Loading...
HomeMy WebLinkAboutMONTAVA - PHASE E - TOWN CENTER RESIDENTIAL - BDR220003 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 2 - SITE PLANSHEET INDEXSHEET 1COVER SHEET1.REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORMDRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS.2.REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALLEASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION.3.THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANSMUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THEPLANS.4.ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROMADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISHSUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THE PREDOMINANT COLOR OF THEBUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBINGVENTS SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDING BUILDING SURFACES.5.ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASINGPLAN IS SHOWN WITH THESE PLANS.6.ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFFCAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION.7.SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BYSEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS ASPECIFIC VARIANCE IS GRANTED BY THE CITY.8.FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDEAN APPROVED FIRE EXTINGUISHING SYSTEM.9.ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED.10.ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSABLE RAMPS MUST BE PROVIDED ATALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLEPARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPENO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE.11.COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFICCIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY THE PROPERTYOWNER OF THE COMMON AREA. THE PROPERTY OWNER IS RESPONSIBLE FOR SNOW REMOVAL ON ALLADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS.12.DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BEIN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS,ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER.13.THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREETSIDEWALKS ADJACENT TO EACH RESIDENTIAL LOT.14.PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVECOVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCEDHAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING,SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHESLINES (IF LOCATED IN BACK YARDS), ODOR CONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OFREQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS.15.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS,SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THISPROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'SEXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OFTHE FIRST CERTIFICATE OF OCCUPANCY.16.FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIALPRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL,APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BEPROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTIONTHEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLECONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY.17.PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITYAND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THEPRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY-FINDING. ALL BUILDINGSSHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN APOSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, ANDPOSTED WITH A MINIMUM OF SIX-INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BYMEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT,POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE.SITE PLAN NOTES:NOT TO SCALECONTEXT MAPN TIMBERLINE RD MOUNTAIN VISTA DRTURNBERRY RD Sheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANGELAMILEWSKI\ONEDRIVE - BHADESIGN\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-COVER_PHASE E.DWGPlot Date:11/30/2022 8:53 AM Plotted By: Angela MilewskiDate Created:11/30/2022 Produced by:Date:Revision:COVERDate:COVER SHEET MONTAVA SUBDIVISION PHASE E HF2M | COLORADO BASIC DEVELOPMENT REVIEW11/30/20221734STORYBOOKMAPLE HILLWATERGLENTRAILHEADWATERFIELDMONTAVA SUBDIVISION PHASE ENOT TO SCALEVICINITY MAPSHEET S1 - S19SITE PLAN