN CONSTRUCTION MECHANICAL & PLUMBING ENGINEER: INTEGRATED MECHANICAL ELECTRICAL ENGINEER: ADONAI PROFESSIONAL SERVICES, INC.11/30/2022 12:48:53 AM11/30/2022 12:48:53 AMC:\Users\bolin\OneDrive - VFLA\Documents\STANFORD_v20_bolinDHVWR.rvtA1 EXTERIOR ELEVATIONS STANFORD SENIOR LIVING FORT COLLINS, CO FDP PLANNING SUBMITTAL 2020-35 SCALE:1/16" = 1'-0"2 PLANNING ELEVATION -EAST SCALE:1/16" = 1'-0"1 PLANNING ELEVATION -SOUTH SCALE:1/16" = 1'-0"3 PLANNING ELEVATION -NORTHEAST SCALE:4 PERSPECTIVE VIEW -SOUTHEAST CORNER PLANNING SUBMITTAL 1 12-23-2020 PLANNING RESUBMITTAL 1 03-31-2021 PLANNING SUBMITTAL 2 04-28-2021 FDP PLANNING SUBMITTAL 07-14-2021 FDP PLANNING SUBMITTAL 09-08-2021 FDP PLANNING SUBMITTAL 3 12-02-2022 CEMENTITIOUS SIDING STUCCO 1 STUCCO 2 ALUMINUM STOREFRONT PREFINISHED METAL WALL CAP STEEL SUNSHADE STUCCO BANDING VINYL WINDOW 149' - 6" 100' - 0" EXTERIOR EXIT STAIR STEEL RAILING 1. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP EXTERIOR ELEVATION GENERAL NOTES EXTERIOR FINISH SCHEDULE STUCCO 1 COLOR LIGHT GREY STUCCO 2 COLOR DARK GREY STONE COLOR TAN CEMENTITIOUS SIDING DARK BROWN TRIM DARK GREY & LIGHT GREY SPLIT FACE CMU DARK GREY STEEL SUNSHADES DARK GREY STOREFRONT FRAME BLACK BALCONY RAILING BLACK STUCCO BANDING STUCCO 1 STUCCO 2 STEEL SUNSHADE STUCCO REVEAL STEEL RAILING CEMENTITIOUS SIDING ALUMINUM STOREFRONT ENTRY MECHANICAL VENT STUCCO 2 STUCCO BANDING STUCCO 1 147' - 8 1/2" 100' - 0" SPLIT FACE CMU STEEL SUNSHADE VINYL WINDOW CEMENTITIOUS SIDING ALUMINUM STOREFRONT PREFINISHED METAL WALL CAP ROOF ACCESS STAIR TOWER ROOF ACCESS STAIR TOWER VINYL WINDOW 147' - 8 1/2"148' - 6"149' - 6" EXTERIOR EXIT STAIR BEYOND LAMBSTONGUE STUCCO 1 STUCCO 2 PREFINISHED METAL WALL CAP STEEL SUNSHADE CEMENTITIOUS SIDINGMECHANICAL VENTVINYL WINDOW STUCCO BANDING STUCCO REVEAL 100' - 0" 149' - 6"149' - 6"148' - 6" STEEL RAILING 147' - 8 1/2" 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE A R C H I T E C T U R E + I N T E R I O R S OWNER: UNITED PROPERTIES CONTRACTOR: BRINKMAN CONSTRUCTION MECHANICAL & PLUMBING ENGINEER: INTEGRATED MECHANICAL ELECTRICAL ENGINEER: ADONAI PROFESSIONAL SERVICES, INC.11/30/2022 12:49:24 AM11/30/2022 12:49:24 AMC:\Users\bolin\OneDrive - VFLA\Documents\STANFORD_v20_bolinDHVWR.rvtA2 EXTERIOR ELEVATIONS STANFORD SENIOR LIVING FORT COLLINS, CO FDP PLANNING SUBMITTAL 2020-35 SCALE:1/16" = 1'-0"2 PLANNING ELEVATION -WEST SCALE:1/16" = 1'-0"1 PLANNING ELEVATION -NORTH SCALE:1/16" = 1'-0"3 PLANNING ELEVATION -NORTHWEST SCALE:4 PERPSECTIVE VIEW -NORTHWEST CORNER PLANNING SUBMITTAL 1 12-23-2020 PLANNING RESUBMITTAL 1 03-31-2021 PLANNING SUBMITTAL 2 04-28-2021 FDP PLANNING SUBMITTAL 07-14-2021 FDP PLANNING SUBMITTAL 09-08-2021 FDP PLANNING SUBMITTAL 3 12-02-2022 A37 A3 3 A3 4 A3 8 20' - 