636 CASTLE RIDGE CT. DEVELOPMENTCIVIL CONSTRUCTION DRAWINGSCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADOCASTLE RIDGE AT MIRAMONT P.U.D., LOT 2UTILITY PLANS FOR 636 CASTLE RIDGE CT DEVELOPMENT
CIVIL CONSTRUCTION DRAWINGS
LOCATED IN A PORTION OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
CASTLE RIDGE AT MIRAMONT P.U.D., LOT 2
ADDRESS: 636 CASTLE RIDGE COURT, FORT COLLINS, CO, 80525
NOT FOR CONSTRUCTION
REVISION BLOCK
#DATE BY
CIVIL ENGINEERING
1 08/10/2021 HWJ
2 01/19/2022 HWJ
3 02/09/2022 HWJ
4 07/05/2022 HWJ
SHEET OF 03
SURVEY STATEMENT:
RAPTOR CIVIL ENGINEERING RELIED ON THE LAND SURVEY PREPARED BY
PATTERSON PARTNERS. RCE TAKES NO RESPONSIBILITY FOR
ERRORS/OMISSIONS BY LAND SURVEYOR.
BASIS OF BEARING NOTE:
A.BEARINGS ARE BASED ON THE SOUTH LINE OF LOT 2, CASTLE RIDGE
AT MIRAMONT P.U.D., AS BEARINGS S60°00'00''W ACCORDING TO
THE SHOWN FOUND MONUMENTS ON THIS DRAWING AS SHOWN
ON THE RECORD SUBDIVISION PLAT.
B.EASEMENTS WERE TAKEN FROM THE RECORDED SUBDIVISION
PLAT AND LEGAL DESCRIPTION WAS PROVIDED BY THE CLIENT AND
NEITHER WERE RESEARCHED.
C.DISTANCES SHOWN ARE IN U.S. SURVEY FEET.
D.UTILITIES SHOWN WERE LOCATED IN THE FIELD BASED ON FOUND
EVIDENCE AND UTILITY LOCATES.
BENCHMARK NOTES:
A.ELEVATIONS ARE BASED ON CITY OF FORT COLLINS BENCHMARK
#4-96 WITH AN ELEVATION OF 4,939.14' (NAVD 1988) DATUM.
1
COVER SHEET
VICINITY MAP:
SHEET INDEX
1 COVER SHEET
2 GRADING & UTILITY PLANS COLLEGE AVE1000 -FT
F
O
S
S
I
L
C
R
E
E
K
P
KW
Y
SITE
FOSSIL CREEK PKWYE BOARDWA
LK
DR
CA
S
T
L
E
RI
D
G
E
C
T
ENGINEER'S QUANTITY ESTIMATE
DESCRIPTION QUANTITY UNIT
4" DIP FIRE LATERAL 69 LF
4" WET TAP WITH THRUST BLOCK 1 EA
4" GATE VALVE WITH MECHANICAL
JOINT RESTRAINTS 1 EA
TOTAL FIRE FLOW REQUIRED FOR THIS SITE IS 1500 GPM MINIMUM AT 20 PSI
RESIDUAL PRESSURE
THIS FLOW MUST BE PROVIDED FROM A MINIMUM OF 1 FIRE HYDRANTS
INDIVIDUALLY, EACH FIRE HYDRANT MUST SUPPLY 1750 GPM MINIMUM AT 20
PSI RESIDUAL PRESSURE
CODE USED FOR ANALYSIS: 2021 IBC
OCCUPANCY GROUP(S): R-4
CONSTRUCTION TYPE(S): V-B
FIRE FLOW CALCULATION AREA: 9,346 SF
*50% FIRE FLOW REDUCTION BY FIRE SPRINKLER SYSTEM
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED:_____________________________________________ __________________________________
CITY ENGINEER, _______________ APPROVED SHEETS DATE
APPROVED:_____________________________________________ __________________________________
WATER & WASTEWATER UTILITY, _______________ APPROVED SHEETS DATE
APPROVED:_____________________________________________ __________________________________
STORMWATER UTILITY, _______________ APPROVED SHEETS DATE
APPROVED:_____________________________________________ __________________________________
PARK PLANNING AND DEVELOPMENT, _______________ APPROVED SHEETS DATE
APPROVED:_____________________________________________ __________________________________
TRAFFIC OPERATIONS, _______________ APPROVED SHEETS DATE
APPROVED:_____________________________________________ __________________________________
ENVIRONMENTAL PLANNER, _______________ APPROVED SHEETS DATE
1
MISSING SHEET 3 FROM
THE SHEET INDEX
City of Fort Collins
Development Review Engineering
Tim Dinger, P.E.