SHEETSSHEET L0 - L16LANDSCAPE PLAN SHEETSPHASE EPROJECTBOUNDARYSHEET M1TREE MITIGATION SHEETSPHASE EPROJECTBOUNDARYLAND USE DATA (PHASE E)RESIDENTIALPROPOSED LAND USET4: 3 STORIES, T5: 4 STORIES88.20 ACRES (INCLUDING FUTURE DEVELOPMENT AREAS)MAX. BUILDING HEIGHT PERMITTEDEXISTING ZONING GROSS SITE AREA LMN WITH PUD OVERLAY N/A (RESIDENTIAL USES)0 S.F. COMMERCIALESTIMATED FLOOR AREA FLOOR AREA RATIO NET SITE AREA PUBLIC ROW9.62 ACRESMAX. BUILDING HEIGHT PROPOSED3 STORIES78.58 ACRESA PARCEL OF LAND SITUATED IN THE SOUTHEAST QUARTER OFSECTION 32, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE 6TH P.M.,COUNTY OF LARIMER, STATE OF COLORADOSHEET A1 - A6ARCHITECTURAL SHEETSNET SITE AREA / # OF UNITS16.32 DU / ACRES (EXCLUDING FUTURE MULTI-FAMILY AND MIXED-USE UNITS)1.PHASE E IS LOCATED WITHIN THE MONTAVA PUD MASTER PLAN AND MONTAVA PUD OVERLAY, ODP 180002APPROVED PURSUANT TO ORDINANCE NO. 014, 2020, RECORDED JUNE 4, 2020 AT RECEPTION #20200039330 INTHE RECORDS OF THE CLERK AND RECORDER OF LARIMER COUNTY, COLORADO.2.PHASE E MAY BECOME SUBJECT TO THE CONSOLIDATED SERVICE PLAN FOR MONTAVA METROPOLITANDISTRICT NOS. 1-7 APPROVED BY RESOLUTION 2018-083.3.PHASE E IS SUBJECT TO THE DEVELOPMENT AGREEMENT TO SECURE PUBLIC BENEFITS FOR MONTAVAPLANNED UNIT DEVELOPMENT MASTER PLAN APPROVED BY RESOLUTION 2020-007 AND RECORDED DECEMBER14, 2020 AT RECEPTION NO. 20200105298 AND RE-RECORDED APRIL 7, 2022 AT RECEPTION NO. 20220022462 INTHE RECORDS OF THE CLERK AND RECORDER OF LARIMER COUNTY, COLORADO.4.NO NEIGHBORHOOD PERIMETER FENCING IS PLANNED IN PHASE E. HEIGHT AND LOCATION OF PRIVATE LOTFENCING IS RESTRICTED BASED BASED ON THE MONTAVA PUD USES, DENSITIES AND DEVELOPMENTSTANDARDS. FENCING LOCATIONS AND STYLES WILL BE SUBJECT TO REVIEW BY THE MONTAVA DESIGN REVIEWCOMMITTEE.5.REFER TO MONTAVA USES, DENSITIES, AND DEVELOPMENT STANDARDS SECTION 5.5 FOR SETBACKDIMENSIONS AND SHEETS A1-4 FOR ARCHITECTURAL ELEVATIONS AND LOT TYPICALS PLANS6.PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY FOR EACH SINGLE-FAMILY DETACHED ANDATTACHED DWELLING UNIT WITHIN PHASE E, THE CITY SHALL BE PROVIDED WRITTEN CERTIFICATION THATEACH SUCH DWELLING UNIT COMPLIES WITH THE FEDERAL DEPARTMENT OF ENERGY'S 'ZERO ENERGY READYHOME' STANDARD IN EFFECT ON DECEMBER 11, 2020 PURSUANT TO SECTION I(F) OF THE DEVELOPMENTAGREEMENT TO SECURE PUBLIC BENEFITS FOR MONTAVA PLANNED UNIT DEVELOPMENT MASTER PLAN.7.MINIMUM SETBACKS ARE INCLUSIVE OF EASEMENTS8.IN ACCORDANCE WITH SECTION I(G)(4) OF THE DEVELOPMENT AGREEMENT TO SECURE PUBLIC BENEFITS FORMONTAVA PLANNED UNIT DEVELOPMENT MASTER PLAN:8.1.THE CITY SHALL APPROVE THAT PORTION OF THE NON-POTABLE WATER SYSTEM PLANS NEEDED TOSERVE PHASE E PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR ANY STRUCTURE WITHIN PHASE E;AND8.2.THE CITY SHALL APPROVE THE INSTALLATION OF THAT PORTION OF THE NON-POTABLE WATER SYSTEMNEEDED TO SERVE PHASE E PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANYSTRUCTURE WITHIN PHASE E'9.MAXIMUM DRIVEWAY WIDTH IS 12' UNLESS THE DRIVEWAY IS PROVIDING ACCESS TO MORE THAN 4 UNITS.ACCESS BETWEEN A GARAGE AND ALLEY LESS THAN 20' IN LENGTH ARE NOT CONSIDERED DRIVEWAYS ANDMAY BE WIDER THAN 12' WHERE NEEDED TO ACCOMMODATE VEHICLE TURNING MOVEMENTS10.ADU'S ARE PERMITTED IN THIS PHASE SUBJECT TO SECTION 5.11 OF MONTAVA USES, DENSITIES ANDDEVELOPMENT STANDARDS (MUDDS) AND WILL REQUIRE ADDITIONAL REVIEW AS APPLICABLE. ADU'S ALSOREQUIRE ADDITIONAL PARKING CALCULATIONS.11.DENSITY SUMMARY SHOWN BELOW, SEE SHEETS S1-S4 FOR MORE INFORMATION.NOTES:PLANNING CERTIFICATE______________________________________________ APPROVED BY THE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES OF THE CITY OF FORTCOLLINS, COLORADO ON THIS _____ DAY OF__________________, 20_____,Director SignatureOWNER'S CERTIFICATETHE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF THE REAL PROPERTYDESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONSSET FORTH ON SAID SITE PLAN.______________________________________________ Owner (Signed)______________________________________________ DateTHE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS _____ DAY OF__________________ A.D., 20_____,BY________________________________________________(print name)AS ________________________________________________MY COMMISSION EXPIRES: ________________________________________________WITNESS MY HAND AND OFFICIAL SEAL.