HomeMy WebLinkAboutARAPAHOE FARM TOWNHOMES PUD - PRELIMINARY - 55-87G - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST 11==.1•••••• ••••• •••• •••••••••••• •••=mIlli)
Checksheet ,,4 -e- T hwvt
The following check sheet is to be used in the preparation of a complete submittal of a Preliminary
PUD Plan:
1. Application (1 copy).
2. Filing fee ($50.00).
Z
3. Legal description of property (2 copies on 8-1/2" x 11" sheet).
4. A current list of names and addresses of all owners of record of real property within
500 feet.
5. Planning objectives (25 copies).
!/• 6. Completed point charts (3 copies).
/U 7. Energy conservation worksheet (3 copies).
`/ 8. Architectural elevations (5 folded copies).
9. Site plan (25 folded copies).
Z.
10. Landscape plan (16 folded copies).
V11. Utility plans (10 unfolded copies).
12. Street cross sections (5 unfolded copies).
,13. Physiographic data (2 copies).
14. Preliminary drainage report and plans and grading plans (4 unfolded copies).
—J4 15. Preliminary subdivision plat (21 folded copies).
(/ _ 16. Traffic impact analysis (4 copies).
/V /A. Hazardous materials impact analysis (4 copies).
18. Other documentation as determined by special circumstances.
4.12