Loading...
HomeMy WebLinkAboutRUDOLPH FARMS INFRASTRUCTURE PROJECT - FDP220010 - SUBMITTAL DOCUMENTS - ROUND 3 - LANDSCAPE PLAN (3)FES CONTROLIRR CONTROLIRR V.P.FE SDD D TRAFFIC VAULT VAULTF.O. ELEC HY DTRAFFIC VAULT GAS/ / / / / / / // / / / / / / /EEEEEEEXXXXEGG/ / / / / / / // / / / / / / // / / / / / / // / / / / / / /WXXXXXFOFOB M ELEC C VAULTF.O. CT C CT VAULTF.O. ELEC ELEC TC C T VAULTF.O. C C VAULTF.O. T C ELEC C ELEC VAULTF.O.CABLE CABLE ELEC BRKR HY DHY DHY DHY DW ELEC FO HY DH2O ELEC ELEC HY DCELEC LID LID util LID ELEC FESFESFES FES FES S S D S D S SS SS SS SS SS SS SS SS SS SS SSSSSTFOCTVEEFOFOCTVCTVE EEEEEE E E E E F E SFES HY DELEC D D D D DD VAULTELEC VAULTELEC VAULTELEC VAULTELEC VAULTELEC VAULTELEC VAULTELEC VAULTELEC ELEC F.O. ELEC FOF.O.F.O. F.O.F.O. M H2O FO M ELEC ELECELEC ELEC FO VAULTF.O. VAULTF.O./ / / / / / / // / / / / / / / / / / / / / / / / / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FOFOFOFOFOFOFOFOFO FO FO FO FO FOWWWWWWWWWWWWWWWW W W W W W W W W W W W W WWW WWSTE E E E E X/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / OHU OHU OHU G G GSTSTSS SS SS SS S SS / / / / / / / // / / / / / / /X/ / / / / / / / / / / / / / / // / / / / / / /G G G GCTV H2O H2O H2O H2O H2OH2O H2O WV WV W C C C W CCW E CABLE H2O WVWV W W W W W W W W W W W W W W V.P. V.P.V.P. CABLE MM C S MMM W T H2O M12345G0G432112345G0G43210000000000000000/ / / / / / / /WW W W SB SB SB SB KIT DEN DR.HUNTSMAN DR. W W W WWW8" SS8" SS8" SS8" SSG G G G G GGGGGGGGG12" SST G G G 12" SS 12" SS 12 " S S 12 " S S 1 2 " S S 8" W 8" W 8" W 8" W 8" W 8" W WF FW T8" W8" W23 22 21 18 16 17 15 14 1 13 11 12 10 7 54 3 19 2 24 M M M M M M M 6 98 20 / / / / / / / // / / / / / / / 400' BAY TAPER FOR LEFT TURN (2 x 200') 84.38' TRANS MATCHES EX. 200' TRANS./BAY TAPER / / / / / / / / / / / / / / / / 200' / / / / / / / / IRRIGATION PUMP STATION PERMANENT PUMP STATION WITH AUTO-FLUSHING FILTER WITH 200 MICRON SCREEN PRESSURE: 95 PSI FLOW: 800 GPM POWER REQUIRED: 460V/3Ph/60Hz CANAL CROSSING POND 1 POND 2 EAST POND 2 WEST POND 3 WEST POND 3 EAST EXISTING WATER SUPPLY CONVEYANCE DITCH WELL WATER SUPPLY OUTLET INTO DITCH PA-5 PA-8 PA-9 PA-6 PA-7 PA-3 PA-4 PA-2 PA-1 P IRRIGATION LEGEND BASKET FILTER AND INTAKE PIPE FROM POND POND FILL FLOAT VALVE ASSEMBLY TO MAINTAIN WATER LEVEL Irrigation water from the well and surface water sources, as well as site stormwater will be directed to three on-site pond locations, as detailed in the current drainage plan prepared by Northern Engineering. Pond 2, with a proposed surface area of 2.42 acres, will serve as the primary collection pond for storage of irrigation water and pond make-up water to be distributed to the secondary ponds 1 and 3. Pond 2 will receive water from the surface water sources and from the on-site wells such that water delivery will be available to maintain the target water level. Water will enter from the existing surface ditch, located on the West side of the site, that will convey the available surface and well water. Make-up water will be transferred to ponds 1 and 3 via an irrigation pumping station which will draw water from pond 2 and into distribution piping to serve irrigation needs and maintain the water elevation in each of the ponds. The irrigation pump station will employ multiple variable speed pumps to provide system redundancy and to enable the system to respond efficiently to a wide range of system flow rates. The pumps will maintain pressure in the system in order to provide a ready supply for the various irrigation systems throughout the site and for the pond fill needs. The ponds are intended to function as wet ponds with storm detention capacity. Pond water levels will be maintained continuously by a float fill system so that storm flows will pass over and will not be held beyond the stormwater detention limits. The proposed pond wet elevations are as follows. (See the Northern Engineering Drainage Plans for more information). ·Pond 1 = 4904.10 ·Pond 2 = 4911 ·Pond 3 = 4919 It is expected that water levels in pond 2 would recede only during peak season irrigation operations. Water delivered from each source will be measured upon delivery to the pond system as will the volume of water transferred through the pump station. In the event that stormwater is received during irrigation operations or at any time when the pond is below the maintenance level, the water volumes received in the pond and the water volume discharged through the pumping system can be tracked via appropriate telemetry to transfer the appropriate volume of stormwater for discharge. SYSTEM OVERVIEW POINT-OF-CONNECTION ASSEMBLYPOINT-OF-CONNECTION ASSEMBLY SLEEVES:CLASS 200 PVC DISTRIBUTION PIPE:CLASS 200 PVC X-INCH SIZE UNLESS OTHERWISE INDICATED OWNER: DATE: SHEET TITLE:CHECKED BY:DRAWN BY:RUDOLPH FARM INFRASTRUCTURE FINAL DEVELOPMENT PLAN (FDP)FORT COLLINS, COPNE PROPSECT ROAD HOLDINGS, LLC 900 CASTLETON RD, STE. 118 CASTLE ROCK, CO 80109 (303) 892-1166 (REP.)ZM,LFCS05/25/22 SUBMITTAL 08/31/22 SUBMITTAL R 244 North College Avenue #165 Fort Collins, Colorado 80524 P 970.409.3414 www.norris-design.com NOT FOR CONSTRUCTION NORTH 0 15075 300 SCALE 1" = 150' OVERALL IRRIGATION IR100