______________________________________________ Notary Public______________________________________________ Address257NO. OF DWELLING UNITSOWNER'S CERTIFICATETHE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF THE REAL PROPERTYDESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONSSET FORTH ON SAID SITE PLAN.______________________________________________ Owner (Signed)______________________________________________ DateTHE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS _____ DAY OF__________________ A.D., 20_____,BY________________________________________________(print name)AS ________________________________________________MY COMMISSION EXPIRES: ________________________________________________WITNESS MY HAND AND OFFICIAL SEAL.______________________________________________ Notary Public______________________________________________ AddressOWNER'S CERTIFICATETHE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF THE REAL PROPERTYDESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONSSET FORTH ON SAID SITE PLAN.______________________________________________ Owner (Signed)______________________________________________ DateTHE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS _____ DAY OF__________________ A.D., 20_____,BY________________________________________________(print name)AS ________________________________________________MY COMMISSION EXPIRES: ________________________________________________WITNESS MY HAND AND OFFICIAL SEAL.______________________________________________ Notary Public______________________________________________ Address Sheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/29/2022 7:04 PM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S1Date:TRANSECT DIAGRAM MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734PHASE G FUT U R E C I T Y P A R K FUTURE PHASES D & FF U T U R E P H A S E S H & I LEGENDT4 ZONET5 ZONE Sheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/29/2022 7:02 PM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S2Date:HOUSING DIAGRAM MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734THE USES REQUESTED IN PHASE E INCLUDE SINGLE FAMILY DETACHED, SINGLEFAMILY ATTACHED, TWO-FAMILY DWELLINGS, AND TOWNHOMES (MULTI-FAMILY UPTO 14 UNITS PER BUILDING). ALL OF THESE LAND USES ARE PERMITTED INTRANSECTS T4 AND T5 UNDER BASIC DEVELOPMENT REVIEW.PHASE G FUTURE CI T Y P A R K FUTURE PHASES D & FF U T U R E P H A S E S H & I LEGENDBUILDING TYPEDU COUNTDU SIZETOWNHOUSE (2 ST / 22 FT)24 DU1350-1750 SFTOWNHOUSE (3 ST / 16 FT)34 DU1450-1650 SFSINGLE FAMILY - SMALL24 DU1400-2400 SFTOWNHOUSE (3 ST / 22FT)35 DU1750-2050 SFTOWNHOUSE (2 ST / 16FT)44 DU 900-1200 SFSINGLE FAMILY - MEDIUM18 DU2350-2700 SFTOWNHOUSE (3 ST / 22FT)48 DU2000-2400 SFTOWNHOUSE (3 ST / 20FT)30 DU1400- 1850 SFMULTI-FAMILY(FUTURE DEVELOPMENT)MIXED-USE(FUTURE DEVELOPMENT)TOTAL257 DUNOTES- To avoid confusion with LUCterminology, Single-Family Detachedtypes consist of: “Cottage”, "Small SingleFamily” and “Medium Single Family”while Single-Family Attached types arethose with any variation of the title“townhouse”.- All building footprints and metrics arepreliminary. All MUDDS requirementswill be met at the time of building permit. Sheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/29/2022 7:02 PM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S3Date:DENSITY DIAGRAM MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734c.1.64 ac.1.18 ac.c.1.01 ac.FUTUREDEVELOPMENT1.22 ac.FUTUREDEVELOPMENT0.78 ac.1.35 ac.1.14 ac.1.88 ac.1.21 ac.0.78 ac.0.28 ac.1.31 ac.0.99 ac.1.17 ac.1.20 ac.1.04 ac.1.13 ac.1.02 ac.1.33 ac.1.02 ac.0.77 ac.0.45 ac.F U T U R E F U T U R E FUTURE DEVELOPMENT FUTUREDEVELOPMENTFUTUREDEVELOPMENTFUTUREDEVELOPMENTPHASE G FUT U R E C I T Y P A R K FUTURE PHASES D & FF U T U R E P H A S E S H & I NOTEThe future development parcel is notincluded in the calculations and willbe subject to compliance with therequirement at time of development. Sheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/29/2022 7:04 PM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S4Date:PARKING DIAGRAM MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734AREA 7AREA 8AREA 1(FURTURE DEVELOPMENT)AREA 1(FUTUREDEVELOPMENT)PHASE