0"STEEL DOORS, PAINT DARK GREY 8" SPLIT FACE CMU, DARK GREY CONCRETE PAD 28' - 0" SLOPE GENERATOR CONTINUOUS STEEL ANGLE, PAINT BLACK 6 YARD DUMPSTER, TYP. 95 GALLON RECEPTACLE, TYP. SPLIT FACE CMU, DARK GREY PREFINISHED METAL WALL CAP, BLACK 108' - 2 1/2" 108' - 2 1/2" SPLIT FACE CMU, DARK GREY PREFINISHED METAL WALL CAP, BLACK STEEL DOOR, PAINTED BLACK SPLIT FACE CMU 108' - 2 1/2" PREFINISHED METAL WALL CAP, BLACK SPLIT FACE CMU -DARK GREY STEEL DOORS, PAINT DARK GREY 108' - 2 1/2" 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE A R C H I T E C T U R E + I N T E R I O R S OWNER: UNITED PROPERTIES CONTRACTOR: BRINKMAN CONSTRUCTION MECHANICAL & PLUMBING ENGINEER: INTEGRATED MECHANICAL ELECTRICAL ENGINEER: ADONAI PROFESSIONAL SERVICES, INC.11/30/2022 12:50:04 AM11/30/2022 12:50:05 AMC:\Users\bolin\OneDrive - VFLA\Documents\STANFORD_v20_bolinDHVWR.rvtA3 PERSPECTIVE VIEWS STANFORD SENIOR LIVING FORT COLLINS, CO FDP PLANNING SUBMITTAL 2020-35 SCALE:1 PERSPECTIVE VIEW -SOUTHWEST SCALE:2 PERSPECTIVE VIEW -NORTHEAST SCALE:5 PERSPECTIVE VIEW -PORTE COCHERE SCALE:1/8" = 1'-0"6 ENLARGED PLAN -TRASH ENCLOSURE FDP SCALE:1/8" = 1'-0"4 TRASH ENCLOSURE ELEVATION WEST SCALE:1/8" = 1'-0"3 TRASH ENCLOSURE ELEVATION SOUTH SCALE:1/8" = 1'-0"8 TRASH ENCLOSURE ELEVATION NORTH SCALE:1/8" = 1'-0"7 TRASH ENCLOSURE ELEVATION EAST PLANNING SUBMITTAL 1 12-23-2020 PLANNING RESUBMITTAL 1 03-31-2021 PLANNING SUBMITTAL 2 04-28-2021 FDP PLANNING SUBMITTAL 07-14-2021 FDP PLANNING SUBMITTAL 09-08-2021 FDP PLANNING SUBMITTAL 3 12-02-2022 DIGITAL MATERIAL BOARD LEGEND STUCCO TEXTURE CEMENTITIOUS LAP SIDING CEMENTITOUS SIDING COLOR DARK BROWNSTUCCO 2 COLOR (DARK GREY)STUCCO 1 COLOR (LIGHT GREY) STOREFRONT FRAME VINYL WINDOW FRAMESYNTHENTIC STONE FRAME COLOR (BLACK)FRAME COLOR (DARK TAN) STEEL SUNDHADES SPLIT FACE CMU CEMENTITIOUS SHIPLAP SIDING CEMENTITOUS SIDING COLOR DARK BROWN METAL SCREEN AT GARAGE OPENINGS (BLACK) FRAME COLOR (BLACK) 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE A R C H I T E C T U R E + I N T E R I O R S OWNER: UNITED PROPERTIES CONTRACTOR: BRINKMAN CONSTRUCTION MECHANICAL & PLUMBING ENGINEER: INTEGRATED MECHANICAL ELECTRICAL ENGINEER: ADONAI PROFESSIONAL SERVICES, INC.11/30/2022 12:50:48 AM11/30/2022 12:50:48 AMC:\Users\bolin\OneDrive - VFLA\Documents\STANFORD_v20_bolinDHVWR.rvtA4 DIGITAL MATERIAL BOARD STANFORD SENIOR LIVING FORT COLLINS, CO FDP PLANNING SUBMITTAL 2020-35 MANUFACTURED STONE SPLIT FACE CMU SHIP LAP SIDING STUCCO COLOR 1 STUCCO COLOR 2 GAURDRAIL ROOF TOP PATIO STUCCO COLOR 2 CEMENTITIOUS SIDING MANUFACTURED STONE VINYL WINDOW STOREFRONT ASSEMBLY STUCCO COLOR 2PORTE COCHERE SHIP LAP SIDING SUNSHADE PLANNING SUBMITTAL 1 12-23-2020 PLANNING RESUBMITTAL 1 03-31-2021 PLANNING SUBMITTAL 2 04-28-2021 FDP