Loading...
HomeMy WebLinkAboutBLOOM OFFSITE WATER - BASIC DEVELOPMENT REVIEW - BDR220004 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVE 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 • GallowayUS.com October 14, 2022 City of Fort Collins Planning & Development Services 281 N. College Ave. Fort Collins, CO 80524 RE: Bloom Development Offsite ELCO Water Main Project Description Narrative Dear Ms. Brandy Bethurem Harras, The Bloom Development Offsite ELCO Water Main includes a proposed 20” water main located approximately ¼ mile east of the Bloom Development. This 20” water main will run generally in a north/south direction with the north connection being to a 6” existing main at East Vine Drive and a southern terminus at Redman Drive to an existing 20” main (Redman is a private road). The proposed water main is approximately 2,200 lineal feet in length and positioned within a permanent 30’ waterline easement as coordinated with ELCO and the property owner. Existing grade disturbed by construction activities will be returned to pre-construction grade and area of disturbance will be re-seeded as detailed with the design documents. Current anticipated construction schedule is first quarter, 2023. This proposed water main is located within property owned by: Poudre Valley Co-Operative Association, Inc 225 NW Frontage Road Fort Collins, CO 80524 Sincerely, GALLOWAY Robert Van Uffelen Principal / Sr. Civil Project Manager RobVanUffelen@gallowayus.com