G FUT U R E C I T Y P A R K FUTURE PHASES D & FF U T U R E P H A S E S H & I AREA 10AREA 9AREA 3AREA 2AREA 4AREA 2AREA 3AREA 4AREA 5AREA 6NOTES Parking calculations assume the highest number of spacesrequired by code per the assigned building types, uses andtransect zones. Total parking surplus/deficit does not includeshared parking reductions.LEGENDT4 ZONET5 ZONET5 ZONE (FUTURE DEVELOPMENT) S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONSheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:42 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S5Date:CIVIC SPACE DIAGRAM MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734KEY MAP0N O R T H60'15'30'S C A L E : 1''= 3 0'T4T 4T4 T 4 T 4T5T5T 5 T 5 T 5 GREENWAY WITH RAIN GARDENS AND POLLINATOR PATHGREEN WITH BIRD/BUTTERFLY GARDENSQUARE WITHBIRD/BUTTERFLYGARDENS7S8S9S12S6S11S10S15S14S13S16S17S18 66.00'ROW 66.00'ROWEX. 57.50' ROW(MONTAVA FILING 1)EX. 54.00' UE(MONTAVA FILING 1)EX. 20.00' UEBK 1889 PG512 TO E. LARIMER CO.WATER DISTRICTEX. 60.00' ROW(MONTAVA FILING 1)EX. 60.0' ROWMONTAVA FILING 1 6'4'4'6'4'4'9'6'4'4'24'4'6'9'9'9'15'4'20'4'CHESAPEAKEN TIMBERLINE RD MOUNTAIN VISTA DR.PASEO DR.MONTAVA DRTRACT I0 SFTRACT AA139167 SF15'TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAS00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:43 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S6Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734KEY MAP0N O R T H60'15'30'S C A L E : 1''= 3 0'S7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 60.00' ROW 6 0 . 0 0 ' ROW 66.00'ROW ROW2 5 . 0 0 ' U E , P A , E A , D E 2 5 . 0 0 ' U E , P A , E A , D E 25.00'UE, PA,EA, DE 25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE12.00'OS, PA, DE, UE5.00'U.E.5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E .5.00'U.E.5.00'U.E.5 . 0 0 ' U . E .5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.6'4'4'24'4'6'9' 3 6 ' 6' 6' 6' 6'12'20'20'CHESAPEAKEFLINT HILL DRN TIMBERLINE RD MONTAVA DRLOT 251788SFLOT 241788SFLOT 233781SFLOT 221392SFLOT 261430SFLOT 20832SFLOT 191118SFLOT 211080SFLOT 23832SFLOT 22832SFLOT 241080SFLOT 201118SFLOT 181118SFLOT 19832SFLOT 211118SFLOT 141080SFLOT 15832SFLOT 161118SFTRACT Y624 SFLOT 101398SFLOT 91398SFLOT 81040SFLOT 71040SFLOT 61398SFLOT 131457SFLOT 41040SFLOT 121040SFLOT 111040SFTRACT Z258606 SFLOT 53976SFLOT 21040SFLOT 31040SFLOT 11360SFTRACT X18523 SFPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPABENCH ANDPLANTING BEDBENCH ANDPLANTING BEDFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE:LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRRIGATIONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:43 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S7Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 60.00'ROW 66.00'ROW66.00'ROW60.00'ROW UNPLATTEDSE 1/4, S32, T8N, R68W25.00'UE, PA,EA, DE 7 6 . 0 0 ' U E , P A , E A , D E 8 9 . 5 0 ' U E , P A , E A , D E UE, PA,EA, DE25.00'UE, PA,EA, DEEA, DE 1 2 . 0 0 'OS , P A , D E , U E25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE1 2 . 0 0 'OS , P A , D E , U E 12.00'OS, PA, DE, UE12.00'OS, PA, DE, UE12.00'OS, PA, DE, U E 12.00'OS, PA, DE, UE12.00'OS, PA, DE, UE12.00'OS, PA, DE, UE5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E. 5 . 0 0 ' U . E . 5.00'U.E. 5 . 0 0 ' U . E . 5 . 0 0 ' U . E .5.00'U.E.5.00'U.E.5.00'U.E.8.00'OS, PA, DE, UE5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.36'6'6'6'6'15'36'1 2 '12'12'1 2 '12'12'2 6 ' - 6 "60'12'6' 1 3 ' 8'20'20'COUNTRY CLUB RDMONTAVA DRFLINT HILL DRMONTAVA DR15'15'36'15'LOT 251788SFLOT 241788SFLOT 233781SFLOT 221392SFLOT 491330SFLOT 261430SFLOT 271430SFLOT 281592SFLOT 471706SFLOT 481330SFLOT 511326SFLOT 501696SFLOT 521222SFLOT 551040SFLOT 531274SFLOT 541040SFLOT 561322SFLOT 381330SFLOT 371706SFLOT 421222SFLOT 411326SFLOT 401696SFLOT 391330SFLOT 451040SFLOT 91040SFLOT 111170SFLOT 101040SFLOT 81222SFLOT 461374SFTRACT R416 SFLOT 51040SFTRACT Q624 SFLOT 61222SFTRACT W5046 SFTRACT S15184 SFTRACT T936 SFLOT 431222SFLOT 441040SFTRACT U16536 SFLOT 16832SFLOT 141118SFLOT 181118SFLOT 17832SFLOT 121080SFLOT 13832SFLOT 151118SFLOT 20832SFLOT 191118SFLOT 211080SFTRACT O59408 SFTRACT V624 SFLOT 23832SFLOT 22832SFLOT 241080SFLOT 201118SFLOT 181118SFLOT 19832SFLOT 211118SFLOT 141080SFLOT 15832SFLOT 161118SFTRACT