www.tstinc.com
November 23, 2022
Tim Dinger, P.E.
Development Review Engineering
City of Fort Collins
281 North College Ave.
Fort Collins, CO 80521
Re: Montava Phase E Variance Request – 7.3.1.A. City of Fort Collins
Classifications – 7-5F, 7-6F and 7-8F
TST Project No. 1230.0005.00
Dear Tim:
We are hereby requesting a variance to the Larimer County Urban Area Street
Standards (LCUASS) for changes to the road cross section geometry for Montava
Phase E.
Current standard 7.3.1.A. of the Larimer County Urban Area Street Standards
(LCUASS), refers to the road cross section geometry for use in road design for the
Fort Collins area. A variance is being requested to three of these sections for use
in the Montava Phase E project as noted below:
-Figure 7-5F Collector – With Parking
- Proposed roads – Timberline Road and Country Club Road
-The proposed Timberline Road cross section will vary on the east
and west sides of the Country Club intersection as shown in the attached exhibits.
Specific variances include the addition of an 8’ median with 9’ travel lanes as you
approach Country Club from the west and moving bike lanes from the road section
to regional pathway. The section east of Country Club will use an 80’ ROW with an
8’ minimum landscape zone and 13’ cycle tracks on both sides of the road instead
of on-street bike lanes.
-The proposed Country Club Road cross section will remove bikes
lanes from the road section and include these in 13’ wide bike/ped. paths on both
sides of the road and use an 8’ parkway and 80’ ROW.
-Figure 7-6F Commercial Local Street
-Proposed roads – Montava Dr., Chesapeake Dr. and Paseo Dr.
- Both roads intend to use a 2’ concrete pan instead of vertical curb
and gutter, use a 6’ parkway instead of 8’, remove the bike lane and use a 66’
ROW
-Figure 7-8F Connector Local Street
-Proposed roads – Flint Hill Drive, Longwood Drive and Godwink Drive
- All three proposed roads will have a 6’ parkway instead of 8’ and the ROW will
be 60’
There are several modifications listed above to the current LCUASS. These revised cross
sections went through a great deal of discussion throughout the PUD design and approval
process with the City of Fort Collins. In general, the intent is to create a viable and vibrant
community where narrow roads slow vehicles and bikes share the travel way or use separated
spaces. Recent Code changes have increased the standard parkway width, but we are
requesting the ability to use the older standard. On the Phase E internal roads this parkway is
in the form of tree grates and small planting strips with pavers breaking up these areas rather
than a standard continuous parkway in order to create an urban walkable environment.
Please refer to the attached exhibit for the proposed Phase E road cross sections and for
reference the overall cross sections discussed during the PUD process have also been
attached.
This variance request for these road cross sections:
is not expected to have a negative impact on capital, or maintenance cost requirements
for the City, or property owners;
is not anticipated to reduce the life of the proposed roadways; and
is unlikely to be detrimental to the public health, safety/welfare, decreased sight
distance, or have any effect on turning movements.
Thank you for your consideration in the approval of this variance request for the revised road
cross sections for the Montava Phase E development. If you have any questions, or require
additional information, please do not hesitate to contact me directly.
Respectfully,
TST, INC. CONSULTING ENGINEERS
Jon Sweet, P.E.
jsweet@tstinc.com
970.488.2128
PHASE E ROAD CROSS SECTIONS
Sheet Number:
Project Number:Project:Client:/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWGPlot Date:9/13/2018 10:34 AM Plotted By: Matthew LambertDate Created:9/13/2018Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734 HF2MMONTAVAMONTAVAOVERALL UTILITY PLANPUD MASTER PLAN10/23/18
DPZ CODESIGNSTREET TYPES AND LOCATIONSCOLLECTOR ROADWAYS
Minor CollectorRight-of-way: 80’ Roadway: 54’4
T5 and T4 land use context <- | -> T3 and T2 land use context
ARTERIAL ROADWAYS
Mountain Vista from Timberline to GiddingsRight-of-way: 102’ Roadway: 74’1a Mountain Vista from Timberline to Giddings (optional median)Right-of-way: 115’ Roadway: 84’2a
Mountain Vista from Giddings eastward (optional median)Right-of-way: 115’ Roadway: 84’2b Giddings from Mountain Vista north (optional median)Right-of-way: 93’ Roadway: 61’3b
Giddings from Mountain Vista north; Mountain Vista from Timberline westward; Timberline from Mountain Vista to Country Club RdRight-of-way: 84’ Roadway: 52’
3a
Mountain Vista from Giddings eastwardRight-of-way: 102’ Roadway: 74’1a
# ROW ROADWAY TYPE
1 [102] [74] 4-lane Arterial
2 [115] [84] 4-lane Arterial (optional median)
3a [84] [52] 2-lane Arterial
3b [93] [61] 2-lane Arterial (optional median)
4 [80] [54] Minor Collector
5a [82] [52] Commercial Local
5b [66] [36] Commercial Local
6 [50-60] [27-30] Residential Local
7a [60] [36] Connector Local
7b [66 exl. Green] [48] Connector Local w/ Green
8 [68 + Green] [40 exl. Green] Local Paired w/ Green
9 [66] [44] Industrial Local
10 [51] [Varies] Home Zone
0’800’200’400’600’1,600’
47a 67a5b5
b7a7a66
6
7a
7a
6 88886
8
10
10 107a10
5b
5b
10
10
10
10
10108
8
8
6 69
5b 45a44
5
b
5b
4
1b
6
7a
6
7b6 6
67b87a
6
1a/2a 10101068
4 7a7a4
10
66
3a 43a
7b7b
7a
7a
7a
6
7a 10108
67a7a5b7a67a1b/2b
3a / 3b
3a
Sheet Number:
Project Number:Project:Client:/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWGPlot Date:9/13/2018 10:34 AM Plotted By: Matthew LambertDate Created:9/13/2018Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734 HF2MMONTAVAMONTAVAOVERALL UTILITY PLANPUD MASTER PLAN10/23/18
DPZ CODESIGN
Connector LocalRight-of-way: 60’ Roadway: 36’
T5 and T4 land use context <- | -> T3 and T2 land use context
Residential Local (without alley)Right-of-way: 53’ Roadway: 30’Industrial LocalRight-of-way: 66’ Roadway: 44’
LOCAL ROADWAYS
Residential Local (with alley)Right-of-way: 50’ Roadway: 27’Commercial Local (with bike lanes)Right-of-way: 82’ Roadway: 52’
T4 and T3 land use context <- | -> T2 land use context
Commercial Local (without bike lanes)Right-of-way: 66’ Roadway: 36’
Local Paired around a GreenRight-of-way: Varies Roadway: 40’
T5 land use context <- | -> T4 and T3 land use context
Connector Local with an Attached GreenRight-of-way: 66’ Roadway: 48’
T5 land use context <- | -> T4 and T3 land use context
SPECIAL LOCAL ROADWAY CONDITIONS
Home ZoneRight-of-way: 51’ Roadway: Varies STREET TYPES AND LOCATIONS7a
6 8
65a
5b
8
7b
10