Loading...
HomeMy WebLinkAboutMONTAVA - PHASE E - TOWN CENTER RESIDENTIAL - BDR220003 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 2 - MAPS/GRAPHICSSheet Number: Project Number:Project:Client:/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWGPlot Date:9/13/2018 10:34 AM Plotted By: Matthew LambertDate Created:9/13/2018Produced by: Date: Revision & Date: X.X. X.X.XXX 1734 HF2MMONTAVAMONTAVAOVERALL UTILITY PLANPUD MASTER PLANDPZ CODESIGN Regional Bike Trail Shared 2-way Trail Recommended 2-way Trail 1-way Bike Facility Future 1-way Bike Facility Bike Route Future Bike Route Key Pedestrian Connections and Trails Water Storage Area Exposed Water Conveyance Piped Water Conveyance 11/01/2022TRAIL AND STORMWATER NETWORKXXXXXXXXXXXXXXX XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX X X XXXXXXXXX XXXXXXXXMAPLE HILL SUBDIVISION FUTURE CITY OF FORT COLLINS PARK SHARED IRRIGATION POND FUTURE ELEMENTARY SCHOOL STORYBOOK SUBDIVISIONMONTAVA FUTURE PHASE E MONTAVA FUTURE PHASE H MONTAVA FUTURE PHASE D FUTURE CITY OF FORT COLLINS PARK Recommended shared path connection through the future city park. Alignment to be determined. Connects Mountain Vista bike lanes with Phase G shared path through the future park and north through Maple Hill and beyond.Bar Harbor Drive (w/ bike lanes)Recommended shared path connection through the future city park. Alignment to be determined. Mountain Vista bicycle lanes. Mountain Vista bicycle lanes. MOUNTAIN VISTA Recommended connection to Maple Hill shared path. Regional trail, future connection to Richard’s Lake. Phase G shared path connection from Mountain Vista to the future city park. Bicycle Route Piped stormwater from Storybook, connected to No. 8 ditch. WEST MONTAVA OUTFALL SYSTEM Shared path along the edge of Phase G and Timberline No. 8 ditch in below grade pipe. Recommended shared path connection through the future city park. Alignment to be determined. Regional bike trail coincident with No. 8 ditch pipe easement. Pedestrian connection to future Phase E pedestrian ways. Shared connection to future Phase E pedestrian ways. Pedestrian trail connection through park north to the elementary school and south to future Phase E pedestrian ways. Pedestrian trail connections to future Phase D Subsurface water quality NOTE: Pedestrian sidewalks are not indicated in this diagram, however they are provided on both sides of every street. Pedestrian connections indi- cated are special by being enhanced for safety, being in important locations, or provided special amenities such as bridges to cross exposed storm- water conveyance. The size and location of all trail and stormwa- ter elements a approximate. They are intended to communicate the general location and interaction of these elements for diagrammatic purposes. Approximate 100 year flood limits