PLANNING SUBMITTAL 07-14-2021 FDP PLANNING SUBMITTAL 09-08-2021 FDP PLANNING SUBMITTAL 3 12-02-2022 MANUFACTURED STONE VENEER PRECAST CONCRETE SILL RECESSED SPLIT FACE CMU ALUMINUM STOREFRONT MANUFACTURED STONE ACCENT TRIM MANUFACTURED STONE ACCENT TRIM STUCCO SPLIT FACE CMU PRE CAST HEADER METAL FRAME W/ MESH SCREENS VINYL WINDOW CEMENTITIOUS SIDING MANUFACTURED STONE VENEER PRECAST CONCRETE SILL RECESSED SPLIT FACE CMU ALUMINUM STOREFRONT MANUFACTURED STONE ACCENT TRIM MANUFACTURED STONE ACCENT TRIM STUCCO SPLIT FACE CMU STUCCO 2 VINYL WINDOW CEMENTITIOUS SIDING STUCCO 2 STUCCO 1 VINYL WINDOW STUCCO REVEAL MANUFACTURED STONE VENEER PRECAST CONCRETE SILL RECESSED SPLIT FACE CMU SPLIT FACE CMU PRECAST CONCRETE HEADER METAL FRAME W/ MESH SCREENS RECESSED SPLIT FACE CMU STUCCO BAND STUCCO VINYL WINDOW CEMENTITIOUS SIDING 5 A5 3 A5 6 A5 4 A5 4 A5 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE A R C H I T E C T U R E + I N T E R I O R S OWNER: UNITED PROPERTIES CONTRACTOR: BRINKMAN CONSTRUCTION MECHANICAL & PLUMBING ENGINEER: INTEGRATED MECHANICAL ELECTRICAL ENGINEER: ADONAI PROFESSIONAL SERVICES, INC.11/30/2022 12:51:27 AM11/30/2022 12:51:27 AMC:\Users\bolin\OneDrive - VFLA\Documents\STANFORD_v20_bolinDHVWR.rvtA5 ELEVATION DETAILS STANFORD SENIOR LIVING FORT COLLINS, CO FDP PLANNING SUBMITTAL 2020-35 SCALE:1 AXON SOUTH SCALE:3 WINDOW DETAIL AT FIRST FLOOR LEVEL SCALE:4 WINDOW AXON AT RESIDENITAL UNIT SCALE:5 WINDOW DETAIL AT AL UNIT SCALE:6 WINDOW DETAIL AT GARAGE LEVEL SCALE:2 AXON NORTH PLANNING SUBMITTAL 1 12-23-2020 PLANNING RESUBMITTAL 1 03-31-2021 PLANNING SUBMITTAL 2 04-28-2021 FDP PLANNING SUBMITTAL 07-14-2021 FDP PLANNING SUBMITTAL 09-08-2021 FDP PLANNING SUBMITTAL 3 12-02-2022 MONROE DR STANFORD RD CYCLE APARTMENTS MARRIOTT HOTEL PARKING LOT MONROE DR STANFORD RD CYCLE APARTMENTS MARRIOTT HOTEL PARKING LOT MONROE DR STANFORD RD CYCLE APARTMENTS MARRIOTT HOTEL PARKING LOT MONROE DR STANFORD RD CYCLE APARTMENTS MARRIOTT HOTEL PARKING LOT MONROE DR STANFORD RD CYCLE APARTMENTS MARRIOTT HOTEL PARKING LOT MONROE DR STANFORD RD CYCLE APARTMENTS MARRIOTT HOTEL PARKING LOT L.U.C. CODE SECTION 3.2.3 -SOLAR ACCESS, ORIENTATION, SHADING Project Summary The proposed project is a four-story senior housing facility located at the southwest corner of Monroe Dr and Stanford Road. The existing vacant lot is located in the CG (General Commercial) Zone District and the Transit-Oriented Development Overlay Zone. A shadow study is provided as required for any building over 40 feet tall. The fourth floor roof line is at 56 feet above the ground plane along Monroe Drive and 66 feet above the southern parking lot. The site’s topography slopes to create a walk-out basement condition on the south side of the property. The shadow