Y624 SFLOT 101398SFLOT 91398SFLOT 131457SFLOT 121040SFLOT 111040SFTRACT X18523 SFPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPABENCH ANDPLANTING BEDTREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE:LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRRIGATIONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:43 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S8Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 66.00'ROW80.00'ROW EX. 20.00' UEUNPLATTEDSE 1/4, S32, T8N, R68W76.00'UE, PA, EA, DEOS, PA, DE, UE 12.00'OS, PA, DE, UE5.00'U.E.5.00'U.E.8.00'OS, PA, DE, UE12'13'8'38'8'13'COUNTRY CLUB RDMONTAVA DR15'36'15'LOT 91040SFLOT 111170SFLOT 101040SFLOT 81222SFTRACT R416 SFLOT 51040SFTRACT Q624 SFLOT 61222SFTRACT S15184 SFTRACT T936 SFTRACT BB340339 SFPAPAPAPAPAPAPAPAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE:LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRRIGATIONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:43 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S9Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE EX. 20.00' UETRACT BB340339 SFFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50N T I M B E R L I N E R O A DS00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:43 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S10Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 60.00' ROW 60.00'ROW EX. 54.00' UEMONTAVA FILING 1102.00' ROW20.00' EX. UEBK 1889 PG512TO E. LARIMER CO. WATERDISTRICTPUBLIC ACCESS EASEMENTWIDTH VARIESBK 1889 PG512TO E. LARIMER CO. WATERDISTRICTEX. 66.00' ROWMONTAVA FILING 125.00'UE, PA,EA, DE22.00'UE, PA,EA, DE25.00' UE, PA, EA, DE 25.00'UE, PA,EA, DE2 5 . 0 0 ' U E , P A , E A , D E25.00'UE, PA,EA, DE47.00'UE, PA,EA, DE25.00'UE, PA,EA, DE3 5 . 5 0 'OS , P A , D E , U E 10.00'OS, PA, DE, UE16.00'OS, PA, DE, UE8.00'OS, PA, DE, UE8 . 0 0 'OS , P A , D E , U E 1 2 . 0 0 'OS , P A , D E , U E25.00'UE, PA,EA, DE8.00'10.00'OS, PA, DE, UE8.00'OS, PA, DE, UE1 2 . 0 0 'OS , P A , D E , U E 7 6 . 0 0 ' U E , P A , E A , D EWIDTH VARIESOS, PA, DE, UEWIDTH VARIESOS, PA, DE, UE5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.8.00'OS, PA, DE, UE 2 4 . 0 0 'OS , P A , D E , U E U.E.5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E .5.00'U.E.5.00' U.E. 5.00' U.E.5.00'U.E.8.00'U.E.8 . 0 0 ' U . E .5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5 . 0 0 ' U . E . 6 . 0 0 ' U . E .5.00' U.E.1 3 ' 8' 3 8 ' 1 3 ' 8'S00°33'32"E 2648.64'10'6' 6'24'3 5 ' - 6 " 1 2 ' 1 2 '8'6'6'12'6'12'12'6'6'12'12'17'-412"11'-512"12' 6 ' 6'26'6' 6'10'10'1 3 '22'20'20'20'2 0 '20'20'20'20'20'20'1 9 ' - 1 0 "24'24'26'20'2 0 ' 1 5 ' 1 5 ' 1 3 '20'6'COUNTRY CLUB RDLONGWOOD DRN TIMBERLINE RDLOT 491397SFLOT 511579SFLOT 451360SFLOT 481397SFLOT 471040SFLOT 461040SFLOT 681495SFLOT 691040SFLOT 701040SFLOT 711359SFTRACT F520 SFLOT 421592SFLOT 431430SFLOT 441750SFLOT 661040SFLOT 651587SFLOT 671587SFLOT 411593SFLOT 362072SFLOT 372072SFLOT 382072SFLOT 392072SFLOT 401824SFTRACT E55671 SFLOT 501462SFLOT 535440SFTRACT A9856 SFLOT 31398SFLOT 21040SFLOT 12283SFLOT 61463SFLOT 51040SFLOT 41397SFLOT 524472SFLOT 642009SFLOT 631040SFLOT 621040SFLOT 611592SFLOT 544590SFLOT 554675SFLOT 352009SFLOT 331592SFLOT 572890SFLOT 602937SFLOT 321592SFLOT 341430SFLOT 582890SFLOT 592805SFLOT 212873SFLOT 202958SFLOT 562975SFLOT 193042SFLOT 172920SFTRACT C845 SFLOT 101807SFLOT 83277SFLOT 91911SFLOT 134907SFLOT 111430SFLOT 121788SFLOT 151430SFLOT 141788SFLOT 161750SFLOT 182958SFLOT 71750SFTRACT G779 SFTRACT D14419 SFTRACT B55075 SFLOT 251788SFLOT 241788SFPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENPLANTING BEDSLAWNPLAY AREASEATING AREASFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50N T I M B ER L I N E R O A DS00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE:LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRRIGATIONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:43 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S11Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 8 0 . 0 0 ' ROW60.00'ROW80.00'ROW 25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE2 8 . 0 0 ' U E , P A , E A , D E 2 8 . 0 0 ' U E , P A , E A , D E 2 8 . 0 0 ' U E , P A , E A , D E 74.00'UE, P A , E A , D E25.00'UE, PA,EA, DE22.00'UE, PA,EA, DE7 2 . 0 0 'OS , P A , D E , U E 7 2 . 