Loading...
HomeMy WebLinkAboutMONTAVA - PHASE G & IRRIGATION POND - BDR210013 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 4 - LEGAL DOCUMENTSJuly 1  8ECaN[Yl9NaRE`l9MEldYDE]RNYEDl\@]@L]@\Ml@YDl`ECaN[YlaNaTE`l@]ElK]lC[YeEYNEYCEl[YRhl@YD @]ElY[al\@]bl[FlaMN`l&L]EEVEYa <-*6*+36* l@`l]EJECaEDlBhlaMEl`NLZ@ad]E`lBER[flaMEl5@_bNE`l@L]EEla[laMElaE]V`l@YDlC[YDNaN[Y`l DE`C]NBEDl @B[eEl +d^bME] lcEl)N`a]NCal D[E`l ME]EBhl \][eNDEl-+0l fNaMlaMEl @B[eE DE`C]NBEDl 1[Ya]NBda@]hl,][dYDf@aE]l ([Y`EYal @YDl-+0lD[E`l ME]EBhl@CCE\al@YDl@\\^[eElaMEl([YDNaN[Y`l aME]Ea[l 53:)6*l8(-33/l).896.(9l6 l -+0 l.1(l@l9*=&8l(365379.31l 1@VEl (M]N`a[\MEl+EBe]El 9NaTE l 5]E`NDEYa l'[@]Dl[Fl*DdC@aN[Yl 1@VE!l*EFFl)]NYK@]Dl 9NaRE"l5]E`NDEYal *gMNBNal&l >)N`a]NCal5][\E^bhl@YDl8dBQECal5^[\E]bh?l 9MEl/@YDl]EH]_EDla[lME]ENYlBES[flN`l`Nad@aEDlNYlaMEl([dYbhl[Gl/@]NVE] l8a@aEl[Gl([R[]@D[ l@YDlN`l DE`C]NBEDl@`lKRT[f`#l &la]@Cal[G R@YDl`Nad@aElNYlaMEl8[daMfE`ajl[Gl8ECaN[Yll9[fY`MN\ll2[]aM l6@YLEll<E`al[Fl aMEl50 l(Nbhl[Gl+[^bl([TRNY` l([dZbhl[Fl/@^NVE]l8a@aEl[Gl([R[]@D[ lfMNCMlC[Y`NDE]NYLlaMEl <E`alSNYEl[GlaMEl<E`al SNYEl[GlaMEl`@NDl 8[daMfE`ajl@`lBE@]PYLl1lll< @YDlfNaMl@TRl BE@]NYL`lC[Ya@NYEDlME]ENYl]ET@aNeElaME]Ea[lN`lC[Ya@NYEDlfOaMNYl aMElB[dYD@^hl SNYE`l fMNCMlBELNYl@al aMEl<E`ajlC[WE]l[Fl`@NDl8ECaN[Yll@YDl]dYlaMEYCEl1lll*lllHEala[laMEl(EYaE]jl C[WE]l[Gl`@NDl8ECaN[Yl$laMEYCEl8lll*llHEala[laMEl8[daMjlC[WE]l[Gl`@NDl 8ECaN[Yl%laMEYCEl8ll<llGEEal@R[YLlaMEl8[daMlUNYEl[Gl`@NDl8[daMfE`aj$laMEYCEl 1ll<llHEa$l aMEYCEl8ll<llHEa$laMEYCEl1ll<ll HEa%laMEYCEl1ll<llHEala[laMEl8[daME@`alC[WE]l[Gl+[]BE`l0NY[]l8dBDNeN`N[Y$l aMEYCEl2lll<l lHEal@T[YLlaMEl*@`alRNYEl[Fl+[]BE`l0NY[]l8dBDNeN`N[Y$lbMEYCEl8l ll4l<llHEal@R[YLlaMEl2[]bMlRNYEl[Fl+[]BE`l0NY[]l8dBDNeN`N[Yla[l@l\[NYal[YlaMEl <E`alSNYEl[Gl`@NDl8[daMfE`ak%laMEYCEl1llil<llGEEala[laMEl5[NYal[Gl'ELNYYNYL l ([dYahl[Gl/@]NXE] l8a@aEl[Gl([R[]@D[ l *gCE\al0[dYa@NYl;N`a@l)]NeElA@l([dYahl6[@Dll        5@LEll[Gll October 8, 2018 Max Moss HF2M Colorado 430 N College Ave. Suite 410 Fort Collins, CO 80524 Re: Montava Poudre School District Site Martin/Martin, Inc. Project No.: 17.0946 The purpose of this letter is to quantify the required size of a stormwater detention and water quality pond for the Montava Poudre School District (PSD) site. This pond sizing exercise was performed assuming the PSD site is 118 acres and has an imperviousness of 55% per Urban Drainage Criteria. The EPA SWMM version 5.1 modelling program was used in accordance with the City of Fort Collins Stormwater Criteria Manual. The program established the allowable release of the stormwater pond which is limited to the runoff from the site under existing conditions assumed to be undeveloped site at 10% impervious during the 2 year storm event. The program then established the proposed conditions assumed to be a developed site at 55% impervious during the 100 year storm event. The required pond volume for detention is the volume required to attenuate the 100 year developed flows from the site while restricting the release from the pond to the undeveloped 2 year flow. The detention volume of the pond was determined to