study is summarized in the following paragraphs. Per LUC code section 3.2.3 (E), the 25 foot wall comparison is not required because the property is located in the Transit Overlay District. Study Overview A shadow study was performed on the proposed four-story senior housing facility. The shadows were generated using a computer modeling program called Revit Architecture. Per code section 3.2.3(A), a study must be done on December 21 to demonstrate the longest shadow day of the year (winter solstice). We included June 21st is our study as well to show the shortest day of the year (Summer Solstice). This allowed the shadow study to look at the longest and shortest shadow days of the year. We also looked at three times for each day; 9am, noon, and 3pm. This allowed the study to look at the change of the shadows throughout the day. Conclusion June 21 June 21 is the longest day of the year and the sun is the highest in the sky. This creates the shortest shadows. Our graphics show that the shadows barely reach off of the property all day long. The shadows do not affect the Cycle Apartments or adjacent Marriot Hotel. December 21 On December 21, the longest shadow day of the year, the shadows of the building reach across Monroe Drive to the Cycle Apartments property at 9am, noon, and 3pm, however the shadows do not reach the buildings. Even though, the shadows are the longest on this day, the number of affected buildings has not increased. This is a result of the site's location and relation to Monroe Drive and Stanford Road. In final summary, the shadow study shows that the proposed building allows sunlight to the adjacent buildings throughout all times of the year. The shadows do reach the Cycle Apartment, Marriot Hotel or Aspen Leaf Apartments on the longest shadow day of the year. SHADOW STUDY SUMMARY 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE A R C H I T E C T U R E + I N T E R I O R S OWNER: UNITED PROPERTIES CONTRACTOR: BRINKMAN CONSTRUCTION MECHANICAL & PLUMBING ENGINEER: INTEGRATED MECHANICAL ELECTRICAL ENGINEER: ADONAI PROFESSIONAL SERVICES, INC.11/30/2022 12:52:42 AM11/30/2022 12:52:42 AMC:\Users\bolin\OneDrive - VFLA\Documents\STANFORD_v20_bolinDHVWR.rvtA6 SHADOW STUDY STANFORD SENIOR LIVING FORT COLLINS, CO FDP PLANNING SUBMITTAL 2020-35SUMMER SOLSTICE JUNE 21 WINTER SOLSTICE DECEMBER 21 SCALE: 6 SHADOW STUDY -SUMMER 9AM SCALE: 5 SHADOW STUDY -SUMMER NOON SCALE: 4 SHADOW STUDY -SUMMER 3PM SCALE: 3 SHADOW STUDY -WINTER 9AM SCALE: 2 SHADOW STUDY -WINTER NOON SCALE: 1 SHADOW STUDY -WINTER 3PM PROJECT NORTH PLANNING SUBMITTAL 1 12-23-2020 PLANNING RESUBMITTAL 1 03-31-2021 PLANNING SUBMITTAL 2 04-28-2021 FDP PLANNING SUBMITTAL 07-14-2021 FDP PLANNING SUBMITTAL 09-08-2021 FDP PLANNING SUBMITTAL 3 12-02-2022