0 0 'OS , P A , D E , U E 10.00'OS, PA, DE, UE25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE25.00'UE, PA,EA, DE 47.00'UE, PA,EA, DE35.50'OS, PA, DE, UE10.00'OS, PA, DE, UE16.00'OS, PA, DE, UE8.00'OS, PA, DE, UE8.00'OS, PA, DE, UE 12.00'OS, PA, DE, UE 25.00'UE, PA,EA, DE10.00'OS, PA, DE, UE10.00'OS, PA, DE, UE1 2 . 0 0 'OS , P A , D E , U E 1 2 . 0 0 'OS , P A , D E , U E 12.00'OS, PA, DE, UE25.00'UE, PA,EA, DE8.00'10.00'OS, PA, DE, UE12.00'OS, PA, DE, UE 76.00'UE, PA,EA, DE UE, PA,EA, DE10.00'OS, PA, DE, UE10.00'OS, PA, DE, UEWIDTH VARIESOS, PA, DE, UE5.00'U.E.5.00'U.E.5.00'U.E.OS, PA, DE, UE 5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E. 5 . 0 0 ' U . E .5.00'U.E.5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E .5.00'U.E.5.00'U.E.8 . 0 0 ' U . E . 5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.8.00'U.E.8.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.2.00'U.E.6.00'U.E.5.00' U.E.13'8'38'13'8' 8' 1 3 ' 3 8 ' 1 3 ' 8'6'6'36'6'6'10'6'6'24'35'-6"12'12'8'6'26'6'6'10'10'13'22'20'20'20'20'20'19'-10"24'24'20'10'1 0 '10'1 0 '102'10'2 6 ' 1 3 '20'1 3 ' 1 3 ' 15'15'13'15'-10"6'10'12'16'20'2 0 ' 20' 2 6 ' 1 2 '20'12'7 2 ' 2 6 ' 2 6 ' 1 3 ' 8' 3 8 ' 2 6 'COUNTRY CLUB RDLONGWOOD DRCOUNTRY CLUB RDLOT 681495SFLOT 691040SFLOT 701040SFLOT 711359SFLOT 661040SFLOT 651587SFLOT 671587SFLOT 535440SFLOT 524472SFLOT 642009SFLOT 631040SFLOT 621040SFLOT 611592SFLOT 544590SFLOT 554675SFLOT 331592SFLOT 572890SFLOT 602937SFLOT 291788SFLOT 301430SFLOT 311430SFLOT 321592SFLOT 261430SFLOT 281788SFLOT 271430SFLOT 251755SFLOT 232873SFLOT 242835SFLOT 582890SFLOT 592805SFLOT 212873SFLOT 202958SFLOT 222873SFLOT 562975SFLOT 193042SFLOT 172920SFTRACT C845 SFLOT 101807SFLOT 134907SFLOT 111430SFLOT 121788SFLOT 151430SFLOT 141788SFLOT 161750SFLOT 182958SFLOT 71750SFTRACT G779 SFTRACT D14419 SFTRACT B55075 SFLOT 471913SFLOT 481424SFLOT 491424SFLOT 501691SFLOT 1041711SFLOT 1031276SFLOT 1021276SFLOT 1011653SFLOT 1001653SFLOT 991276SFLOT 981653SFLOT 971653SFLOT 961276SFLOT 951276SFLOT 941711SFLOT 751276SFLOT 761276SFLOT 771595SFLOT 781653SFLOT 791276SFLOT 801711SFLOT 921936SFLOT 932684SFLOT 911936SFLOT 603080SFLOT 553212SFLOT 563080SFLOT 573080SFLOT 583080SFLOT 593080SFLOT 512540SFLOT 521936SFLOT 531936SFLOT 542684SFTRACT M879 SFLOT 1051653SFLOT 1061595SFLOT 623212SFLOT 613080SFLOT 633124SFLOT 643080SFLOT 653068SFTRACT L879 SFLOT 31787SFLOT 11750SFLOT 21430SFLOT 43469SFLOT 53517SFLOT 1072684SFLOT 681847SFLOT 671430SFLOT 661885SFLOT 1082540SFLOT 731653SFTRACT K30516 SFLOT 692540SFLOT 702684SFLOT 224400SFLOT 711711SFLOT 721276SFLOT 741595SFLOT 214840SFLOT 234400SFTRACT H64295 SFLOT 341430SFLOT 33LOT 361755SFLOT 351430SFPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE:LANDSCAPEPLANTING BEDSLAWNPLAY AREASEATING AREASMOUNTAIN VISTA DRIVEE CO RD 50N T I M B ER L I N E R O A DS00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:44 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S12Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 80.00'ROW60.00'ROWEX. 20.00' UE25.00'UE, PA,EA, DE6 0 . 0 0 'OS , P A , D E , U E 28.00'UE, PA,EA, DE 2 4 . 0 0 ' U E , P A , E A , D E 25.00'UE, PA,EA, DE19.00'UE, PA,EA, DE28.00'UE, PA,EA, DE 28.00'UE, PA,EA, DE 72.00'OS, PA, DE, UE72.00'OS, PA, DE, UE 10.00'OS, PA, DE, UE10.00'OS, PA, DE, UE60.00'ROW25.00'UE, PA,EA, DE10.00'OS, PA, DE, UE10.00'OS, PA, DE, UE12.00'OS, PA, DE, UE 1 2 . 0 0 'OS , P A , D E , U E12.00'OS, PA, DE, UE10.00'OS, PA, DE, UE6.00'5.00'U.E.5.00'U.E.5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E. 5 . 0 0 'U. E . 5 . 0 0 ' U . E . 5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.13'8'10'10'10'102'10'26'13'20'13'72'26'26' 2 6 ' 1 0 '6'6'13'8'38'22'22'GODWINK DRCOUNTRY CLUB RDCOUNTRY CLUB RDLOT 451072SFLOT 461440SFLOT 471913SFLOT 481424SFLOT 491424SFLOT 501691SFLOT 421072SFLOT 401273SFLOT 411072SFLOT 441440SFLOT 431440SFLOT 901936SFLOT 892540SFTRACT N803 SFLOT 351498SFLOT 361072SFLOT 371072SFLOT 381072SFLOT 391273SFLOT 341486SFLOT 311072SFLOT 321072SFLOT 331072SFLOT 301520SFLOT 1041711SFLOT 1031276SFLOT 1021276SFLOT 1011653SFLOT 1001653SFLOT 991276SFLOT 981653SFLOT 971653SFLOT 961276SFLOT 951276SFLOT 941711SFLOT 751276SFLOT 761276SFLOT 771595SFLOT 781653SFLOT 791276SFLOT 801711SFLOT 811653SFLOT 821276SFLOT 921936SFLOT 831595SFLOT 861936SFLOT 