be 17.2 acre feet and a summary is attached to this letter as Exhibit A. Per COFC stormwater criteria the water quality capture volume (WQCV) is to be added to the detention volume. The WQCV for the PSD site was determined to be 2.2 acre feet and is attached to this letter as Exhibit B. The total pond volume for the PSD site is 19.4 acre feet. Martin/Martin performed a grading exercise to accommodate a pond of 19.4 acre feet on the PSD site and is attached to this letter as Exhibit C. The total volume of the designed pond is calculated using the an excel spreadsheet calculating the volume using the prismoidal method and is attached to this letter as Exhibit D. The volume provided in the design is slightly higher than the required volume and accounts for approximately 5% construction tolerance. The required size of the pond would be 640’ wide by 640’ long and would cover 10 acres in area. Sincerely, Peter S. Buckley, P.E. Associate Attachments: Exhibits A, B, C & D. EPA SWMM Modeling Basin L (School Parcel) Detention Pond Output EXHIBIT A PROJECT INFORMATION PROJECT NAME: PROJECT #: POND NAME: DATE: Required Water Quality Volume: Detention Sizing Method: WQCV NRCS Hydrologic Soil Group: C & D *Figure 3-1, UDFCD (V.3), Chapter 3, Page 3-5 *Equations 12-1, 12-2, 12-3, UDFCD (V.2), Chapter 12, Page 12-4 Where: WQCV = Water Quality Capture Volume (Watershed Inches) a = Constant Dependent on Drain Time (Typically a=1.0 40-Hr Drain Time) i = Percent Imperviousness i = 55.0% WQCV = 0.220 (watershed inches) *Equation 3-3, UDFCD (V.3), Chapter 3, Page 3-6 Where: WQCV = Water Quality Capture Volume (Watershed Inches) Area = Contributing Watershed Area (Acres) Area = 118.00 (acres) Required Storage = 2.1675 (ac-ft) MONTAVA 17.0946 School Pond 10/4/2018 ( )  ´= 43.0 5.0 WQCVLEED WQCV ( )AREAEURV´  = 12 Storage Required ()iiiaWQCV78.019.191.0 23 +-´= ( )AREAWQCV´  = 12 Storage Required 08.1 / 08.1 28.1 20.1 36.1 68.1 iEURV iEURV iEURV DC B A = = = 10/8/2018 8:51 AM WQCV G:\SCHLAGETER\17.0946-Anheuser-Busch Mix-Used Development\ENG\DRAINAGE\School Site Pond WQCV.xlsx Required pond = 17.2 ac-ft + 2.2 ac-ft = 19.4 ac-ft EXHIBIT B EXHIBIT C REGIONAL POND PSD SITE PROJECT INFORMATION PROJECT NAME:Montava PROJECT #:17.0946 POND NAME:PSD Prelim Onsite Pond DATE:10/08/18 Required Water Quality Volume = (ft³) (ac-ft) Water Quality Surface Elevation = Required 5-Year Volume = (ft³) (ac-ft) 5-Year Water Surface Elevation = Required 10-Year Volume = (ft³) (ac-ft) 10-Year Water Surface Elevation = Required 100-Year Volume = (ft³) (ac-ft) 100-Year Water Surface Elevation = Total Pond Volume =894747 (ft³) 20.541 (ac-ft) Incremental Volume= Contour Elevation Contour Area (ft²)Cumulative Volume (ft³)Cumulative Volume (acre-ft) 4983.00 0.0 0 0.00 4984.00 59536.0 19845 0.46 4985.00 121104.0 108363 2.49 4986.00 204304.0 269264 6.18 4987.00 309136.0 524181 12.03 4988.00 435600.0 894747 20.54 160901 254917 370565 Volume (ft³) 0 19845 88517 10/8/2018 5:32 PM Pond_WSEL \\mmcivil\civil\SCHLAGETER\17.0946-Anheuser-Busch Mix-Used Development\SENT\2018.10.04 School Pond\PSD Prelim Onsite Pond.xlsm EXHIBIT D June 20