HomeMy WebLinkAboutBLOOM OFFSITE WATER - BASIC DEVELOPMENT REVIEW - BDR220004 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVE
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300 • GallowayUS.com
October 14, 2022
City of Fort Collins Planning & Development Services
281 N. College Ave.
Fort Collins, CO 80524
RE: Bloom Development Offsite ELCO Water Main
Project Description Narrative
Dear Ms. Brandy Bethurem Harras,
The Bloom Development Offsite ELCO Water Main includes a proposed 20” water main located
approximately ¼ mile east of the Bloom Development. This 20” water main will run generally in a
north/south direction with the north connection being to a 6” existing main at East Vine Drive and a
southern terminus at Redman Drive to an existing 20” main (Redman is a private road). The proposed
water main is approximately 2,200 lineal feet in length and positioned within a permanent 30’ waterline
easement as coordinated with ELCO and the property owner. Existing grade disturbed by construction
activities will be returned to pre-construction grade and area of disturbance will be re-seeded as
detailed with the design documents. Current anticipated construction schedule is first quarter, 2023.
This proposed water main is located within property owned by:
Poudre Valley Co-Operative Association, Inc
225 NW Frontage Road
Fort Collins, CO 80524
Sincerely,
GALLOWAY
Robert Van Uffelen
Principal / Sr. Civil Project Manager
RobVanUffelen@gallowayus.com