HomeMy WebLinkAboutMONTAVA - PHASE E - TOWN CENTER RESIDENTIAL - BDR220003 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 2 - MAPS/GRAPHICSSheet Number:
Project Number:Project:Client:/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWGPlot Date:9/13/2018 10:34 AM Plotted By: Matthew LambertDate Created:9/13/2018Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734 HF2MMONTAVAMONTAVAOVERALL UTILITY PLANPUD MASTER PLANDPZ CODESIGN
Regional Bike Trail
Shared 2-way Trail
Recommended 2-way Trail
1-way Bike Facility
Future 1-way Bike Facility
Bike Route
Future Bike Route
Key Pedestrian Connections
and Trails
Water Storage Area
Exposed Water Conveyance
Piped Water Conveyance
11/01/2022TRAIL AND STORMWATER NETWORKXXXXXXXXXXXXXXX XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X XXX X X X X X X X X X X XXXXXXXXXXXXXXXXXXXX
X
X
XXXXXXXXX
XXXXXXXXMAPLE HILL SUBDIVISION
FUTURE CITY OF FORT COLLINS PARK
SHARED IRRIGATION POND
FUTURE ELEMENTARY SCHOOL
STORYBOOK SUBDIVISIONMONTAVA FUTURE PHASE E
MONTAVA FUTURE PHASE H
MONTAVA FUTURE PHASE D
FUTURE CITY OF FORT COLLINS PARK
Recommended shared path connection through
the future city park. Alignment to be determined.
Connects Mountain Vista bike lanes with Phase
G shared path through the future park and north
through Maple Hill and beyond.Bar Harbor Drive (w/ bike lanes)Recommended shared path
connection through the future city
park. Alignment to be determined.
Mountain Vista bicycle lanes.
Mountain Vista bicycle lanes.
MOUNTAIN VISTA
Recommended connection to
Maple Hill shared path.
Regional trail, future connection
to Richard’s Lake.
Phase G shared path connection
from Mountain Vista to the future
city park.
Bicycle Route
Piped stormwater from Storybook,
connected to No. 8 ditch.
WEST MONTAVA OUTFALL SYSTEM
Shared path along the edge of
Phase G and Timberline
No. 8 ditch in below grade pipe.
Recommended shared path
connection through the future city
park. Alignment to be determined.
Regional bike trail coincident with
No. 8 ditch pipe easement.
Pedestrian connection to future
Phase E pedestrian ways.
Shared connection to future
Phase E pedestrian ways.
Pedestrian trail connection
through park north to the
elementary school and south to
future Phase E pedestrian ways.
Pedestrian trail connections
to future Phase D
Subsurface water quality
NOTE: Pedestrian sidewalks are not indicated in
this diagram, however they are provided on both
sides of every street. Pedestrian connections indi-
cated are special by being enhanced for safety,
being in important locations, or provided special
amenities such as bridges to cross exposed storm-
water conveyance.
The size and location of all trail and stormwa-
ter elements a approximate. They are intended to
communicate the general location and interaction
of these elements for diagrammatic purposes.
Approximate 100
year flood limits