HomeMy WebLinkAboutBLOOM OFFSITE WATER - BASIC DEVELOPMENT REVIEW - BDR220004 - DOCUMENT MARKUPS - ROUND 2 - STORMWATER MANAGEMENT PLAN Storm Water Management Plan Bloom Offsite Waterline Project Owner: Hartford Homes 4801 Goodman Road Timnath, Colorado 80547 Phone: (970) 674-1109 Prepared By: Galloway & Company, Inc. 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 Contact: James Prelog, P.E. SWMP Preparation Date: October 19, 2022 Estimated Project Dates: Project Start Date: January 2023 Project Completion Date: March 2023 Project Owner/Developer Signature Block b) Seed Mix Information SF AC Sod / Bed 0 0 Temp / Native Seed 236,864 5.44 c) Final Stabilization Notes: Buildings, hardscapes, and rock beds are considered stabilized immediately upon installation. Other exposed dirt areas require vegetation for stabilization. All seed mixtures for permanent or temporary seeding, and the Cooper Slough buffer requires preparation of soil in accordance with the City Municipal Code, section 12-130-132. Section 132 defines necessary actions for soil to comply with city standards and details about communicating with other potential parties. Vegetation should adhere to regulations specified in City of Fort Collins Landscape Standards (LUC 3.2.1). See section 4: “Final Stabilization & Long-Term StormWater Management” bullet for the City of Fort Collins definition of final stabilization. Reference Fort Collins’ Development Submittal Requirements in chapter 2, section 6.1.4.9 for additional requirements of final stabilization. The Cooper Slough 300’ Buffer enters the project site on the west side and will require its own seeding mixture. It is anticipated that the site is seeded in spring 2023 and will be fully established in the fall of 2023. Permanent stabilization, 70% vegetative density, is expected to be reviewed in October 2023 to help mitigate frost damage. All temporary control measures will be removed after final stabilization. Sediment shall be properly removed from all pipes, drainage ways, and other stormwater structures. Sediment will be properly disposed of on-site before final inspection. HARTFORD HOMES BLOOM OFFSITE WATER FINAL DEVELOPMENT PLAN OCTOBER, 2022 A TRACT OF LAND LOCATED IN THE NORTHEAST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO. FORT COLLINS, CO Know what's before you dig. Planning. Architecture. Engineering. GAS Xcel Energy Stephanie Rich (970) 225-7828 ELECTRIC City of Fort Collins Light and Power Tyler Siegmund (970) 416-2772 CABLE Xfinity Don Kapperman (970) 484-7166 TELECOM. Centurylink William Johnson (970) 377-6401 WATER ELCO Mike Scheid (970) 493-2044 WASTEWATER Boxelder Sanitation District Karen Reynolds (970) 498-0604 STORMWATER City of Fort Collins Utilities Wes Lamarque (970) 416-2418 UTILITY COMPANY CONTACT PHONE NUMBER * ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. SITES. TIMBERLINE RD.E. VINE DRIVE INTERSTATE - 25DateCity Engineer, Date Date Date Date Stormwater Utility, Parks Planning and Development, Traffic Operations, Date APPROVED: APPROVED: APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility, City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner, APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS APPROVED SHEETS REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. GENERAL MANAGER REVIEWED BY: DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW - - - - - - - - - - - - - - STAMP H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\Offsite water\HFH022_OFW_C0.0_Cover Sheet.dwg - Matthew Kasch - 10/20/2022Init.#Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM OFFSITE WATERFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: 10.20.2022 HFH000022 MCK JEP COVER SHEET C0.0