Loading...
HomeMy WebLinkAboutCASTLE RIDGE GROUP HOME - FDP220013 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORT9/12/22, 7:47 PM Gmail - Fwd: Re: Castle Ridge Grouphome - Erosion Control Cost Estimate https://mail.google.com/mail/u/0/?ik=ac9162ec1a&view=pt&search=all&permthid=thread-f%3A1743250652702397143%7Cmsg-f%3A1743250652702…1/3 Stephanie Hansen <stephanie0hansen@gmail.com> Fwd: Re: Castle Ridge Grouphome - Erosion Control Cost Estimate 1 message Alex Gresh <ag@f9productions.com>Tue, Sep 6, 2022 at 1:42 PM To: Stephanie Hansen <stephanie0hansen@gmail.com> Cc: Xioma Diaz <peacockassistedliving@gmail.com>, Eric Shenk <ceric.shenk@gmail.com> ---------- Forwarded message --------- From: Jesse Schlam <JSchlam@fcgov.com> Date: Tue, Sep 6, 2022 at 1:41 PM Subject: RE: Re: Castle Ridge Grouphome - Erosion Control Cost Estimate To: Alex Gresh <ag@f9productions.com>, Matt Simpson <masimpson@fcgov.com> Cc: Erosion <erosion@fcgov.com>, Spencer M. Smith <smsmith@fcgov.com>, Lance Cayko <lmc@f9productions.com>, Brandy Bethurem Harras <BBethuremHarras@fcgov.com> In talking with Alex this project is still under 10,000 SF of disturbance and during CDR200095 and PDP210012 left with the comment that erosion control is not applicable. So I am assuming it being on the checklist was an accidently oversight as we are not requiring erosion control of this project so escrows and fees will not be required. Let me know if I am missing something Brandy or Matt but I think we are good not needing that on this project. If you need anything else from me please let me know. ¿En qué puedo servirle? Jesse . . . . . . . . . . . . . . . JESSE SCHLAM Sr Env Regulatory Specialist, Utilities City of Fort Collins 700 Wood Street 970-224-6015 office 970-218-2932 mobile jschlam@fcgov.com Erosion Control Resources may be accessed through www.fcgov.com/erosion Soil Amendment Resources may be accessed through www.fcgov.com/soil-amendment Stormwater Inspection Resources may be 9/12/22, 7:47 PM Gmail - Fwd: Re: Castle Ridge Grouphome - Erosion Control Cost Estimate https://mail.google.com/mail/u/0/?ik=ac9162ec1a&view=pt&search=all&permthid=thread-f%3A1743250652702397143%7Cmsg-f%3A1743250652702…2/3 www.fcgov.com/stormwaterinspection Building permit status and Development Projects may be accessed through Citizen Portal fcgov.com/CitizenAccess From: Alex Gresh <ag@f9productions.com> Sent: Tuesday, September 6, 2022 12:26 PM To: Matt Simpson <masimpson@fcgov.com> Cc: Erosion <erosion@fcgov.com>; Spencer M. Smith <smsmith@fcgov.com>; Lance Cayko <lmc@f9productions.com>; Brandy Bethurem Harras <BBethuremHarras@fcgov.com> Subject: [EXTERNAL] Re: Castle Ridge Grouphome - Erosion Control Cost Estimate Hi Matt, The amount of disturbed area will be approximately 370 square feet. Thanks, On Tue, Sep 6, 2022 at 10:27 AM Matt Simpson <masimpson@fcgov.com> wrote: Hi Alex, You will likely need to provide an erosion control cost estimate. You should contact our erosion control department (cc’d) to follow up further. Would you be able to provide the amount of disturbed area with your project? This will drive erosion control requirements. Thanks, Matt Matt Simpson, PE, CFM Water Utility Development Review Engineer City of Fort Collins 970-416-2754 office From: Alex Gresh <ag@f9productions.com> Sent: Tuesday, September 6, 2022 9:09 AM To: Brandy Bethurem Harras <BBethuremHarras@fcgov.com> Cc: Spencer M. Smith <smsmith@fcgov.com>; Matt Simpson <masimpson@fcgov.com>; Lance Cayko <lmc@f9productions.com> Subject: [EXTERNAL] Castle Ridge Grouphome - Erosion Control Cost Estimate Hi Brandy, 9/12/22, 7:47 PM Gmail - Fwd: Re: Castle Ridge Grouphome - Erosion Control Cost Estimate https://mail.google.com/mail/u/0/?ik=ac9162ec1a&view=pt&search=all&permthid=thread-f%3A1743250652702397143%7Cmsg-f%3A1743250652702…3/3 This is Alex Gresh from F9 Productions. We are the architects working on the Castle Ridge Grouphome with Stephanie Hansen. We received a Development Application Submittal Checklist from Ft. Collins stating what is required for our project. It states that we do not need an final drainage and erosion control report, but we do need an erosion control cost estimate. Is the erosion control cost estimate still necessary without the drainage and erosion control report? If so, do you know where I could find the form for the erosion control cost estimate? Thanks, -- (Please remember to reply all on email chains) A L E X  G R E S H F9 PRODUCTIONS C. 3 0 3 - 8 8 4 - 0 7 5 5 -- (Please remember to reply all on email chains) A L E X  G R E S H F9 PRODUCTIONS C. 3 0 3 - 8 8 4 - 0 7 5 5 -- (Please remember to reply all on email chains) A L E X  G R E S H F9 PRODUCTIONS C. 3 0 3 - 8 8 4 - 0 7 5 5