Date: 10/12/2022
ELEVATIONELEVATIONVERTICAL SCALE: 1"=2'
HORIZONTAL SCALE: 1"=10'
STATION
FIRE LINE PROFILE
4928.00
4929.00
4930.00
4931.00
4932.00
4933.00
4934.00
4935.00
4936.00
4937.00
4938.00
4939.00
4940.00
4941.00
4942.00
4928.00
4929.00
4930.00
4931.00
4932.00
4933.00
4934.00
4935.00
4936.00
4937.00
4938.00
4939.00
4940.00
4941.00
4942.00
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+79
EXISTING GRADE
6' BURIAL DEPTH4" GATE VALVE WITH
MECHANICAL RESTRAINTS
69 LF - 4" DIP FIRE MAIN
INSIDE NON-SINGLE FAMILY
RESIDENTIAL CONNECTION
VERTICAL 90° BEND
STA:0+71
ELEV:4933.21
4" WET TAP OF 8" WATER
MAIN WITH THRUST BLOCK
STA:0+10
ELEV:4930.28
DEPTH SHOWN AS
APPROXIMATE ELEVATION
CONTRACTOR TO FIELD VERIFY
PRIOR TO CONSTRUCTION
EX. BUILDING
EX. 8" PVC
WATER MAIN
EX. 8" PVC SANITARY
SEWER MAIN
STA:0+20
ELEV:4933.1818"PRIMARY VALVE
9.62
'
9.6'
9.65
'
9.57
'
9.78
'
9.71
'
9.73
'
9.94
'
9.9'9.91
'
8.6'
7.68
'
8.73
'
9.52
'
9.61
'
6.45
'
9.72
'
9.92
'
FF
=
9
.
9
9
'
E
E
E
ETTTTTTTTTTTTT
TTT
T
T
T
TGGGGGGGGGGGGG
GGGG G G G
7.71
'
636 CASTLE RIDGE COURT
EXISTING ONE STORY
RESIDENCE TO REMAIN
EX. SHRUBS TO BE REMOVED
PROPOSED DRIVEWAY WIDENING
1.7'
15.0%
3.3%
1.0%
PROP. 4" GATE VALVE WITH
MECHANICAL JOINT RESTRAINTS
PROP.69 LF - 4" DIP FIRE MAIN
PROP. 4" WET TAP OF 8" WATER
MAIN WITH THRUST BLOCK
*CONTRACTOR TO FIELD VERIFY
EXISTING MAIN SIZE IN FIELD
EX. 33 LF - 6" WATER
LINE TO FIRE HYDRANT
TO REMAIN
EX. 8" PVC WATER MAIN
EX. COMMUNICATIONS LINE
EX. ELECTRIC LINE
EX. GAS LINE
EX. GAS MAIN
EX. 34" DOMESTIC WATER
LINE TO REMAIN
EX. A/C UNITS
ZONE LOT LINE
FIRE DEPARTMENT
CONNECTION
EX. FIRE HYDRANT TO REMAIN
EX. FIRE HYDRANT GATE
VALVE TO REMAIN
30.0' - MAI
N
T
O
PROPERTY
LI
N
E
ADA ACCESSIBLE PATH
CASTLE R
IDGE
COURTPRIVATE
STREETTRACT B
OF
CASTLE
R
IDGE
AT
M
IRAMONTP.U
.D
.
EX. 8" PVC SANITARY
SEWER MAIN
EX. SANITARY SEWER
MANHOLE
EX. DOMESTIC WATER
LINE TO REMAIN
EX. DOMESTIC WATER
LINE TO REMAIN
EX. DOMESTIC WATER
SERVICE TAP #10969
EX. DOMESTIC WATER
SERVICE TAP #10970
EX. SANITARY SEWER
SERVICE LINE
EX. SANITARY SEWER
SERVICE LINE TO REMAIN
ZONE LOT LINE
ZONE LOT LINE
0+00
0+25
0+50
0+69
21-32
WORK@RAPTOR-CIVIL.COM
WWW.RAPTOR-CIVIL.COM
720-774-7736
636 CASTLE RIDGE CT. DEVELOPMENTCIVIL CONSTRUCTION DRAWINGSCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADOCASTLE RIDGE AT MIRAMONT P.U.D., LOT 2UTILITY PLANS FOR 636 CASTLE RIDGE CT DEVELOPMENT
CIVIL CONSTRUCTION DRAWINGS
LOCATED IN A PORTION OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
CASTLE RIDGE AT MIRAMONT P.U.D., LOT 2
ADDRESS: 636 CASTLE RIDGE COURT, FORT COLLINS, CO, 80525
NOT FOR CONSTRUCTION
REVISION BLOCK
#DATE BY
CIVIL ENGINEERING
1 08/10/2021 HWJ
2 01/19/2022 HWJ
3 02/09/2022 HWJ
4 07/05/2022 HWJ
SHEET OF 03
2
GRADING & UTILITY PLAN
0'5'10'20'
SCALE: 1"=10'
GRADING NOTES:
1)NO ON-SITE GRADING PROPOSED AS PART OF THIS DEVELOPMENT. RCE HAS DETERMINED THAT EXISTING ADA PATH MEETS CURRENT ADA ACCESSIBILITY REQUIREMENTS.