932684SFLOT 842684SFLOT 911936SFLOT 851936SFLOT 882540SFLOT 871936SFLOT 254840SFLOT 274400SFLOT 264840SFLOT 294771SFLOT 284400SFLOT 553212SFLOT 563080SFLOT 573080SFLOT 583080SFLOT 512540SFLOT 521936SFLOT 531936SFLOT 542684SFTRACT M879 SFLOT 731653SFTRACT K30516 SFLOT 741595SFLOT 244400SFLOT 341430SFLOT 361755SFLOT 351430SFLOT 21040SFLOT 11340SFLOT 51040SFLOT 61222SFLOT 31326SFLOT 41326SFPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE:LANDSCAPEGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50N T I M B E R L I N E R O A DS00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:44 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S13Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE EX. 20.00' UEUNPLATTEDSE 1/4, S32, T8N, R68W60.00'ROWPAFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50FUTURECOUNTRY CLUBCONNECTIONPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:44 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S14Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 8 0 . 0 0 ' ROW102.00' ROW8 0 . 0 0 ' ROW20.00' EX. UEBK 1889 PG512TO E. LARIMER CO. WATERDISTRICTUNPLATTEDSE 1/4, S32, T8N, R68WUE, PA,EA, DE22.00'UE, PA,EA, DE7 6 . 0 0 ' U E , P A , E A , D E5.00'U.E.5.00'U.E.5.00'U.E.U.E.5 . 0 0 ' U . E . 5 . 0 0 ' U . E .5.00'U.E.5.00' U.E.UNPLATTEDSE 1/4, S32, T8N, R68WN T IMB ER L IN E ROAD 1 3 ' 8' 3 8 ' 8'6'12'1 7 ' - 4 1 2" 1 1 ' - 5 1 2" 1 2 '22'1 9 ' - 1 0 " 1 5 ' 1 5 ' 1 3 ' 15'-10"6'1 0 '12'16'20'8'6'6'15'15'8' 1 0 '6'13'13'FUTURECOUNTRY CLUBCONNECTIONCOUNTRY CLUB RDN T IMBER L INE RDTRACT ALOT 172920SFLOT 101807SFLOT 83277SFLOT 91911SFLOT 134907SFLOT 111430SFLOT 121788SFLOT 151430SFLOT 141788SFLOT 161750SFLOT 18LOT 71750SFTRACT B55075 SFLOT 31787SFLOT 11750SFLOT 21430SFLOT 43469SFLOT 53517SFLOT 61787SFLOT 71430SFPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAFUTURECOMMUNITY PARKNON-POTABLE IRRIGATIONPOND - SEE PHASE G PLANSMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:44 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S15Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE 80.00'ROW80.00'ROW 2 8 . 0 0 ' U E , P A , E A , D E25.00'UE, PA,EA, DE2 8 . 0 0 ' U E , P A , E A , D E 74.00'UE, PA,EA, DE25.00'UE, PA,EA, DE22.00'UE, PA,EA, DE7 2 . 0 0 'OS , P A , D E , U E 10.00'OS, PA, DE, UE1 2 . 0 0 'OS , P A , D E , U E 12.00'OS, PA, DE, UE10.00'OS, PA, DE, UE12.00'OS, PA, DE, UEEA, DE 25.00'UE, PA,EA, DE10.00'OS, PA, DE, UE8.00'5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5.00'U.E.5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 5 . 0 0 ' U . E . 6 0 . 0 0 'OS , P A , D E , U EN TIMBERLINE ROAD13'8'38'13'8'22'10'1 0 '10'1 0 ' 15'15'13'15'-10"16'20'20'20'26' 1 2 '20'12'6'15'15'8' 2 6 ' 2 6 ' 2 6 ' 6'13'13'22'38'38'13'13'8'13'8'13'6'COUNTRY CLUB RDLOT 134907SFLOT 151430SFLOT 141788SFLOT 161750SFTRACT B55075 SFLOT 1041711SFLOT 1031276SFLOT 1021276SFLOT 1011653SFLOT 751276SFLOT 761276SFLOT 771595SFLOT 781653SFLOT 791276SFLOT 801711SFLOT 1051653SFLOT 1061595SFLOT 623212SFLOT 633124SFLOT 643080SFLOT 653068SFTRACT L879 SFLOT 31787SFLOT 11750SFLOT 21430SFLOT 43469SFLOT 53517SFLOT 1072684SFLOT 61787SFLOT 71430SFLOT 81430SFLOT 92501SFLOT 681847SFLOT 671430SFLOT 661885SFLOT 111936SFLOT 122816SFLOT 132728SFLOT 141936SFLOT 152672SFLOT 1082540SFLOT 731653SFLOT 174400SFTRACT K30516 SFLOT 692540SFLOT 702684SFLOT 224400SFLOT 711711SFLOT 721276SFLOT 741595SFLOT 164840SFLOT 184400SFLOT 194400SFLOT 204488SFLOT 214840SFTRACT H64295 SFLOT 102816SFTRACT I2039 SFPAPAPAPAPAPAPAPAPAPAPAPAGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE:LANDSCAPEGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHFUTUREDEVELOPMENTAREANON-POTABLE IRRIGATIONPOND - SEE PHASE G PLANSMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEATING, OPENTURF, PLANTING BEDSRAIN GARDEN RE:LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:44 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S16Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE UNPLATTEDSE 1/4, S32, T8N, R68W60.00'OS, PA, DE, UE 28.00'UE, PA,EA, DE10.00'OS, PA, DE, UE5.00'U.E.UNPLATTEDSE 1/4, S32, T8N, R68WLOT 771595SFLOT 781653SFLOT 791276SFLOT 801711SFLOT 254840SFLOT 27LOT 264840SFLOT 224400SFTRACT J51679 SFLOT 234400SFLOT 244400SFPAPAPAPAGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:44 