Loading...
HomeMy WebLinkAboutCOBBLESTONE CORNERS PUD - FINAL - 55-87F - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS Robb, Brenner alielig, Inc. 125 South Howes•Suite 880•P. 0. Box Fort Collins, CO 80522-(303)484-0117 Architecture Planning Interior Design RBB September 7 , 1993 Mr. Ted Shepard Senior Planner City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 RE: Cobblestone Corners Dear Ted, I received your comments dated August 24 , 1993 and have the following responses to your comments. 1. Full width of Wabash Street adjacent to the site will be dedicated as public right-of-way in conjunction with utility easements connecting Wabash to existing utility easements in the proposed alignment of Troutman Parkway. 2 . Sewer and water easements are being developed in conjunction with Masterplanning on adjacent property to eliminate relocation of utilities. 3 . We have not received information from the City's pavement engineer to use in developing R values for this site based on traffic loading for Wabash Street. As soon as this information is available R values will be developed and amended to the Soils Report. 4 . We will correct terminology on the plat to include dedicated areas outside the lots as tracts. 5. 15 ' x 30 ' easement for telephone equipment cabinets on the east side of the PUD will be provided, if required. 6. Additional utility easements will be noted as required. Coordination between utilities and landscaping will be done to alleviate conflicts. 7 . We will work Light and Power Department if they need off-site easement. 8 . Landscape development in the drainage detention area will be coordinated to alleviate conflicts. Robb, Brenner arlelig, Inc. • 9 . Utility easement, Lot 1, will be noted as utility and drainage. 10. Warren Jones, Poudre Fire Authority, has approved placing a temporary gate at the south end of the temporary fire access so that it will prevent two center parking places from being used until the gate and temporary access are removed. 11. Temporary access will be designed as required to support fire trucks. Both ends will be secured as required by Warren Jones. 12 . An additional fire hydrant will be provided. 13 . Project street name will be changed from Cobble Court to Pickford Commons. 14A. Common space landscape will be tied to completion of Type B and C lots. 14B. Planting at entry at Shields and Wabash will be adjusted. 14C. Cottonwoods shown within the temporary fire access easement are future to be installed after temporary fire access is removed. 14D. Cross hatch and typical front yard area represents cobble paving. 14E. Livestock fence detail will be provided on landscape plan. Telephone equipment cabinets will be located in easement behind and below the entry sign and landscaping. 15A. Per discussion with Warren Jones, Poudre Fire Authority, north end of temporary fire access at Richmond Drive will be a pair of 10 ' gates in the new wooden fence across the north side of site. South area will be chained. Both barriers will be signed, as required. 15B. Developer will enter into discussions to resolve any further questions on buffering between two affected north properties. 15C. Landscape Plan will carry notation on mature height of planting along north boundary of property. If there are any questions or supplemental information that needs to be provided please do not hesitate to call. Si c re , K. Mer orth, AIA Projec Architect KMH/lw