2)IF CONTRACTOR REQUIRES GRADING CHANGES ON SITE, RCE SHALL BE INFORMED IMMEDIATELY AS ADDITIONAL PERMITS/PLANS MAY BE NECESSARY.
FORT COLLINS-LOVELAND WATER DISTRICT & SOUTH FORT COLLINS SANITATION DISTRICT NOTES:
1)ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE FORT COLLINS-LOVELAND WATER DISTRICT AND THE SOUTH FORT COLLINS SANITATION
DISTRICT STANDARDS AND SPECIFICATIONS.
2)CONSTRUCTION OF WATER AND SEWER FACILITIES REQUIRE A PRECON MEETING WITH DISTRICT INSPECTION STAFF PRIOR TO CONSTRUCTION.
3)CONTRACTOR SHALL NOTIFY DISTRICT INSPECTORS PRIOR TO STARTING WORK.
4)CONTRACTOR SHALL CONTACT THE SANITATION DISTRICT INSPECTOR FOR SEWER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING SEWER STUBS.
5)IF GROUNDWATER IS ENCOUNTERED WITHIN DEPTH OF SEWER CONSTRUCTION, MANHOLES MUST BE WATER-PROOFED.
6)CONTRACTOR SHALL CONTACT THE WATER DISTRICT FOR WATER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING INFRASTRUCTURE.
7)ALL COMMERCIAL DOMESTIC SERVICES REQUIRE A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION DEVICE.
8)ALL WATER LINES SHALL BE A MINIMUM OF (5) FIVE FEET AND A MAXIMUM OF (6) SIX FEET BELOW FINAL GRADE.
9)ALL DISTRICT VALVES SHALL ONLY BE OPERATED BY DISTRICT OPERATIONS STAFF.
10)PIPE PRESSURE AND VACUUM TESTING SHALL BE WITNESSED BY DISTRICT INSPECTORS. WATERLINE BACTERIA TESTS SHALL ALSO BE TAKEN BY DISTRICT INSPECTORS.
11)ONCE THE SYSTEM IS OPERATIONAL AND ALL TESTS HAVE PASSED, CONTRACTOR SHALL REQUEST SUBSTANTIAL COMPLETION WITH A LETTER TO THE DISTRICT.
12)AS-BUILTS SHALL BE SUBMITTED IN PDF AND DWG TO THE DISTRICT FOR FINAL APPROVAL.
13)ONCE ALL PUNCH LIST ITEMS ARE COMPLETE, EASEMENTS ARE RECORDED, AND AS-BUILT FILES ARE APPROVED, THE CONTRACTOR SHALL REQUEST FINAL COMPLETION WITH A LETTER TO
THE DISTRICT THAT INCLUDES THE DOLLAR VALUE OF THE WATER AND SEWER IMPROVEMENTS LISTED SEPARATELY.
NORTH
2
COORDINATE WITH THE UTILITIES
DEPARTMENT ON THIS CROSSING.
SHOW ON THE PROFILE IF THE
GAS LINE ELEVATION IS KNOWN.
LABEL EXISTING
UTILITY EASEMENT
City of Fort Collins
Development Review Engineering
Tim Dinger, P.E.
Date: 10/12/2022
21-32
WORK@RAPTOR-CIVIL.COM
WWW.RAPTOR-CIVIL.COM
720-774-7736
636 CASTLE RIDGE CT. DEVELOPMENTCIVIL CONSTRUCTION DRAWINGSCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADOCASTLE RIDGE AT MIRAMONT P.U.D., LOT 2UTILITY PLANS FOR 636 CASTLE RIDGE CT DEVELOPMENT
CIVIL CONSTRUCTION DRAWINGS
LOCATED IN A PORTION OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
CASTLE RIDGE AT MIRAMONT P.U.D., LOT 2
ADDRESS: 636 CASTLE RIDGE COURT, FORT COLLINS, CO, 80525
NOT FOR CONSTRUCTION
REVISION BLOCK
#DATE BY
CIVIL ENGINEERING
1 08/10/2021 HWJ
2 01/19/2022 HWJ
3 02/09/2022 HWJ
4 07/05/2022 HWJ
SHEET OF 03
3
GENERAL NOTES
3
GENERAL NOTES: CITY OF FORT COLLINS AND LARIMER COUNTY:
1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND
SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE
THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL
APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY.
2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED
OTHERWISE.
3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE
LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE
EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN
IN THESE PLANS.