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S17Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE UNPLATTEDFUTURECOUNTRY CLUBCONNECTIONMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURECOUNTRY CLUBCONNECTIONPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPASQUARE WITHBIRD/BUTTERFLYGARDENGREEN WITH PLAYSPACE, SEAT ING, OPENTURF, PLANT ING BEDSRAIN GARDEN RE :LANDSCAPERAIN GARDEN RE :LANDSCAPEBENCH ANDPLANTING BEDBENCH ANDPLANTING BEDGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RAINGARDENS ANDPOLLINATOR PATHGREENWAY WITH RA INGARDENS ANDPOLLINATOR PATHPLANTING BEDSLAWNPLAY AREASEATING AREASTREE GRATE - TYPE 2TREE GRATE - TYPE 2FUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTURECOMMUNITY PARKFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREAFUTUREDEVELOPMENTAREANON-POTABLE IRR IGAT IONPOND - SEE PHASE G PLANSFUTURECOMMUNITY PARKPASheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:45 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S18Date:SITE PLAN MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS7S8S9S12S6S11S10S15S14S13S16S17S18LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTMINIMUM SETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLAYGROUND SURFACINGPLANTING AREABUILDING FRONTAGE INTERLOCKING PAVERS, SEE SITE PLANCAST IN PLACE CONCRETE HEADER, SHALL BE POUREDMONOLITHICALLY WITH CONCRETE THAT IS PLACED BENEATHINTERLOCKING PAVERS, TYP. PROVIDE 1/4" RADIUS AT TOPEDGES. SLOPE TOP SURFACE PER GRADING PLANS, TYP.COMPACTED SUBGRADE PER GEOTECHPROVIDE 1/2" EXPANSION MATERIAL WHERE ADJACENT TO BUILDING,WALL, OR CURB. CAULK JOINT TO MATCH ADJACENT CONCRETE.VARIES BUILDING, PROPERTY LINE, OR LANDSCAPE (VARIES)FORM STAKE HOLES TO REMAIN AT 4'O.C. ON LOW END OF CONCRETE, TYP.12"SQ. FILTER FABRIC AT WEEPS, EXTEND UP FACEOF CONCRETE CURB, BUT HOLD FABRIC DOWNAPPROX. 2" BELOW FGSLOPE PERGRADINGPLANSNOTES:1.PROVIDE 2" MIN. CLEAR CONCRETE AROUND REBAR.2.UNLESS OTHERWISE NOTED, PROVIDE TOOLED JOINTS EVERY 7' O.C. MIN. ON TOP SURFACEOF HEADER3.PROVIDE MEDIUM BROOM FINISH (PERPENDICULAR TO DIRECTION OF HEADER) ON TOPSURFACE OF HEADER, TYP.#4 REBAR, CONTINUOUS CENTER INCONCRETE HEADERVARIES,9" MIN.PAVERS PER PLAN1" SAND SETTING BED5" CONCRETE; PROVIDE EXPANSIONJOINT EVERY 1000 SQUARE FEET,CONTROL JOINTS EVERY 100SQUARE FEETCOMPACTED SUBGRADEPER GEOTECHAPPLY POLYMERIC SANDBETWEEN JOINTS PER MANUF.'SRECOMMENDATIONS60mm 1" MIN. 5"IRONSMITH PAVER-GRATE PRODUCT, INSTALL PER MANUF.INTERLOCKING PAVERSSEE SITE PLAN FOR LOCATION AND PATTERNFLUSH, TYP.FABRIC GRATING, PER MANF. PROVIDE SAND OVERFABRIC GRATE AS NEEDED FOR LEVELINGIRONSMITH 24" SQUARE TRIM RING, SEE SPECSPLAN VIEWSECTIONEXTEND PAVERS BELOW EDGE OFTRIM RING PER MANUF.IRONSMITH 24" SQUARE TRIM RINGSEE TREE PLANTING DETAILPROVIDE 1/2" DIA. WHITE PVC AROUND WIRE,3" MAX. OF WIRE MAY BE EXPOSED ON EACHEND, SECURE TREE IN THREE LOCATIONSEMBED EYE BOLT INTHICKENED EDGE, PROVIDE 2"CLEAR BETWEEN EYE BOLTAND EDGE OF CONCRETE, TYP.TRUNK FLARE (LOCATED AT TOP OF ROOTBALL) SHALLBE HELD 3" DOWN FROM TOP SURFACE OF TREE GRATEMANUF. BENT REBAR EMBEDDED FRAME,CAST FRAME INTO ADJACENT THICKENEDEDGE PER MANUF.'S RECOMMENDATIONS,PROVIDE 2" CLEAR BETWEEN EYE BOLT ANDEDGE OF CONCRETE AND REBAR LOCATIONS10"FILL AREA BETWEEN TOP OF ROOTBALL/TOP OF SOIL AND BOTTOM OF TREEGRATE WITH 3/8" PEA GRAVEL PLACEDOVER WEED BARRIER FABRIC, RE: SPECSAPPROX. LIMITS OFTHICKENED EDGE (BELOW)THICKENED EDGE, TYP.HOLD WIRE/PVC, HOLD 6" MIN. FROM EDGE OFTREE GRATE ON SIDE OF SIDEWALK THATACCOMMODATES PEDESTRIAN TRAFFIC, TYP.LIMITS OF IRONSMITH PAVER-GRATEPRODUCT, BELOW PAVER, SEE SPECSELECTRICAL BOX ACCESS PANEL AND CAP,EXACT LOCATION TO BE DETERMINED BYOWNER'S REP.4'8'2'2' 6"TREE ABOVE, TYP.PAVERSELECTRICAL RECEPTACLE IN WATER TIGHT BOX, RE:ELEC, POSITION BOX OPENING UNDER ACCESS PANELCONDUIT PER ELEC.ELECTRICAL ACCESS PANELAND SECURED CAPADJACENT CONCRETEPAN, SEE CIVILCONCRETE PAN, SEE CIVILSheet Number:Project Number:Project: Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:11/30/2022 9:45 AM Plotted By: Andy PattonDate Created:11/29/2022 Produced by:Date:Revision:S19Date:SITE DETAILS MONTAVA SUBDIVISION PHASE E HF2M | COLORADO PHASE E BASIC DEVELOPMENT REVIEW11/30/20221734SCALE:3/4" = 1'-0"1TREE GRATE - TYPE 2SCALE:1"=1'-0"3THICKENED EDGE AT PAVERSSCALE:1"=1'-0"2PAVER SECTION