4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL
ENTITY, AS BENEFICIARY OF SAID ENGINEER’S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS
BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO
THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND
EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN
THESE PLANS.
5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER “DRY” UTILITY INSTALLATIONS,
SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY
ENGINEER.
6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT
SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF
THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES.
7.THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS
PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E.
DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE
LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES
THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE
APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED.
9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL
COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING
CONSTRUCTION.
10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT
THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR
CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES.
11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER
NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE
DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK.
12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN
GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND
APPROVED BY THE WATER UTILITY.
14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL
UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT
COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE
EROSION CONTROL PLAN.
16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY.
MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17.PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED
ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE
STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR
COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE
RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF
GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH
DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR
STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY (NAME OF THE STUDY AND DATE) BY (ENGINEERING FIRM)
SHALL BE FOLLOWED AND IMPLEMENTED.
20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION
CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED
WITH HARD SURFACE OR LANDSCAPING.
21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET
SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT
DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR
DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT
OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY
EROSION CONTROL INSPECTOR (FORT COLLINS – 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR
CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF
CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY
RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.
24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHTOF- WAY AFTER RIGHT OF WAY GRADING AND
ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL
SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE
DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY’S
DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY
A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO
PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY
ENGINEER APPROVES THE FINAL REPORT.
25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET
SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE
ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND
SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE
COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS.
26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL
STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL
STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR
BUILDING CONNECTIONS.
27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO
FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS.
28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION
CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A
SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT.
30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING,
TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE
RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING,
THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE
CONSTRUCTION ACTIVITIES.
32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT
LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR;
HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT
TO REINSTALL THE SIGN AS NEEDED.
33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT
RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING
AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND
NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED
IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED
OTHERWISE.
36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN,
CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE
STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN
THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE
CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S)
SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40.THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2)
FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THE INFORMATION SHALL BE AS FOLLOWS:
BENCHMARKS—LOCAL ENTITY SURVEY.
B.M.NUMBER #4-96, ELEV.= 4,939.14' (NAVD 1988).
41.ALL STATIONING IS BASED ON CENTERLINE/FLOWLINE (INSERT PROPER WORD) OF ROADWAYS UNLESS OTHERWISE NOTED.
42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS,
CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS
PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO
THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS
ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS
ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN
SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE
THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF
NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE
MADE.
44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT
WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS.
46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM
MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING
STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (LIST).
48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: (PLAN SET MUST HAVE A LIST OF ALL APPLICABLE VARIANCES FOR THE PROJECT).
SITE PLAN NOTES:
1.REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND
SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS.
2.REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS,
WALKS AND OTHER SURVEY INFORMATION.
3.THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY
THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS.
4.ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC STREETS.
IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISH SUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THE
PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBING VENTS
SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDING BUILDING SURFACES.
5.ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS.
6.[IF APPLICABLE -- INCLUDE LANGUAGE FOR ANY MODIFICATIONS AND CONDITIONS APPROVED WITH PDP/ODP].
7.[IF APPLICABLE] ALL SINGLE FAMILY DETACHED HOMES SHALL MEET OR EXCEED THE GARAGE DOOR STANDARDS AS OUTLINED IN 3.5.2(E) OF THE LAND
USE CODE.
8.[IF APPLICABLE] A MINIMUM OF (NUMBER TBD) HOUSING MODELS FOR THE SINGLE FAMILY HOMES SHALL BE REQUIRED. THESE HOUSING MODELS
SHALL MEET OR EXCEED THE STANDARDS AS OUTLINED IN 3.5.2(C) OF THE LAND USE CODE.
9.ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE
A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND
UNNECESSARY DIFFUSION.
10.SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO
CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY.
11.FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING
SYSTEM.
12.ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED.
13.ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSABLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS
AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL
ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE.
14.COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN
SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY THE PROPERTY OWNER OF THE COMMON AREA. THE PROPERTY OWNER IS RESPONSIBLE FOR
SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS.
15.DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY
STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE
RESPONSIBILITY OF THE OWNER/DEVELOPER.
16.THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREET SIDEWALKS ADJACENT TO EACH RESIDENTIAL
LOT.
17.PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS
WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE
LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK
YARDS), ODORCONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN
TURF GRASS.
18.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS,
DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS
STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE
FIRST CERTIFICATE OF OCCUPANCY.
19.FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY
CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE
WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION
THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE
REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY.
20.PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO
THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW
WAY-FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION
THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX-INCH NUMERALS ON
A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A
MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE.
WATERLINE NOTE:
1.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS
AND APPROVED BY THE WATER UTILITY.
City of Fort Collins
Development Review Engineering
Tim Dinger, P.E.
Date: 10/12/2022